This document outlines requirements for a multiple award task order contract (MATOC) solicitation. The General Services Administration (GSA) Region 10 is seeking up to six contractors to complete construction projects in eastern Washington, eastern Oregon, and Idaho over the next five years. Work will include tenant improvements, repairs, and exterior projects. The total contract value across all awards is $70 million. Contractors must be able to complete projects within schedule and budget using various delivery methods including design-bid-build and design-build. The applicable North American Industry Classification System code is 236220 for commercial and institutional building construction, and the small business size standard is $39.5 million in average annual revenue. A pre-proposal site visit for an example project will take place on July 6, 2022.

View the file

Other files for this federal contract opportunity

Other files attached to Eastern Multiple Award Task Order Contract (MATOC) Replacement, newest first.
File Type Posted
Amend 0007 Attachment F Seed Project Price and Services Schedule Rev2.xlsx XLSX spreadsheet
Amend 0007 SF30 47PL0122R0035.pdf PDF
Amend 0007 Contractor RFIs and Responses.pdf PDF
Amend 0006 Attachment F Seed Project Price and Services Schedule Rev1.xlsx XLSX spreadsheet
Amend 0006 Contractor RFIs and Responses.pdf PDF
Amend 0006 SF30 47PL0122R0035.pdf PDF
Amend 0006 Attachment F Seed Project Price and Services Schedule Rev1.xlsx XLSX spreadsheet
Amend 0005 SF30 47PL0122R0035.pdf PDF
Amend 0005 Contractor RFIs and Responses 4.pdf PDF
Amend 0004 SF30 47PL0122R0035.pdf PDF
Amend 0004 Site Visit Sign In Sheet 2 Redacted.pdf PDF
Amend 0004 Contractor RFIs and Responses 3.pdf PDF
Amend 0003 2019 Asbestos Reinspection Survey Report Thomas S Foley USCH.pdf PDF
Amend 0003 SF30 47PL0122R0035.pdf PDF
Amend 0002 SF30 47PL0122R0035.pdf PDF
Amend 0002 Exhibit 6 Past Performance Questionnaire Rev1.docx DOCX document
Amend 0002 R10 EMATOC SOW 04222022.pdf PDF
Amend 0002 Site Visit Sign In Sheet Redacted.pdf PDF
Amend 0002 Contractor RFIs and Responses.pdf PDF
Amend 0001 SF1442 47PL0122R0035.pdf PDF
Amend 0001 Attachment D - TORFP Seed Project.pdf PDF
Amend 0001 RFP EMATOC 47PL0122R0035.pdf PDF
Amend 0001 SF30 47PL0122R0035.pdf PDF
Attachment C Example of TO Reps and Certs.docx DOCX document
Exhibit 2 Read Me First - CUI Document.pdf PDF
7.5 Submittal Transmittal Form.xls XLS spreadsheet
Attachment G Seed Project Wage Determination.pdf PDF
Exhibit 3 GSAAffiliatedCustomerAccounts.pdf PDF
Exhibit 6 Past Performance Questionnaire.docx DOCX document
Exhibit 7 GSA Security Manual.pdf PDF
7.2 Sample ROCAL.xlsx XLSX spreadsheet
7.3 Sample CIW Form 850.docx DOCX document
7.7 R10 NCMMS Asset ImpExp Template.xlsx XLSX spreadsheet
SF1442 47PL0122R0035 EMATOC.pdf PDF
Attachment A EMATOC Terms and Conditions.pdf PDF
Attachment D TORFP Seed Project.pdf PDF
Attachment E Seed Project SOW.pdf PDF
Attachment F Seed Project Price and Services Schedule.xlsx XLSX spreadsheet
7.1 Vendor Security Training.pdf PDF
7.4 Sample OF 306.pdf PDF
RFP EMATOC 47PL0122R0035.pdf PDF
EMATOC Agreement.pdf PDF
Attachment B Example of TO Agreement.docx DOCX document
Exhibit 1 3490.3 Policy.pdf PDF
Exhibit 4 Contractor Project Experience Form.docx DOCX document
Exhibit 5 Key Personnel Resume Form.docx DOCX document
Exhibit 8 IDIQ Price Schedule.xlsx XLSX spreadsheet
SF1442 47PL0122R0041 Seed Project.pdf PDF
7.6 Controlled Unclassified Information 34903.pdf PDF
GSA527-21.pdf PDF
Show all 50

Eastern Multiple Award Task Order Contract (MATOC) Replacement has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

R10 Statement of Work (SOW) - Project Management Information System (PMIS)

1.1 PURPOSE

A. Project Management Information System (PMIS)

The Contractor is required to use GSA’s web-based electronic Project Management Information System (PMIS). PMIS is a web-based project management tool which provides GSA with an automated workflow, collaboration, document management and project management solution to assist GSA in the management of design and construction projects.

GSA uses PMIS throughout the design and construction phases as a repository for all project information and as a tool to manage and monitor progress and modifications.

Unless as otherwise provided, the Contractor will rely exclusively on PMIS to post, review, access, comment on, collaborate, or otherwise submit all project information.

The current PMIS system in use by GSA is Kahua Project Management Software.

1.2 PROJECT COLLABORATION AND DOCUMENTATION

A. General

1. The Contractor is required to effectively manage the GSA Project Management Information System including maintaining adequate staffing levels and ensuring that personnel attend the mandatory GSA-provided training sessions.

2. The Contractor is required to use the GSA Project Management Information System to upload, store, capture, preserve, record, maintain, update, and route all project-related documentation to comply with GSA's Document Security Requirements. Classified material is not permitted to be stored in this system. Properly marked Controlled Unclassified (CUI) material is permitted to be stored in this system.

3. The Contractor is required to use the workflow processes contained within the GSA Project Management Information System to submit and receive approval for all project deliverables.

Updated April 2022 GSA R10 Project Management Information System - 1

4. The Contractor is required to continuously monitor and review the GSA Project Management Information System to ensure the Contractor data is current through completion of the Close-out Phase of Construction.

5. The Contractor is required to store documents from their subcontractors and vendors in the GSA Project Management Information System.

B. Contents of the GSA Project Management Information System

1. Refer to the Statement of Work for all required submittals

2. The Contractor is required to use the GSA Project Management Information System as the electronic filing cabinet for all project-related documentation, correspondence and submittals.

1.3 SCHEDULING REQUIREMENTS

1.3.1 The Project Schedule shall be produced using widely used, commercially available computer software that is capable of generating and monitoring a CPM schedule. Contractor provided schedules should be uploaded or imported to the GSA Project Management Information System on a recurring basis.

1.4 EQUIPMENT AND TRAINING

A. Equipment

1. GSA will not furnish any equipment related to accessing the GSA Project Management Information System. The GSA Project Management Information System is web-accessible, and can therefore be accessed via any computer with an Internet connection.

B. GSA Project Management Information System Training

1. GSA will provide no cost training to familiarize team members with the GSA Project Management Information System. The GSA Project Manager will ensure that appropriate personnel should attend training and what roles will be set up within the system based on their project responsibilities.

C. GSA Project Management Information System Support

1. GSA will provide GSA Project Management Information System administration and end user support, for the duration of the project.

Updated April 2022 GSA R10 Project Management Information System - 2

1.5 PERSONNEL REQUIREMENTS

An HSPD-12 (Homeland Security Presidential Directive 12) security clearance is required for full access to the PMIS.

Project team members without an HSPD-12 clearance will be given limited access to the PMIS system at contract award to allow initial document submissions while clearances are in process.

1.6 DATA OWNERSHIP

A. GSA will retain ownership of all data entered into the system and will administer all information contained therein. Distribution of any system data will be made upon request.

1.7 DOCUMENT SECURITY

A. GSA Project Management Information System security access levels ensure that sensitive documents can only be accessed by the appropriate personnel. It is the contractor’s responsibility to ensure their employees, subcontractors and vendors have the appropriate level of security to ensure document security.

Updated April 2022 GSA R10 Project Management Information System - 3

File details come from the government source that posted it. Updated .