375108-CD Amendment 1 Revised Drawings.pdf
PDF 484 KB Posted
- Solicitation number
- 375108-CD
About this file
The documents are single-line electrical diagrams for a 15kV cable installation project at the Fermi National Accelerator Laboratory for the United States Department of Energy. The project involves installing communications and power cables between multiple service buildings (F-0, F-1, F-2, F-3, F-4, A-0), with two primary bid options (Feeder 48 and Feeder 46A). Key technical specifications include:
The cable installation requires 1-36 strand fiber optic cables, 1 1/4" innerduct, and 19 1/2" Heliax cables, with precise routing instructions for each building. Owner-furnished 15kV air switches (S & C Model: PME-10) will be installed on existing pads, with the subcontractor responsible for cable terminations using dead break and live front style connections. The project involves cable lengths ranging from 126' to 461', using 750MCM cables, and includes multiple in-line splices. The documentation is dated October 6, 2025, and provides detailed single-line diagrams for cable routes and installation requirements.
View the file
Other files
Show all 33
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
F-2
F-0D
F-27F-1
INSTALL COMMUNICAITONS CABLE
COMMUNICATIONS MANHOLE
INDICATES APROXIMATE DISTANCE FROM CENTER OF MANHOLE COVER TO
CENTER OF MANHOLE COVER. (SUBCONTRACTOR TO VERIFY ALL DISTANCES.)XXX'
SYMBOLS:
292'233' 842'
A-0
F-4
215'
748'
A0 SERVICE
BUILDING
126' F-3
461'
F4 SERVICE
BUILDING
F3 SERVICE
BUILDING
RF0 SERVICE
BUILDING
500'
125'
125'
FFDG TO SUPPLY THE COMMUNICATIONS CABLES FOR INSTALLATION
BY THE SUBCONTRACTOR UNDER THIS PROJECT.
FFDG TO TERMINATE ALL COMMUNICATIONS CABLES.
FOR ALL COMMUNICATIONS CABLE TO BE PULLED INTO EACH
BUILDING, PROVIDE A SLACK COIL OF CABLE WITH LENGTH TO
ALLOW FFDG TO ROUTE THE CABLE TO THE FINAL END POINT AND
TERMINATE.
·1 - 36 STRAND FIBER OPTIC CABLE 1 - 36 STRAND FIBER OPTIC CABLE
2 - 1 1/4" INNERDUCT (SEE NOTES)
19 - 1/2" HELIAX CABLES
REVISIONS
REV. DATE DESCRIPTIONS
DRAWN
APPROVED
SUBMITTED
CHECKED
DESIGNED
NAME DATE
SCALE:
UNITED STATES DEPARTMENT OF ENERGY
FERMI NATIONAL ACCELERATOR LABORATORY
DRAWING NO. REV.
D ec
3,
- 3
:4 8p m M
:\3 \7
P O
W
ER
C
O M
M U
N
IC
AT
IO
N D
IS
TR
IB
U
TI
O
N \1
B
F3 -F
C ab le
R ep la ce
\D ra w in gs \3
-7 -1
B_
SI
N
G
LE
L
IN
E D
IA
G
R
AM
_E -1
E -2
E -3 r4 .d w g
P-F3 TO P-F4 15KV CABLE INSTALLATION
3-7-103B XXE-1A
Communications Single Line Diagram
O C
T
ISSUED FOR PROPOSALS
ADDENDUM #1
11/1/2025 12/3/2025
N�T�S�
AutoCAD SHX Text A0 building: The 36-strand fiber cable, after coming out of the floor conduit, no less ~30 ft of cable should be coiled up in a no less than 36 inches in diameter. The coil should be left at the floor conduit location. F3 and F4 buildings: Between F3 and F4 service building (in the new Duct bank) new interduct should be installed for the fiber optic cable. One color for the pass-through cable and one color for the building-to-building cable. The 36-strand fiber cable, after coming out of the floor conduit, has no less ~100 ft of cable coiled up in a in no less than 36 inches in diameter. The coil should be left at the floor conduit location. (19) ½ inch Conductor cables after coming out of the floor conduit, no less ~70 ft of cable coiled up in a in no less than 36 inches in diameter. Each cable should be coiled separately, and a number designation for each cable so we can identify both ends. The coils should be hung on the framework of the heat exchanger (Big blue cylindrical tank) along the hibay side of the heat exchanger. RF0 building: The 36-strand fiber cable will come out of F-0D communication manhole and enter the north side of the RF0 service building. The cable will pass through the Pump Room via the cable trench pathway (~ 40 ft in length) and enter the RF0 gallery in the same pathway. Once it enters the Gallery area, in the trench, add an additional ~50 ft of cable coiled up in a no less than 36 inches in diameter.
P-A-0P-F-3 P-F-4P-F-27
IN-LINE SPLICE (SP)
INSTALL CABLE
CABLE TO REMAIN
POWER MANHOLE (PMH)
INDICATES APROXIMATE DISTANCE FROM CENTER OF MANHOLE COVER TO
CENTER OF MANHOLE COVER. (SUBCONTRACTOR TO VERIFY ALL DISTANCES.)XXX'
SYMBOLS: QUANTITIES
SUPPLIED BY
FNAL
963 FNAL
6 FNAL
6 SUBCONTRACTOR
4-WAY AIR SWITCH (EA)
750MCM CABLE (3Ø),(LF,CEN-CEN)
IN LINE SPLICES (1Ø), (EA)
REEL #32
215' 461'
126'
(BID OPTION #1)
DSTR-FDR48-F4
70'70'
158'590'
REEL #41
SINGLE LINE DIAGRAM - FEEDER 48
INSTALL OWNER FURNISHED 15KV AIR SWITCH ON EXISTING PAD,
S & C MODEL: PME-10
AIR SWITCH TEMINATIONS (1Ø), (EA)
DEAD BREAK STYLE (K656LR-WOX)
REVISIONS
REV. DATE DESCRIPTIONS
DRAWN
APPROVED
SUBMITTED
CHECKED
DESIGNED
NAME DATE
SCALE:
UNITED STATES DEPARTMENT OF ENERGY
FERMI NATIONAL ACCELERATOR LABORATORY
DRAWING NO. REV.
D ec
3,
- 1
:3 9p m M
:\3 \7
P O
W
ER
C
O M
M U
N
IC
AT
IO
N D
IS
TR
IB
U
TI
O
N \1
B
F3 -F
C ab le
R ep la ce
\D ra w in gs \3
-7 -1
B_
SI
N
G
LE
L
IN
E D
IA
G
R
AM
_E -1
E -2
E -3 r4 .d w g
P-F3 TO P-F4 15KV CABLE INSTALLATION
3-7-103B XXE-5
FEEDER 48 INSTALLATION SINGLE LINE DIAGRAM
O C
T
ISSUED FOR PROPOSALS
ADDENDUM #1
11/1/2025 12/3/2025
N�T�S�
P-A-0P-F-3 P-F-4P-F-27
IN-LINE SPLICE (SP)
INSTALL CABLE
CABLE TO REMAIN
POWER MANHOLE (PMH)
INDICATES APROXIMATE DISTANCE FROM CENTER OF MANHOLE COVER TO
CENTER OF MANHOLE COVER. (SUBCONTRACTOR TO VERIFY ALL DISTANCES.)XXX'
SYMBOLS: QUANTITIES
SUPPLIED BY
FNAL
1550 FNAL
3 FNAL
6 SUBCONTRACTOR
4-WAY AIR SWITCH (EA)
750MCM CABLE (3Ø),(LF,CEN-CEN)
IN LINE SPLICES (1Ø), (EA)
AIR SWITCH TEMINATIONS (1Ø), (EA)
DEAD BREAK STYLE (K656LR-WOX)
REEL #25
215' 461'
DSTR-46A-P71
(EXISTING)
126'
TO
DSTR-FDR46A-F4
70'70'
158'590'
INSTALL OWNER FURNISHED 15KV AIR SWITCH ON EXISTING PAD.
S & C MODEL: PME-10
DSTR-A0-6
3 SUBCONTRACTOR
AIR SWITCH TEMINATIONS (1Ø), (EA)
LIVE FRONT STYLE (3M)
REVISIONS
REV. DATE DESCRIPTIONS
DRAWN
APPROVED
SUBMITTED
CHECKED
DESIGNED
NAME DATE
SCALE:
UNITED STATES DEPARTMENT OF ENERGY
FERMI NATIONAL ACCELERATOR LABORATORY
DRAWING NO. REV.
D ec
3,
- 1
:3 6p m M
:\3 \7
P O
W
ER
C
O M
M U
N
IC
AT
IO
N D
IS
TR
IB
U
TI
O
N \1
B
F3 -F
C ab le
R ep la ce
\D ra w in gs \3
-7 -1
B_
AS
_S
IN
G
LE
L
IN
E D
IA
G
R
AM
_E -1 r4
.d w g
P-F3 TO P-F4 15KV CABLE INSTALLATION
3-7-103B XXE-10
FEEDER 46A INSTALLATION SINGLE LINE DIAGRAM
O C
T
ISSUED FOR PROPOSALS
ADDENDUM #1
11/1/2025 12/3/2025
N�T�S�
SINGLE LINE DIAGRAM - FEEDER 46A
N.T.S.
(BID OPTION #1)
| Sheets and Views |
| E-1A |
| 3-7-103B_E-5 Add 1.pdf |
| Sheets and Views |
| E-5 |
| 3-7-103B_E-10 Add 1.pdf |
| Sheets and Views |
| E-10 |
File details come from the government source that posted it. Updated .