ESBD_379399_1733945506902_RFO HHS0014749 Amendment Addendum 3.pdf
PDF 160 KB Posted
- Solicitation number
- HHS0014749
- Issued by
- Texas
About this file
This is Addendum No. 3 to Request for Offers (RFO) No. HHS0014749 issued by Texas Health and Human Services Commission (HHSC) for Critical Incident Management Systems (CIMS). The addendum primarily revises Section 3.6.3 (Submission Checklist) and Section 5.2 (Technical Proposal) of the RFO. The submission checklist outlines required documents categorized as either Solicitation Consideration (SC) documents or Award Consideration (AC) documents. The technical proposal section requires respondents to provide a detailed description of their proposed CIMS, including completion of Exhibit N (Requirements Traceability Matrix) in Excel format.
The technical proposal must address four key components outlined in Exhibit N: CIMS RTM-Functional requirements, CIMS RTM-Technical requirements, CIMS Service Requirements, and CIMS SLRs throughout the project. The document emphasizes that submissions must use searchable PDF files where required, noting that non-searchable (image only) PDFs may result in disqualification. Both electronic and hand-made signatures are acceptable for exhibits requiring signatures. The checklist includes 17 items under Proposal and Respondent Information, plus separate sections for Cost Proposal and HUB Subcontracting Plan.
View the file
Other files
Show all 42
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFO No. HHS0014749, Addendum No. 3 Page 1 of 3
Request for Offers (RFO) For
Critical Incident Management Systems (CIMS) Solicitation No. HHS0014749
Addendum No. 3
This RFO is amended as follows:
1. Section 3.6.3 (Submission Checklist) of the RFO is deleted in its entirety and replaced with the following:
3.6.3 Submission Checklist
Solicitation Consideration and Award Consideration Documents, reference Section 1.2 (Definitions) must be submitted by the Deadline for Submission of Solicitation Responses, reference Section 3.1 (Schedule of Events). Solicitation Consideration Documents will be reviewed as received, and Respondent will not have an opportunity to remedy missed requirements. At its sole discretion, HHSC may request some or all of the Respondents to remedy missing elements of Award Consideration Documents. Those marked “SC” are Solicitation Consideration Documents and those marked “AC” are Award Consideration Documents.
The Solicitation Response must be submitted using one of the approved methods identified in Section 3.6, (Solicitation Response Submission and Delivery). Below are the documents required to be submitted with the Solicitation Response. Where searchable PDF files are required, submission of non-searchable (image only) PDF files may result in disqualification from further consideration for Contract award. For exhibits requiring signatures, both electronic and hand-made signatures are acceptable.
A. Proposal and Respondent Information
1. Narrative Proposal (Section 5.1) SC ___
2. Technical Proposal (Section 5.2, Exhibit N)
SC ___
3. Company Information (Section 6.1) SC ___
4. Authorization to Conduct Business in Texas, and, if applicable, Franchise Tax Exemption
(Section 6.2) AC ___
5. References (Section 6.3) AC ___
6. Major Subcontractor Information (Section 6.4) SC ___
RFO No. HHS0014749, Addendum No. 3 Page 2 of 3
7. HHS Solicitation Affirmations (Section 6.5, Exhibit A)
SC ___
8. Federal Assurances - Non-Construction Programs
(Section 6.5, Exhibit Q)
AC ___
9. Certification Regarding Lobbying (Section 6.5, Exhibit L)
AC ___
10. Federal Funding Accountability and Transparency Act (FFATA) Certification Form
(Section 6.5, Exhibit X)
AC ___
11. Exceptions (if applicable) (Section 3.5.4, Exhibit E)
SC ___
12. Assumptions (if applicable) (Section 3.5.5, Exhibit F)
SC ___
13. Dun and Bradstreet Report (Section 6.6.1) AC ___
14. Financial Statements and Financial Solvency
(Section 6.6.2) AC ___
15. Corporate Guarantee (Section 6.7) AC ___
16. SPI (Section 2.3, Exhibits D and D1)
AC ___
17. Signed Solicitation Addenda Acknowledgement
AC ___
B. Cost Proposal (Article VII) SC ___
C. HUB Subcontracting Plan (Section 6.8 and Exhibit H)
SC ___
2. Section 5.2 (Technical Proposal) of the RFO is deleted in its entirety and replaced with the following:
5.2 Technical Proposal
Respondents must provide a detailed description of their proposed CIMS, which must support all business activities and requirements described in this RFO. The technical proposal must reflect Respondent’s clear understanding of the nature of the Work undertaken and must include a detailed description of Respondent’s proposed system(s).
RFO No. HHS0014749, Addendum No. 3 Page 3 of 3
Respondent must complete and return with its Solicitation Response Exhibit N, Requirements Traceability Matrix, in Excel format.
The technical proposal must include a description of the following system components, at a minimum:
a. Approach to meeting the requirements listed in Exhibit N, Requirements Traceability Matrix, Tab 3, CIMS RTM-Functional throughout the Project.
b. Approach to meeting the requirements listed in Exhibit N, Requirements Traceability Matrix, Tab 4, CIMS RTM-Technical throughout the Project.
c. Approach to meeting the requirements listed in Exhibit N, Requirements Traceability Matrix, Tab 5, CIMS Service Requirements throughout the Project.
d. Approach to meeting the requirements listed in Exhibit N, Requirements Traceability Matrix, Tab 7, CIMS SLRs throughout the Project.
| 3.6.3 Submission Checklist |
| 5.2 Technical Proposal |
File details come from the government source that posted it. Updated .