Exhibit_1_-_Time_&_Materials_(T&M)_Work_Authorization_Form.pdf

PDF 173 KB Posted

Attached to
Smart Irrigation Controllers and Master Valve/Flow Sensor with Professional Services
Solicitation number
012-3044004-EB-2
Issued by
Orange County, San Francisco City, California

About this file

This is a Time & Materials (T&M) Work Authorization Form used by the County of Orange, OC Community Resources, for the Mile Square Northeast Area Smart Irrigation Controller Upgrade project. The form documents field work related to the installation and upgrade of smart irrigation controllers at Mile Square Regional Park in Fountain Valley, California. The authorized work includes re-wiring with dedicated low-voltage wire runs (splitting wires is prohibited) and trenching for new wire paths. The form provides a structured table to track individual valve and station work, including trenching footage, wiring footage, materials used (valves and controllers), and total material costs. Each valve must have a dedicated wire run to the controller, and all work must be recorded on the WeatherTRAK site map. The form requires both contractor certification confirming no wire splitting occurred and County Project Manager approval verifying that work performed meets project specifications.

The T&M Work Authorization Form functions as a field documentation and cost-tracking mechanism for the larger smart irrigation controller upgrade contract. Work is compensated on a time and materials basis, with line items for trenching, wiring, and specific materials such as valves and controllers. The form includes mandatory contractor and field verification signatures, ensuring accountability and compliance with project requirements regarding dedicated wire runs and proper documentation. This form is an exhibit to the broader IFB #012-3044004-EB-2 procurement, which has a bid closing date of May 19, 2026, at 2:00 PM and includes both firm fixed-fee items for controller installation and optional T&M bid items for field wiring repairs at specified hourly rates.

View the file

Other files

File Type Posted
Smart_Irrigation_Controllers_and_Master_Valve_Flow_Sensor_with_Professional_Services_(Addendum_#3_Revision).pdf PDF
Model_Contract_-_Smart_Irrigation_Controllers_and_Master_Valve_Flow_Sensor_with_Professional_Services_Rev_5-14-26.pdf PDF
Referenced_Pictures_from_Job_Walk_-_Controller_#2.pdf PDF
Attachment_C_-_Irrigation_Specification.pdf PDF
Attachment_E_–_Valve_Boxes_Replacement_List.pdf PDF
Exhibit_2_-_Turnover_And_Acceptance_Form.pdf PDF
306_Countys_Safety_and_Loss_Prevention_Policy_and_Procedure.pdf PDF
Jobsite_Safety_Checklist.pdf PDF
Exhibit_6_-_Evacuation_Request_for_Reclaimed_Water_Line_at_Mile_Square_Park.pdf PDF
ATTACHMENT_F_-_GUARANTEE_FOR_IRRIGATION_SYSTEM.pdf PDF
Attachment_D_-_Irrigation_Drawings.pdf PDF
Contractor_Safety_-_Activity_Checklist.pdf PDF
Referenced_Pictures_from_Job_Walk_-_Controller_#2.pdf PDF
Smart_Irrigation_Controllers_and_Master_Valve_Flow_Sensor_with_Professional_Services_(Addendum_#1_Revision).pdf PDF
Exhibit_2_-_Turnover_And_Acceptance_Form.pdf PDF
Exhibit_6_-_Evacuation_Request_for_Reclaimed_Water_Line_at_Mile_Square_Park.pdf PDF
Jobsite_Safety_Checklist.pdf PDF
Exhibit_1_-_Time_&_Materials_(T&M)_Work_Authorization_Form.pdf PDF
306_Countys_Safety_and_Loss_Prevention_Policy_and_Procedure.pdf PDF
ATTACHMENT_F_-_GUARANTEE_FOR_IRRIGATION_SYSTEM.pdf PDF
Contractor_Safety_-_Activity_Checklist.pdf PDF
Attachment_C_-_Irrigation_Specification.pdf PDF
Model_Contract_-_Smart_Irrigation_Controllers_and_Master_Valve_Flow_Sensor_with_Professional_Services.pdf PDF
Attachment_D_-_Irrigation_Drawings.pdf PDF
Attachment_E_–_Valve_Boxes_Replacement_List.pdf PDF
Labor_and_Material_Payment_Bond.pdf PDF
Performance_Bond.pdf PDF
Performance_Bond.pdf PDF
Labor_and_Material_Payment_Bond.pdf PDF
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Exhibit 1: Time & Materials (T&M) Work Authorization Form

Project: Mile Square Northeast Area Smart Irrigation Controller Upgrade

Work Order #: [Internal Number] | Date: [Date of Work]

1. Work Description

In accordance with the Project Scope, the following tasks are authorized for T&M compensation:

• Re-wiring: Installation of dedicated low-voltage wire runs (no splitting/doubling).

• Trenching: Excavation required for new wire paths.

2. Time & Material Tracking

Note: Each valve must have a dedicated wire run. Splitting wires is prohibited.

Valve / Station #

Trenching

(LF)

Wiring

(LF)

Materials Used (Valves, etc.)

Total Material Cost

Ex: Station 2

Controller C 45 $

Ex: Station 5

Controller H 55 $

Ex: Station 4 1 Valve $

Valve / Station #

Trenching

(LF)

Wiring

(LF)

Materials Used (Valves, etc.)

Total Material Cost

TOTALS [Sum] LF [Sum]

LF

$0.00

4. Contractor Certification & Field Verification

The Contractor certifies that no wiring was split or shared between valves. Each valve serviced above has a dedicated lead to the controller and has been updated on the WeatherTRAK site map.

Contractor Representative: _______________________ Date: __________

5. County Project Manager Approval

I have verified the work performed and the materials/measurements listed above meet the project specifications.

County Project Manager: _____________________________ Date: __________