ESBD_449777_1756396311373_ATTACHMENT G.V - Ellington Field (EF) Houston Texas Standard Operating Procedure (Sop) For Inadvertent Discovery Of Unmarked Burials.pdf

PDF 122 KB Posted

Attached to
Transformer Replacement Rebid
Solicitation number
TMD25-ANG-WJ-24150007v2
Issued by
Harris County, Texas

About this file

This document is a Standard Operating Procedure (SOP) for Ellington Air Force Base (AFB) in Houston, Texas, specifically addressing the protocol for inadvertent discovery of unmarked burials. The procedure applies to various personnel including installation leadership, training site managers, civil engineers, security police, maintenance crews, unit commanders, tenants, and contractors. The SOP outlines specific steps to be taken when human remains or unmarked burial sites are unexpectedly encountered during ground-disturbing activities such as construction, maintenance, or outdoor recreation.

The document details a comprehensive workflow for handling such discoveries, emphasizing immediate cessation of ground-disturbing activities, securing the discovery location, and notifying appropriate personnel including the unit commander, Environmental Manager (CEV), and security officers. Key regulatory references include the Native American Graves Protection and Repatriation Act, Archaeological Resources Protection Act, and National Historic Preservation Act. The procedure requires notifying the medical examiner, determining if the remains are NAGPRA-related, and initiating appropriate consultations with archaeological and tribal authorities. The flow chart provides a step-by-step decision-making guide for personnel who might encounter unmarked burials, ensuring proper protection, documentation, and respect for potential cultural and historical remains.

View the file

Other files

File Type Posted
ESBD_449777_1756395940409_ATTACHMENT G.G - Ellington AFB (EF) Quality Control.pdf PDF
ESBD_449777_1756396090980_ATTACHMENT G.O - Ellington Field (EF) Starting Of Systems.pdf PDF
ESBD_449777_1756395679126_ATTACHMENT G.8 HUB Subcontracting Plan (HSP).pdf PDF
ESBD_449777_1756396128110_ATTACHMENT G.Q - Ellington AFB (EF) Cutting And Patching.pdf PDF
ESBD_449777_1756395845858_ATTACHMENT G.D - Ellington AFB (EF) Field Engineering.pdf PDF
ESBD_449777_1756396081512_ATTACHMENT G.N.1 - Ellington Field (EF) Manufacturer’s Certificate Of Proper Installation.pdf PDF
ESBD_449777_1756396291938_ATTACHMENT G.X - Ellington AFB (EF) AF3000.pdf PDF
ESBD_449777_1756395875686_ATTACHMENT G.F.1 - Ellington AFB (EF) Contractor Hazardous Material Usage Data.pdf PDF
ESBD_449777_1756501479663_Addendum 1 - TMD25-ANG-WJ-24150007.pdf PDF
ESBD_449777_1756395865813_ATTACHMENT G.F - Ellington Field (EF) EMS Hazardous Material Procedures.pdf PDF
ESBD_449777_1756396053573_ATTACHMENT G.L - Ellington Field JRB Final Asbestos Abatement Report Template.pdf PDF
ESBD_449777_1756396168631_ATTACHMENT G.U - Ellington Field (EF) Sustainable Design Requirements.pdf PDF
ESBD_449777_1756395856125_ATTACHMENT G.E - Ellington Field (EF) Safety Policies And Procedures.pdf PDF
ESBD_449777_1756396139089_ATTACHMENT G.R - Ellington Field (EF) EMS Construction Waste Management And Disposal Part 1 - General.pdf PDF
ESBD_449777_1756395651552_ATTACHMENT G.7 Project Map-Hush House Map.pdf PDF
ESBD_449777_1756396062076_ATTACHMENT G.M - Ellington AFB (EF) Material Equipment.pdf PDF
ESBD_449777_1756395719417_ATTACHMENT G.1 Direct Deposit Authorization Form 74-176 (Rev.9-2121).pdf PDF
ESBD_449777_1756395836697_ATTACHMENT G.C - Ellington AFB (EF) Project Coordination.pdf PDF
ESBD_449777_1756395731444_ATTACHMENT G.2 Application for Texas Identification Number AP-152.pdf PDF
ESBD_449777_1756396279811_ATTACHMENT G.W - Ellington AFB (EF) AF103_REV.pdf PDF
ESBD_449777_1756395817373_ATTACHMENT G.B - Ellington Field (EF) Coordination And Meetings.pdf PDF
ESBD_449777_1756395968488_ATTACHMENT G.I - Ellington Field (EF) Houston Texas Standard Operating Procedure (Sop) For Inadvertent Discovery Of Cultural Materials.pdf PDF
ESBD_449777_1756396148437_ATTACHMENT G.S - Ellington AFB (EF) Substitutions Request Form.pdf PDF
ESBD_449777_1756395957039_ATTACHMENT G.H - Ellington Field (EF) EMS Environmental Protection.pdf PDF
ESBD_449777_1756395630851_ATTACHMENT G.5 Photo of Hush House Transformer.pdf PDF
ESBD_449777_1756396042129_ATTACHMENT G.K - Ellington AFB (EF) Construction Facilities And Temporary Controls.pdf PDF
ESBD_449777_1756395641216_ATTACHMENT G.6 ALAMO Transformer Schematic.pdf PDF
ESBD_449777_1756396157692_ATTACHMENT G.T - Ellington Field (EF) Post Award Submittals.pdf PDF
ESBD_449777_1756395887888_ATTACHMENT G.F.2 - Ellington AFB (EF) Contractor Hazardous Material Identification Form Close-Out Procedures.pdf PDF
ESBD_449777_1756395807712_ATTACHMENT G.A - Ellington Field (EF) General Requirements.pdf PDF
ESBD_449777_1756395616803_TMD25-ANG-WJ-24150007v2 Transformer Replacement Rebid.pdf PDF
ESBD_449777_1756395988780_ATTACHMENT G.J.1 - Ellington AFB (EF) Maintenance Summary Form.pdf PDF
ESBD_449777_1756395783572_ATTACHMENT G.3 Texas Military Department Standard Terms and Conditions Revision 6.pdf PDF
ESBD_449777_1756396100710_ATTACHMENT G.P - Ellington Field (EF) Contract Closeout.pdf PDF
ESBD_449777_1756396072107_ATTACHMENT G.N - Ellington Field (EF) Manufacturers’ Services.pdf PDF
ESBD_449777_1756501514709_TMD25-ANG-WJ-24150007v2 Update1 Transformer Replacement Rebid.pdf PDF
ESBD_449777_1756395598194_ATTACHMENT G.4 Mandatory Pricing Schedule.xlsx XLSX spreadsheet
ESBD_449777_1756395978869_ATTACHMENT G.J - Ellington Field (EF) Operation And Maintenance Data.pdf PDF
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT G.V - ELLINGTON AFB (EF), HOUSTON, TEXAS

STANDARD OPERATING PROCEDURE (SOP) FOR INADVERTENT

DISCOVERY OF UNMARKED BURIALS

20 Apr 22

Contact: Mr. Mark Garcia, Ellington Field Environmental Manager (CEV) 281-929-2013, mark.garcia.16@us.af.mil

Statutory References:

1. Native American Graves Protection and Repatriation Act

2. Archaeological Resources Protection Act

3. National Historic Preservation Act and its implementing regulations

Regulations:

1. 42 CFR 10

2. 32 CFR 229

3. 36 CFR Part 800

Applies to:

1. Installation leadership

2. Training Site Manager

3. Base Civil Engineer

4. Real Property Office

5. Security Police

6. Public Affairs Office

7. Judge Advocates Office

8. Maintenance, utilities, and grounds crews and foremen

9. Unit commanders and unit/activity personnel

10. Tenants and contractors

Typical Situations: Ground disturbance from construction involving digging, bulldozing, clearing, or grubbing, maintenance or repair activities, off-road traffic, field units on exercise, outdoor recreation, observation of eroded areas.

Typical Triggering Event: Discovery of unmarked burial(s), including Native American burials or cemeteries from which headstones were relocated but not the physical remains.

Policy: In the event that an unanticipated discovery of cultural artifacts occurs, activity in the immediate vicinity should cease until an assessment of the materials can be made.

The unit commander/supervisor should be notified immediately so the CEV can be contacted.

Procedures: This section describes specific actions to be taken for discovery of unmarked burials. The flow chart (figure 5-3) is intended to be used by unit/activity level personnel, unit commanders, and similar personnel as a decision-making guide when inadvertent discoveries of burials are made as described under the applicability section of this SOP.

mailto:mark.garcia.16@us.af.mil https://www.nps.gov/subjects/nagpra/index.htm https://www.fs.usda.gov/lei/archeological-resources-protection.php#:~:text=It%20governs%20the%20excavation%20of,archaeological%20collections%20from%20those%20sites.

https://www.achp.gov/sites/default/files/2018-06/nhpa.pdf https://www.ecfr.gov/current/title-42/chapter-I/subchapter-A/part-10 https://www.ecfr.gov/current/title-32/subtitle-A/chapter-I/subchapter-M/part-229 https://www.wbdg.org/ffc/fed/code-federal-regulations/36-cfr-part-800#:~:text=Section%20106%20of%20the%20National,to%20comment%20on%20such%20undertakings.

ELLINGTON FIELD, HOUSTON, TX 21 May 2024

Scenario I: inadvertent discovery of burials.

A. Unit commander, environmental liaison, PA, Unit/activity personnel

a. Goals: understand the procedure when burials are inadvertently discovered so that the remains can be adequately protected.

B. Tasks:

a. Cease ground-disturbing activity when possible, human remains or burials are observed or encountered.

b. Unit personnel will report any observations or discoveries of human remains or burials immediately to the unit commander or facility manager and they will in turn notify the CEV immediately. They will await instructions from

CEV.

c. Secure the discovery location(s). Examine the location of the discovery to ensure that it has been properly secured. Take appropriate measures to further secure location if needed.

d. Coordinate with CEV on where and when activities can resume and give direction to the construction superintendent.

C. Environmental Manager

a. Goals: ensure that when each discovery occurs procedures are followed that will protect and properly treat any remains that are discovered.

D. Tasks:

a. ensure the site location and materials are properly protected.

b. Provide unit commander with necessary information so burials can be protected/avoided, etc.

c. ensure that all remains, and artifacts are accounted for and properly labeled and packaged if removed from the ground.

d. notify the installation commander.

e. notify the medical examiner.

f. determine if the remains and objects are NAGPRA related and initiate appropriate consultation if necessary.

ELLINGTON FIELD, HOUSTON, TX 21 May 2024