The documents are single-line electrical diagrams for a 15kV cable installation project at the Fermi National Accelerator Laboratory for the United States Department of Energy. The project involves installing communications and power cables between multiple service buildings (F-0, F-1, F-2, F-3, F-4, A-0), with two primary bid options (Feeder 48 and Feeder 46A). Key technical specifications include:

The cable installation requires 1-36 strand fiber optic cables, 1 1/4" innerduct, and 19 1/2" Heliax cables, with precise routing instructions for each building. Owner-furnished 15kV air switches (S & C Model: PME-10) will be installed on existing pads, with the subcontractor responsible for cable terminations using dead break and live front style connections. The project involves cable lengths ranging from 126' to 461', using 750MCM cables, and includes multiple in-line splices. The documentation is dated October 6, 2025, and provides detailed single-line diagrams for cable routes and installation requirements.

View the file

Other files

File Type Posted
Amend 03 to RFP 375018-CD.pdf PDF
375108-CD Amendmant 2 Revised Response to Questions.pdf PDF
375108-CD Amendment 2 Revised Exhibit R - Proposal Form.pdf PDF
375108-CD Amendment 2 Revised Drawings.pdf PDF
Amend 02 to RFP 375108-CD.pdf PDF
375108-CD Amendment 1 Revised Exhibit R - Proposal Form.pdf PDF
375108-CD Amendmant 1 Response to Questions.pdf PDF
Amend 01 to RFP 375108-CD.pdf PDF
Exhibit B2- Section 16121 Medium Voltgage Cable.pdf PDF
Exhibit H - 2025 Construction Insurance Requirements.pdf PDF
Exhibit I - Bond Bid FL-41.pdf PDF
Exhibit M - Fermilab Subcontractor Safety Information Questionnaire.pdf PDF
Exhibit P- Davis Bacon Wage Rates.pdf PDF
1.0 RFP 375108-CD.pdf PDF
Exhibit B1- Section 16010 General Electrical Requirements.pdf PDF
Exhibit B3- Section 16125 15KV Cable Installation.pdf PDF
Exhibit C- 010010 General Requirements.pdf PDF
Exhibit G- FFDG General Terms and Conditions for Construction (08.2025).pdf PDF
Exhibit J - Bond Payment FL-42.pdf PDF
Exhibit K- Bond Performance FL-40.pdf PDF
Exhibit L - Statement of Acknowledgment (SF-1413).pdf PDF
Exhibit Q- Summary of Required RFP Submittal Documents.pdf PDF
Exhibit A- P-F3 TO P-F4 15KV Cable Installation SOW.pdf PDF
Exhibit E- 013300 Submittals.pdf PDF
Exhibit N - SARC_Subcontractor Annual RepsCerts Rev 4_FFDG.pdf PDF
Exhibit O - Proposal Certifications Form PUR-466_FFDG.pdf PDF
Exhibit S- Sample Firm-Fixed-Price Subcontract.pdf PDF
Exhibit B Drawings.pdf PDF
Exhibit B4- Section 16450 Grounding and Bonding.pdf PDF
Exhibit B5- Section 16950 Testing Electrical Systems.pdf PDF
Exhibit D- 013100 ESH Requirements.pdf PDF
Exhibit F- 014100 Quality Requirements.pdf PDF
Exhibit R - Proposal Form 375018-CD F3 to F4 15KV Cable Installation.pdf PDF
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

F-2

F-0D

F-27F-1

INSTALL COMMUNICAITONS CABLE

COMMUNICATIONS MANHOLE

INDICATES APROXIMATE DISTANCE FROM CENTER OF MANHOLE COVER TO

CENTER OF MANHOLE COVER. (SUBCONTRACTOR TO VERIFY ALL DISTANCES.)XXX'

SYMBOLS:

292'233' 842'

A-0

F-4

215'

748'

A0 SERVICE

BUILDING

126' F-3

461'

F4 SERVICE

BUILDING

F3 SERVICE

BUILDING

RF0 SERVICE

BUILDING

500'

125'

125'

FFDG TO SUPPLY THE COMMUNICATIONS CABLES FOR INSTALLATION

BY THE SUBCONTRACTOR UNDER THIS PROJECT.

FFDG TO TERMINATE ALL COMMUNICATIONS CABLES.

FOR ALL COMMUNICATIONS CABLE TO BE PULLED INTO EACH

BUILDING, PROVIDE A SLACK COIL OF CABLE WITH LENGTH TO

ALLOW FFDG TO ROUTE THE CABLE TO THE FINAL END POINT AND

TERMINATE.

·1 - 36 STRAND FIBER OPTIC CABLE 1 - 36 STRAND FIBER OPTIC CABLE

2 - 1 1/4" INNERDUCT (SEE NOTES)

19 - 1/2" HELIAX CABLES

REVISIONS

REV. DATE DESCRIPTIONS

DRAWN

APPROVED

SUBMITTED

CHECKED

DESIGNED

NAME DATE

SCALE:

UNITED STATES DEPARTMENT OF ENERGY

FERMI NATIONAL ACCELERATOR LABORATORY

DRAWING NO. REV.

D ec

3,

- 3

:4 8p m M

:\3 \7

P O

W

ER

C

O M

M U

N

IC

AT

IO

N D

IS

TR

IB

U

TI

O

N \1

B

F3 -F

C ab le

R ep la ce

\D ra w in gs \3

-7 -1

B_

SI

N

G

LE

L

IN

E D

IA

G

R

AM

_E -1

E -2

E -3 r4 .d w g

P-F3 TO P-F4 15KV CABLE INSTALLATION

3-7-103B XXE-1A

Communications Single Line Diagram

O C

T

ISSUED FOR PROPOSALS

ADDENDUM #1

11/1/2025 12/3/2025

N�T�S�

AutoCAD SHX Text A0 building: The 36-strand fiber cable, after coming out of the floor conduit, no less ~30 ft of cable should be coiled up in a no less than 36 inches in diameter. The coil should be left at the floor conduit location. F3 and F4 buildings: Between F3 and F4 service building (in the new Duct bank) new interduct should be installed for the fiber optic cable. One color for the pass-through cable and one color for the building-to-building cable. The 36-strand fiber cable, after coming out of the floor conduit, has no less ~100 ft of cable coiled up in a in no less than 36 inches in diameter. The coil should be left at the floor conduit location. (19) ½ inch Conductor cables after coming out of the floor conduit, no less ~70 ft of cable coiled up in a in no less than 36 inches in diameter. Each cable should be coiled separately, and a number designation for each cable so we can identify both ends. The coils should be hung on the framework of the heat exchanger (Big blue cylindrical tank) along the hibay side of the heat exchanger. RF0 building: The 36-strand fiber cable will come out of F-0D communication manhole and enter the north side of the RF0 service building. The cable will pass through the Pump Room via the cable trench pathway (~ 40 ft in length) and enter the RF0 gallery in the same pathway. Once it enters the Gallery area, in the trench, add an additional ~50 ft of cable coiled up in a no less than 36 inches in diameter.

P-A-0P-F-3 P-F-4P-F-27

IN-LINE SPLICE (SP)

INSTALL CABLE

CABLE TO REMAIN

POWER MANHOLE (PMH)

INDICATES APROXIMATE DISTANCE FROM CENTER OF MANHOLE COVER TO

CENTER OF MANHOLE COVER. (SUBCONTRACTOR TO VERIFY ALL DISTANCES.)XXX'

SYMBOLS: QUANTITIES

SUPPLIED BY

FNAL

963 FNAL

6 FNAL

6 SUBCONTRACTOR

4-WAY AIR SWITCH (EA)

750MCM CABLE (3Ø),(LF,CEN-CEN)

IN LINE SPLICES (1Ø), (EA)

REEL #32

215' 461'

126'

(BID OPTION #1)

DSTR-FDR48-F4

70'70'

158'590'

REEL #41

SINGLE LINE DIAGRAM - FEEDER 48

INSTALL OWNER FURNISHED 15KV AIR SWITCH ON EXISTING PAD,

S & C MODEL: PME-10

AIR SWITCH TEMINATIONS (1Ø), (EA)

DEAD BREAK STYLE (K656LR-WOX)

REVISIONS

REV. DATE DESCRIPTIONS

DRAWN

APPROVED

SUBMITTED

CHECKED

DESIGNED

NAME DATE

SCALE:

UNITED STATES DEPARTMENT OF ENERGY

FERMI NATIONAL ACCELERATOR LABORATORY

DRAWING NO. REV.

D ec

3,

- 1

:3 9p m M

:\3 \7

P O

W

ER

C

O M

M U

N

IC

AT

IO

N D

IS

TR

IB

U

TI

O

N \1

B

F3 -F

C ab le

R ep la ce

\D ra w in gs \3

-7 -1

B_

SI

N

G

LE

L

IN

E D

IA

G

R

AM

_E -1

E -2

E -3 r4 .d w g

P-F3 TO P-F4 15KV CABLE INSTALLATION

3-7-103B XXE-5

FEEDER 48 INSTALLATION SINGLE LINE DIAGRAM

O C

T

ISSUED FOR PROPOSALS

ADDENDUM #1

11/1/2025 12/3/2025

N�T�S�

P-A-0P-F-3 P-F-4P-F-27

IN-LINE SPLICE (SP)

INSTALL CABLE

CABLE TO REMAIN

POWER MANHOLE (PMH)

INDICATES APROXIMATE DISTANCE FROM CENTER OF MANHOLE COVER TO

CENTER OF MANHOLE COVER. (SUBCONTRACTOR TO VERIFY ALL DISTANCES.)XXX'

SYMBOLS: QUANTITIES

SUPPLIED BY

FNAL

1550 FNAL

3 FNAL

6 SUBCONTRACTOR

4-WAY AIR SWITCH (EA)

750MCM CABLE (3Ø),(LF,CEN-CEN)

IN LINE SPLICES (1Ø), (EA)

AIR SWITCH TEMINATIONS (1Ø), (EA)

DEAD BREAK STYLE (K656LR-WOX)

REEL #25

215' 461'

DSTR-46A-P71

(EXISTING)

126'

TO

DSTR-FDR46A-F4

70'70'

158'590'

INSTALL OWNER FURNISHED 15KV AIR SWITCH ON EXISTING PAD.

S & C MODEL: PME-10

DSTR-A0-6

3 SUBCONTRACTOR

AIR SWITCH TEMINATIONS (1Ø), (EA)

LIVE FRONT STYLE (3M)

REVISIONS

REV. DATE DESCRIPTIONS

DRAWN

APPROVED

SUBMITTED

CHECKED

DESIGNED

NAME DATE

SCALE:

UNITED STATES DEPARTMENT OF ENERGY

FERMI NATIONAL ACCELERATOR LABORATORY

DRAWING NO. REV.

D ec

3,

- 1

:3 6p m M

:\3 \7

P O

W

ER

C

O M

M U

N

IC

AT

IO

N D

IS

TR

IB

U

TI

O

N \1

B

F3 -F

C ab le

R ep la ce

\D ra w in gs \3

-7 -1

B_

AS

_S

IN

G

LE

L

IN

E D

IA

G

R

AM

_E -1 r4

.d w g

P-F3 TO P-F4 15KV CABLE INSTALLATION

3-7-103B XXE-10

FEEDER 46A INSTALLATION SINGLE LINE DIAGRAM

O C

T

ISSUED FOR PROPOSALS

ADDENDUM #1

11/1/2025 12/3/2025

N�T�S�

SINGLE LINE DIAGRAM - FEEDER 46A

N.T.S.

(BID OPTION #1)

Sheets and Views
E-1A
3-7-103B_E-5 Add 1.pdf
Sheets and Views
E-5
3-7-103B_E-10 Add 1.pdf
Sheets and Views
E-10

File details come from the government source that posted it. Updated .