HEAT PUMP AND BOILER AND BOILER FLUE REPLACEMENTS
Solicitation number
TMD25-ANG-WJ-24150004_5_6_B1057_1363_1377
Issued by
Harris County, Texas

About this file

This document is a Final Asbestos Abatement Report for the Ellington Field Joint Reserve Base (JRB) in Houston, Texas, prepared by ACME Environmental and involving the Texas Department of State Health Services (TDSHS). The project involved the removal of approximately 1,350 square feet of asbestos-containing floor tile and mastic, with work conducted in compliance with Texas Health and Human Services regulations, Texas Laws, and Federal Code of Regulations regarding asbestos health protection. The abatement project was monitored by a TDSHS Asbestos Air Monitoring Technician and included comprehensive air sampling and waste transportation to a Houston landfill.

The project utilized licensed subcontractors who conducted Phase Contrast Microscopy (PCM) air sample analysis, with all area air samples collected outside the work area being at or below the threshold value of 0.01 fibers per cubic centimeter. Personal samples were below the OSHA Permissible Exposure Limit for both Short Term Exposure and Time Weighted Average standards. The report includes multiple appendices documenting TDSHS notifications, air sample results, chain of custody forms, air monitoring field forms, project notes, certifications, licenses, project photographs, and signed waste manifests, demonstrating a comprehensive and regulated approach to asbestos abatement.

View the file

Other files

File Type Posted
ESBD_401277_1748872677255_ATB408~1.PDF PDF
ESBD_401277_1748872520449_ATF409~1.PDF PDF
ESBD_401277_1748872644533_ATAC97~1.PDF PDF
ESBD_401277_1748872655152_ATBB18~1.PDF PDF
ESBD_401277_1748872126186_ATTACHMENT G.1 Direct Deposit 74-176.pdf PDF
ESBD_401277_1748872207683_ATTACHMENT G.8 B1377 System.pdf PDF
ESBD_401277_1748872139337_ATTACHMENT G.2 Application for Texas ID #_AP_152.pdf PDF
ESBD_401277_1748872577160_ATCD32~1.PDF PDF
ESBD_401277_1748872472153_AT7BBC~1.PDF PDF
ESBD_401277_1748872162925_ATTACHMENT G.4 Mandatory Pricing Schedule.xlsx XLSX spreadsheet
ESBD_401277_1748872431050_AT9E6E~1.PDF PDF
ESBD_401277_1748872553365_ATCF02~1.PDF PDF
ESBD_401277_1748872309609_ATTACHMENT G.5 Site Location.pdf PDF
ESBD_401277_1748872197790_ATTACHMENT G.7 B1363 System.pdf PDF
ESBD_401277_1748872632942_ATC8C2~1.PDF PDF
ESBD_401277_1748872531990_ATE6CA~1.PDF PDF
ESBD_401277_1748872665557_ATTACHMENT G.W - Ellington AFB (EF) AF103_REV.pdf PDF
ESBD_401277_1748872371253_AT6F64~1.PDF PDF
ESBD_401277_1748872415459_ATFC65~1.PDF PDF
ESBD_401277_1748872621894_AT9546~1.PDF PDF
ESBD_401277_1748872396937_AT909E~1.PDF PDF
ESBD_401277_1748872599840_AT8DD5~1.PDF PDF
ESBD_401277_1748872497677_AT5BF6~1.PDF PDF
ESBD_401277_1748872186497_ATTACHMENT G.6 B1057 System.pdf PDF
ESBD_401277_1748872588788_ATC871~1.PDF PDF
ESBD_401277_1748872543207_ATF572~1.PDF PDF
ESBD_401277_1748872611679_ATE420~1.PDF PDF
ESBD_401277_1748872342568_ATTACHMENT G.9 HUB Subcontracting Plan (HSP).pdf PDF
ESBD_401277_1748872104631_TMD25-~1.PDF PDF
ESBD_401277_1748872509961_ATF9DE~1.PDF PDF
ESBD_401277_1748872487237_ATF70F~1.PDF PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT G.L - Ellington Field JRB Final Asbestos Abatement Report Template

ELLINGTON FIELD JOINT RESERVE BASE

FINAL ASBESTOS ABATEMENT REPORT

FOR WORK PERFORMED AT:

PROJECT NUMBER:

PREPARED FOR:

Ellington Field JRB

14657 Sneider Street Houston, Texas 77034

REPORT DATE:

14657 Sneider Street

Houston, Texas 77034 281-929-2013

Project Number: Date:

FINAL ASBESTOS ABATEMENT REPORT

Date

Address of Company

Ellington Field JRB Project Number:

Prepared by: ____________________________________________

Project Manager

Reviewed by: ____________________________________________

TDSHS Asbestos Consultant, License #

Company Logo

Company Address

Table of Contents

PROJECT INFORMATION _______________________________________________ 1

ASBESTOS ABATEMENT COMPLETION REPORT 1

Project Location

PROJECT SUMMARY 1

APPENDICES _________________________________________________________ 3

Appendix 1: TDSHS Notifications

Appendix 2: Summary of Air Samples

Air Sample Results

Appendix 3: Chain of Custody Forms

Appendix 4: Summary of Monitoring

Air Monitoring Field Forms

Appendix 5: Daily Project Notes & Additional Field Forms

Appendix 6: TDSHS Certifications and Licenses

Prime and Subcontractors

Appendix 7: Pictures- (Before and After)……………………………………………………………3

Appendix 8: Signed Copies of All Waste Manifests…………………………………….3

Project Information

ELLINGTON FIELD PROJECT NUMBER:

ASBESTOS ABATEMENT COMPLETION REPORT

This report represents a summary of the asbestos abatement, project duration, and air monitoring results for the abatement project conducted on Date:

Project Location

All of the work described within this report was conducted at the following location:

Location:

Owner/Generator: Ellington Field Joint Reserve Base Environmental Manager Mr. Mark A. Garcia

Project Type: Asbestos abatement of ???????????.

Ellington Project: #######

PROJECT SUMMARY (EXAMPLE TEXT SUBMISSION)

ACME Environmental submitted the Original Notification for abatement to the Texas Department of State Health Services (TDSHS) on November 14, 20?? (Attached) to precede the 10 day notification for the State. ACME Environmental submitted an amendment on December 1, 20??

If required. The project will comply with Texas Health and Human Services, Texas Laws and Regulations under Operational Codes Chapter 1954-Asbestos Health Protection, Texas Administrative Code, Title 25, Part 1, Chapter 296-Texas Asbestos Health Protection and Federal Code of Regulations, Title 40, Chapter1, Part 61-National Emission Standards for Hazardous Air Pollutants (NESHAP).

ACME Environmental, TDSHS License Number ##-####, conducted the asbestos abatement for the project listed above. ACME Environmental, TDSHS Waste Transporter License Number ##- #### and EPA ID Number ##-#####, provided waste transportation to ##### Landfill located in Houston, Texas.

The abatement project included the removal of approximately 1,350 square feet (sf) of asbestos-containing floor tile and mastic. The materials removed from the site were collected and manifested (Manifest Number #####) per regulations set forth by the Texas Commission on Environmental Quality (TCEQ). The manifest was properly signed by the Ellington Field Base Environmental Manager signifying the military base as the generator.

Mr. Bob Doe, TDSHS Asbestos Air Monitoring Technician License Number ##-####, continually monitored work performance and compliance with federal, state and local regulations, conducted the final visual inspection for cleanliness, and provided daily air monitoring during the abatement project. All licenses can be found in Appendix 6.

ACME SUBCONTRACTOR collected and analyzed Phase Contrast Microscopy (PCM) samples according to National Institute of Occupational Safety and Health (NIOSH) methods. ACME SUBCONTRACTOR is a participant in the NIOSH Proficiency and Analytical Testing Program (PAT) and performs fiber count analysis by the NIOSH Method 7400 Revision 3, Rule A. ACME SUBCONTRACTOR is a licensed asbestos laboratory with the TDSHS, Toxic Substance Control Division for analysis of airborne asbestos fibers.

Area air monitoring was conducted by ACME SUBCONTRACTOR in accordance with the Texas Asbestos Health Protection Rules (TAHPR). Area samples were collected on December 1-6, 20XX. All of the area air samples collected outside the work area were at or below the threshold value of 0.01 fibers / cubic centimeter (f/cc) or below the limit of detection (L.O.D.).

All of the personal samples were below the OSHA Permissible Exposure Limit (PEL) for the Short Term Exposure (STEL) of 1.0 f/cc and the Time Weighted Average (TWA) limit of 0.1 f/cc.

The contract was performed in general compliance with contract documents. All ACME SUBCONTRACTOR post-abatement submittals are attached. ACME Environmental post-abatement submittals will be sent under separate cover from the contractor.

Appendices

TECHNICAL DETAILS AND ATTACHMENTS

Appendix 1: TDSHS Notifications

Appendix 2: Air Sample Results

Appendix 3: Chain of Custody Forms

Appendix 4: Air Monitoring Field Forms

Appendix 5: Daily Project Notes & Additional Field Forms

Appendix 6: TDSHS Certifications and Licenses

Appendix 7: Pictures

Appendix 8: Signed Copies of All Waste Manifests

TDSHS Notifications

Air Sample Results

Chain of Custody Forms

Air Monitoring Field Forms

Daily Project Notes & Additional Field Forms

TDSHS Certifications and Licenses

PICTURES

Copies of All Signed Waste Manifests

File details come from the government source that posted it. Updated .