ESBD_401277_1748872621894_AT9546~1.PDF

PDF 17 KB Posted

Attached to
HEAT PUMP AND BOILER AND BOILER FLUE REPLACEMENTS
Solicitation number
TMD25-ANG-WJ-24150004_5_6_B1057_1363_1377
Issued by
Harris County, Texas

About this file

This document is a Substitutions Request Form for the Ellington Air Force Base (EF) project, issued by a government procurement agency. The form provides a standardized process for contractors or vendors to propose alternative items or materials that could replace originally specified components in a construction or renovation project. The form requires detailed documentation and certification from the proposing party, including assurances that the substituted item will maintain equivalent or superior functionality, appearance, and quality to the original specification. The requesting party must also confirm that the substitution will not negatively impact dimensions, installation, other trades, construction schedules, or warranty requirements.

The form includes seven key certification points that the proposing party must validate, such as local availability of maintenance and service parts, comprehensive documentation of proposed changes, and willingness to reimburse the government for any review or redesign services necessitated by the substitution. The document provides space for the proposing firm's signature, contact information, and a list of attachments to support the substitution request. While the specific project details are not fully elaborated, the form represents a standard government procurement mechanism for managing potential material or equipment substitutions during a construction or renovation project.

View the file

Other files

File Type Posted
ESBD_401277_1748872677255_ATB408~1.PDF PDF
ESBD_401277_1748872520449_ATF409~1.PDF PDF
ESBD_401277_1748872644533_ATAC97~1.PDF PDF
ESBD_401277_1748872655152_ATBB18~1.PDF PDF
ESBD_401277_1748872126186_ATTACHMENT G.1 Direct Deposit 74-176.pdf PDF
ESBD_401277_1748872207683_ATTACHMENT G.8 B1377 System.pdf PDF
ESBD_401277_1748872139337_ATTACHMENT G.2 Application for Texas ID #_AP_152.pdf PDF
ESBD_401277_1748872577160_ATCD32~1.PDF PDF
ESBD_401277_1748872472153_AT7BBC~1.PDF PDF
ESBD_401277_1748872566336_AT04E2~1.PDF PDF
ESBD_401277_1748872162925_ATTACHMENT G.4 Mandatory Pricing Schedule.xlsx XLSX spreadsheet
ESBD_401277_1748872431050_AT9E6E~1.PDF PDF
ESBD_401277_1748872553365_ATCF02~1.PDF PDF
ESBD_401277_1748872309609_ATTACHMENT G.5 Site Location.pdf PDF
ESBD_401277_1748872197790_ATTACHMENT G.7 B1363 System.pdf PDF
ESBD_401277_1748872632942_ATC8C2~1.PDF PDF
ESBD_401277_1748872531990_ATE6CA~1.PDF PDF
ESBD_401277_1748872665557_ATTACHMENT G.W - Ellington AFB (EF) AF103_REV.pdf PDF
ESBD_401277_1748872371253_AT6F64~1.PDF PDF
ESBD_401277_1748872415459_ATFC65~1.PDF PDF
ESBD_401277_1748872396937_AT909E~1.PDF PDF
ESBD_401277_1748872599840_AT8DD5~1.PDF PDF
ESBD_401277_1748872497677_AT5BF6~1.PDF PDF
ESBD_401277_1748872186497_ATTACHMENT G.6 B1057 System.pdf PDF
ESBD_401277_1748872588788_ATC871~1.PDF PDF
ESBD_401277_1748872543207_ATF572~1.PDF PDF
ESBD_401277_1748872611679_ATE420~1.PDF PDF
ESBD_401277_1748872342568_ATTACHMENT G.9 HUB Subcontracting Plan (HSP).pdf PDF
ESBD_401277_1748872104631_TMD25-~1.PDF PDF
ESBD_401277_1748872509961_ATF9DE~1.PDF PDF
ESBD_401277_1748872487237_ATF70F~1.PDF PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT G.S - ELLINGTON AFB (EF)

SUBSTITUTIONS REQUEST FORM

To: Project Manager

Specified Item:

Section Page Paragraph Description

The undersigned requests consideration of the following:

Proposed Substitution: ___________________________________________________

The undersigned certifies that the following paragraphs, unless modified or clarified by attachments, are correct:

1. The proposed substitution does not affect dimensions shown on the Drawings.

2. The undersigned will reimburse the Government for review or redesign services associated with re- approval by authorities.

3. The undersigned will coordinate installation and make changes to other Work which may be re- quired for the Work to be complete with no additional cost to

Owner.

4. The proposed substitution will have no adverse effect on other trades, the construction schedule, or specified warranty requirements.

5. Maintenance and service parts will be locally available for the proposed substitution.

6. Attached data includes support items listed in Section 01600, and applicable portions of the data are clearly identified.

7. Attached data also includes a description of any revisions to the Contract

Documents which the proposed substitution will require for its proper installation.

The undersigned further certifies that the function, appearance and quality of the proposed substitution are equivalent or superior to the specified item.

Submitted by:

Signature __________________________________________________________

Firm ______________________________________________________________

Address ____________________________________________________________

Date

Telephone

List of Attachments:

File details come from the government source that posted it. Updated .