Exhibit A- P-F3 TO P-F4 15KV Cable Installation SOW.pdf
PDF 130 KB Posted
- Solicitation number
- 375108-CD
About this file
This Statement of Work (SOW) details a medium voltage electrical cable installation project for ISD Project 3-7-103B, scheduled for November 3, 2025. The project involves installing 15,000 feet of 15KV medium voltage power cables and 5,800 feet of communication cables into an existing underground duct bank system in the F3 to F4 area of the Main Ring. The work will be performed by qualified electrical workers in DuPage and Kane Counties, with the specific scope requiring installation of cables in an underground electrical infrastructure.
The SOW emphasizes that the subcontractor's work is not limited to the general description provided and must be completed in full accordance with project drawings and specifications. The document instructs potential offerors that proposal quantities and scope should be based solely on their own estimates developed from project drawings, specifications, and site examination, rather than relying on the general description in the document.
View the file
Other files
Show all 33
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
P-F3 to P-F4, 15 KV Cable Installation
ISD PROJECT 3-7-103B
November 3, 2025
Description
The Subcontractor’s scope of work is not limited to the general work outline described below. The Subcontractor shall perform all work required to complete the construction work in accordance with the drawings and/or specifications. The description and quantities listed below are general in nature and are only intended to describe the range and complexity of this scope of work. The description and quantities provided below are not to be used as the basis for establishing a cost proposal. Specific quantities and definitions of the scope of work for providing a proposal shall be based solely on estimates developed by the Offer from the drawings, specifications, and the information obtained from examining of the project site.
Medium voltage electrical work performed by qualified electrical workers to install medium voltage and communications cables into existing underground duct bank systems.
The scope of work includes the installation of 15,000 feet of 15KV medium voltage power cables and 5,800 feet of Communication Cable in an existing underground electrical duct bank system in the F3 to F4 area of the Main
Ring.
Work to be done in DuPage and Kane Counties.