ESBD_401277_1748872162925_ATTACHMENT G.4 Mandatory Pricing Schedule.xlsx
XLSX spreadsheet 21 KB Posted
- Solicitation number
- TMD25-ANG-WJ-24150004_5_6_B1057_1363_1377
- Issued by
- Harris County, Texas
About this file
This document is a Mandatory Pricing Schedule for the Texas Military Department (TMD) Procurement and Contract Services, specifically related to an Invitation for Bids (IFB) numbered TMD25-ANG-WJ-24150004_5_6. The solicitation covers comprehensive boiler and heat pump replacement services for three buildings (1057, 1363, and 1377), with each building requiring specific maintenance, parts, and equipment replacement tasks. The scope includes removing and replacing condensers, gas boilers, and flue pipes, with each project categorized into three line items: labor services, parts/accessories, and equipment rental/lease.
The pricing schedule is structured with 11 line items across NIGP (National Institute of Governmental Purchasing) classification codes, focusing on boiler maintenance, parts, and equipment needs. Each line item is set at a quantity of 1 job, with specific technical requirements such as replacing a 15-Ton Condenser, installing a 1,559 mbH gas boiler, and updating flue pipes. The document provides a template for bidders to input unit pricing, with yellow-highlighted cells indicating where data entry is permitted. Notably, the current pricing total is set at $0, suggesting that actual pricing will be completed by the bidding vendor. The document emphasizes that any modifications to the spreadsheet beyond the designated entry areas could result in proposal disqualification.
View the file
Other files
Show all 31
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Pricing Schedule
| Texas Military Department |
| Procurement and Contract Services (P&CS) |
| Attachment G.4 - INVITATION FOR BIDS (IFB) – TMD25-ANG-WJ-24150004_5_6 B1057_1363_1377 HEAT PUMP AND BOILER AND BOILER FLUE REPLAC |
| Company Name: |
| Company Point Of Contact: |
| Contact Phone #: |
| Contact Email: |
Items proposed below must meet the specifications described in the "Detailed Descriptions" tab. Cells highlighted in yellow permit data entry. Please DO NOT add, delete or change any other cells. Doing so may subject your proposal to disqualification.
Line Item Details
| Item # | NIGP Class and Item | Item Description | |||||
| Quantaty | Unit of Measure (UOM) | Estimated # of Days to Complete Work | Unit Price | ||||
| 1 | 941-25 Boiler Maintenance and Repair, Steam, Including Testing Services | Building 1363 - All labor to remove a 15-Ton Condenser and replace a with an equal or better unit | 1 | JOB | |||
| 2 | 820-14 Boiler Parts and Accessories (Not Otherwise Classified) | Building 1363 - All parts, material, and any miscellaneous material needed to remove a 15-Ton Condenser and replace a with an equal or better unit for Building 1364 | 1 | JOB | |||
| 3 | 981-54 Plumbing Equipment Rental or Lease | Building 1363 - All equipment needed to remove a 15-Ton Condenser and replace a with an equal or better unit for Building 1365 | 1 | JOB | |||
| 5 | 941-25 Boiler Maintenance and Repair, Steam, Including Testing Services | Building 1377 - All labor to remove the existing 1,559 Thousands (M) of British Thermal Unit (BTU)'s per Hour (mbH) Gas Boiler and replace with an equal or better unit with the same capacity condensing Boiler | 1 | JOB | |||
| 6 | 820-14 Boiler Parts and Accessories (Not Otherwise Classified) | Building 1377 - All parts, material, and any miscellaneous material needed to remove the existing 1,559 Thousands (M) of British Thermal Unit (BTU)'s per Hour (mbH) Gas Boiler and replace with an equal or better unit with the same capacity condensing Boiler | 1 | JOB | |||
| 7 | 981-54 Plumbing Equipment Rental or Lease | Building 1377 - All equipment needed to remove the existing 1,559 Thousands (M) of British Thermal Unit (BTU)'s per Hour (mbH) Gas Boiler and replace with an equal or better unit with the same capacity condensing Boiler | 1 | JOB | |||
| 9 | 941-25 Boiler Maintenance and Repair, Steam, Including Testing Services | Building 1057 - All labor to removal all single and double wall flue pipe at the boiler and hot water heater and replace with equal or better double wall pipe flues | 1 | JOB | |||
| 10 | 820-14 Boiler Parts and Accessories (Not Otherwise Classified) | Building 1057 - All parts, material, and any miscellaneous material needed to removal all single and double wall flue pipe at the boiler and hot water heater and replace with equal or better double wall pipe flues | 1 | JOB | |||
| 11 | 981-54 Plumbing Equipment Rental or Lease | Building 1057 - All equipment needed to removal all single and double wall flue pipe at the boiler and hot water heater and replace with equal or better double wall pipe flues | 1 | JOB | |||
| Total: | $ - 0 |
File details come from the government source that posted it. Updated .