Exhibit H Statement and Acknowledgment (Standard Form 1413) (Rev 42013).pdf

Standard Form PDF 812 KB Posted

Attached to
Fermilab - Replacement of two Pedestrian Gates with Access Controlled Gates
Solicitation number
ISD-365248-RK
Issued by

About this file

This is Standard Form 1413 (Statement and Acknowledgment) for subcontract work under prime contract DE-AC02-07CH11359, showing Fermi Forward Discovery Group LLC as both the prime contractor and awarding firm. The form documents a subcontract for replacing two pedestrian gates with access-controlled gates at the Fermilab Site, located 3 miles east of Batavia in Kane County, Illinois.

The scope of work includes providing labor, tools, sub-contractor oversight, hardware, and programming for a turnkey installation to remove and replace two pedestrian gates with custom-made Midwest Fence electrically lockable gates with card access readers. Key activities include JULIE locates, ground penetrating radar for excavation areas, saw cutting pavement, hydro-excavation of trenches, installing rigid steel conduit, and connecting to existing card access panels. The form is signed by Richard Konan, Procurement Specialist III, and includes acknowledgment of standard labor clauses such as Contract Work Hours and Safety Standards Act, Construction Wage Rate Requirements, and related regulations that apply to the subcontract.

View the file

Other versions and copies of SF 1413

File Revision Posted Attached to
B2_DRAFT_08.3_Sec_J_SF1413_exp_05-2027.pdf May 2027 SLAC Job Order Contract
S02_Attachment - SF 1413 updated.pdf Revision not stated Fort Bliss National Cemetery, Gravesite Expansion and FCA Deficiencies
SF-1413_Statement_and_Acknowledgement_Form_(Subcontracting).pdf Revision not stated IE181 - WHS Greenhouse Construction
SF 1413-23A - Statement and Acknowledgment.pdf Revision not stated 70Z03026QCLEV0106 - USCG STA/ANT BUFFALO GENERATOR MAINTENANCE
B08_Attachment_9_Subcontractor_Ack_SF1413-23a_upon_award.pdf Revision not stated EROS Removal and replacement of chilled and conden
Exhibit I - Statement of Acknowledgment (SF-1413).pdf Revision not stated Central Utility Building Addition and Renovation Construction, UIP Subproject 1-CUB
S02_Attachment - Standard Form 1413.pdf Revision not stated Fort Bliss National Cemetery, Gravesite Expansion and FCA Deficiencies
S02_Attachment - Standard Form 1413.pdf Revision not stated CAMP NELSON NATIONAL CEMETERY, KY 833CM3030 – CORRECT FCA DEFICIENCIES
Exhibit K - SF1413.pdf Revision not stated Fire Sprinkler Repair_XGal_IB2A_Lab1_MI50
SF 1413-23A - Statement and Acknowledgment (2).pdf Revision not stated 70Z03026QCLEV0100 - GROUND MAINTENANCE AND SNOW REMOVAL FOR USCG STATION ST. IGNACE
SF 1413-23A - Statement and Acknowledgment (2).pdf Revision not stated 70Z03026QCLEV0101 - GROUND MAINTENANCE AND SNOW REMOVAL FOR SECTOR NORTHERN GRREAT LAKES
SF 1413 - Statement and Acknowledgment.pdf Revision not stated 70Z03026QCLEV0071 - USCG STA LORAIN SECURITY SYSTEM WITH CCTV PROJECT
Exhibit I SF1413_fill-ins.pdf Revision not stated MINOS High Bay Roof Replacement & Masonry Wall Repair
SF 1413 - Statement and Acknowledgment.pdf Revision not stated 70Z03026QCLEV0099 Replacement HVAC Station Building at STA Sodus Point
S02_Attachment - Standard Form 1413.pdf Revision not stated Leavenworth National Cemetery, Gravesite Expansion
SF 1413 - Statement and Acknowledgment.pdf Revision not stated 70Z03026QCLEV0097 - U. S. Coast Guard Station Lorain Gate Replacement
B08_Attachment_7_Subcontractor_Statement_and_Acknowledgment_SF1413-23a.pdf Revision not stated DREDGING OF SEDIMENT POND & CONTACT POOL
SF 1413-23A - Statement and Acknowledgment (1) (1).pdf Revision not stated 70Z03026QCLEV0053- USCG STATION ST. IGNACE REPLACEMENT SHOWER STALL
Exhibit K SF1413_printed.pdf Revision not stated Roof Maintenance and Repair Services IDIQ
SF1413 Statement of Acknowledgement.pdf Revision not stated CSS 99147 Mini Splits Scranton, PA (PA162)
Show all 20

Who attaches SF 1413

State Files
Florida 3
Colorado 1

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT AND ACKNOWLEDGMENT OMB Control Number: 9000-0066 Expiration Date: 5/31/2025

PART I - STATEMENT OF PRIME CONTRACTOR

1. PRIME CONTRACT NUMBER 2. DATE SUBCONTRACT

AWARDED

3. SUBCONTRACT NUMBER

15b. TITLE OF PERSON SIGNING

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1413 (REV. 4/2013)

Prescribed by GSA/FAR (48 CFR) 53.222(e)

4. PRIME CONTRACTOR 5. SUBCONTRACTOR

a. NAME a. NAME

b. STREET ADDRESS b. STREET ADDRESS

c. CITY d. STATE e. ZIP CODE c. CITY d. STATE e. ZIP CODE

6. The prime contract does, does not contain the clause entitled "Contract Work Hours and Safety Standards Act -- Overtime Compensation."

7. The prime contractor states that under the contract shown in Item 1, a subcontract was awarded on the date shown in Item 2 to the subcontractor identified in item 5 by the following firm:

a. NAME OF AWARDING FIRM

b. DESCRIPTION OF WORK BY SUBCONTRACTOR

8. PROJECT 9. LOCATION

10a. NAME OF PERSON SIGNING 11. BY (Signature) 12. DATE SIGNED

10b. TITLE OF PERSON SIGNING

PART II - ACKNOWLEDGMENT OF SUBCONTRACTOR

13. The subcontractor acknowledges that the following clauses of the contract shown in Item 1 are included in this subcontract:

Contract Work Hours and Safety Standards Act - Overtime Compensation (If included in prime contract see Block 6) Payrolls and Basic Records Withholding of Funds Disputes Concerning Labor Standards Compliance with Construction Wage Rate Requirements and Related Regulations

Construction Wage Rate Requirements Apprentices and Trainees Compliance with Copeland Act Requirements Subcontracts (Labor Standards) Contract Termination - Debarment Certification of Eligibility

14. NAME(S) OF ANY INTERMEDIATE SUBCONTRACTORS, IF ANY

A C

B D

15a. NAME OF PERSON SIGNING 16. BY (Signature) 17. DATE SIGNED

Paperwork Reduction Act Statement - This information collection meets the requirements of 44 U.S.C. § 3507, as amended by section 2 of the Paperwork Reduction Act of 1995. You do not need to answer these questions unless we display a valid Office of Management and Budget (OMB) control number.

The OMB control number for this collection is 9000-0066. We estimate that it will take .05 hours to read the instructions, gather the facts, and answer the questions. Send only comments relating to our time estimate, including suggestions for reducing this burden, or any other aspects of this collection of information to: U.S. General Services Administration, Regulatory Secretariat Division (M1V1CB), 1800 F Street, NW, Washington, DC 20405.

1.6 Presentation Agent PDFlib 3.02 (C++/Win32) D:20050617125503-04'00' D:20080212101247-05'00' Presentation Agent Standard Form 1413 - Statement and Acknowledgment

STATEMENT AND ACKNOWLEDGMENT

OMB Control Number: 9000-0066 Expiration Date: 5/31/2025

PART I - STATEMENT OF PRIME CONTRACTOR

1. PRIME CONTRACT NUMBER

2. DATE SUBCONTRACT AWARDED

3. SUBCONTRACT NUMBER

15b. TITLE OF PERSON SIGNING

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1413 (REV. 4/2013)

Prescribed by GSA/FAR (48 CFR) 53.222(e)

4. PRIME CONTRACTOR

5. SUBCONTRACTOR

a. NAME

a. NAME

b. STREET ADDRESS

b. STREET ADDRESS

c. CITY

d. STATE

e. ZIP CODE

c. CITY

d. STATE

e. ZIP CODE

6. The prime contract does, does not contain the clause entitled "Contract Work Hours and Safety Standards Act -- Overtime Compensation."

7. The prime contractor states that under the contract shown in Item 1, a subcontract was awarded on the date shown in Item 2 to the subcontractor identified in item 5 by the following firm:

a. NAME OF AWARDING FIRM

b. DESCRIPTION OF WORK BY SUBCONTRACTOR

8. PROJECT

9. LOCATION

10a. NAME OF PERSON SIGNING

11. BY (Signature)

12. DATE SIGNED

10b. TITLE OF PERSON SIGNING

PART II - ACKNOWLEDGMENT OF SUBCONTRACTOR

13. The subcontractor acknowledges that the following clauses of the contract shown in Item 1 are included in this subcontract:

Contract Work Hours and Safety Standards Act - Overtime Compensation (If included in prime contract see Block 6) Payrolls and Basic RecordsWithholding of FundsDisputes Concerning Labor StandardsCompliance with Construction Wage Rate Requirements and Related Regulations Construction Wage Rate Requirements Apprentices and Trainees Compliance with Copeland Act Requirements Subcontracts (Labor Standards) Contract Termination - Debarment Certification of Eligibility

14. NAME(S) OF ANY INTERMEDIATE SUBCONTRACTORS, IF ANY

A C B D 15a. NAME OF PERSON SIGNING

16. BY (Signature)

17. DATE SIGNED

Paperwork Reduction Act Statement - This information collection meets the requirements of 44 U.S.C. § 3507, as amended by section 2 of the Paperwork Reduction Act of 1995. You do not need to answer these questions unless we display a valid Office of Management and Budget (OMB) control number. The OMB control number for this collection is 9000-0066. We estimate that it will take .05 hours to read the instructions, gather the facts, and answer the questions. Send only comments relating to our time estimate, including suggestions for reducing this burden, or any other aspects of this collection of information to: U.S. General Services Administration, Regulatory Secretariat Division (M1V1CB), 1800 F Street, NW, Washington, DC 20405.

1. PRIME CONTRACT NUMBER: DE-AC02-07CH11359
4A. NAME: Fermi Research Alliance LLC
4B. STREET ADDRESS: Kirk Road and Wilson Street
4C. CITY: Batavia
7A. NAME OF AWARDING FIRM: Fermi Research Alliance LLC
10A. NAME OF PERSON SIGNING: Robert Ropos
15A. NAME OF PERSON SIGNING:
15B. TITLE OF PERSON SIGNING:
10B. TITLE OF PERSON SIGNING: Procurement Specialist III
14. NAME(S) OF ANY INTERMEDIATE SUBCONTRACTORS, IF ANY. Line A.:
14. NAME(S) OF ANY INTERMEDIATE SUBCONTRACTORS, IF ANY. Line D.:
14. NAME(S) OF ANY INTERMEDIATE SUBCONTRACTORS, IF ANY. Line C.:
14. NAME(S) OF ANY INTERMEDIATE SUBCONTRACTORS, IF ANY. Line B.:
8. PROJECT: Fermilab Target Systems Integration Building
9. LOCATION: Fermilab Site, 3 miles east of the City of Batavia, in Kane County, Illinois
7B. DESCRIPTION OF WORK BY SUBCONTRACTOR: Subcontractor to furnish all labor, materials, equipment, tools, overhead, bonding costs, insurance, safety oversight, quality control oversight, and supervision to complete all work as delineated in the Construction Specifications and Drawings for the Fermilab Target Systems Integration Building and all other attached, cited and referenced documents.
5C. CITY:
4E. ZIP CODE: 60510
5E. ZIP CODE:
4D. STATE: IL
5D. STATE:
3. SUBCONTRACT NUMBER:
5A. NAME:
5B. STREET ADDRESS:
2. DATE SUBCONTRACT AWARDED. Enter 2 digit month, 2 digit day and 4 digit year.:
12. DATE SIGNED. Enter 2 digit month, 2 digit day and 4 digit year.:
17. DATE SIGNED. Enter 2 digit month, 2 digit day and 4 digit year.:
6. The prime contract does contain the clause entitled "Contract Work Hours and Safety Standards Act -- Overtime Compensation.": 0
6. The prime contract does not contain the clause entitled "Contract Work Hours and Safety Standards Act -- Overtime Compensation.": 0
Sign here if you are the Subcontractor.:

File details come from the government source that posted it. Updated .