RiverS_APP_B.pdf

PDF 9 KB Posted

Attached to
WA RRP RIDG 100(2), RIVER S BRIDGE REPLACEMENT Federal contract opportunity
Solicitation number
DTFH7017B00007
Issued by
Department of Transportation Federal Highway Administration

About this file

Physical Data RiverS_APP_B

View the file

Other files for this federal contract opportunity

Other files attached to WA RRP RIDG 100(2), RIVER S BRIDGE REPLACEMENT, newest first.
File Type Posted
Bid_Opening_Summary.pdf PDF
Q&A_10-1-18.pdf PDF
Finding_of_Fact_1981.pdf PDF
Permit_amendment_dated_1982.pdf PDF
River_S_Revised_Cross-Sections_Line_RS1_Sta_13+50_to_17+00.pdf PDF
Amendment_A007.pdf PDF
Original_Permit_ACOE_1958.pdf PDF
Public_Notice_1958.pdf PDF
(6)_Ridgefield_WQDataTracker_FINAL_081815_ToClient.xlsx XLSX spreadsheet
Public_Notice_1981.pdf PDF
Finding_of_Fact_1958.pdf PDF
Amendment_A006.pdf PDF
Q&A_9-26-18.pdf PDF
Revised_RiverS_APP_E.pdf PDF
Revised_RiverS_APP_D.pdf PDF
Amendment_A005.pdf PDF
Revised_RiverS_APP_C.pdf PDF
RiverS_APP_A.pdf PDF
A0004_River_S.pdf PDF
RiverS_APP_D.pdf PDF
FIS_Vol_2_of_2_-_53011CV002A.pdf PDF
FIS_Vol_1_of_2_-_53011CV001A.pdf PDF
RiverS_APP_C.pdf PDF
RiverS_APP_E.pdf PDF
Q&A_9-20-18.pdf PDF
Q&A_9-14-18.pdf PDF
Amendment_A003.pdf PDF
Amendment_A002.pdf PDF
Q&A_9-13-18.pdf PDF
Amendment_A001.pdf PDF
Q&A_9-5-18.pdf PDF
Q&A_9-4-18.pdf PDF
20a_GM_08-12_Geotech_Memo.pdf PDF
21a_Asbestos_Inspection_and_Reporting.pdf PDF
20b_GM_08-12_Ridgefield_Existing_Condition_Assessment.pdf PDF
22b_Auto_Tour_Rt_Geometry.xml XML file
09_Bridge_and_Seismic_Design_Standards-WA_RRP_RIDG_100(2).pdf PDF
21d_Navigation_Report.pdf PDF
22c_Access_Rd_Geometry.xml XML file
19a_River_'S'_Earthwork.pdf PDF
SWPPP_WA_RRP_RIDG_100(2).pdf PDF
01b_Plan_Set-WA_RRP_RIDG_100(2)_Updated_07242018.pdf PDF
22a_S_Refuge_Rd_Geometry.xml XML file
21b_Bridge_Inspection_Report.pdf PDF
20c_GR14-15_Geotech_Report.pdf PDF
Draft_20170919_WQMPP_Plan_WA_RRP_RIFG_100(2)_River_S_Bridge_Replace.pdf PDF
21c_Hydraulics_Report.pdf PDF
IFB.pdf PDF
19_Cross_Sections-WA_RRP_RIDG_100(2).pdf PDF
20d_GR14-15_River_S_Bridge_Replacement,_Final_Geotech_Report,_Aug_2016.pdf PDF
Show all 50

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

APPENDIX B

Table 1: Peak Discharge Estimates

Table 2: Water Surface Elevation, Clearance, Flow Velocity

Table 1.

Peak Discharge Estimates

Peak Discharge Estimation Method

D ra in ag e A re a

(s q . m il es

) Recurrence Interval

10-year 50-year 100-year 500-year

FEMA FIS – Flood Profiles 118

8322 cfs 12,584 cfs 13,868 cfs 17,287 cfs

Flood Profiles 22 ft 26 ft 27 ft 29.5 ft

Notes:

1. Columbia River Flood Profiles, Flood Insurance Study, Clark County, Washington and Incorporated

Areas (Flood Insurance Study Number 53011CV001A).

2. Flood profile elevation datum: NAVD 88

Table 2.

Proposed Lake River Bridge

Recurrence Interval 10-year 50-year 100-year 500-year

Existing Water Surface Elevation (feet)

22 26 27 29.5

Clearance (feet)

14.4 10.4 9.4 6.9

Flow Velocity (ft/sec)

1.40 1.51 1.55 1.63

Notes:

1. Elevation datum – NAVD88

2. Clearance is distance between low chord and water surface (Bridge low chord – 36.4 feet)

File details come from the government source that posted it.