Exhibit_2_-_Turnover_And_Acceptance_Form.pdf

PDF 107 KB Posted

Attached to
Smart Irrigation Controllers and Master Valve/Flow Sensor with Professional Services
Solicitation number
012-3044004-EB-2
Issued by
Orange County, San Francisco City, California

About this file

This is a Turnover and Acceptance Form submitted to the County of Orange, OC Community Resources, for the procurement of Smart Irrigation Controllers and Master Valve/Flow Sensor with Professional Services at Mile Square Regional Park in Fountain Valley, California. The project requires the installation of eight HydroPoint WeatherTRAK OptiFlow XR series smart irrigation controllers to replace ten existing controllers, one Cla-Val master valve with WeatherTRAK flow sensor assembly, one HydroPoint Rain Sensor, and replacement valve boxes and covers (31 lids and 53 complete lid and box combinations). Deliverables include all labor, materials, equipment, commissioning services, site optimization, operational and maintenance manuals in two hard-cover three-ring binders, manufacturer certification letters, two keys per controller, completed guarantee statements, and digital irrigation record drawings in AutoCAD and PDF formats. The solicitation deadline for sealed electronic bids is May 19, 2026, at 2:00 PM through the County's eProcurement Portal, with questions due by May 12, 2026, at 2:00 PM. A mandatory pre-job conference must be scheduled with seven days' notice, and installation observations and final inspections require 48 hours' notice. The contract is structured as a firm fixed-fee agreement for a one-year term commencing upon execution, with award to the lowest responsive, responsible bidder.

Qualified bidders must possess a minimum of five years of continuous experience in commercial irrigation system installation, maintain a valid California C27 Landscaping Contractor license, provide current Injury and Illness Prevention Program documentation, and submit three professional references. Insurance requirements include $1,000,000 general liability per occurrence, workers' compensation, and employers liability coverage. All installation work must be performed by HydroPoint WeatherTRAK Levels 1-4 certified irrigation managers, with both the contractor and field superintendent maintaining current HydroPoint Certified Installer Program certification before commencing work. County of Orange Local Small Business (OCLSB) certified vendors receive a 5 percent preference deduction, while Disabled Veteran Business Enterprise (DVBE) certified vendors receive a 5 percent preference, or 8 percent if certified as both OCLSB and DVBE. The contractor is responsible for obtaining and funding all commissioning services through HydroPoint Data Systems or an approved distributor. County Board of Supervisors approval is required for contract awards exceeding $200,000 annually or $1,000,000 in total value across multiple years. The contract includes a cooperative provision allowing extension to other governmental entities with a 2 percent administrative rebate to the County on subordinate contract sales.

View the file

Other files

File Type Posted
Smart_Irrigation_Controllers_and_Master_Valve_Flow_Sensor_with_Professional_Services_(Addendum_#3_Revision).pdf PDF
Model_Contract_-_Smart_Irrigation_Controllers_and_Master_Valve_Flow_Sensor_with_Professional_Services_Rev_5-14-26.pdf PDF
Referenced_Pictures_from_Job_Walk_-_Controller_#2.pdf PDF
Attachment_C_-_Irrigation_Specification.pdf PDF
Attachment_E_–_Valve_Boxes_Replacement_List.pdf PDF
ATTACHMENT_F_-_GUARANTEE_FOR_IRRIGATION_SYSTEM.pdf PDF
Attachment_D_-_Irrigation_Drawings.pdf PDF
Contractor_Safety_-_Activity_Checklist.pdf PDF
306_Countys_Safety_and_Loss_Prevention_Policy_and_Procedure.pdf PDF
Exhibit_1_-_Time_&_Materials_(T&M)_Work_Authorization_Form.pdf PDF
Jobsite_Safety_Checklist.pdf PDF
Exhibit_6_-_Evacuation_Request_for_Reclaimed_Water_Line_at_Mile_Square_Park.pdf PDF
Referenced_Pictures_from_Job_Walk_-_Controller_#2.pdf PDF
Smart_Irrigation_Controllers_and_Master_Valve_Flow_Sensor_with_Professional_Services_(Addendum_#1_Revision).pdf PDF
Exhibit_2_-_Turnover_And_Acceptance_Form.pdf PDF
Exhibit_6_-_Evacuation_Request_for_Reclaimed_Water_Line_at_Mile_Square_Park.pdf PDF
Jobsite_Safety_Checklist.pdf PDF
306_Countys_Safety_and_Loss_Prevention_Policy_and_Procedure.pdf PDF
ATTACHMENT_F_-_GUARANTEE_FOR_IRRIGATION_SYSTEM.pdf PDF
Contractor_Safety_-_Activity_Checklist.pdf PDF
Exhibit_1_-_Time_&_Materials_(T&M)_Work_Authorization_Form.pdf PDF
Attachment_C_-_Irrigation_Specification.pdf PDF
Model_Contract_-_Smart_Irrigation_Controllers_and_Master_Valve_Flow_Sensor_with_Professional_Services.pdf PDF
Attachment_D_-_Irrigation_Drawings.pdf PDF
Attachment_E_–_Valve_Boxes_Replacement_List.pdf PDF
Performance_Bond.pdf PDF
Labor_and_Material_Payment_Bond.pdf PDF
Labor_and_Material_Payment_Bond.pdf PDF
Performance_Bond.pdf PDF
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Exhibit 2: TURNOVER AND ACCEPTANCE FORM

PROJECT NAME: Mile Square Reginal Park – Phase 1 Irrigation Controller Upgrade

PROJECT LOCATION: Mile Square Reginal Park

TURNOVER ITEMS:

☐ Operation and maintenance manuals.

☐ Irrigation controller certification letter from the Authorized WeatherTRAK ET-PRO 3-C Distributor for each controller installed under this contract.

☐ Two (2) keys for each irrigation controller.

☐ Irrigation controller manuals.

☐ One (1) digital file of the irrigation record drawings and controller charts in AutoCAD and PDF format.

☐ Completed Irrigation Guarantee Statement.

DELIVERED BY:

ACCEPTED BY:

NAME OF CONTRACTOR:

NAME OF CONTRACTOR’S AUTHORIZED:

SIGNATURE CONTRACTOR’S AUTHORIZED REPRESENTATIVE

X

OC PARKS PROJECT MANAGER:

SIGNATURE OF OC PARKS PROJECT MANAGER:

DATE OF DELIVERANCE TO OWNER:

DATE OF ACCEPTANCE OC PARKS MANAGER:

File details come from the government source that posted it. Updated .