Exhibit A- P-F3 TO P-F4 15KV Cable Installation SOW.pdf

PDF 130 KB Posted

Attached to
Main Ring Electrical P-F3 to P-F4 15KV Cable Installation, FESS Project 3-7-103B
Solicitation number
375108-CD
Issued by

About this file

This Statement of Work (SOW) details a medium voltage electrical cable installation project for ISD Project 3-7-103B, scheduled for November 3, 2025. The project involves installing 15,000 feet of 15KV medium voltage power cables and 5,800 feet of communication cables into an existing underground duct bank system in the F3 to F4 area of the Main Ring. The work will be performed by qualified electrical workers in DuPage and Kane Counties, with the specific scope requiring installation of cables in an underground electrical infrastructure.

The SOW emphasizes that the subcontractor's work is not limited to the general description provided and must be completed in full accordance with project drawings and specifications. The document instructs potential offerors that proposal quantities and scope should be based solely on their own estimates developed from project drawings, specifications, and site examination, rather than relying on the general description in the document.

View the file

Other files

File Type Posted
Amend 03 to RFP 375018-CD.pdf PDF
375108-CD Amendment 2 Revised Exhibit R - Proposal Form.pdf PDF
375108-CD Amendmant 2 Revised Response to Questions.pdf PDF
Amend 02 to RFP 375108-CD.pdf PDF
375108-CD Amendment 2 Revised Drawings.pdf PDF
375108-CD Amendmant 1 Response to Questions.pdf PDF
375108-CD Amendment 1 Revised Exhibit R - Proposal Form.pdf PDF
375108-CD Amendment 1 Revised Drawings.pdf PDF
Amend 01 to RFP 375108-CD.pdf PDF
Exhibit C- 010010 General Requirements.pdf PDF
Exhibit K- Bond Performance FL-40.pdf PDF
Exhibit E- 013300 Submittals.pdf PDF
Exhibit M - Fermilab Subcontractor Safety Information Questionnaire.pdf PDF
Exhibit J - Bond Payment FL-42.pdf PDF
Exhibit B3- Section 16125 15KV Cable Installation.pdf PDF
1.0 RFP 375108-CD.pdf PDF
Exhibit H - 2025 Construction Insurance Requirements.pdf PDF
Exhibit B Drawings.pdf PDF
Exhibit F- 014100 Quality Requirements.pdf PDF
Exhibit R - Proposal Form 375018-CD F3 to F4 15KV Cable Installation.pdf PDF
Exhibit D- 013100 ESH Requirements.pdf PDF
Exhibit L - Statement of Acknowledgment (SF-1413).pdf PDF
Exhibit Q- Summary of Required RFP Submittal Documents.pdf PDF
Exhibit G- FFDG General Terms and Conditions for Construction (08.2025).pdf PDF
Exhibit B1- Section 16010 General Electrical Requirements.pdf PDF
Exhibit B5- Section 16950 Testing Electrical Systems.pdf PDF
Exhibit B2- Section 16121 Medium Voltgage Cable.pdf PDF
Exhibit P- Davis Bacon Wage Rates.pdf PDF
Exhibit B4- Section 16450 Grounding and Bonding.pdf PDF
Exhibit I - Bond Bid FL-41.pdf PDF
Exhibit N - SARC_Subcontractor Annual RepsCerts Rev 4_FFDG.pdf PDF
Exhibit S- Sample Firm-Fixed-Price Subcontract.pdf PDF
Exhibit O - Proposal Certifications Form PUR-466_FFDG.pdf PDF
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

P-F3 to P-F4, 15 KV Cable Installation

ISD PROJECT 3-7-103B

November 3, 2025

Description

The Subcontractor’s scope of work is not limited to the general work outline described below. The Subcontractor shall perform all work required to complete the construction work in accordance with the drawings and/or specifications. The description and quantities listed below are general in nature and are only intended to describe the range and complexity of this scope of work. The description and quantities provided below are not to be used as the basis for establishing a cost proposal. Specific quantities and definitions of the scope of work for providing a proposal shall be based solely on estimates developed by the Offer from the drawings, specifications, and the information obtained from examining of the project site.

Medium voltage electrical work performed by qualified electrical workers to install medium voltage and communications cables into existing underground duct bank systems.

The scope of work includes the installation of 15,000 feet of 15KV medium voltage power cables and 5,800 feet of Communication Cable in an existing underground electrical duct bank system in the F3 to F4 area of the Main

Ring.

Work to be done in DuPage and Kane Counties.

File details come from the government source that posted it. Updated .