ESBD_449777_1756395845858_ATTACHMENT G.D - Ellington AFB (EF) Field Engineering.pdf

PDF 104 KB Posted

Attached to
Transformer Replacement Rebid
Solicitation number
TMD25-ANG-WJ-24150007v2
Issued by
Harris County, Texas

About this file

This document is an Attachment G.D for Field Engineering specifications for Ellington Air Force Base (AFB) located in Houston, Texas, dated 21 May 2024. The attachment outlines comprehensive requirements for field engineering services, specifically detailing the contractor's responsibilities for survey work, professional engineering services, and geospatial data collection. The contractor must provide all field engineering services, including survey work, civil and structural engineering, and maintaining accurate engineering control for the project's horizontal and vertical dimensions.

The specification requires the contractor to retain a Texas-registered surveyor, establish and protect survey reference points, create temporary benchmarks, and maintain detailed records throughout the construction process. At project completion, the contractor must submit a comprehensive survey of installation including roadways, drainage, site grading, buried utilities, and manholes. Additionally, the contractor must prepare a Geographic Information System (GIS) electronic map integrating with the 147 CES Common Installation Picture, providing precise geospatial data for all project elements such as building corners, valves, manholes, light poles, fire hydrants, and parking lot outlines to enable complete government documentation of the project's infrastructure.

View the file

Other files

File Type Posted
ESBD_449777_1756395719417_ATTACHMENT G.1 Direct Deposit Authorization Form 74-176 (Rev.9-2121).pdf PDF
ESBD_449777_1756395731444_ATTACHMENT G.2 Application for Texas Identification Number AP-152.pdf PDF
ESBD_449777_1756395817373_ATTACHMENT G.B - Ellington Field (EF) Coordination And Meetings.pdf PDF
ESBD_449777_1756395836697_ATTACHMENT G.C - Ellington AFB (EF) Project Coordination.pdf PDF
ESBD_449777_1756395875686_ATTACHMENT G.F.1 - Ellington AFB (EF) Contractor Hazardous Material Usage Data.pdf PDF
ESBD_449777_1756395968488_ATTACHMENT G.I - Ellington Field (EF) Houston Texas Standard Operating Procedure (Sop) For Inadvertent Discovery Of Cultural Materials.pdf PDF
ESBD_449777_1756395988780_ATTACHMENT G.J.1 - Ellington AFB (EF) Maintenance Summary Form.pdf PDF
ESBD_449777_1756396062076_ATTACHMENT G.M - Ellington AFB (EF) Material Equipment.pdf PDF
ESBD_449777_1756396279811_ATTACHMENT G.W - Ellington AFB (EF) AF103_REV.pdf PDF
ESBD_449777_1756501479663_Addendum 1 - TMD25-ANG-WJ-24150007.pdf PDF
ESBD_449777_1756395616803_TMD25-ANG-WJ-24150007v2 Transformer Replacement Rebid.pdf PDF
ESBD_449777_1756395651552_ATTACHMENT G.7 Project Map-Hush House Map.pdf PDF
ESBD_449777_1756395679126_ATTACHMENT G.8 HUB Subcontracting Plan (HSP).pdf PDF
ESBD_449777_1756395807712_ATTACHMENT G.A - Ellington Field (EF) General Requirements.pdf PDF
ESBD_449777_1756395856125_ATTACHMENT G.E - Ellington Field (EF) Safety Policies And Procedures.pdf PDF
ESBD_449777_1756395865813_ATTACHMENT G.F - Ellington Field (EF) EMS Hazardous Material Procedures.pdf PDF
ESBD_449777_1756395887888_ATTACHMENT G.F.2 - Ellington AFB (EF) Contractor Hazardous Material Identification Form Close-Out Procedures.pdf PDF
ESBD_449777_1756396053573_ATTACHMENT G.L - Ellington Field JRB Final Asbestos Abatement Report Template.pdf PDF
ESBD_449777_1756396090980_ATTACHMENT G.O - Ellington Field (EF) Starting Of Systems.pdf PDF
ESBD_449777_1756396139089_ATTACHMENT G.R - Ellington Field (EF) EMS Construction Waste Management And Disposal Part 1 - General.pdf PDF
ESBD_449777_1756395630851_ATTACHMENT G.5 Photo of Hush House Transformer.pdf PDF
ESBD_449777_1756395641216_ATTACHMENT G.6 ALAMO Transformer Schematic.pdf PDF
ESBD_449777_1756395957039_ATTACHMENT G.H - Ellington Field (EF) EMS Environmental Protection.pdf PDF
ESBD_449777_1756396042129_ATTACHMENT G.K - Ellington AFB (EF) Construction Facilities And Temporary Controls.pdf PDF
ESBD_449777_1756396081512_ATTACHMENT G.N.1 - Ellington Field (EF) Manufacturer’s Certificate Of Proper Installation.pdf PDF
ESBD_449777_1756396128110_ATTACHMENT G.Q - Ellington AFB (EF) Cutting And Patching.pdf PDF
ESBD_449777_1756396148437_ATTACHMENT G.S - Ellington AFB (EF) Substitutions Request Form.pdf PDF
ESBD_449777_1756396157692_ATTACHMENT G.T - Ellington Field (EF) Post Award Submittals.pdf PDF
ESBD_449777_1756396168631_ATTACHMENT G.U - Ellington Field (EF) Sustainable Design Requirements.pdf PDF
ESBD_449777_1756396291938_ATTACHMENT G.X - Ellington AFB (EF) AF3000.pdf PDF
ESBD_449777_1756396311373_ATTACHMENT G.V - Ellington Field (EF) Houston Texas Standard Operating Procedure (Sop) For Inadvertent Discovery Of Unmarked Burials.pdf PDF
ESBD_449777_1756395598194_ATTACHMENT G.4 Mandatory Pricing Schedule.xlsx XLSX spreadsheet
ESBD_449777_1756395783572_ATTACHMENT G.3 Texas Military Department Standard Terms and Conditions Revision 6.pdf PDF
ESBD_449777_1756395940409_ATTACHMENT G.G - Ellington AFB (EF) Quality Control.pdf PDF
ESBD_449777_1756395978869_ATTACHMENT G.J - Ellington Field (EF) Operation And Maintenance Data.pdf PDF
ESBD_449777_1756396072107_ATTACHMENT G.N - Ellington Field (EF) Manufacturers’ Services.pdf PDF
ESBD_449777_1756396100710_ATTACHMENT G.P - Ellington Field (EF) Contract Closeout.pdf PDF
ESBD_449777_1756501514709_TMD25-ANG-WJ-24150007v2 Update1 Transformer Replacement Rebid.pdf PDF
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT G.D - ELLINGTON AFB (EF) FIELD ENGINEERING

PART 1 – GENERAL

1. REQUIREMENTS INCLUDED

A. The Contractor shall provide and pay for field engineering services for:

a. Survey work required in execution of work.

b. Civil, structural, or other professional engineering services specified or required to execute the Contractor’s construction method.

B. The method of field staking for the construction of the work shall be at the option of the Contractor.

C. The accuracy of any method of staking shall be responsibility of the Contractor. All engineering for vertical and horizontal control shall be the responsibility of the

Contractor.

a. The Contractor shall be held responsible for the preservation of all stakes and marks. If any stakes or marks are carelessly or willfully disturbed by the

Contractor, the Contractor shall not proceed with any work until he has re-established such points, marks, lines, and elevations as may be necessary for the prosecution of the work.

b. The Contractor shall retain the services of a competent surveyor, registered in the State of Texas, to lay out the work and maintain a survey during construction. The Contractor shall be solely responsible for proper location of the work.

2. SURVEY REFERENCE POINTS

A. Locate and protect control points prior to starting site work and preserve all permanent reference points during construction.

a. Make no changes or relocations without prior written notice to the Project

Manager.

b. Report to the Project Manager when any reference point is lost or destroyed or requires relocation because of necessary changes in grades or locations.

3. PROTECT SURVEY REQUIREMENTS

A. Establish temporary benchmarks as needed, referenced to data established by survey control points. Record locations with horizontal and vertical data, on Record

Drawings.

B. Establish lines and levels, and locate and lay out, by instrumentation and similar appropriate means:

a. Site improvements, including utility slopes and invert elevations.

b. Batter boards for structures.

c. From time to time, verify layouts by same methods.

4. RECORDS

A. Maintain a complete, accurate log of al control and survey work as it progresses.

B. At Contract closeout, submit a survey of installation of roadways, drainage, site grading, buried utilities, and manholes at the same scale as the Construction

Documents indicating elevations and stationing at 100-foot increments.

ELLINGTON FIELD, HOUSTON, TX 21 May 2024

5. SUBMITTALS

A. On request of the Project Manager, submit documentation to verify accuracy of field engineering work.

B. Submit Drawings showing locations of all pipes and structures constructed. This

Drawing shall be included with the Record Drawings.

6. GEOSPATIAL DATA STANDARD

A. Prepare and furnish geographical Information System (GIS) electronic map of the site and site utilities that integrates into the 147 CES Common Installation Picture (CIP) using Geographical Positioning System (GPS) Geospatial Electronic data per ANG

ETL 19-12, Geographic Information System (GIS) Data Format Specifications Dated

18 November 2019.

B. At the end of the project all data points will need to be provided by the contractor.

Provide all final locations of the corners (outline) of building, valves, manholes, handholes, light poles, fire hydrants, outline of parking lots and other items to provide a complete picture of what has been built and installed. Provide enough data to enable the government to have the location of everything on the project.