Exhibit B Drawings.pdf
PDF 3 MB Posted
- Solicitation number
- 375108-CD
About this file
This document is a comprehensive set of engineering drawings for a 15kV Cable Installation project at Fermi National Accelerator Laboratory (Fermilab), with project number 3-7-103B dated October 6, 2025. The project involves installing new electrical feeder cables across multiple locations, connecting various power manholes and service buildings. The drawings include site plans, vicinity plans, single-line diagrams, cable and reel schedules, and detailed manhole configuration maps for multiple feeders (including Feeders 94/95-1, 94/95-2, 48, 21/22, 46B, 45, 24, 46A), with specific cable routing and splice details.
Key technical specifications include using 750MCM cables, performing cable installations and splices between different power manholes, and implementing cable terminations. The project involves multiple bid options, with specific attention to cable routing, manhole positioning, and maintaining precise distances between connection points. The drawings provide granular details about cable lengths, manhole locations, feeder segments, and installation requirements, with notations emphasizing the need to verify feeder identification and follow specific installation protocols. The project appears to be a comprehensive electrical infrastructure upgrade for the Fermilab site, involving precise engineering and careful cable management across multiple locations.
View the file
Other files
Show all 33
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WILSON ST………….6 AM- 4:30 PM M-F NO TRUCKS ALLOWED
PINE ST………………..6 AM TO 6 PM NO TRUCKS ALLOWED
BATAVIA RD………...6 AM to 6 PM
REVISIONS
REV. DATE DESCRIPTIONS
DRAWN
APPROVED
SUBMITTED
CHECKED
DESIGNED
NAME DATE
SCALE:
DRAWING NO. REV.
O ct
8,
- 7
:1 0a m M
:\3 \7
P O
W
ER
C
O M
M U
N
IC
AT
IO
N D
IS
TR
IB
U
TI
O
N \1
B
F3 -F
C ab le
R ep la ce
\3 -7
-1
B_ G
-1 -G
-2 r3
.d w g
3-7-103B XXG-1
FERMILAB SITE PLAN AND DRAWING LIST
O C
T
ISSUED FOR PROPOSALS
FERMILAB SITE PLAN
N.T.S.
FEED FEED FEED FEED
FE
ED
FE
ED
FE
ED
FE
ED
FEED
FEED
FEED
FEED
FEED
FEED
FEED
FEED
FEED
FEED
P -98
P -A -0
P -A -1
P -E -4
P -F-0D
P -F-0U
P -F-1
P -F-2
P -F-27
P -F-3
P -F-4
P -R F
P
P
P
P
P
P
P
P
P
P
P
P
F-3
EX
IS
TI
NG
S
OU
TH
BO
OS
TE
R
RO
AD
MAIN RING ROAD
WILSON HALL
SERV.
BLDG. A-1
SERV.
BLDG. A-0
PIN
E STR
EET
DISCOVERY ROADBO
O
STER
R O
AD
PIP-II
P-A-0 P-F-4
SERV.
BLDG. F-4
EXIST. AIR
SWITCH
DSTR-MRF4-3
P-F-3
INDIAN CREEKROAD
SERV.
BLDG. F-3
SERV.
BLDG. F-27
P-F-27
MAIN RING ROAD P-F-2
SERV.
BLDG. F-2
KA
UT
Z
RO
AD
ANCILLAR
BLDG. F-23
SERV.
BLDG. F-1
P-F-0D
P-RF
SERV. BLDG.
RF/ F-0
P-F-0U
EXIST.
Y F01
SERV. BLDG. E-4
P-E-4
M
AI
N
RI
NG
R
O
AD
P-E-3
P-F-1
DSTR-A0-6
FE
ED
FE
ED
FEEDFEED
FE
ED
FE
ED
P -E -2
P -E -3
P M H -K R S -6
P M H -K R S -7
P M H -K R S -8
P M H -K R S -5
P
P
P
P
P
P
P-E-3
PMH-KRS-8
SERV.
BLDG.
E-3
FE
ED
FEED
FE
ED
FEED
FE
ED
FEED
FE
ED
FE
EDFEED
FE
EDFEED
FE
ED
FEED
FE
ED
FEED
FEED
FE
ED
FEED
FE
ED
FE
ED
FE
EDFEED
FE
ED
FE
ED
FE
ED
FE
EDFEED
FEED
FE
ED
FE
ED
FEED
FE
ED
FE
EDFEED
PMH-KRS-6
NEW
DSTR-46A-KRS
PMH-KRS-5
PMH-KRS-7
CB-88-46A
KAUTZ ROAD
SUB-STATION
PROJECT
NORTH
E
S
W
REVISIONS
REV. DATE DESCRIPTIONS
DRAWN
APPROVED
SUBMITTED
CHECKED
DESIGNED
NAME DATE
SCALE:
UNITED STATES DEPARTMENT OF ENERGY
FERMI NATIONAL ACCELERATOR LABORATORY
DRAWING NO. REV.
O ct
7,
- 5
:0 9p m M
:\3 \7
P O
W
ER
C
O M
M U
N
IC
AT
IO
N D
IS
TR
IB
U
TI
O
N \1
B
F3 -F
C ab le
R ep la ce
\3 -7
-1
B_ G
-1 -G
-2 r3
.d w g
P-F3 TO P-F4 15 KV CABLE INSTALLATION
3-7-103B XXG-2
VICINITY PLAN
O C
T
11/1/2025 ISSUED FOR PROPOSALS
VICINITY PLAN
N.T.S.
1:1000
SCALE FEET
10005000 250
SYMBOL LEGEND
FEEDER LINE
EXISTING MANHOLE (POWER)
FEED
FEED
P -F-3 P
1:1000
SCALE FEET
10005000 250
REVISIONS
REV. DATE DESCRIPTIONS
DRAWN
APPROVED
SUBMITTED
CHECKED
DESIGNED
NAME DATE
SCALE:
UNITED STATES DEPARTMENT OF ENERGY
FERMI NATIONAL ACCELERATOR LABORATORY
DRAWING NO. REV.
O ct
7,
- 5
:1 0p m M
:\3 \7
P O
W
ER
C
O M
M U
N
IC
AT
IO
N D
IS
TR
IB
U
TI
O
N \1
B
F3 -F
C ab le
R ep la ce
\3 -7
-1
B_ G
-1 -G
-2 r3
.d w g
P-F3 TO P-F4 15 KV CABLE INSTALLATION
3-7-103B RJWG-3
GENERAL NOTES
O C
T
11/1/2025 ISSUED FOR PROPOSALS
1. PROJECT 3-7-103B CONSISTS OF THE INSTALLATION OF 15KV FEEDER CABLES FOR EXISTING 15KV FEEDERS.
2. FERMILAB SUPPLIES CERTAIN MATERIAL ONLY. ALL WORK BY SUBCONTRACTOR:
a. 15KV SPLICE KITS
b. 15KV POWER CABLE
c. 1/2" HELIAX COMMUNICATIONS CABLE
d. 36 STRAND FIBER OPTIC COMMUNICATIONS CABLE
3. SUBCONTRACTOR SUPPLIES ALL OTHER LABOR, EQUIPMENT, AND MATERIALS, INCLUDING BUT NOT LIMITED TO:
a. IDENTIFICATION OF ALL CABLES IN EACH MANHOLE PRIOR TO CUTTING AND REMOVAL. ALL TESTING OBSERVED BY
FERMILAB PERSONNEL. ALL CUTS MUST BE PERFORMED REMOTE WITH NO PERSONNEL IN MANHOLE.
b. INSTALLATION OF 15KV, 750MCM ALUMINUM CABLES IN CONCRETE ENCASED ELECTRICAL DUCT SYSTEM.
c. TRANSPORTING UNUSED CABLE/REELS BACK TO FERMILAB RAILYARD.
d. SUBCONTRACTOR SHALL FURNISH AS-BUILT DRAWINGS, INCLUDING DUCT SECTION DRAWINGS FOR THE LOCATION OF
THE REPLACEMENT FEEDER CABLES. BUTTERFLY DRAWINGS MUST INCLUDE PICTURES OF EACH FACE OF ALL
MANHOLES ENTERED.
e. TO PROVIDE "HAZARD ANALYSIS" FOR WORKING IN CONFINED SPACES AND ENERGIZED CONDUCTORS. HAZARD
ANALYSIS MUST BE SUBMITTED AND APPROVED BY FERMILAB PRIOR TO THE START OF WORK
f. ALL SAFETY EQUIPMENT AND SUPERVISION
g. 1 HOUR FERMILAB ORIENTATION TRAINING CLASS FOR ALL PERSONNEL ON FERMILAB SITE
h. ALL REQUIRED BADGING FOR ALL SUBCONTRACTOR PERSONNEL REQUIRED FOR THE JOB
4. ALL 15KV CIRCUIT BREAKER AND DISCONNECT SWITCHING SHALL BE PERFORMED BY FERMILAB. SUBCONTRACTOR SHALL ADHERE TO FERMILAB LOCK-OUT AND TAG-OUT PROCEDURES FOR CIRCUIT DE-ENERGIZING AND BACKFEED ISOLATION. ALL VERIFICATION OF DEENERGIZATION AND SAFETY GROUNDING INCLUDING ALL REQUIRED SAFETY GROUND CABLES BY
SUBCONTRACTOR.
5. WORK MAY NEED TO BE PERFORMED IN MANHOLES WITH ENERGIZED CONDUCTORS, IR GUN SURVEY AND BLAST BLANKETS
PROVIDED BY SUBCONTRACTOR.
6. ALL WORK AND TRAFFIC AT THE LABORATORY ARE TO FOLLOW THE ILLINOIS RULES OF THE ROAD. THE ILLINOIS DEPARTMENT OF TRANSPORTATION STANDARDS ARE TO BE USED BY SUBCONTRACTORS WHEN
CONDUCTING WORK THAT INVOLVES TEMPORARY TRAFFIC CONTROL PLANS CAN BE FOUND HERE:
https://idot.illinois.gov/doing-business/procurements/engineering-architectural-professional-services/ Consultants-Resources/highway-standards-and-district-specific-standards
KAUTZ ROAD
SUB-STATION
P-F-2P-F-0DP-F-0U P-F-27P-F-1P-RFP-E-4
PPMH-KRS-8
NEW CABLE
CABLE TO REMAIN
POWER MANHOLE (PMH)
INDICATES APROXIMATE DISTANCE FROM CENTER OF MANHOLE COVER TO
CENTER OF MANHOLE COVER. (SUBCONTRACTOR TO VERIFY ALL DISTANCES.)XXX'
SYMBOLS:
PPMH-KRS-6PPMH-KRS-5
P-E-3
292'
233'
198'
246' 773'
272'
842'49'
287'
461'310'
CB
88-46A
PMH KRS 7
451'
CB
55-23
F-2
50'
F-1
P-A-0P-F-3 P-F-4
215'
748' DSTR-46A-P71
DSTR-A0-6
126'
TO
F-3
461'
DSTR-MIF4-1
DSTR-MIF4-2
DSTR-MIF4-3
100'50'50'
DSTR-FDR46A-F4
DSTR-FDR48-F4
REVISIONS
REV. DATE DESCRIPTIONS
DRAWN
APPROVED
SUBMITTED
CHECKED
DESIGNED
NAME DATE
SCALE:
UNITED STATES DEPARTMENT OF ENERGY
FERMI NATIONAL ACCELERATOR LABORATORY
DRAWING NO. REV.
O ct
7,
- 5
:1 2p m M
:\3 \7
P O
W
ER
C
O M
M U
N
IC
AT
IO
N D
IS
TR
IB
U
TI
O
N \1
B
F3 -F
C ab le
R ep la ce
\3 -7
-1
B_
SI
N G
LE
L
IN
E
D
IA
G R
AM
_E
-1 E
-2 E
-3 r3
.d w g
P-F3 TO P-F4 15KV CABLE INSTALLATION
3-7-103B XXE-1
Overview Single Line Diagram
O C
T
ISSUED FOR PROPOSALS
11/1/2025
N�T�S�
F-2
F-0D
F-27F-1
INSTALL COMMUNICAITONS CABLE
COMMUNICATIONS MANHOLE
INDICATES APROXIMATE DISTANCE FROM CENTER OF MANHOLE COVER TO
CENTER OF MANHOLE COVER. (SUBCONTRACTOR TO VERIFY ALL DISTANCES.)XXX'
SYMBOLS:
292'233' 842'
A-0
F-4
215'
748'
A0 SERVICE
BUILDING
126'
F-3
461'
F4 SERVICE
BUILDING
F3 SERVICE
BUILDING
F3 SERVICE
BUILDING
500'
125'
125'
FFDG TO SUPPLY THE COMMUNICATIONS CABLES FOR INSTALLATION
BY THE SUBCONTRACTOR UNDER THIS PROJECT.
REVISIONS
REV. DATE DESCRIPTIONS
DRAWN
APPROVED
SUBMITTED
CHECKED
DESIGNED
NAME DATE
SCALE:
UNITED STATES DEPARTMENT OF ENERGY
FERMI NATIONAL ACCELERATOR LABORATORY
DRAWING NO. REV.
O ct
7,
- 5
:1 2p m M
:\3 \7
P O
W
ER
C
O M
M U
N
IC
AT
IO
N D
IS
TR
IB
U
TI
O
N \1
B
F3 -F
C ab le
R ep la ce
\3 -7
-1
B_
SI
N G
LE
L
IN
E
D
IA
G R
AM
_E
-1 E
-2 E
-3 r3
.d w g
P-F3 TO P-F4 15KV CABLE INSTALLATION
3-7-103B XXE-1A
Communications Single Line Diagram
O C
T
ISSUED FOR PROPOSALS
11/1/2025
REVISIONS
REV. DATE DESCRIPTIONS
DRAWN
APPROVED
SUBMITTED
CHECKED
DESIGNED
NAME DATE
SCALE:
UNITED STATES DEPARTMENT OF ENERGY
FERMI NATIONAL ACCELERATOR LABORATORY
DRAWING NO. REV.
O ct
8,
- 7
:3 6a m M
:\3 \7
P O
W
ER
C
O M
M U
N
IC
AT
IO
N D
IS
TR
IB
U
TI
O
N \1
B
F3 -F
C ab le
R ep la ce
\3 -7
-1
B_
SI
N G
LE
L
IN
E
D
IA
G R
AM
_E
-1 E
-2 E
-3 r3
.d w g
P-F3 TO P-F4 15KV CABLE INSTALLATION
3-7-103B XXE-2
CABLE AND REEL SCHEDULE
O C
T
ISSUED FOR PROPOSALS
11/1/2025
P-A-0P-F-3 P-F-4P-F-27
IN-LINE SPLICE (SP)
INSTALL CABLE
CABLE TO REMAIN
POWER MANHOLE (PMH)
INDICATES APROXIMATE DISTANCE FROM CENTER OF MANHOLE COVER TO
CENTER OF MANHOLE COVER. (SUBCONTRACTOR TO VERIFY ALL DISTANCES.)XXX'
SYMBOLS: QUANTITIES
SUPPLIED BY
FNAL
858 FNAL
0 FNAL
6 SUBCONTRACTOR
4-WAY AIR SWITCH (EA)
750MCM CABLE (3Ø),(LF,CEN-CEN)
IN LINE SPLICES (1Ø), (EA)
AIR SWITCH TEMINATIONS (1Ø), (EA)
215'748' 461'
50'
DSTR-MIF4-1
60'
DSTR-MIF3-1
SINGLE LINE DIAGRAM - FEEDER 94/95-1
REEL #43
REVISIONS
REV. DATE DESCRIPTIONS
DRAWN
APPROVED
SUBMITTED
CHECKED
DESIGNED
NAME DATE
SCALE:
UNITED STATES DEPARTMENT OF ENERGY
FERMI NATIONAL ACCELERATOR LABORATORY
DRAWING NO. REV.
O ct
7,
- 5
:1 4p m M
:\3 \7
P O
W
ER
C
O M
M U
N
IC
AT
IO
N D
IS
TR
IB
U
TI
O
N \1
B
F3 -F
C ab le
R ep la ce
\3 -7
-1
B_
SI
N G
LE
L
IN
E
D
IA
G R
AM
_E
-1 E
-2 E
-3 r3
.d w g
P-F3 TO P-F4 15KV CABLE INSTALLATION
3-7-103B XXE-3
FEEDER 94/95-1 INSTALLATION SINGLE LINE DIAGRAM
O C
T
ISSUED FOR PROPOSALS
11/1/2025
INSTALL CABLE
CABLE TO REMAIN
POWER MANHOLE (PMH)
INDICATES APROXIMATE DISTANCE FROM CENTER OF MANHOLE COVER TO
CENTER OF MANHOLE COVER. (SUBCONTRACTOR TO VERIFY ALL DISTANCES.)XXX'
SYMBOLS: QUANTITIES
SUPPLIED BY
FNAL
1551 FNAL
3 FNAL
3 SUBCONTRACTOR
4-WAY AIR SWITCH (EA)
750MCM CABLE (3Ø),(LF,CEN-CEN)
IN LINE SPLICES (1Ø), (EA)
AIR SWITCH TEMINATIONS (1Ø), (EA)
REEL #44
215'748' 461'
50'
DSTR-MIF4-1
SINGLE LINE DIAGRAM - FEEDER 94/95-2
P-F-2
292'
REVISIONS
REV. DATE DESCRIPTIONS
DRAWN
APPROVED
SUBMITTED
CHECKED
DESIGNED
NAME DATE
SCALE:
UNITED STATES DEPARTMENT OF ENERGY
FERMI NATIONAL ACCELERATOR LABORATORY
DRAWING NO. REV.
O ct
7,
- 5
:1 5p m M
:\3 \7
P O
W
ER
C
O M
M U
N
IC
AT
IO
N D
IS
TR
IB
U
TI
O
N \1
B
F3 -F
C ab le
R ep la ce
\3 -7
-1
B_
SI
N G
LE
L
IN
E
D
IA
G R
AM
_E
-1 E
-2 E
-3 r3
.d w g
P-F3 TO P-F4 15KV CABLE INSTALLATION
3-7-103B XXE-4
FEEDER 94/95-2 INSTALLATION SINGLE LINE DIAGRAM
O C
T
ISSUED FOR PROPOSALS
11/1/20205
INSTALL CABLE
CABLE TO REMAIN
POWER MANHOLE (PMH)
INDICATES APROXIMATE DISTANCE FROM CENTER OF MANHOLE COVER TO
CENTER OF MANHOLE COVER. (SUBCONTRACTOR TO VERIFY ALL DISTANCES.)XXX'
SYMBOLS: QUANTITIES
SUPPLIED BY
FNAL
963 FNAL
6 FNAL
0 SUBCONTRACTOR
4-WAY AIR SWITCH (EA)
750MCM CABLE (3Ø),(LF,CEN-CEN)
IN LINE SPLICES (1Ø), (EA)
AIR SWITCH TEMINATIONS (1Ø), (EA)
REEL #32
215' 461'
126'
(BID OPTION #1)
DSTR-FDR48-F4
70'70'
158'590'
REEL #41
SINGLE LINE DIAGRAM - FEEDER 48
REVISIONS
REV. DATE DESCRIPTIONS
DRAWN
APPROVED
SUBMITTED
CHECKED
DESIGNED
NAME DATE
SCALE:
UNITED STATES DEPARTMENT OF ENERGY
FERMI NATIONAL ACCELERATOR LABORATORY
DRAWING NO. REV.
O ct
7,
- 5
:1 5p m M
:\3 \7
P O
W
ER
C
O M
M U
N
IC
AT
IO
N D
IS
TR
IB
U
TI
O
N \1
B
F3 -F
C ab le
R ep la ce
\3 -7
-1
B_
SI
N G
LE
L
IN
E
D
IA
G R
AM
_E
-1 E
-2 E
-3 r3
.d w g
P-F3 TO P-F4 15KV CABLE INSTALLATION
3-7-103B XXE-5
FEEDER 48 INSTALLATION SINGLE LINE DIAGRAM
O C
T
ISSUED FOR PROPOSALS
11/1/2025
P-A-0P-F-3P-F-2P-F-0D P-F-4P-F-27P-F-1P-RF
INSTALL CABLE
CABLE TO REMAIN
POWER MANHOLE (PMH)
INDICATES APROXIMATE DISTANCE FROM CENTER OF MANHOLE COVER TO
CENTER OF MANHOLE COVER. (SUBCONTRACTOR TO VERIFY ALL DISTANCES.)XXX'
SYMBOLS: QUANTITIES
SUPPLIED BY
FNAL
3216 FNAL
3 FNAL
6 SUBCONTRACTOR
4-WAY AIR SWITCH (EA)
750MCM CABLE (3Ø),(LF,CEN-CEN)
IN LINE SPLICES (1Ø), (EA)
AIR SWITCH TEMINATIONS (1Ø), (EA)
REEL #34
215'748' 461'
292'233'198'272' 842'
DSTR-MRF4-3
SINGLE LINE DIAGRAM - FEEDER 46B
REEL #33
Y-F01
P-F-0U
100'
90'
REVISIONS
REV. DATE DESCRIPTIONS
DRAWN
APPROVED
SUBMITTED
CHECKED
DESIGNED
NAME DATE
SCALE:
UNITED STATES DEPARTMENT OF ENERGY
FERMI NATIONAL ACCELERATOR LABORATORY
DRAWING NO. REV.
O ct
7,
- 5
:1 6p m M
:\3 \7
P O
W
ER
C
O M
M U
N
IC
AT
IO
N D
IS
TR
IB
U
TI
O
N \1
B
F3 -F
C ab le
R ep la ce
\3 -7
-1
B_
SI
N G
LE
L
IN
E
D
IA
G R
AM
_E
-1 E
-2 E
-3 r3
.d w g
P-F3 TO P-F4 15KV CABLE INSTALLATION
3-7-103B XXE-6
FEEDER 46B INSTALLATION SINGLE LINE DIAGRAM
O C
T
ISSUED FOR PROPOSALS
11/1/2025
P-A-0P-F-3P-F-2 P-F-4P-F-27
INSTALL CABLE
CABLE TO REMAIN
POWER MANHOLE (PMH)
INDICATES APROXIMATE DISTANCE FROM CENTER OF MANHOLE COVER TO
CENTER OF MANHOLE COVER. (SUBCONTRACTOR TO VERIFY ALL DISTANCES.)XXX'
SYMBOLS: QUANTITIES
SUPPLIED BY
FNAL
3627 FNAL
21 FNAL
0 SUBCONTRACTOR
4-WAY AIR SWITCH (EA)
750MCM CABLE (3Ø),(LF,CEN-CEN)
IN LINE SPLICES (1Ø), (EA)
AIR SWITCH TEMINATIONS (1Ø), (EA)
REEL #32
215'748' 461'
292'842' 126'
REEL #40
REEL #41
SINGLE LINE DIAGRAM - FEEDER
21/22-1, 21/22-2, 21/22-3
REVISIONS
REV. DATE DESCRIPTIONS
DRAWN
APPROVED
SUBMITTED
CHECKED
DESIGNED
NAME DATE
SCALE:
UNITED STATES DEPARTMENT OF ENERGY
FERMI NATIONAL ACCELERATOR LABORATORY
DRAWING NO. REV.
O ct
7,
- 5
:1 7p m M
:\3 \7
P O
W
ER
C
O M
M U
N
IC
AT
IO
N D
IS
TR
IB
U
TI
O
N \1
B
F3 -F
C ab le
R ep la ce
\3 -7
-1
B_
SI
N G
LE
L
IN
E
D
IA
G R
AM
_E
-1 E
-2 E
-3 r3
.d w g
P-F3 TO P-F4 15KV CABLE INSTALLATION
3-7-103B XXE-7
FEEDER 21/22 INSTALLATION SINGLE LINE DIAGRAM
O C
T
ISSUED FOR PROPOSALS
11/1/2025
INSTALL CABLE
CABLE TO REMAIN
POWER MANHOLE (PMH)
INDICATES APROXIMATE DISTANCE FROM CENTER OF MANHOLE COVER TO
CENTER OF MANHOLE COVER. (SUBCONTRACTOR TO VERIFY ALL DISTANCES.)XXX'
SYMBOLS: QUANTITIES
SUPPLIED BY
FNAL
858 FNAL
0 FNAL
6 SUBCONTRACTOR
4-WAY AIR SWITCH (EA)
750MCM CABLE (3Ø),(LF,CEN-CEN)
IN LINE SPLICES (1Ø), (EA)
AIR SWITCH TEMINATIONS (1Ø), (EA)
REEL #42
215'748' 461'
50'
DSTR-F4-1Y-F3
SINGLE LINE DIAGRAM - FEEDER 45
P-F-2
292'
60'
REVISIONS
REV. DATE DESCRIPTIONS
DRAWN
APPROVED
SUBMITTED
CHECKED
DESIGNED
NAME DATE
SCALE:
UNITED STATES DEPARTMENT OF ENERGY
FERMI NATIONAL ACCELERATOR LABORATORY
DRAWING NO. REV.
O ct
7,
- 5
:1 7p m M
:\3 \7
P O
W
ER
C
O M
M U
N
IC
AT
IO
N D
IS
TR
IB
U
TI
O
N \1
B
F3 -F
C ab le
R ep la ce
\3 -7
-1
B_
SI
N G
LE
L
IN
E
D
IA
G R
AM
_E
-1 E
-2 E
-3 r3
.d w g
P-F3 TO P-F4 15KV CABLE INSTALLATION
3-7-103B XXE-8
FEEDER 45 INSTALLATION SINGLE LINE DIAGRAM
O C
T
ISSUED FOR PROPOSALS
11/1/2025
INSTALL CABLE
CABLE TO REMAIN
POWER MANHOLE (PMH)
INDICATES APROXIMATE DISTANCE FROM CENTER OF MANHOLE COVER TO
CENTER OF MANHOLE COVER. (SUBCONTRACTOR TO VERIFY ALL DISTANCES.)XXX'
SYMBOLS: QUANTITIES
SUPPLIED BY
FNAL
828 FNAL
3 FNAL
3 SUBCONTRACTOR
4-WAY AIR SWITCH (EA)
750MCM CABLE (3Ø),(LF,CEN-CEN)
IN LINE SPLICES (1Ø), (EA)
AIR SWITCH TEMINATIONS (1Ø), (EA)
REEL #43
215'748' 461'
80'
DSTR-MIF3-2
SINGLE LINE DIAGRAM - FEEDER 24
P-F-2
292'
REVISIONS
REV. DATE DESCRIPTIONS
DRAWN
APPROVED
SUBMITTED
CHECKED
DESIGNED
NAME DATE
SCALE:
UNITED STATES DEPARTMENT OF ENERGY
FERMI NATIONAL ACCELERATOR LABORATORY
DRAWING NO. REV.
O ct
7,
- 5
:1 8p m M
:\3 \7
P O
W
ER
C
O M
M U
N
IC
AT
IO
N D
IS
TR
IB
U
TI
O
N \1
B
F3 -F
C ab le
R ep la ce
\3 -7
-1
B_
SI
N G
LE
L
IN
E
D
IA
G R
AM
_E
-1 E
-2 E
-3 r3
.d w g
P-F3 TO P-F4 15KV CABLE INSTALLATION
3-7-103B XXE-9
FEEDER 24 INSTALLATION SINGLE LINE DIAGRAM
O C
T
ISSUED FOR PROPOSALS
11/1/2025
INSTALL CABLE
CABLE TO REMAIN
POWER MANHOLE (PMH)
INDICATES APROXIMATE DISTANCE FROM CENTER OF MANHOLE COVER TO
CENTER OF MANHOLE COVER. (SUBCONTRACTOR TO VERIFY ALL DISTANCES.)XXX'
SYMBOLS: QUANTITIES
SUPPLIED BY
FNAL
1550 FNAL
3 FNAL
3 SUBCONTRACTOR
4-WAY AIR SWITCH (EA)
750MCM CABLE (3Ø),(LF,CEN-CEN)
IN LINE SPLICES (1Ø), (EA)
AIR SWITCH TEMINATIONS (1Ø), (EA)
REEL #25
215' 461'
DSTR-46A-P71
DSTR-A0-6
126'
TO
DSTR-FDR46A-F4
70'70'
158'590'
REVISIONS
REV. DATE DESCRIPTIONS
DRAWN
APPROVED
SUBMITTED
CHECKED
DESIGNED
NAME DATE
SCALE:
UNITED STATES DEPARTMENT OF ENERGY
FERMI NATIONAL ACCELERATOR LABORATORY
DRAWING NO. REV.
O ct
8,
- 6
:5 0a m M
:\3 \7
P O
W
ER
C
O M
M U
N
IC
AT
IO
N D
IS
TR
IB
U
TI
O
N \1
B
F3 -F
C ab le
R ep la ce
\3 -7
-1
B_
AS
_S
IN
G
LE
L
IN
E
D
IA
G R
AM
_E
-1 r3 .d w g
P-F3 TO P-F4 15KV CABLE INSTALLATION
3-7-103B XXE-10
FEEDER 46A INSTALLATION SINGLE LINE DIAGRAM
O C
T
ISSUED FOR PROPOSALS
11/1/2025
N�T�S�
SINGLE LINE DIAGRAM - FEEDER 46A
(BID OPTION #1)
FEED
FEED
FEED
FEED
FEED FEED FEED FEED FEED FEED FEED FEED
FEED
FEED
FEED
FEED
FEED
FEED
FEED
FEED
FEED
FEED
FEED
FEED
FEED
FEED
FEED
FEED
FEED
FEED
FEEDFEED
P -98
P -A -0
P -A -1
P -F-2
P -F-27
P -F-3
P -F-4
P
P
P
P
P
P
P
F-3
EX
IS
TI
NG
S
OU
TH
BO
OS
TE
R
RO
AD
MAIN RING ROAD
WILSON HALL
SERVICE BLDG. A-0
BO
O
STER
R
O
AD
PIP-II
P-A-0 P-F-4
SERV. BLDG. F-4
EXIST. AIR
SWITCH
DSTR-MRF4-3
P-F-3
INDIAN CREEK ROAD
SERV. BLDG. F-3
SERV. BLDG. F-27
P-F-27
MAIN RING ROAD
P-F-2
SERV. BLDG. F-2
ANCILLAR
BLDG.
F-23
DSTR-A0-6
DSTR-FDR46A-F4
DSTR-FDR48-F4
PROJECT
NORTH
E
S
W
REVISIONS
REV. DATE DESCRIPTIONS
DRAWN
APPROVED
SUBMITTED
CHECKED
DESIGNED
NAME DATE
SCALE:
UNITED STATES DEPARTMENT OF ENERGY
FERMI NATIONAL ACCELERATOR LABORATORY
DRAWING NO. REV.
O ct
8,
- 6
:5 2a m M
:\3 \7
P O
W
ER
C
O M
M U
N
IC
AT
IO
N D
IS
TR
IB
U
TI
O
N \1
B
F3 -F
C ab le
R ep la ce
\3 -7
-1
B_
LO
C
AT
IO
N
P
LA
N E
-1
E-r3 .d w g
P-F3 TO P-F4 15KV CABLE INSTALLATION
3-7-103B XXE-11
PARTIAL LOCATION PLAN
O C
T
11/1/2025ISSUED FOR PROPOSALS
1"=200'
SCALE FEET
2000 100 300
SYMBOL LEGEND
FEEDER LINE
EXISTING MANHOLE (POWER)
FEED
FEED
P -F-3
P
1"= 200'
PARTIAL LOCATION PLAN
FEED
FEED
FEED
FE
ED
FE
ED
FE
ED
FE
ED
FE
ED
FE
ED
FE
ED
FE
ED
FE
ED
FEED
FEED
FEED
FEED
FEED
P -E -4
P -F-0D
P -F-0U
P -F-1
P -R F
P
P
P
P
P
MAIN RING ROAD
KA
UT
Z
RO
AD
SERV.
BLDG. F-1
P-F-0D
P-RF
SERV. BLDG
RF/F-0
P-F-0U
EXIST. Y F01
SERV.
BLDG.
E-4 P-E-4
M
AI
N
RI
NG
R
O
AD
P-F-1
PROJECT
NORTH
E
S
W
REVISIONS
REV. DATE DESCRIPTIONS
DRAWN
APPROVED
SUBMITTED
CHECKED
DESIGNED
NAME DATE
SCALE:
UNITED STATES DEPARTMENT OF ENERGY
FERMI NATIONAL ACCELERATOR LABORATORY
DRAWING NO. REV.
O ct
8,
- 6
:5 2a m M
:\3 \7
P O
W
ER
C
O M
M U
N
IC
AT
IO
N D
IS
TR
IB
U
TI
O
N \1
B
F3 -F
C ab le
R ep la ce
\3 -7
-1
B_
LO
C
AT
IO
N
P
LA
N E
-1
E-r3 .d w g
P-F3 TO P-F4 15KV CABLE INSTALLATION
3-7-103B XXE-12
PARTIAL LOCATION PLAN
O C
T
11/1/2025 ISSUED FOR PROPOSALS
1"=200'
SCALE FEET
2000 100 300
SYMBOL LEGEND
FEEDER LINE
EXISTING MANHOLE (POWER)
FEED
FEED
P -F-3 P
1"= 200'
PARTIAL LOCATION PLAN
CONTINUES TO P-E-3
9-5"C
TOWARDS A-0 SERVICE BUILDING
DSTR-A0-6
12-5"C
FROM P-A-1
MANHOLE NO. A-0
12-5"C
FROM P-F-4
10-5"C
FROM P-F-3
9-5"C
TOWARDS F-4 SERVICE BUILDING
12-5"C
FROM P-A-0
MANHOLE NO. F-4
SEE SHEET E-14
SPLICE FDR 48
SPLICE FDR 21/22-1, 2, 3
SPLICE FDR 24
FIELD VERIFY
1-5"C
FROM
DSTR-FDR46A-F4
1-5"C
FROM
DSTR-FDR48-F4
FDR 46A AND 48
BID OPTION #1
NOTES
1. SEE TYPICAL MANHOLE DETAILS DRAWING SHEET E-14 FOR
TYPICAL MANHOLE CABLE SUPPORT DETAIL.
2. FIELD VERIFY IDENTIFICATION OF FEEDERS PRIOR TO
WORKING WITH CABLE. VERIFICATION SHALL BE WITNESSED
BY FRA .
REVISIONS
REV. DATE DESCRIPTIONS
DRAWN
APPROVED
SUBMITTED
CHECKED
DESIGNED
NAME DATE
SCALE:
UNITED STATES DEPARTMENT OF ENERGY
FERMI NATIONAL ACCELERATOR LABORATORY
DRAWING NO. REV.
O ct
8,
- 6
:5 4a m M
:\3 \7
P O
W
ER
C
O M
M U
N
IC
AT
IO
N D
IS
TR
IB
U
TI
O
N \1
B
F3 -F
C ab le
R ep la ce
\3 -7
-1
B_ E1
3- E
_M
AN
H
O
LE
D
ET
AI
LS
r3 .d w g
P-F3 TO P-F4 15KV CABLE INSTALLATION
3-7-103B XXE-13
MANHOLE DETAILS P-A-0 & P-F-4
O C
T
ISSUED FOR PROPOSALS
11/1/2025
N.T.S.
XX
XXX
SYMBOL LEGEND
EXISTING FEEDERS TO REMAIN, NO WORK REQUIRED
INDICATES WORK ON FEEDERS
XX
XXX
12-5"C
FROM P- F-2
9-5"C
TOWARDS F-27 SERVICE BUILDING
12-5"C
FROM P-F-3
MANHOLE NO. F-27
12-5"C
FROM P-F-27
11-5"C
TOWARDS F-3 SERVICE BUILDING
10-5"C
FROM P-F-4
MANHOLE NO. F-3
SEE SHEET E-15
SEE SHEET E-13
SPLICE FDR 21/22-1, 2, 3
SPLICE FDR 48
1-5"C
FROM
DSTR-FDR46A-F4
1-5"C
FROM
DSTR-FDR48-F4
FDR 46A AND 48
BID OPTION #1
REVISIONS
REV. DATE DESCRIPTIONS
DRAWN
APPROVED
SUBMITTED
CHECKED
DESIGNED
NAME DATE
SCALE:
UNITED STATES DEPARTMENT OF ENERGY
FERMI NATIONAL ACCELERATOR LABORATORY
DRAWING NO. REV.
O ct
8,
- 6
:5 5a m M
:\3 \7
P O
W
ER
C
O M
M U
N
IC
AT
IO
N D
IS
TR
IB
U
TI
O
N \1
B
F3 -F
C ab le
R ep la ce
\3 -7
-1
B_ E1
3- E
_M
AN
H
O
LE
D
ET
AI
LS
r3 .d w g
3/26/24
Value
P-F3 TO P-F4 15KV CABLE INSTALLATION
3-7-103B XXE-14
MANHOLE DETAILS P-F-3 & P-F-27
O C
T
ISSUED FOR PROPOSALS
11/1/2025
NOTES
1. SEE TYPICAL MANHOLE DETAILS DRAWING SHEET E-14 FOR
TYPICAL MANHOLE CABLE SUPPORT DETAIL.
2. FIELD VERIFY IDENTIFICATION OF FEEDERS PRIOR TO
WORKING WITH CABLE. VERIFICATION SHALL BE WITNESSED
BY FRA .
N.T.S.
XX
XXX
SYMBOL LEGEND
EXISTING FEEDERS TO REMAIN, NO WORK REQUIRED
INDICATES WORK ON FEEDERS
FROM P-F-0D
9-5"C
TOWARDS F-1 SERVICE BUILDING
12-5"C
FROM P-F-2
MANHOLE NO. F-1
12-5"C
FROM P-F-1
12-5"C
TOWARDS F-2 SERVICE BUILDING
12-5"C
FROM P-F-27
MANHOLE NO. F-2
SEE SHEET E-16
SEE SHEET E-14
SPLICE FDR 94/95
REVISIONS
REV. DATE DESCRIPTIONS
DRAWN
APPROVED
SUBMITTED
CHECKED
DESIGNED
NAME DATE
SCALE:
UNITED STATES DEPARTMENT OF ENERGY
FERMI NATIONAL ACCELERATOR LABORATORY
DRAWING NO. REV.
O ct
8,
- 6
:5 6a m M
:\3 \7
P O
W
ER
C
O M
M U
N
IC
AT
IO
N D
IS
TR
IB
U
TI
O
N \1
B
F3 -F
C ab le
R ep la ce
\3 -7
-1
B_ E1
3- E
_M
AN
H
O
LE
D
ET
AI
LS
r3 .d w g
Value
P-F3 TO P-F4 15KV CABLE INSTALLATION
3-7-103B XXE-15
MANHOLE DETAILS P-F-2 & P-F-1
O C
T
ISSUED FOR PROPOSALS
11/1/2025
NOTES
1. SEE TYPICAL MANHOLE DETAILS DRAWING SHEET E-14 FOR
TYPICAL MANHOLE CABLE SUPPORT DETAIL.
2. FIELD VERIFY IDENTIFICATION OF FEEDERS PRIOR TO
WORKING WITH CABLE. VERIFICATION SHALL BE WITNESSED
BY FRA .
N.T.S.
XX
XXX
SYMBOL LEGEND
EXISTING FEEDERS TO REMAIN, NO WORK REQUIRED
INDICATES WORK ON FEEDERS
FROM P-F-0U
9-5"C
TOWARDS RF/F-0 SERVICE BUILDING
12-5"C
FROM P-F-0D
MANHOLE NO. RF
12-5"C
FROM P-RF
9-5"C
TOWARDS RF/F-0 SERVICE BUILDING
12-5"C
FROM P-F-1
MANHOLE NO. F-0D
SEE SHEET E-17
REVISIONS
REV. DATE DESCRIPTIONS
DRAWN
APPROVED
SUBMITTED
CHECKED
DESIGNED
NAME DATE
SCALE:
UNITED STATES DEPARTMENT OF ENERGY
FERMI NATIONAL ACCELERATOR LABORATORY
DRAWING NO. REV.
O ct
8,
- 6
:5 7a m M
:\3 \7
P O
W
ER
C
O M
M U
N
IC
AT
IO
N D
IS
TR
IB
U
TI
O
N \1
B
F3 -F
C ab le
R ep la ce
\3 -7
-1
B_ E1
3- E
_M
AN
H
O
LE
D
ET
AI
LS
r3 .d w g
P-F3 TO P-F4 15KV CABLE INSTALLATION
3-7-103B XXE-16
MANHOLE DETAILS P-F0D & P-RF
O C
T
ISSUED FOR PROPOSALS
11/1/2025
NOTES
1. SEE TYPICAL MANHOLE DETAILS DRAWING SHEET E-14 FOR
TYPICAL MANHOLE CABLE SUPPORT DETAIL.
2. FIELD VERIFY IDENTIFICATION OF FEEDERS PRIOR TO
WORKING WITH CABLE. VERIFICATION SHALL BE WITNESSED
BY FRA .
N.T.S.
XX
XXX
SYMBOL LEGEND
EXISTING FEEDERS TO REMAIN, NO WORK REQUIRED
INDICATES WORK ON FEEDERS
FROM P-E-3
9-5"C
TOWARDS E-4 SERVICE BUILDING
12-5"C
FROM P- F-0U
MANHOLE NO. E-4
12-5"C
FROM P-E-4
9-5"C
TOWARDS RF/F-0 SERVICE BUILDING
12-5"C
FROM P-RF
MANHOLE NO. F-0U
SEE SHEET E-16
TERM FDR 46B @ XMFR
REVISIONS
REV. DATE DESCRIPTIONS
DRAWN
APPROVED
SUBMITTED
CHECKED
DESIGNED
NAME DATE
SCALE:
UNITED STATES DEPARTMENT OF ENERGY
FERMI NATIONAL ACCELERATOR LABORATORY
DRAWING NO. REV.
O ct
8,
- 7
:0 4a m M
:\3 \7
P O
W
ER
C
O M
M U
N
IC
AT
IO
N D
IS
TR
IB
U
TI
O
N \1
B
F3 -F
C ab le
R ep la ce
\3 -7
-1
B_ E1
3- E
_M
AN
H
O
LE
D
ET
AI
LS
r3 .d w g
P-F3 TO P-F4 15KV CABLE INSTALLATION
3-7-103B XXE-17
MANHOLE DETAILS P-F-0U & P-E-4
O C
T
ISSUED FOR PROPOSALS
11/1/2025
NOTES
1. SEE TYPICAL MANHOLE DETAILS DRAWING SHEET E-14 FOR
TYPICAL MANHOLE CABLE SUPPORT DETAIL.
2. FIELD VERIFY IDENTIFICATION OF FEEDERS PRIOR TO
WORKING WITH CABLE. VERIFICATION SHALL BE WITNESSED
BY FRA .
N.T.S.
XX
XXX
SYMBOL LEGEND
EXISTING FEEDERS TO REMAIN, NO WORK REQUIRED
INDICATES WORK ON FEEDERS
| 3-7-103B_G-1-G-2 r3-G-1 |
| 3-7-103B_G-1-G-2 r3-G-2 |
| Sheets and Views |
| G-2 |
| 3-7-103B_G-1-G-2 r3-G-3 |
| Sheets and Views |
| G-3 |
| 3-7-103B_SINGLE LINE DIAGRAM_E-1 E-2 E-3 r3-E-1 |
| Sheets and Views |
| E-1 |
| 3-7-103B_SINGLE LINE DIAGRAM_E-1 E-2 E-3 r3-E-1A |
| Sheets and Views |
| E-1A |
| 3-7-103B_SINGLE LINE DIAGRAM_E-1 E-2 E-3 r3-E-2 |
| Sheets and Views |
| E-2 |
| 3-7-103B_SINGLE LINE DIAGRAM_E-1 E-2 E-3 r3-E-3 |
| Sheets and Views |
| E-3 |
| 3-7-103B_SINGLE LINE DIAGRAM_E-1 E-2 E-3 r3-E-4 |
| Sheets and Views |
| E-4 |
| 3-7-103B_SINGLE LINE DIAGRAM_E-1 E-2 E-3 r3-E-5 |
| Sheets and Views |
| E-5 |
| 3-7-103B_SINGLE LINE DIAGRAM_E-1 E-2 E-3 r3-E-6 |
| Sheets and Views |
| E-6 |
| 3-7-103B_SINGLE LINE DIAGRAM_E-1 E-2 E-3 r3-E-7 |
| Sheets and Views |
| E-7 |
| 3-7-103B_SINGLE LINE DIAGRAM_E-1 E-2 E-3 r3-E-8 |
| Sheets and Views |
| E-8 |
| 3-7-103B_SINGLE LINE DIAGRAM_E-1 E-2 E-3 r3-E-9 |
| Sheets and Views |
| E-9 |
| 3-7-103B_46AS_SINGLE LINE DIAGRAM_E-10 r3-E-10 |
| Sheets and Views |
| E-10 |
| 3-7-103B_LOCATION PLAN E-11 E-12 r3-E-11 |
| Sheets and Views |
| E-11 |
| 3-7-103B_LOCATION PLAN E-11 E-12 r3-E-12 |
| Sheets and Views |
| E-12 |
| 3-7-103B_E13- E17_MANHOLE DETAILS r3-E-13 |
| Sheets and Views |
| E-13 |
| 3-7-103B_E13- E17_MANHOLE DETAILS r3-E-14 |
| Sheets and Views |
| E-14 |
| 3-7-103B_E13- E17_MANHOLE DETAILS r3-E-15 |
| Sheets and Views |
| E-15 |
| 3-7-103B_E13- E17_MANHOLE DETAILS r3-E-16 |
| Sheets and Views |
| E-16 |
| 3-7-103B_E13- E17_MANHOLE DETAILS r3-E-17 |
| Sheets and Views |
| E-17 |
File details come from the government source that posted it. Updated .