ESBD_449777_1756395968488_ATTACHMENT G.I - Ellington Field (EF) Houston Texas Standard Operating Procedure (Sop) For Inadvertent Discovery Of Cultural Materials.pdf

PDF 122 KB Posted

Attached to
Transformer Replacement Rebid
Solicitation number
TMD25-ANG-WJ-24150007v2
Issued by
Harris County, Texas

About this file

This document is a Standard Operating Procedure (SOP) for the Inadvertent Discovery of Cultural Materials at Ellington Field in Houston, Texas, dated 20 April 2022 and updated on 21 May 2024. The SOP applies to installation leadership, military personnel, contractors, and various base departments, providing comprehensive guidelines for handling unexpected cultural material discoveries during ground-disturbing activities such as construction, maintenance, or field exercises.

The procedure outlines specific steps for personnel who encounter potential cultural resources, including ceasing ground-disturbing activities, securing the discovery location, reporting observations to unit commanders, and notifying the Environmental Manager (CEV). Key statutory references include the Native American Graves Protection and Repatriation Act (NAGPRA), Archaeological Resources Protection Act, and National Historic Preservation Act. The document includes a detailed flow chart illustrating the precise protocol for managing inadvertent discoveries, with specific instructions for scenarios involving potential human remains, historical artifacts, or archaeological features. The SOP emphasizes protecting cultural materials, initiating appropriate consultations, and coordinating with various offices including Public Affairs, installation commanders, and potentially the medical examiner or state authorities.

View the file

Other files

File Type Posted
ESBD_449777_1756395940409_ATTACHMENT G.G - Ellington AFB (EF) Quality Control.pdf PDF
ESBD_449777_1756396090980_ATTACHMENT G.O - Ellington Field (EF) Starting Of Systems.pdf PDF
ESBD_449777_1756395679126_ATTACHMENT G.8 HUB Subcontracting Plan (HSP).pdf PDF
ESBD_449777_1756396128110_ATTACHMENT G.Q - Ellington AFB (EF) Cutting And Patching.pdf PDF
ESBD_449777_1756395845858_ATTACHMENT G.D - Ellington AFB (EF) Field Engineering.pdf PDF
ESBD_449777_1756396081512_ATTACHMENT G.N.1 - Ellington Field (EF) Manufacturer’s Certificate Of Proper Installation.pdf PDF
ESBD_449777_1756396291938_ATTACHMENT G.X - Ellington AFB (EF) AF3000.pdf PDF
ESBD_449777_1756395875686_ATTACHMENT G.F.1 - Ellington AFB (EF) Contractor Hazardous Material Usage Data.pdf PDF
ESBD_449777_1756501479663_Addendum 1 - TMD25-ANG-WJ-24150007.pdf PDF
ESBD_449777_1756395865813_ATTACHMENT G.F - Ellington Field (EF) EMS Hazardous Material Procedures.pdf PDF
ESBD_449777_1756396053573_ATTACHMENT G.L - Ellington Field JRB Final Asbestos Abatement Report Template.pdf PDF
ESBD_449777_1756396168631_ATTACHMENT G.U - Ellington Field (EF) Sustainable Design Requirements.pdf PDF
ESBD_449777_1756395856125_ATTACHMENT G.E - Ellington Field (EF) Safety Policies And Procedures.pdf PDF
ESBD_449777_1756396139089_ATTACHMENT G.R - Ellington Field (EF) EMS Construction Waste Management And Disposal Part 1 - General.pdf PDF
ESBD_449777_1756395651552_ATTACHMENT G.7 Project Map-Hush House Map.pdf PDF
ESBD_449777_1756396062076_ATTACHMENT G.M - Ellington AFB (EF) Material Equipment.pdf PDF
ESBD_449777_1756395719417_ATTACHMENT G.1 Direct Deposit Authorization Form 74-176 (Rev.9-2121).pdf PDF
ESBD_449777_1756395836697_ATTACHMENT G.C - Ellington AFB (EF) Project Coordination.pdf PDF
ESBD_449777_1756395731444_ATTACHMENT G.2 Application for Texas Identification Number AP-152.pdf PDF
ESBD_449777_1756396279811_ATTACHMENT G.W - Ellington AFB (EF) AF103_REV.pdf PDF
ESBD_449777_1756395817373_ATTACHMENT G.B - Ellington Field (EF) Coordination And Meetings.pdf PDF
ESBD_449777_1756396311373_ATTACHMENT G.V - Ellington Field (EF) Houston Texas Standard Operating Procedure (Sop) For Inadvertent Discovery Of Unmarked Burials.pdf PDF
ESBD_449777_1756396148437_ATTACHMENT G.S - Ellington AFB (EF) Substitutions Request Form.pdf PDF
ESBD_449777_1756395957039_ATTACHMENT G.H - Ellington Field (EF) EMS Environmental Protection.pdf PDF
ESBD_449777_1756395630851_ATTACHMENT G.5 Photo of Hush House Transformer.pdf PDF
ESBD_449777_1756396042129_ATTACHMENT G.K - Ellington AFB (EF) Construction Facilities And Temporary Controls.pdf PDF
ESBD_449777_1756395641216_ATTACHMENT G.6 ALAMO Transformer Schematic.pdf PDF
ESBD_449777_1756396157692_ATTACHMENT G.T - Ellington Field (EF) Post Award Submittals.pdf PDF
ESBD_449777_1756395887888_ATTACHMENT G.F.2 - Ellington AFB (EF) Contractor Hazardous Material Identification Form Close-Out Procedures.pdf PDF
ESBD_449777_1756395807712_ATTACHMENT G.A - Ellington Field (EF) General Requirements.pdf PDF
ESBD_449777_1756395616803_TMD25-ANG-WJ-24150007v2 Transformer Replacement Rebid.pdf PDF
ESBD_449777_1756395988780_ATTACHMENT G.J.1 - Ellington AFB (EF) Maintenance Summary Form.pdf PDF
ESBD_449777_1756395783572_ATTACHMENT G.3 Texas Military Department Standard Terms and Conditions Revision 6.pdf PDF
ESBD_449777_1756396100710_ATTACHMENT G.P - Ellington Field (EF) Contract Closeout.pdf PDF
ESBD_449777_1756396072107_ATTACHMENT G.N - Ellington Field (EF) Manufacturers’ Services.pdf PDF
ESBD_449777_1756501514709_TMD25-ANG-WJ-24150007v2 Update1 Transformer Replacement Rebid.pdf PDF
ESBD_449777_1756395598194_ATTACHMENT G.4 Mandatory Pricing Schedule.xlsx XLSX spreadsheet
ESBD_449777_1756395978869_ATTACHMENT G.J - Ellington Field (EF) Operation And Maintenance Data.pdf PDF
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT G.I - ELLINGTON FIELD, HOUSTON, TEXAS

STANDARD OPERATING PROCEDURE (SOP) FOR INADVERTENT

DISCOVERY OF CULTURAL MATERIALS

20 Apr 22

Contact: Mr. Mark Garcia, Ellington Field Environmental Manager (CEV) 281-929-2013, mark.garcia.16@us.af.mil

Statutory References:

1. Native American Graves Protection and Repatriation Act (NAGPRA)

2. Archaeological Resources Protection Act

3. National Historic Preservation Act and its implementing regulations

Regulations:

1. 42 CFR 10

2. 32 CFR 229 - https://www.ecfr.gov/current/title-32/subtitle-A/chapter-I/subchapter-M/part-

3. 36 CFR Part 800 - https://www.wbdg.org/ffc/fed/code-federal-regulations/36-cfr-part-800

Applies to:

1. Installation leadership

2. Training Site Manager

3. Base Civil Engineer

4. Real Property Office

5. Security Police

6. Public Affairs Office

7. Judge Advocates Office

8. Maintenance, utilities, and grounds crews and foremen

9. Unit commanders and unit/activity personnel

10. Tenants and contractors

Typical Situations: Ground disturbance from construction involving digging, bulldozing, clearing, or grubbing, maintenance or repair activities, off-road traffic, field units on exercise, outdoor recreation, observation of eroded areas.

Typical Triggering Events: Discovery of known or likely human remains, unmarked graves, Native American or historical artifacts, archeological features, and/or paleontological remains

Policy: In the event that an unanticipated discovery of cultural artifacts occurs, activity in the immediate vicinity should cease until an assessment of the materials can be made. The unit commander/supervisor should be notified immediately so the Environmental Manager (CEV) can be contacted.

Procedures: This section describes specific actions to be taken for inadvertent discovery. The flow chart is intended to be used by unit/activity level personnel, unit commanders, and similar personnel as a decision-making guide when inadvertent discoveries are made as described under the applicability section of this Standard Operating Procedure (SOP).

mailto:mark.garcia.16@us.af.mil https://www.ecfr.gov/current/title-32/subtitle-A/chapter-I/subchapter-M/part-229 https://www.ecfr.gov/current/title-32/subtitle-A/chapter-I/subchapter-M/part-229 https://www.wbdg.org/ffc/fed/code-federal-regulations/36-cfr-part-800

ELLINGTON FIELD, HOUSTON, TX 21 May 2024

Scenario I: inadvertent discovery of cultural materials.

A. Unit commander, environmental liaison, Public Affairs Office (PAO), Unit/activity personnel

a. Goals: understand the procedure when cultural materials are inadvertently discovered so that the materials can be adequately protected.

b. Tasks:

i. Cease ground-disturbing activity when possible historical artifacts and features, human remains, or burials are observed or encountered.

ii. Unit personnel will report any observations or discoveries of historical artifacts and features, human remains, burials, or features immediately to the unit commander or facility manager and they will in turn notify

CEV immediately. They will await instructions from the CEV.

iii. Secure the discovery location(s). Examine the location of the discovery to ensure that it has been properly secured. Take appropriate measures to further secure location if needed.

iv. Coordinate with CEV on where activities can resume and give direction to the construction superintendent.

v. If human remains are known or suspected to be present, also promptly notify the CEV. The CEV through coordination with the Wing

Commander shall advise Public Affairs.

c. Environmental Manager

i. Goals: ensure that when each discovery occurs procedures are followed that will protect and properly treat any materials that are discovered.

d. Tasks:

i. Ensure the site location and materials are properly protected.

ii. Provide unit commander with necessary information so they can be protected/avoided, etc.

iii. Ensure that all remains, and artifacts are accounted for and properly labeled and packaged if removed from the ground.

iv. Notify the installation commander.

v. notify the medical examiner if necessary and appropriate.

vi. determine if the objects are NAGPRA related and initiate appropriate consultation if necessary.

ELLINGTON FIELD, HOUSTON, TX 21 May 2024

Security Officer secures discovery location with adequate buffer area, protection from vandalism and weather, and immediately notifies

CEV

If suspect human remains, the CEV. PA and ATKW/CC will immediately notify state police. The CEV will also notify the Arch Assistance Division of NPS, SHPO, and

FLOW CHART FOR THE INADVERTENT DISCOVERY OF POTENTIAL CULTURAL RESOURCES

Unit Commander or Supervisor:

secures discovery location with adequate buffer area and notifies CEV or Security

Report observations to the Unit Commander or Supervisor

Cease ground-disturbing activity

Discovery of possible cultural resource or material

Do not resume activities at the discovery location until directed by the CEV

Do not resume activities at the discovery location until directed by the Unit Commander, Supervisor, Security, or CEV

File details come from the government source that posted it. Updated .