ESBD_449777_1756395887888_ATTACHMENT G.F.2 - Ellington AFB (EF) Contractor Hazardous Material Identification Form Close-Out Procedures.pdf
PDF 52 KB Posted
- Attached to
- Transformer Replacement Rebid
- Solicitation number
- TMD25-ANG-WJ-24150007v2
- Issued by
- Harris County, Texas
About this file
This document is an Attachment G.F.2 from Ellington Air Force Base (AFB) outlining contractor hazardous material (HM) identification form close-out procedures. The attachment, labeled as Part II, requires the contractor to accompany the Project Manager's Representative and the Environmental Manager during a close-out inspection to verify that all used and unused hazardous materials have been removed from the installation.
The document provides a signature page for close-out approval, with designated signature lines for the Contractor and the Project Manager/Representative CEV (Environmental Manager). The form is designed to ensure proper documentation and verification of hazardous material removal upon project completion, with spaces for both parties to sign and date the close-out inspection document.
View the file
Other files
Show all 38
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT G.F.2 - ELLINGTON AFB (EF) CONTRACTOR HAZARDOUS
MATERIAL IDENTIFICATION FORM CLOSE-OUT PROCEDURES
Part II
Attach this part to Part I
Contractor shall accompany the Project Manager’s Representative and the
Environmental Manager on the close-out inspection to ensure all used and unused HM has been removed from the installation.
Close-out Approval Signatures:
Contractor
Signature Date
Project Manager
/Representative CEV
(Environmental Manager)
File details come from the government source that posted it. Updated .