Exhibit B Drawings.pdf

PDF 3 MB Posted

Attached to
Main Ring Electrical P-F3 to P-F4 15KV Cable Installation, FESS Project 3-7-103B
Solicitation number
375108-CD
Issued by

About this file

This document is a comprehensive set of engineering drawings for a 15kV Cable Installation project at Fermi National Accelerator Laboratory (Fermilab), with project number 3-7-103B dated October 6, 2025. The project involves installing new electrical feeder cables across multiple locations, connecting various power manholes and service buildings. The drawings include site plans, vicinity plans, single-line diagrams, cable and reel schedules, and detailed manhole configuration maps for multiple feeders (including Feeders 94/95-1, 94/95-2, 48, 21/22, 46B, 45, 24, 46A), with specific cable routing and splice details.

Key technical specifications include using 750MCM cables, performing cable installations and splices between different power manholes, and implementing cable terminations. The project involves multiple bid options, with specific attention to cable routing, manhole positioning, and maintaining precise distances between connection points. The drawings provide granular details about cable lengths, manhole locations, feeder segments, and installation requirements, with notations emphasizing the need to verify feeder identification and follow specific installation protocols. The project appears to be a comprehensive electrical infrastructure upgrade for the Fermilab site, involving precise engineering and careful cable management across multiple locations.

View the file

Other files

File Type Posted
Amend 03 to RFP 375018-CD.pdf PDF
375108-CD Amendmant 2 Revised Response to Questions.pdf PDF
375108-CD Amendment 2 Revised Exhibit R - Proposal Form.pdf PDF
375108-CD Amendment 2 Revised Drawings.pdf PDF
Amend 02 to RFP 375108-CD.pdf PDF
375108-CD Amendment 1 Revised Exhibit R - Proposal Form.pdf PDF
375108-CD Amendment 1 Revised Drawings.pdf PDF
375108-CD Amendmant 1 Response to Questions.pdf PDF
Amend 01 to RFP 375108-CD.pdf PDF
Exhibit B2- Section 16121 Medium Voltgage Cable.pdf PDF
Exhibit H - 2025 Construction Insurance Requirements.pdf PDF
Exhibit I - Bond Bid FL-41.pdf PDF
Exhibit M - Fermilab Subcontractor Safety Information Questionnaire.pdf PDF
Exhibit P- Davis Bacon Wage Rates.pdf PDF
1.0 RFP 375108-CD.pdf PDF
Exhibit B1- Section 16010 General Electrical Requirements.pdf PDF
Exhibit B3- Section 16125 15KV Cable Installation.pdf PDF
Exhibit C- 010010 General Requirements.pdf PDF
Exhibit G- FFDG General Terms and Conditions for Construction (08.2025).pdf PDF
Exhibit J - Bond Payment FL-42.pdf PDF
Exhibit K- Bond Performance FL-40.pdf PDF
Exhibit L - Statement of Acknowledgment (SF-1413).pdf PDF
Exhibit Q- Summary of Required RFP Submittal Documents.pdf PDF
Exhibit A- P-F3 TO P-F4 15KV Cable Installation SOW.pdf PDF
Exhibit E- 013300 Submittals.pdf PDF
Exhibit N - SARC_Subcontractor Annual RepsCerts Rev 4_FFDG.pdf PDF
Exhibit O - Proposal Certifications Form PUR-466_FFDG.pdf PDF
Exhibit S- Sample Firm-Fixed-Price Subcontract.pdf PDF
Exhibit B4- Section 16450 Grounding and Bonding.pdf PDF
Exhibit B5- Section 16950 Testing Electrical Systems.pdf PDF
Exhibit D- 013100 ESH Requirements.pdf PDF
Exhibit F- 014100 Quality Requirements.pdf PDF
Exhibit R - Proposal Form 375018-CD F3 to F4 15KV Cable Installation.pdf PDF
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WILSON ST………….6 AM- 4:30 PM M-F NO TRUCKS ALLOWED

PINE ST………………..6 AM TO 6 PM NO TRUCKS ALLOWED

BATAVIA RD………...6 AM to 6 PM

REVISIONS

REV. DATE DESCRIPTIONS

DRAWN

APPROVED

SUBMITTED

CHECKED

DESIGNED

NAME DATE

SCALE:

DRAWING NO. REV.

O ct

8,

- 7

:1 0a m M

:\3 \7

P O

W

ER

C

O M

M U

N

IC

AT

IO

N D

IS

TR

IB

U

TI

O

N \1

B

F3 -F

C ab le

R ep la ce

\3 -7

-1

B_ G

-1 -G

-2 r3

.d w g

3-7-103B XXG-1

FERMILAB SITE PLAN AND DRAWING LIST

O C

T

ISSUED FOR PROPOSALS

FERMILAB SITE PLAN

N.T.S.

FEED FEED FEED FEED

FE

ED

FE

ED

FE

ED

FE

ED

FEED

FEED

FEED

FEED

FEED

FEED

FEED

FEED

FEED

FEED

P -98

P -A -0

P -A -1

P -E -4

P -F-0D

P -F-0U

P -F-1

P -F-2

P -F-27

P -F-3

P -F-4

P -R F

P

P

P

P

P

P

P

P

P

P

P

P

F-3

EX

IS

TI

NG

S

OU

TH

BO

OS

TE

R

RO

AD

MAIN RING ROAD

WILSON HALL

SERV.

BLDG. A-1

SERV.

BLDG. A-0

PIN

E STR

EET

DISCOVERY ROADBO

O

STER

R O

AD

PIP-II

P-A-0 P-F-4

SERV.

BLDG. F-4

EXIST. AIR

SWITCH

DSTR-MRF4-3

P-F-3

INDIAN CREEKROAD

SERV.

BLDG. F-3

SERV.

BLDG. F-27

P-F-27

MAIN RING ROAD P-F-2

SERV.

BLDG. F-2

KA

UT

Z

RO

AD

ANCILLAR

BLDG. F-23

SERV.

BLDG. F-1

P-F-0D

P-RF

SERV. BLDG.

RF/ F-0

P-F-0U

EXIST.

Y F01

SERV. BLDG. E-4

P-E-4

M

AI

N

RI

NG

R

O

AD

P-E-3

P-F-1

DSTR-A0-6

FE

ED

FE

ED

FEEDFEED

FE

ED

FE

ED

P -E -2

P -E -3

P M H -K R S -6

P M H -K R S -7

P M H -K R S -8

P M H -K R S -5

P

P

P

P

P

P

P-E-3

PMH-KRS-8

SERV.

BLDG.

E-3

FE

ED

FEED

FE

ED

FEED

FE

ED

FEED

FE

ED

FE

EDFEED

FE

EDFEED

FE

ED

FEED

FE

ED

FEED

FEED

FE

ED

FEED

FE

ED

FE

ED

FE

EDFEED

FE

ED

FE

ED

FE

ED

FE

EDFEED

FEED

FE

ED

FE

ED

FEED

FE

ED

FE

EDFEED

PMH-KRS-6

NEW

DSTR-46A-KRS

PMH-KRS-5

PMH-KRS-7

CB-88-46A

KAUTZ ROAD

SUB-STATION

PROJECT

NORTH

E

S

W

REVISIONS

REV. DATE DESCRIPTIONS

DRAWN

APPROVED

SUBMITTED

CHECKED

DESIGNED

NAME DATE

SCALE:

UNITED STATES DEPARTMENT OF ENERGY

FERMI NATIONAL ACCELERATOR LABORATORY

DRAWING NO. REV.

O ct

7,

- 5

:0 9p m M

:\3 \7

P O

W

ER

C

O M

M U

N

IC

AT

IO

N D

IS

TR

IB

U

TI

O

N \1

B

F3 -F

C ab le

R ep la ce

\3 -7

-1

B_ G

-1 -G

-2 r3

.d w g

P-F3 TO P-F4 15 KV CABLE INSTALLATION

3-7-103B XXG-2

VICINITY PLAN

O C

T

11/1/2025 ISSUED FOR PROPOSALS

VICINITY PLAN

N.T.S.

1:1000

SCALE FEET

10005000 250

SYMBOL LEGEND

FEEDER LINE

EXISTING MANHOLE (POWER)

FEED

FEED

P -F-3 P

1:1000

SCALE FEET

10005000 250

REVISIONS

REV. DATE DESCRIPTIONS

DRAWN

APPROVED

SUBMITTED

CHECKED

DESIGNED

NAME DATE

SCALE:

UNITED STATES DEPARTMENT OF ENERGY

FERMI NATIONAL ACCELERATOR LABORATORY

DRAWING NO. REV.

O ct

7,

- 5

:1 0p m M

:\3 \7

P O

W

ER

C

O M

M U

N

IC

AT

IO

N D

IS

TR

IB

U

TI

O

N \1

B

F3 -F

C ab le

R ep la ce

\3 -7

-1

B_ G

-1 -G

-2 r3

.d w g

P-F3 TO P-F4 15 KV CABLE INSTALLATION

3-7-103B RJWG-3

GENERAL NOTES

O C

T

11/1/2025 ISSUED FOR PROPOSALS

1. PROJECT 3-7-103B CONSISTS OF THE INSTALLATION OF 15KV FEEDER CABLES FOR EXISTING 15KV FEEDERS.

2. FERMILAB SUPPLIES CERTAIN MATERIAL ONLY. ALL WORK BY SUBCONTRACTOR:

a. 15KV SPLICE KITS

b. 15KV POWER CABLE

c. 1/2" HELIAX COMMUNICATIONS CABLE

d. 36 STRAND FIBER OPTIC COMMUNICATIONS CABLE

3. SUBCONTRACTOR SUPPLIES ALL OTHER LABOR, EQUIPMENT, AND MATERIALS, INCLUDING BUT NOT LIMITED TO:

a. IDENTIFICATION OF ALL CABLES IN EACH MANHOLE PRIOR TO CUTTING AND REMOVAL. ALL TESTING OBSERVED BY

FERMILAB PERSONNEL. ALL CUTS MUST BE PERFORMED REMOTE WITH NO PERSONNEL IN MANHOLE.

b. INSTALLATION OF 15KV, 750MCM ALUMINUM CABLES IN CONCRETE ENCASED ELECTRICAL DUCT SYSTEM.

c. TRANSPORTING UNUSED CABLE/REELS BACK TO FERMILAB RAILYARD.

d. SUBCONTRACTOR SHALL FURNISH AS-BUILT DRAWINGS, INCLUDING DUCT SECTION DRAWINGS FOR THE LOCATION OF

THE REPLACEMENT FEEDER CABLES. BUTTERFLY DRAWINGS MUST INCLUDE PICTURES OF EACH FACE OF ALL

MANHOLES ENTERED.

e. TO PROVIDE "HAZARD ANALYSIS" FOR WORKING IN CONFINED SPACES AND ENERGIZED CONDUCTORS. HAZARD

ANALYSIS MUST BE SUBMITTED AND APPROVED BY FERMILAB PRIOR TO THE START OF WORK

f. ALL SAFETY EQUIPMENT AND SUPERVISION

g. 1 HOUR FERMILAB ORIENTATION TRAINING CLASS FOR ALL PERSONNEL ON FERMILAB SITE

h. ALL REQUIRED BADGING FOR ALL SUBCONTRACTOR PERSONNEL REQUIRED FOR THE JOB

4. ALL 15KV CIRCUIT BREAKER AND DISCONNECT SWITCHING SHALL BE PERFORMED BY FERMILAB. SUBCONTRACTOR SHALL ADHERE TO FERMILAB LOCK-OUT AND TAG-OUT PROCEDURES FOR CIRCUIT DE-ENERGIZING AND BACKFEED ISOLATION. ALL VERIFICATION OF DEENERGIZATION AND SAFETY GROUNDING INCLUDING ALL REQUIRED SAFETY GROUND CABLES BY

SUBCONTRACTOR.

5. WORK MAY NEED TO BE PERFORMED IN MANHOLES WITH ENERGIZED CONDUCTORS, IR GUN SURVEY AND BLAST BLANKETS

PROVIDED BY SUBCONTRACTOR.

6. ALL WORK AND TRAFFIC AT THE LABORATORY ARE TO FOLLOW THE ILLINOIS RULES OF THE ROAD. THE ILLINOIS DEPARTMENT OF TRANSPORTATION STANDARDS ARE TO BE USED BY SUBCONTRACTORS WHEN

CONDUCTING WORK THAT INVOLVES TEMPORARY TRAFFIC CONTROL PLANS CAN BE FOUND HERE:

https://idot.illinois.gov/doing-business/procurements/engineering-architectural-professional-services/ Consultants-Resources/highway-standards-and-district-specific-standards

KAUTZ ROAD

SUB-STATION

P-F-2P-F-0DP-F-0U P-F-27P-F-1P-RFP-E-4

PPMH-KRS-8

NEW CABLE

CABLE TO REMAIN

POWER MANHOLE (PMH)

INDICATES APROXIMATE DISTANCE FROM CENTER OF MANHOLE COVER TO

CENTER OF MANHOLE COVER. (SUBCONTRACTOR TO VERIFY ALL DISTANCES.)XXX'

SYMBOLS:

PPMH-KRS-6PPMH-KRS-5

P-E-3

292'

233'

198'

246' 773'

272'

842'49'

287'

461'310'

CB

88-46A

PMH KRS 7

451'

CB

55-23

F-2

50'

F-1

P-A-0P-F-3 P-F-4

215'

748' DSTR-46A-P71

DSTR-A0-6

126'

TO

F-3

461'

DSTR-MIF4-1

DSTR-MIF4-2

DSTR-MIF4-3

100'50'50'

DSTR-FDR46A-F4

DSTR-FDR48-F4

REVISIONS

REV. DATE DESCRIPTIONS

DRAWN

APPROVED

SUBMITTED

CHECKED

DESIGNED

NAME DATE

SCALE:

UNITED STATES DEPARTMENT OF ENERGY

FERMI NATIONAL ACCELERATOR LABORATORY

DRAWING NO. REV.

O ct

7,

- 5

:1 2p m M

:\3 \7

P O

W

ER

C

O M

M U

N

IC

AT

IO

N D

IS

TR

IB

U

TI

O

N \1

B

F3 -F

C ab le

R ep la ce

\3 -7

-1

B_

SI

N G

LE

L

IN

E

D

IA

G R

AM

_E

-1 E

-2 E

-3 r3

.d w g

P-F3 TO P-F4 15KV CABLE INSTALLATION

3-7-103B XXE-1

Overview Single Line Diagram

O C

T

ISSUED FOR PROPOSALS

11/1/2025

N�T�S�

F-2

F-0D

F-27F-1

INSTALL COMMUNICAITONS CABLE

COMMUNICATIONS MANHOLE

INDICATES APROXIMATE DISTANCE FROM CENTER OF MANHOLE COVER TO

CENTER OF MANHOLE COVER. (SUBCONTRACTOR TO VERIFY ALL DISTANCES.)XXX'

SYMBOLS:

292'233' 842'

A-0

F-4

215'

748'

A0 SERVICE

BUILDING

126'

F-3

461'

F4 SERVICE

BUILDING

F3 SERVICE

BUILDING

F3 SERVICE

BUILDING

500'

125'

125'

FFDG TO SUPPLY THE COMMUNICATIONS CABLES FOR INSTALLATION

BY THE SUBCONTRACTOR UNDER THIS PROJECT.

REVISIONS

REV. DATE DESCRIPTIONS

DRAWN

APPROVED

SUBMITTED

CHECKED

DESIGNED

NAME DATE

SCALE:

UNITED STATES DEPARTMENT OF ENERGY

FERMI NATIONAL ACCELERATOR LABORATORY

DRAWING NO. REV.

O ct

7,

- 5

:1 2p m M

:\3 \7

P O

W

ER

C

O M

M U

N

IC

AT

IO

N D

IS

TR

IB

U

TI

O

N \1

B

F3 -F

C ab le

R ep la ce

\3 -7

-1

B_

SI

N G

LE

L

IN

E

D

IA

G R

AM

_E

-1 E

-2 E

-3 r3

.d w g

P-F3 TO P-F4 15KV CABLE INSTALLATION

3-7-103B XXE-1A

Communications Single Line Diagram

O C

T

ISSUED FOR PROPOSALS

11/1/2025

REVISIONS

REV. DATE DESCRIPTIONS

DRAWN

APPROVED

SUBMITTED

CHECKED

DESIGNED

NAME DATE

SCALE:

UNITED STATES DEPARTMENT OF ENERGY

FERMI NATIONAL ACCELERATOR LABORATORY

DRAWING NO. REV.

O ct

8,

- 7

:3 6a m M

:\3 \7

P O

W

ER

C

O M

M U

N

IC

AT

IO

N D

IS

TR

IB

U

TI

O

N \1

B

F3 -F

C ab le

R ep la ce

\3 -7

-1

B_

SI

N G

LE

L

IN

E

D

IA

G R

AM

_E

-1 E

-2 E

-3 r3

.d w g

P-F3 TO P-F4 15KV CABLE INSTALLATION

3-7-103B XXE-2

CABLE AND REEL SCHEDULE

O C

T

ISSUED FOR PROPOSALS

11/1/2025

P-A-0P-F-3 P-F-4P-F-27

IN-LINE SPLICE (SP)

INSTALL CABLE

CABLE TO REMAIN

POWER MANHOLE (PMH)

INDICATES APROXIMATE DISTANCE FROM CENTER OF MANHOLE COVER TO

CENTER OF MANHOLE COVER. (SUBCONTRACTOR TO VERIFY ALL DISTANCES.)XXX'

SYMBOLS: QUANTITIES

SUPPLIED BY

FNAL

858 FNAL

0 FNAL

6 SUBCONTRACTOR

4-WAY AIR SWITCH (EA)

750MCM CABLE (3Ø),(LF,CEN-CEN)

IN LINE SPLICES (1Ø), (EA)

AIR SWITCH TEMINATIONS (1Ø), (EA)

215'748' 461'

50'

DSTR-MIF4-1

60'

DSTR-MIF3-1

SINGLE LINE DIAGRAM - FEEDER 94/95-1

REEL #43

REVISIONS

REV. DATE DESCRIPTIONS

DRAWN

APPROVED

SUBMITTED

CHECKED

DESIGNED

NAME DATE

SCALE:

UNITED STATES DEPARTMENT OF ENERGY

FERMI NATIONAL ACCELERATOR LABORATORY

DRAWING NO. REV.

O ct

7,

- 5

:1 4p m M

:\3 \7

P O

W

ER

C

O M

M U

N

IC

AT

IO

N D

IS

TR

IB

U

TI

O

N \1

B

F3 -F

C ab le

R ep la ce

\3 -7

-1

B_

SI

N G

LE

L

IN

E

D

IA

G R

AM

_E

-1 E

-2 E

-3 r3

.d w g

P-F3 TO P-F4 15KV CABLE INSTALLATION

3-7-103B XXE-3

FEEDER 94/95-1 INSTALLATION SINGLE LINE DIAGRAM

O C

T

ISSUED FOR PROPOSALS

11/1/2025

INSTALL CABLE

CABLE TO REMAIN

POWER MANHOLE (PMH)

INDICATES APROXIMATE DISTANCE FROM CENTER OF MANHOLE COVER TO

CENTER OF MANHOLE COVER. (SUBCONTRACTOR TO VERIFY ALL DISTANCES.)XXX'

SYMBOLS: QUANTITIES

SUPPLIED BY

FNAL

1551 FNAL

3 FNAL

3 SUBCONTRACTOR

4-WAY AIR SWITCH (EA)

750MCM CABLE (3Ø),(LF,CEN-CEN)

IN LINE SPLICES (1Ø), (EA)

AIR SWITCH TEMINATIONS (1Ø), (EA)

REEL #44

215'748' 461'

50'

DSTR-MIF4-1

SINGLE LINE DIAGRAM - FEEDER 94/95-2

P-F-2

292'

REVISIONS

REV. DATE DESCRIPTIONS

DRAWN

APPROVED

SUBMITTED

CHECKED

DESIGNED

NAME DATE

SCALE:

UNITED STATES DEPARTMENT OF ENERGY

FERMI NATIONAL ACCELERATOR LABORATORY

DRAWING NO. REV.

O ct

7,

- 5

:1 5p m M

:\3 \7

P O

W

ER

C

O M

M U

N

IC

AT

IO

N D

IS

TR

IB

U

TI

O

N \1

B

F3 -F

C ab le

R ep la ce

\3 -7

-1

B_

SI

N G

LE

L

IN

E

D

IA

G R

AM

_E

-1 E

-2 E

-3 r3

.d w g

P-F3 TO P-F4 15KV CABLE INSTALLATION

3-7-103B XXE-4

FEEDER 94/95-2 INSTALLATION SINGLE LINE DIAGRAM

O C

T

ISSUED FOR PROPOSALS

11/1/20205

INSTALL CABLE

CABLE TO REMAIN

POWER MANHOLE (PMH)

INDICATES APROXIMATE DISTANCE FROM CENTER OF MANHOLE COVER TO

CENTER OF MANHOLE COVER. (SUBCONTRACTOR TO VERIFY ALL DISTANCES.)XXX'

SYMBOLS: QUANTITIES

SUPPLIED BY

FNAL

963 FNAL

6 FNAL

0 SUBCONTRACTOR

4-WAY AIR SWITCH (EA)

750MCM CABLE (3Ø),(LF,CEN-CEN)

IN LINE SPLICES (1Ø), (EA)

AIR SWITCH TEMINATIONS (1Ø), (EA)

REEL #32

215' 461'

126'

(BID OPTION #1)

DSTR-FDR48-F4

70'70'

158'590'

REEL #41

SINGLE LINE DIAGRAM - FEEDER 48

REVISIONS

REV. DATE DESCRIPTIONS

DRAWN

APPROVED

SUBMITTED

CHECKED

DESIGNED

NAME DATE

SCALE:

UNITED STATES DEPARTMENT OF ENERGY

FERMI NATIONAL ACCELERATOR LABORATORY

DRAWING NO. REV.

O ct

7,

- 5

:1 5p m M

:\3 \7

P O

W

ER

C

O M

M U

N

IC

AT

IO

N D

IS

TR

IB

U

TI

O

N \1

B

F3 -F

C ab le

R ep la ce

\3 -7

-1

B_

SI

N G

LE

L

IN

E

D

IA

G R

AM

_E

-1 E

-2 E

-3 r3

.d w g

P-F3 TO P-F4 15KV CABLE INSTALLATION

3-7-103B XXE-5

FEEDER 48 INSTALLATION SINGLE LINE DIAGRAM

O C

T

ISSUED FOR PROPOSALS

11/1/2025

P-A-0P-F-3P-F-2P-F-0D P-F-4P-F-27P-F-1P-RF

INSTALL CABLE

CABLE TO REMAIN

POWER MANHOLE (PMH)

INDICATES APROXIMATE DISTANCE FROM CENTER OF MANHOLE COVER TO

CENTER OF MANHOLE COVER. (SUBCONTRACTOR TO VERIFY ALL DISTANCES.)XXX'

SYMBOLS: QUANTITIES

SUPPLIED BY

FNAL

3216 FNAL

3 FNAL

6 SUBCONTRACTOR

4-WAY AIR SWITCH (EA)

750MCM CABLE (3Ø),(LF,CEN-CEN)

IN LINE SPLICES (1Ø), (EA)

AIR SWITCH TEMINATIONS (1Ø), (EA)

REEL #34

215'748' 461'

292'233'198'272' 842'

DSTR-MRF4-3

SINGLE LINE DIAGRAM - FEEDER 46B

REEL #33

Y-F01

P-F-0U

100'

90'

REVISIONS

REV. DATE DESCRIPTIONS

DRAWN

APPROVED

SUBMITTED

CHECKED

DESIGNED

NAME DATE

SCALE:

UNITED STATES DEPARTMENT OF ENERGY

FERMI NATIONAL ACCELERATOR LABORATORY

DRAWING NO. REV.

O ct

7,

- 5

:1 6p m M

:\3 \7

P O

W

ER

C

O M

M U

N

IC

AT

IO

N D

IS

TR

IB

U

TI

O

N \1

B

F3 -F

C ab le

R ep la ce

\3 -7

-1

B_

SI

N G

LE

L

IN

E

D

IA

G R

AM

_E

-1 E

-2 E

-3 r3

.d w g

P-F3 TO P-F4 15KV CABLE INSTALLATION

3-7-103B XXE-6

FEEDER 46B INSTALLATION SINGLE LINE DIAGRAM

O C

T

ISSUED FOR PROPOSALS

11/1/2025

P-A-0P-F-3P-F-2 P-F-4P-F-27

INSTALL CABLE

CABLE TO REMAIN

POWER MANHOLE (PMH)

INDICATES APROXIMATE DISTANCE FROM CENTER OF MANHOLE COVER TO

CENTER OF MANHOLE COVER. (SUBCONTRACTOR TO VERIFY ALL DISTANCES.)XXX'

SYMBOLS: QUANTITIES

SUPPLIED BY

FNAL

3627 FNAL

21 FNAL

0 SUBCONTRACTOR

4-WAY AIR SWITCH (EA)

750MCM CABLE (3Ø),(LF,CEN-CEN)

IN LINE SPLICES (1Ø), (EA)

AIR SWITCH TEMINATIONS (1Ø), (EA)

REEL #32

215'748' 461'

292'842' 126'

REEL #40

REEL #41

SINGLE LINE DIAGRAM - FEEDER

21/22-1, 21/22-2, 21/22-3

REVISIONS

REV. DATE DESCRIPTIONS

DRAWN

APPROVED

SUBMITTED

CHECKED

DESIGNED

NAME DATE

SCALE:

UNITED STATES DEPARTMENT OF ENERGY

FERMI NATIONAL ACCELERATOR LABORATORY

DRAWING NO. REV.

O ct

7,

- 5

:1 7p m M

:\3 \7

P O

W

ER

C

O M

M U

N

IC

AT

IO

N D

IS

TR

IB

U

TI

O

N \1

B

F3 -F

C ab le

R ep la ce

\3 -7

-1

B_

SI

N G

LE

L

IN

E

D

IA

G R

AM

_E

-1 E

-2 E

-3 r3

.d w g

P-F3 TO P-F4 15KV CABLE INSTALLATION

3-7-103B XXE-7

FEEDER 21/22 INSTALLATION SINGLE LINE DIAGRAM

O C

T

ISSUED FOR PROPOSALS

11/1/2025

INSTALL CABLE

CABLE TO REMAIN

POWER MANHOLE (PMH)

INDICATES APROXIMATE DISTANCE FROM CENTER OF MANHOLE COVER TO

CENTER OF MANHOLE COVER. (SUBCONTRACTOR TO VERIFY ALL DISTANCES.)XXX'

SYMBOLS: QUANTITIES

SUPPLIED BY

FNAL

858 FNAL

0 FNAL

6 SUBCONTRACTOR

4-WAY AIR SWITCH (EA)

750MCM CABLE (3Ø),(LF,CEN-CEN)

IN LINE SPLICES (1Ø), (EA)

AIR SWITCH TEMINATIONS (1Ø), (EA)

REEL #42

215'748' 461'

50'

DSTR-F4-1Y-F3

SINGLE LINE DIAGRAM - FEEDER 45

P-F-2

292'

60'

REVISIONS

REV. DATE DESCRIPTIONS

DRAWN

APPROVED

SUBMITTED

CHECKED

DESIGNED

NAME DATE

SCALE:

UNITED STATES DEPARTMENT OF ENERGY

FERMI NATIONAL ACCELERATOR LABORATORY

DRAWING NO. REV.

O ct

7,

- 5

:1 7p m M

:\3 \7

P O

W

ER

C

O M

M U

N

IC

AT

IO

N D

IS

TR

IB

U

TI

O

N \1

B

F3 -F

C ab le

R ep la ce

\3 -7

-1

B_

SI

N G

LE

L

IN

E

D

IA

G R

AM

_E

-1 E

-2 E

-3 r3

.d w g

P-F3 TO P-F4 15KV CABLE INSTALLATION

3-7-103B XXE-8

FEEDER 45 INSTALLATION SINGLE LINE DIAGRAM

O C

T

ISSUED FOR PROPOSALS

11/1/2025

INSTALL CABLE

CABLE TO REMAIN

POWER MANHOLE (PMH)

INDICATES APROXIMATE DISTANCE FROM CENTER OF MANHOLE COVER TO

CENTER OF MANHOLE COVER. (SUBCONTRACTOR TO VERIFY ALL DISTANCES.)XXX'

SYMBOLS: QUANTITIES

SUPPLIED BY

FNAL

828 FNAL

3 FNAL

3 SUBCONTRACTOR

4-WAY AIR SWITCH (EA)

750MCM CABLE (3Ø),(LF,CEN-CEN)

IN LINE SPLICES (1Ø), (EA)

AIR SWITCH TEMINATIONS (1Ø), (EA)

REEL #43

215'748' 461'

80'

DSTR-MIF3-2

SINGLE LINE DIAGRAM - FEEDER 24

P-F-2

292'

REVISIONS

REV. DATE DESCRIPTIONS

DRAWN

APPROVED

SUBMITTED

CHECKED

DESIGNED

NAME DATE

SCALE:

UNITED STATES DEPARTMENT OF ENERGY

FERMI NATIONAL ACCELERATOR LABORATORY

DRAWING NO. REV.

O ct

7,

- 5

:1 8p m M

:\3 \7

P O

W

ER

C

O M

M U

N

IC

AT

IO

N D

IS

TR

IB

U

TI

O

N \1

B

F3 -F

C ab le

R ep la ce

\3 -7

-1

B_

SI

N G

LE

L

IN

E

D

IA

G R

AM

_E

-1 E

-2 E

-3 r3

.d w g

P-F3 TO P-F4 15KV CABLE INSTALLATION

3-7-103B XXE-9

FEEDER 24 INSTALLATION SINGLE LINE DIAGRAM

O C

T

ISSUED FOR PROPOSALS

11/1/2025

INSTALL CABLE

CABLE TO REMAIN

POWER MANHOLE (PMH)

INDICATES APROXIMATE DISTANCE FROM CENTER OF MANHOLE COVER TO

CENTER OF MANHOLE COVER. (SUBCONTRACTOR TO VERIFY ALL DISTANCES.)XXX'

SYMBOLS: QUANTITIES

SUPPLIED BY

FNAL

1550 FNAL

3 FNAL

3 SUBCONTRACTOR

4-WAY AIR SWITCH (EA)

750MCM CABLE (3Ø),(LF,CEN-CEN)

IN LINE SPLICES (1Ø), (EA)

AIR SWITCH TEMINATIONS (1Ø), (EA)

REEL #25

215' 461'

DSTR-46A-P71

DSTR-A0-6

126'

TO

DSTR-FDR46A-F4

70'70'

158'590'

REVISIONS

REV. DATE DESCRIPTIONS

DRAWN

APPROVED

SUBMITTED

CHECKED

DESIGNED

NAME DATE

SCALE:

UNITED STATES DEPARTMENT OF ENERGY

FERMI NATIONAL ACCELERATOR LABORATORY

DRAWING NO. REV.

O ct

8,

- 6

:5 0a m M

:\3 \7

P O

W

ER

C

O M

M U

N

IC

AT

IO

N D

IS

TR

IB

U

TI

O

N \1

B

F3 -F

C ab le

R ep la ce

\3 -7

-1

B_

AS

_S

IN

G

LE

L

IN

E

D

IA

G R

AM

_E

-1 r3 .d w g

P-F3 TO P-F4 15KV CABLE INSTALLATION

3-7-103B XXE-10

FEEDER 46A INSTALLATION SINGLE LINE DIAGRAM

O C

T

ISSUED FOR PROPOSALS

11/1/2025

N�T�S�

SINGLE LINE DIAGRAM - FEEDER 46A

(BID OPTION #1)

FEED

FEED

FEED

FEED

FEED FEED FEED FEED FEED FEED FEED FEED

FEED

FEED

FEED

FEED

FEED

FEED

FEED

FEED

FEED

FEED

FEED

FEED

FEED

FEED

FEED

FEED

FEED

FEED

FEEDFEED

P -98

P -A -0

P -A -1

P -F-2

P -F-27

P -F-3

P -F-4

P

P

P

P

P

P

P

F-3

EX

IS

TI

NG

S

OU

TH

BO

OS

TE

R

RO

AD

MAIN RING ROAD

WILSON HALL

SERVICE BLDG. A-0

BO

O

STER

R

O

AD

PIP-II

P-A-0 P-F-4

SERV. BLDG. F-4

EXIST. AIR

SWITCH

DSTR-MRF4-3

P-F-3

INDIAN CREEK ROAD

SERV. BLDG. F-3

SERV. BLDG. F-27

P-F-27

MAIN RING ROAD

P-F-2

SERV. BLDG. F-2

ANCILLAR

BLDG.

F-23

DSTR-A0-6

DSTR-FDR46A-F4

DSTR-FDR48-F4

PROJECT

NORTH

E

S

W

REVISIONS

REV. DATE DESCRIPTIONS

DRAWN

APPROVED

SUBMITTED

CHECKED

DESIGNED

NAME DATE

SCALE:

UNITED STATES DEPARTMENT OF ENERGY

FERMI NATIONAL ACCELERATOR LABORATORY

DRAWING NO. REV.

O ct

8,

- 6

:5 2a m M

:\3 \7

P O

W

ER

C

O M

M U

N

IC

AT

IO

N D

IS

TR

IB

U

TI

O

N \1

B

F3 -F

C ab le

R ep la ce

\3 -7

-1

B_

LO

C

AT

IO

N

P

LA

N E

-1

E-r3 .d w g

P-F3 TO P-F4 15KV CABLE INSTALLATION

3-7-103B XXE-11

PARTIAL LOCATION PLAN

O C

T

11/1/2025ISSUED FOR PROPOSALS

1"=200'

SCALE FEET

2000 100 300

SYMBOL LEGEND

FEEDER LINE

EXISTING MANHOLE (POWER)

FEED

FEED

P -F-3

P

1"= 200'

PARTIAL LOCATION PLAN

FEED

FEED

FEED

FE

ED

FE

ED

FE

ED

FE

ED

FE

ED

FE

ED

FE

ED

FE

ED

FE

ED

FEED

FEED

FEED

FEED

FEED

P -E -4

P -F-0D

P -F-0U

P -F-1

P -R F

P

P

P

P

P

MAIN RING ROAD

KA

UT

Z

RO

AD

SERV.

BLDG. F-1

P-F-0D

P-RF

SERV. BLDG

RF/F-0

P-F-0U

EXIST. Y F01

SERV.

BLDG.

E-4 P-E-4

M

AI

N

RI

NG

R

O

AD

P-F-1

PROJECT

NORTH

E

S

W

REVISIONS

REV. DATE DESCRIPTIONS

DRAWN

APPROVED

SUBMITTED

CHECKED

DESIGNED

NAME DATE

SCALE:

UNITED STATES DEPARTMENT OF ENERGY

FERMI NATIONAL ACCELERATOR LABORATORY

DRAWING NO. REV.

O ct

8,

- 6

:5 2a m M

:\3 \7

P O

W

ER

C

O M

M U

N

IC

AT

IO

N D

IS

TR

IB

U

TI

O

N \1

B

F3 -F

C ab le

R ep la ce

\3 -7

-1

B_

LO

C

AT

IO

N

P

LA

N E

-1

E-r3 .d w g

P-F3 TO P-F4 15KV CABLE INSTALLATION

3-7-103B XXE-12

PARTIAL LOCATION PLAN

O C

T

11/1/2025 ISSUED FOR PROPOSALS

1"=200'

SCALE FEET

2000 100 300

SYMBOL LEGEND

FEEDER LINE

EXISTING MANHOLE (POWER)

FEED

FEED

P -F-3 P

1"= 200'

PARTIAL LOCATION PLAN

CONTINUES TO P-E-3

9-5"C

TOWARDS A-0 SERVICE BUILDING

DSTR-A0-6

12-5"C

FROM P-A-1

MANHOLE NO. A-0

12-5"C

FROM P-F-4

10-5"C

FROM P-F-3

9-5"C

TOWARDS F-4 SERVICE BUILDING

12-5"C

FROM P-A-0

MANHOLE NO. F-4

SEE SHEET E-14

SPLICE FDR 48

SPLICE FDR 21/22-1, 2, 3

SPLICE FDR 24

FIELD VERIFY

1-5"C

FROM

DSTR-FDR46A-F4

1-5"C

FROM

DSTR-FDR48-F4

FDR 46A AND 48

BID OPTION #1

NOTES

1. SEE TYPICAL MANHOLE DETAILS DRAWING SHEET E-14 FOR

TYPICAL MANHOLE CABLE SUPPORT DETAIL.

2. FIELD VERIFY IDENTIFICATION OF FEEDERS PRIOR TO

WORKING WITH CABLE. VERIFICATION SHALL BE WITNESSED

BY FRA .

REVISIONS

REV. DATE DESCRIPTIONS

DRAWN

APPROVED

SUBMITTED

CHECKED

DESIGNED

NAME DATE

SCALE:

UNITED STATES DEPARTMENT OF ENERGY

FERMI NATIONAL ACCELERATOR LABORATORY

DRAWING NO. REV.

O ct

8,

- 6

:5 4a m M

:\3 \7

P O

W

ER

C

O M

M U

N

IC

AT

IO

N D

IS

TR

IB

U

TI

O

N \1

B

F3 -F

C ab le

R ep la ce

\3 -7

-1

B_ E1

3- E

_M

AN

H

O

LE

D

ET

AI

LS

r3 .d w g

P-F3 TO P-F4 15KV CABLE INSTALLATION

3-7-103B XXE-13

MANHOLE DETAILS P-A-0 & P-F-4

O C

T

ISSUED FOR PROPOSALS

11/1/2025

N.T.S.

XX

XXX

SYMBOL LEGEND

EXISTING FEEDERS TO REMAIN, NO WORK REQUIRED

INDICATES WORK ON FEEDERS

XX

XXX

12-5"C

FROM P- F-2

9-5"C

TOWARDS F-27 SERVICE BUILDING

12-5"C

FROM P-F-3

MANHOLE NO. F-27

12-5"C

FROM P-F-27

11-5"C

TOWARDS F-3 SERVICE BUILDING

10-5"C

FROM P-F-4

MANHOLE NO. F-3

SEE SHEET E-15

SEE SHEET E-13

SPLICE FDR 21/22-1, 2, 3

SPLICE FDR 48

1-5"C

FROM

DSTR-FDR46A-F4

1-5"C

FROM

DSTR-FDR48-F4

FDR 46A AND 48

BID OPTION #1

REVISIONS

REV. DATE DESCRIPTIONS

DRAWN

APPROVED

SUBMITTED

CHECKED

DESIGNED

NAME DATE

SCALE:

UNITED STATES DEPARTMENT OF ENERGY

FERMI NATIONAL ACCELERATOR LABORATORY

DRAWING NO. REV.

O ct

8,

- 6

:5 5a m M

:\3 \7

P O

W

ER

C

O M

M U

N

IC

AT

IO

N D

IS

TR

IB

U

TI

O

N \1

B

F3 -F

C ab le

R ep la ce

\3 -7

-1

B_ E1

3- E

_M

AN

H

O

LE

D

ET

AI

LS

r3 .d w g

3/26/24

Value

P-F3 TO P-F4 15KV CABLE INSTALLATION

3-7-103B XXE-14

MANHOLE DETAILS P-F-3 & P-F-27

O C

T

ISSUED FOR PROPOSALS

11/1/2025

NOTES

1. SEE TYPICAL MANHOLE DETAILS DRAWING SHEET E-14 FOR

TYPICAL MANHOLE CABLE SUPPORT DETAIL.

2. FIELD VERIFY IDENTIFICATION OF FEEDERS PRIOR TO

WORKING WITH CABLE. VERIFICATION SHALL BE WITNESSED

BY FRA .

N.T.S.

XX

XXX

SYMBOL LEGEND

EXISTING FEEDERS TO REMAIN, NO WORK REQUIRED

INDICATES WORK ON FEEDERS

FROM P-F-0D

9-5"C

TOWARDS F-1 SERVICE BUILDING

12-5"C

FROM P-F-2

MANHOLE NO. F-1

12-5"C

FROM P-F-1

12-5"C

TOWARDS F-2 SERVICE BUILDING

12-5"C

FROM P-F-27

MANHOLE NO. F-2

SEE SHEET E-16

SEE SHEET E-14

SPLICE FDR 94/95

REVISIONS

REV. DATE DESCRIPTIONS

DRAWN

APPROVED

SUBMITTED

CHECKED

DESIGNED

NAME DATE

SCALE:

UNITED STATES DEPARTMENT OF ENERGY

FERMI NATIONAL ACCELERATOR LABORATORY

DRAWING NO. REV.

O ct

8,

- 6

:5 6a m M

:\3 \7

P O

W

ER

C

O M

M U

N

IC

AT

IO

N D

IS

TR

IB

U

TI

O

N \1

B

F3 -F

C ab le

R ep la ce

\3 -7

-1

B_ E1

3- E

_M

AN

H

O

LE

D

ET

AI

LS

r3 .d w g

Value

P-F3 TO P-F4 15KV CABLE INSTALLATION

3-7-103B XXE-15

MANHOLE DETAILS P-F-2 & P-F-1

O C

T

ISSUED FOR PROPOSALS

11/1/2025

NOTES

1. SEE TYPICAL MANHOLE DETAILS DRAWING SHEET E-14 FOR

TYPICAL MANHOLE CABLE SUPPORT DETAIL.

2. FIELD VERIFY IDENTIFICATION OF FEEDERS PRIOR TO

WORKING WITH CABLE. VERIFICATION SHALL BE WITNESSED

BY FRA .

N.T.S.

XX

XXX

SYMBOL LEGEND

EXISTING FEEDERS TO REMAIN, NO WORK REQUIRED

INDICATES WORK ON FEEDERS

FROM P-F-0U

9-5"C

TOWARDS RF/F-0 SERVICE BUILDING

12-5"C

FROM P-F-0D

MANHOLE NO. RF

12-5"C

FROM P-RF

9-5"C

TOWARDS RF/F-0 SERVICE BUILDING

12-5"C

FROM P-F-1

MANHOLE NO. F-0D

SEE SHEET E-17

REVISIONS

REV. DATE DESCRIPTIONS

DRAWN

APPROVED

SUBMITTED

CHECKED

DESIGNED

NAME DATE

SCALE:

UNITED STATES DEPARTMENT OF ENERGY

FERMI NATIONAL ACCELERATOR LABORATORY

DRAWING NO. REV.

O ct

8,

- 6

:5 7a m M

:\3 \7

P O

W

ER

C

O M

M U

N

IC

AT

IO

N D

IS

TR

IB

U

TI

O

N \1

B

F3 -F

C ab le

R ep la ce

\3 -7

-1

B_ E1

3- E

_M

AN

H

O

LE

D

ET

AI

LS

r3 .d w g

P-F3 TO P-F4 15KV CABLE INSTALLATION

3-7-103B XXE-16

MANHOLE DETAILS P-F0D & P-RF

O C

T

ISSUED FOR PROPOSALS

11/1/2025

NOTES

1. SEE TYPICAL MANHOLE DETAILS DRAWING SHEET E-14 FOR

TYPICAL MANHOLE CABLE SUPPORT DETAIL.

2. FIELD VERIFY IDENTIFICATION OF FEEDERS PRIOR TO

WORKING WITH CABLE. VERIFICATION SHALL BE WITNESSED

BY FRA .

N.T.S.

XX

XXX

SYMBOL LEGEND

EXISTING FEEDERS TO REMAIN, NO WORK REQUIRED

INDICATES WORK ON FEEDERS

FROM P-E-3

9-5"C

TOWARDS E-4 SERVICE BUILDING

12-5"C

FROM P- F-0U

MANHOLE NO. E-4

12-5"C

FROM P-E-4

9-5"C

TOWARDS RF/F-0 SERVICE BUILDING

12-5"C

FROM P-RF

MANHOLE NO. F-0U

SEE SHEET E-16

TERM FDR 46B @ XMFR

REVISIONS

REV. DATE DESCRIPTIONS

DRAWN

APPROVED

SUBMITTED

CHECKED

DESIGNED

NAME DATE

SCALE:

UNITED STATES DEPARTMENT OF ENERGY

FERMI NATIONAL ACCELERATOR LABORATORY

DRAWING NO. REV.

O ct

8,

- 7

:0 4a m M

:\3 \7

P O

W

ER

C

O M

M U

N

IC

AT

IO

N D

IS

TR

IB

U

TI

O

N \1

B

F3 -F

C ab le

R ep la ce

\3 -7

-1

B_ E1

3- E

_M

AN

H

O

LE

D

ET

AI

LS

r3 .d w g

P-F3 TO P-F4 15KV CABLE INSTALLATION

3-7-103B XXE-17

MANHOLE DETAILS P-F-0U & P-E-4

O C

T

ISSUED FOR PROPOSALS

11/1/2025

NOTES

1. SEE TYPICAL MANHOLE DETAILS DRAWING SHEET E-14 FOR

TYPICAL MANHOLE CABLE SUPPORT DETAIL.

2. FIELD VERIFY IDENTIFICATION OF FEEDERS PRIOR TO

WORKING WITH CABLE. VERIFICATION SHALL BE WITNESSED

BY FRA .

N.T.S.

XX

XXX

SYMBOL LEGEND

EXISTING FEEDERS TO REMAIN, NO WORK REQUIRED

INDICATES WORK ON FEEDERS

3-7-103B_G-1-G-2 r3-G-1
3-7-103B_G-1-G-2 r3-G-2
Sheets and Views
G-2
3-7-103B_G-1-G-2 r3-G-3
Sheets and Views
G-3
3-7-103B_SINGLE LINE DIAGRAM_E-1 E-2 E-3 r3-E-1
Sheets and Views
E-1
3-7-103B_SINGLE LINE DIAGRAM_E-1 E-2 E-3 r3-E-1A
Sheets and Views
E-1A
3-7-103B_SINGLE LINE DIAGRAM_E-1 E-2 E-3 r3-E-2
Sheets and Views
E-2
3-7-103B_SINGLE LINE DIAGRAM_E-1 E-2 E-3 r3-E-3
Sheets and Views
E-3
3-7-103B_SINGLE LINE DIAGRAM_E-1 E-2 E-3 r3-E-4
Sheets and Views
E-4
3-7-103B_SINGLE LINE DIAGRAM_E-1 E-2 E-3 r3-E-5
Sheets and Views
E-5
3-7-103B_SINGLE LINE DIAGRAM_E-1 E-2 E-3 r3-E-6
Sheets and Views
E-6
3-7-103B_SINGLE LINE DIAGRAM_E-1 E-2 E-3 r3-E-7
Sheets and Views
E-7
3-7-103B_SINGLE LINE DIAGRAM_E-1 E-2 E-3 r3-E-8
Sheets and Views
E-8
3-7-103B_SINGLE LINE DIAGRAM_E-1 E-2 E-3 r3-E-9
Sheets and Views
E-9
3-7-103B_46AS_SINGLE LINE DIAGRAM_E-10 r3-E-10
Sheets and Views
E-10
3-7-103B_LOCATION PLAN E-11 E-12 r3-E-11
Sheets and Views
E-11
3-7-103B_LOCATION PLAN E-11 E-12 r3-E-12
Sheets and Views
E-12
3-7-103B_E13- E17_MANHOLE DETAILS r3-E-13
Sheets and Views
E-13
3-7-103B_E13- E17_MANHOLE DETAILS r3-E-14
Sheets and Views
E-14
3-7-103B_E13- E17_MANHOLE DETAILS r3-E-15
Sheets and Views
E-15
3-7-103B_E13- E17_MANHOLE DETAILS r3-E-16
Sheets and Views
E-16
3-7-103B_E13- E17_MANHOLE DETAILS r3-E-17
Sheets and Views
E-17

File details come from the government source that posted it. Updated .