This is a Time & Materials Work Authorization Form for the Mile Square Northeast Area Smart Irrigation Controller Upgrade project, issued by the County of Orange, California. The form documents field work performed on smart irrigation system installations, specifically authorizing re-wiring and trenching tasks as compensation-eligible activities. The project requires installation of dedicated low-voltage wire runs to individual irrigation valves, with each valve mandated to have its own dedicated wire lead to the controller rather than sharing or splitting wires between stations. The form captures specific data on valve and station numbers, trenching footage, wiring footage, and materials used, with columns provided to track total material costs associated with each station.

The work authorization incorporates strict compliance requirements, including contractor certification that no wiring was split or shared between valves and that each valve serviced has been updated on the WeatherTRAK site map. The form requires dual verification signatures: contractor representative sign-off certifying work compliance and county project manager approval confirming that performed work and listed materials and measurements meet project specifications. Time and materials tracking is essential to the form's function, with designated fields for summing total trenching and wiring linear feet and calculating aggregate material costs, enabling transparent documentation of field expenditures under the Time & Materials compensation structure.

View the file

Other files

File Type Posted
Smart_Irrigation_Controllers_and_Master_Valve_Flow_Sensor_with_Professional_Services_(Addendum_#3_Revision).pdf PDF
Model_Contract_-_Smart_Irrigation_Controllers_and_Master_Valve_Flow_Sensor_with_Professional_Services_Rev_5-14-26.pdf PDF
Referenced_Pictures_from_Job_Walk_-_Controller_#2.pdf PDF
Attachment_C_-_Irrigation_Specification.pdf PDF
Attachment_E_–_Valve_Boxes_Replacement_List.pdf PDF
Exhibit_2_-_Turnover_And_Acceptance_Form.pdf PDF
306_Countys_Safety_and_Loss_Prevention_Policy_and_Procedure.pdf PDF
Exhibit_1_-_Time_&_Materials_(T&M)_Work_Authorization_Form.pdf PDF
Jobsite_Safety_Checklist.pdf PDF
ATTACHMENT_F_-_GUARANTEE_FOR_IRRIGATION_SYSTEM.pdf PDF
Attachment_D_-_Irrigation_Drawings.pdf PDF
Contractor_Safety_-_Activity_Checklist.pdf PDF
Exhibit_6_-_Evacuation_Request_for_Reclaimed_Water_Line_at_Mile_Square_Park.pdf PDF
Referenced_Pictures_from_Job_Walk_-_Controller_#2.pdf PDF
Smart_Irrigation_Controllers_and_Master_Valve_Flow_Sensor_with_Professional_Services_(Addendum_#1_Revision).pdf PDF
Exhibit_2_-_Turnover_And_Acceptance_Form.pdf PDF
Exhibit_6_-_Evacuation_Request_for_Reclaimed_Water_Line_at_Mile_Square_Park.pdf PDF
Jobsite_Safety_Checklist.pdf PDF
306_Countys_Safety_and_Loss_Prevention_Policy_and_Procedure.pdf PDF
ATTACHMENT_F_-_GUARANTEE_FOR_IRRIGATION_SYSTEM.pdf PDF
Contractor_Safety_-_Activity_Checklist.pdf PDF
Attachment_C_-_Irrigation_Specification.pdf PDF
Model_Contract_-_Smart_Irrigation_Controllers_and_Master_Valve_Flow_Sensor_with_Professional_Services.pdf PDF
Attachment_D_-_Irrigation_Drawings.pdf PDF
Attachment_E_–_Valve_Boxes_Replacement_List.pdf PDF
Performance_Bond.pdf PDF
Labor_and_Material_Payment_Bond.pdf PDF
Labor_and_Material_Payment_Bond.pdf PDF
Performance_Bond.pdf PDF
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Exhibit 1: Time & Materials (T&M) Work Authorization Form

Project: Mile Square Northeast Area Smart Irrigation Controller Upgrade

Work Order #: [Internal Number] | Date: [Date of Work]

1. Work Description

In accordance with the Project Scope, the following tasks are authorized for T&M compensation:

• Re-wiring: Installation of dedicated low-voltage wire runs (no splitting/doubling).

• Trenching: Excavation required for new wire paths.

2. Time & Material Tracking

Note: Each valve must have a dedicated wire run. Splitting wires is prohibited.

Valve / Station #

Trenching

(LF)

Wiring

(LF)

Materials Used (Valves, etc.)

Total Material Cost

Ex: Station 2

Controller C 45 $

Ex: Station 5

Controller H 55 $

Ex: Station 4 1 Valve $

Valve / Station #

Trenching

(LF)

Wiring

(LF)

Materials Used (Valves, etc.)

Total Material Cost

TOTALS [Sum] LF [Sum]

LF

$0.00

4. Contractor Certification & Field Verification

The Contractor certifies that no wiring was split or shared between valves. Each valve serviced above has a dedicated lead to the controller and has been updated on the WeatherTRAK site map.

Contractor Representative: _______________________ Date: __________

5. County Project Manager Approval

I have verified the work performed and the materials/measurements listed above meet the project specifications.

County Project Manager: _____________________________ Date: __________

Exhibit 1: Time & Materials (T&M) Work Authorization Form