ESBD_401277_1748872520449_ATF409~1.PDF

PDF 122 KB Posted

Attached to
HEAT PUMP AND BOILER AND BOILER FLUE REPLACEMENTS
Solicitation number
TMD25-ANG-WJ-24150004_5_6_B1057_1363_1377
Issued by
Harris County, Texas

About this file

This document is a Standard Operating Procedure (SOP) for the Ellington Field military installation in Houston, Texas, focusing on the inadvertent discovery of cultural materials. The SOP provides comprehensive guidelines for personnel, contractors, and military units encountering potential cultural resources during ground-disturbing activities such as construction, maintenance, repairs, or field exercises. The procedure applies to various personnel, including installation leadership, training site managers, civil engineers, security police, maintenance crews, and contractors.

The document outlines a detailed protocol for handling unexpected discoveries of historical artifacts, human remains, Native American artifacts, archaeological features, or paleontological remains. Key procedural steps include immediately ceasing ground-disturbing activities, securing the discovery location, notifying the Environmental Manager (CEV), and following a specific decision-making flow chart. The SOP references several federal regulations and statutory acts, including the Native American Graves Protection and Repatriation Act (NAGPRA), Archaeological Resources Protection Act, and National Historic Preservation Act, to ensure proper treatment and consultation when cultural materials are unexpectedly encountered.

View the file

Other files

File Type Posted
ESBD_401277_1748872677255_ATB408~1.PDF PDF
ESBD_401277_1748872644533_ATAC97~1.PDF PDF
ESBD_401277_1748872655152_ATBB18~1.PDF PDF
ESBD_401277_1748872126186_ATTACHMENT G.1 Direct Deposit 74-176.pdf PDF
ESBD_401277_1748872207683_ATTACHMENT G.8 B1377 System.pdf PDF
ESBD_401277_1748872139337_ATTACHMENT G.2 Application for Texas ID #_AP_152.pdf PDF
ESBD_401277_1748872577160_ATCD32~1.PDF PDF
ESBD_401277_1748872472153_AT7BBC~1.PDF PDF
ESBD_401277_1748872566336_AT04E2~1.PDF PDF
ESBD_401277_1748872162925_ATTACHMENT G.4 Mandatory Pricing Schedule.xlsx XLSX spreadsheet
ESBD_401277_1748872431050_AT9E6E~1.PDF PDF
ESBD_401277_1748872553365_ATCF02~1.PDF PDF
ESBD_401277_1748872309609_ATTACHMENT G.5 Site Location.pdf PDF
ESBD_401277_1748872197790_ATTACHMENT G.7 B1363 System.pdf PDF
ESBD_401277_1748872632942_ATC8C2~1.PDF PDF
ESBD_401277_1748872531990_ATE6CA~1.PDF PDF
ESBD_401277_1748872665557_ATTACHMENT G.W - Ellington AFB (EF) AF103_REV.pdf PDF
ESBD_401277_1748872371253_AT6F64~1.PDF PDF
ESBD_401277_1748872415459_ATFC65~1.PDF PDF
ESBD_401277_1748872621894_AT9546~1.PDF PDF
ESBD_401277_1748872396937_AT909E~1.PDF PDF
ESBD_401277_1748872599840_AT8DD5~1.PDF PDF
ESBD_401277_1748872497677_AT5BF6~1.PDF PDF
ESBD_401277_1748872186497_ATTACHMENT G.6 B1057 System.pdf PDF
ESBD_401277_1748872588788_ATC871~1.PDF PDF
ESBD_401277_1748872543207_ATF572~1.PDF PDF
ESBD_401277_1748872611679_ATE420~1.PDF PDF
ESBD_401277_1748872342568_ATTACHMENT G.9 HUB Subcontracting Plan (HSP).pdf PDF
ESBD_401277_1748872104631_TMD25-~1.PDF PDF
ESBD_401277_1748872509961_ATF9DE~1.PDF PDF
ESBD_401277_1748872487237_ATF70F~1.PDF PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT G.I - ELLINGTON FIELD, HOUSTON, TEXAS

STANDARD OPERATING PROCEDURE (SOP) FOR INADVERTENT

DISCOVERY OF CULTURAL MATERIALS

20 Apr 22

Contact: Mr. Mark Garcia, Ellington Field Environmental Manager (CEV) 281-929-2013, mark.garcia.16@us.af.mil

Statutory References:

1. Native American Graves Protection and Repatriation Act (NAGPRA)

2. Archaeological Resources Protection Act

3. National Historic Preservation Act and its implementing regulations

Regulations:

1. 42 CFR 10

2. 32 CFR 229 - https://www.ecfr.gov/current/title-32/subtitle-A/chapter-I/subchapter-M/part-

3. 36 CFR Part 800 - https://www.wbdg.org/ffc/fed/code-federal-regulations/36-cfr-part-800

Applies to:

1. Installation leadership

2. Training Site Manager

3. Base Civil Engineer

4. Real Property Office

5. Security Police

6. Public Affairs Office

7. Judge Advocates Office

8. Maintenance, utilities, and grounds crews and foremen

9. Unit commanders and unit/activity personnel

10. Tenants and contractors

Typical Situations: Ground disturbance from construction involving digging, bulldozing, clearing, or grubbing, maintenance or repair activities, off-road traffic, field units on exercise, outdoor recreation, observation of eroded areas.

Typical Triggering Events: Discovery of known or likely human remains, unmarked graves, Native American or historical artifacts, archeological features, and/or paleontological remains

Policy: In the event that an unanticipated discovery of cultural artifacts occurs, activity in the immediate vicinity should cease until an assessment of the materials can be made. The unit commander/supervisor should be notified immediately so the Environmental Manager (CEV) can be contacted.

Procedures: This section describes specific actions to be taken for inadvertent discovery. The flow chart is intended to be used by unit/activity level personnel, unit commanders, and similar personnel as a decision-making guide when inadvertent discoveries are made as described under the applicability section of this Standard Operating Procedure (SOP).

mailto:mark.garcia.16@us.af.mil https://www.ecfr.gov/current/title-32/subtitle-A/chapter-I/subchapter-M/part-229 https://www.ecfr.gov/current/title-32/subtitle-A/chapter-I/subchapter-M/part-229 https://www.wbdg.org/ffc/fed/code-federal-regulations/36-cfr-part-800

ELLINGTON FIELD, HOUSTON, TX 21 May 2024

Scenario I: inadvertent discovery of cultural materials.

A. Unit commander, environmental liaison, Public Affairs Office (PAO), Unit/activity personnel

a. Goals: understand the procedure when cultural materials are inadvertently discovered so that the materials can be adequately protected.

b. Tasks:

i. Cease ground-disturbing activity when possible historical artifacts and features, human remains, or burials are observed or encountered.

ii. Unit personnel will report any observations or discoveries of historical artifacts and features, human remains, burials, or features immediately to the unit commander or facility manager and they will in turn notify

CEV immediately. They will await instructions from the CEV.

iii. Secure the discovery location(s). Examine the location of the discovery to ensure that it has been properly secured. Take appropriate measures to further secure location if needed.

iv. Coordinate with CEV on where activities can resume and give direction to the construction superintendent.

v. If human remains are known or suspected to be present, also promptly notify the CEV. The CEV through coordination with the Wing

Commander shall advise Public Affairs.

c. Environmental Manager

i. Goals: ensure that when each discovery occurs procedures are followed that will protect and properly treat any materials that are discovered.

d. Tasks:

i. Ensure the site location and materials are properly protected.

ii. Provide unit commander with necessary information so they can be protected/avoided, etc.

iii. Ensure that all remains, and artifacts are accounted for and properly labeled and packaged if removed from the ground.

iv. Notify the installation commander.

v. notify the medical examiner if necessary and appropriate.

vi. determine if the objects are NAGPRA related and initiate appropriate consultation if necessary.

ELLINGTON FIELD, HOUSTON, TX 21 May 2024

Security Officer secures discovery location with adequate buffer area, protection from vandalism and weather, and immediately notifies

CEV

If suspect human remains, the CEV. PA and ATKW/CC will immediately notify state police. The CEV will also notify the Arch Assistance Division of NPS, SHPO, and

FLOW CHART FOR THE INADVERTENT DISCOVERY OF POTENTIAL CULTURAL RESOURCES

Unit Commander or Supervisor:

secures discovery location with adequate buffer area and notifies CEV or Security

Report observations to the Unit Commander or Supervisor

Cease ground-disturbing activity

Discovery of possible cultural resource or material

Do not resume activities at the discovery location until directed by the CEV

Do not resume activities at the discovery location until directed by the Unit Commander, Supervisor, Security, or CEV

File details come from the government source that posted it. Updated .