This document is an Attachment G.B from a construction project coordination file for Ellington Air Force Base (AFB) in Houston, Texas, dated 21 May 2024. The attachment outlines detailed protocols for project coordination, meetings, and administrative processes for construction work. The file specifies requirements for various meeting types including pre-construction meetings, progress meetings, and pre-installation meetings, with specific guidelines for scheduling, participant requirements, and documentation. Key coordination activities include scheduling interdependent construction elements, verifying utility compatibility, efficient space utilization, and maintaining work progress.

The document emphasizes comprehensive project management practices, requiring the contractor to coordinate closely with the Project Manager, maintain detailed meeting minutes, track work progress, identify potential problems, review submittals, and ensure quality standards are maintained. The attachment provides a structured approach to project execution, including examination of existing site conditions, substrate preparation, and adherence to manufacturer recommendations for material application. While no specific pricing or funding details are included, the document demonstrates a meticulous approach to project coordination and communication throughout the construction process.

View the file

Other files

File Type Posted
ESBD_401277_1748872677255_ATB408~1.PDF PDF
ESBD_401277_1748872520449_ATF409~1.PDF PDF
ESBD_401277_1748872644533_ATAC97~1.PDF PDF
ESBD_401277_1748872655152_ATBB18~1.PDF PDF
ESBD_401277_1748872126186_ATTACHMENT G.1 Direct Deposit 74-176.pdf PDF
ESBD_401277_1748872207683_ATTACHMENT G.8 B1377 System.pdf PDF
ESBD_401277_1748872139337_ATTACHMENT G.2 Application for Texas ID #_AP_152.pdf PDF
ESBD_401277_1748872577160_ATCD32~1.PDF PDF
ESBD_401277_1748872472153_AT7BBC~1.PDF PDF
ESBD_401277_1748872566336_AT04E2~1.PDF PDF
ESBD_401277_1748872162925_ATTACHMENT G.4 Mandatory Pricing Schedule.xlsx XLSX spreadsheet
ESBD_401277_1748872431050_AT9E6E~1.PDF PDF
ESBD_401277_1748872553365_ATCF02~1.PDF PDF
ESBD_401277_1748872309609_ATTACHMENT G.5 Site Location.pdf PDF
ESBD_401277_1748872197790_ATTACHMENT G.7 B1363 System.pdf PDF
ESBD_401277_1748872632942_ATC8C2~1.PDF PDF
ESBD_401277_1748872531990_ATE6CA~1.PDF PDF
ESBD_401277_1748872665557_ATTACHMENT G.W - Ellington AFB (EF) AF103_REV.pdf PDF
ESBD_401277_1748872371253_AT6F64~1.PDF PDF
ESBD_401277_1748872415459_ATFC65~1.PDF PDF
ESBD_401277_1748872621894_AT9546~1.PDF PDF
ESBD_401277_1748872599840_AT8DD5~1.PDF PDF
ESBD_401277_1748872497677_AT5BF6~1.PDF PDF
ESBD_401277_1748872186497_ATTACHMENT G.6 B1057 System.pdf PDF
ESBD_401277_1748872588788_ATC871~1.PDF PDF
ESBD_401277_1748872543207_ATF572~1.PDF PDF
ESBD_401277_1748872611679_ATE420~1.PDF PDF
ESBD_401277_1748872342568_ATTACHMENT G.9 HUB Subcontracting Plan (HSP).pdf PDF
ESBD_401277_1748872104631_TMD25-~1.PDF PDF
ESBD_401277_1748872509961_ATF9DE~1.PDF PDF
ESBD_401277_1748872487237_ATF70F~1.PDF PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT G.B - ELLINGTON AFB (EF) COORDINATION AND

MEETINGS

PART 1 – GENERAL

1. SUMMARY

A. This Section includes:

a. Coordination

b. Preconstruction meeting

c. Progress meetings

d. Pre-installation meetings

e. Examination

f. Preparation

2. COORDINATION

A. Coordinate scheduling, submittals, and Work of the various sections of the Project

Manual to assure efficient and orderly sequence of installation of interdependent construction elements, [with provisions for accommodating items installed later].

B. Verify utility requirements and characteristics of operating equipment are compatible with building utilities. Coordinate work of various sections having interdependent responsibilities for installing, connecting to, and placing in service, such equipment.

C. Coordinate space requirements and installation of mechanical and electrical work which are indicated diagrammatically on Drawings. Follow routing shown for pipes, ducts, and conduit, as closely as practicable; place runs parallel with line of building.

Utilize spaces efficiently to maximize accessibility for other installations, for maintenance, and for repairs.

D. In finished areas [except as otherwise indicated], conceal pipes, ducts, and wiring within the construction. Coordinate locations of fixtures and outlets with finish elements.

E. Coordinate completion and cleanup of Work of separate sections in preparation for

Substantial Completion.

F. After Owner occupancy of premises, coordinate access to site for correction of defective Work and Work not in accordance with Contract Documents, to minimize disruption of Owner's activities.

3. PRE-CONSTRUCTION MEETING

A. The Project Manager will schedule a meeting after Notice of Award.

B. Agenda:

a. Distribution of Contract Documents

b. Submission of list of Subcontractors, list of Products, schedule of values, and proposed construction schedule.

c. Designation of personnel representing the parties in Contract

d. Procedures and processing of field decisions, submittals, substitutions, applications for payments, proposal request, Change Orders, and Contract closeout procedures

e. Scheduling

f. Safety plan submittal

ELLINGTON FIELD, HOUSTON, TX 21 May 2024

4. PROGRESS MEETINGS

A. The Contractor will in Coordination with the Project Manager:

a. Schedule and administer meetings throughout progress of the Work at maximum monthly intervals, every 2-weeks is preferred.

b. Make arrangements for meetings, prepare agenda with copies for participants, and preside at meetings.

c. Review coordination with related work

d. Provide written documentation of the meeting minutes for review and acceptance by all present within 3 working days of each meeting.

B. Attendance Required: Job superintendent, major Subcontractors and suppliers, the

Project Manager as appropriate to agenda topics for each meeting.

C. Agenda:

a. Review minutes of previous meetings

b. Review of Work progress

c. Field observations, problems, and decisions

d. Identification of problems which impede planned progress.

e. Review of submittals schedule with emphasis on Critical Path Items and status of submittals

f. Review of off-site fabrication and delivery schedules

g. Maintenance of progress schedule

h. Corrective measures to regain projected schedules.

i. Planned progress during succeeding work period.

j. Coordination of projected progress

k. Maintenance of quality and work standards

l. Effect of proposed changes on progress schedule and coordination

m. Other business relating to Work.

5. PRE-INSTALLATION MEETING

A. When required in individual specification sections, convene a pre-installation meeting at work site prior to commencing work of the section.

B. Require attendance of parties directly affecting, or affected by, work of the

C. specific section.

D. Notify the Project Manager four days in advance of meeting date.

E. Contractor will prepare agenda and preside at meeting:

a. Review conditions of installation, preparation, and installation procedures

b. Provide written documentation of the minutes of the meeting within 3 working days of each meeting.

PART 2 – EXECUTION

1. EXAMINATION

A. Verify that existing site conditions and substrate surfaces are acceptable for subsequent Work. Beginning new Work means acceptance of existing conditions.

B. Verify that existing substrate is capable of structural attachment of new Work being applied or attached.

ELLINGTON FIELD, HOUSTON, TX 21 May 2024

C. Examine and verify specific conditions described in individual specification sections.

D. Verify that utility services are available, of the correct characteristics, and in the correct location.

2. PREPARATION

A. Clean substrate surfaces prior to applying next material or substance.

B. Seal cracks or openings of substrate prior to applying next material or substance.

C. Apply any manufacturer required or recommended substrate primer, sealer, or conditioner prior to applying any new material or substance in contact or bond.