INVITATION FOR BIDS
Solicitation No. DTFH7017B00007
WA RRP RIDG 100(2)
RIVER S BRIDGE REPLACEMENT
Solicitation, Offer & Award, Bid Schedule, Contract Clauses, General Wage Decision, Special Contract Requirements, and Plans
This solicitation cites Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-14 This project uses U.S. Customary units of measure
ISSUING OFFICE:
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
610 EAST FIFTH STREET
VANCOUVER, WA 98661-3801
Phone: (360) 619-7520 – FAX: (360) 619-7932 e-mail: wfl.contracts@dot.gov
Bid Opening Date: 09/27/2018 See Page A-3, Block 13A
QUICK INDEX
Page Item --- Bid Submittal Checklist --- Authority to Sign --- Bid Bond --- Table of Contents A-1 Notice to Bidders A-3 SF 1442, Solicitation, Offer and
Award A-6a Subcontracting Plan A-7 Bid Schedule B-1 Solicitation Provisions C-1 Contract Clauses D-1 General Wage Decision E-1 Special Contract Requirements H-1 Permits I-1 Reserved J-1 Fire Protection and Suppression
BID REMINDERS
Electronic bids will not be accepted. Submit printed copy of bid to the address listed on the enclosed SF 1442. Before submitting your bid, please review the following:
Have you rechecked your bid figures?
Have you completed the bid schedule?
Have you completed and signed the SF 1442, Solicitation, Offer & Award?
Have you acknowledged all amendments?
Have you completed the Representations & Certifications (Page B-1)?
Is your bid guarantee enclosed in proper form and amount (see FAR Clause 52.228-1), including Power of Attorney affidavit?
Does the lower left corner of the proposal envelope state “Bid Enclosed”?
Does the lower left corner include the Solicitation Number and the project number/name?
A-1 Notice to Bidders
PROJECT NAME WA RRP RIDG 100(2)
RIVER S BRIDGE REPLACEMENT
SCHEDULE A
BEGINNING AT 3+00
ENDING AT 33+07
LENGTH 0.569 MILES
NATIONAL WILDLIFE REFUGE RIDGEFIELD
COUNTY CLARK
STATE WASHINGTON
FIXED COMPLETION DATE See FAR Clause 52.211-10 (FAR Clauses begin on page C-1)
Bidder Submittal Checklist
Offer Submittal Checklist
Project: WA RRP RIDG 100(2), River S Bridge Replacement
Before submitting your offer, please review the following:
Done?
Is this in the envelope?
Bid Envelope
Did I correctly address the envelope? (See page A-3, blocks 7 & 8)
Does the lower left corner of the envelope include the Solicitation Number and the project name/number?
Pages A-3 & A-4 (SF 1442, Solicitation Offer & Award)
Did I include our firm name and address in block 14?
Did I include our firm’s phone number in block 15?
Did I include our firm’s remittance address in block 16?
(Use when different than block 14)
Did I include my unique entity identifier and my Cage Code?
Did I include the number & date of all amendments in block 19?
Did the appropriate official sign/date in block 20A, 20B & 20C?
Subcontracting Plan (see page A-6a) Did I include the completed subcontracting plan (LARGE businesses only)
Bid Schedule (see page A-7)
Did I insert “Unit Bid Price” and “Amount Bid” for each bid item?
Did the appropriate official initial corrections?
When applicable, did I include the totals for each schedule in the summary page?
(See last page of bid schedules.)
Bid Bond (Standard Form 24)
Bids received without a valid bid bond will be rejected.
Did I complete my bid bond correctly?
Did I include the original?
Did I attach the Power of Attorney to the bid bond?
Authority to Sign
Did I include a completed form for each person signing the SF1442 and Bid Bond?
Representations & Certifications & FAR Clause
Did I include the completed B-pages (beginning on B-1)?
Did I include the completed clause 1252.228-73 Notification of Miller Act Payment Bond Protection (See page C-118)?
System for Award Management (SAM) https://www.sam.gov/portal/public/SAM/
Do we have up-to-date data in SAM?
Veteran Reporting (FAR Clause 52.222-37) If applicable, did I ensure our firm has completed this annual report?
NOTE: The Contractor is fully responsible to verify that all data is correct each time a offer package is submitted. Failure to properly input and/or update your data may cause the offer to be rejected.
Bidder Submittal Checklist
Offer Submittal Checklist
Project: WA RRP RIDG 100(2), River S Bridge Replacement
Driving Directions to our Vancouver Washington Office:
Directions to WFLHD
Authority to Sign
INSTRUCTIONS: When the offeror/principal is a corporation, include this certification with your offer/bid.
Corporate Certificate
I, ____________________________________________ (name), certify that I am the
________________________________________(title), of the corporation named as the Offeror/Principal herein;
that _________________________________________(name), who signed this offer and/or bid bond on behalf of ___________________________ (company name) is
________________________________________ (title) of this corporation;
that the offer was duly signed for and on behalf of said corporation by authority and scope of its governing body, and within the scope of its corporate powers.
_____________________________________ (signature) Affix Corporate Seal
_____________________________________ (title)
INSTRUCTIONS: When the offeror/principal is a limited liability company, include this certification with your offer/bid.
Limited Liability Certificate
I, ____________________________________________ (name), certify that I am the
________________________________________(title), of the limited liability company named as the Offeror/Principal herein;
that _________________________________________(name), who signed this offer and/or bid bond on behalf of ___________________________ (company name) is
________________________________________ (title) of this company;
that the offer was duly signed for and on behalf of said company by authority and scope of its governing body, and within the scope of its powers.
_____________________________________ (signature) Affix Company Seal (as applicable) __________ _________________________ (title)
INSTRUCTIONS: When the offeror/principal is a partnership, include this
Authority to Bind Partnership
This certifies that the names and signatures of all partners are listed below, and that the person signing the proposal has the authority to actually bind the partnership pursuant to its partnership agreement. Each of the partners individually has full authority to enter into and execute contractual instruments on behalf of said partnership, except as follows:
(State “None” or describe limitations, if any)
This authority shall remain in full force and effect until such time as the revocation of authority by any cause whatsoever has been furnished in writing to and acknowledge by the Contracting Officer.
(Include names and signatures of all partners)
INSTRUCTIONS: When the offeror/principal is a joint venture, include this
Authority to Bind Joint Venture
This certifies that the person signing the proposal has the authority to actually bind the joint venture pursuant to its joint venture agreement, and that each of the named persons listed below individually has full authority to enter into and execute contractual instruments on behalf of said joint venture, except as follows:
(State “None” or describe limitations, if any)
This authority shall remain in full force and effect until such time as the revocation of authority by any cause whatsoever has been furnished in writing to and acknowledge by the Contracting Officer.
(Include names and signatures of all applicable individuals)
INSTRUCTIONS: When the offeror/principal is a sole proprietorship, the signature on the offer/bid and on the bonds must be as follows:
Sole Proprietorship Requirement
An Offeror/Principal that is a sole proprietorship must submit an offer/bid and a bond signed by the sole proprietor, or by one duly authorized to sign for the sole proprietor.
If the signature is by someone other than the sole proprietor, a copy of the power of attorney authorizing the individual to sign must be provided with the offer/bid.
RESERVED
BID BOND
(See instructions on reverse)
OMB Control Number: 9000-0045 Expiration Date: 7/31/2019
PRINCIPAL (Legal name and business address) TYPE OF ORGANIZATION ("X" one)
STATE OF INCORPORATION
SURETY(IES) (Name and business address)
PERCENT
OF BID
PRICE
PENAL SUM OF BOND
AMOUNT NOT TO EXCEED
MILLION(S) THOUSAND(S) HUNDRED(S) CENTS
BID IDENTIFICATION
BID DATE INVITATION NUMBER
PRINCIPAL
SIGNATURE(S)
NAME(S) &
TITLE(S)
(Typed)
1.
1. 2.
2.
3.
3.
(Seal) (Seal) (Seal) Corporate
Seal
INDIVIDUAL SURETY(IES)
SIGNATURE(S)
NAME(S)
(Typed) 1.
1.
2.
2.
(Seal) (Seal)
CORPORATE SURETY(IES)
S U
R E
T Y
A
NAME &
ADDRESS
STATE OF INCORPORATION LIABILITY LIMIT ($)
SIGNATURE(S)
NAME(S) &
TITLE(S)
(Typed)
1.
1.
2.
2. Corporate
Seal
AUTHORIZED FOR LOCAL REPRODUCTION
Previous edition is NOT usable
STANDARD FORM 24 (REV. 8/2016)
Prescribed by GSA - FAR (48 CFR) 53.228(a)
FOR (Construction, Supplies or Services)
OBLIGATION:
We, the Principal and Surety(ies) are firmly bound to the United States of America (hereinafter called the Government) in the above penal sum. For payment of the penal sum, we bind ourselves, our heirs, executors, administrators, and successors, jointly and severally. However, where the Sureties are corporations acting as co-sureties, we, the Sureties, bind ourselves in such sum "jointly and severally" as well as "severally" only for the purpose of allowing a joint action or actions against any or all of us. For all other purposes, each Surety binds itself, jointly and severally with the Principal, for the payment of the sum shown opposite the name of the Surety. If no limit of liability is indicated, the limit of liability is the full amount of the penal sum.
CONDITIONS:
The Principal has submitted the bid identified above.
THEREFORE:
The above obligation is void if the Principal - (a) upon acceptance by the Government of the bid identified above, within the period specified therein for acceptance (sixty (60) days if no period is specified), executes the further contractual documents and gives the bond(s) required by the terms of the bid as accepted within the time specified (ten (10) days if no period is specified) after receipt of the forms by the principal; or (b) in the event of failure to execute such further contractual documents and give such bonds, pays the Government for any cost of procuring the work which exceeds the amount of the bid.
Each Surety executing this instrument agrees that its obligation is not impaired by any extension(s) of the time for acceptance of the bid that the Principal may grant to the Government.
Notice to the surety(ies) of extension(s) is waived. However, waiver of the notice applies only to extensions aggregating not more than sixty (60) calendar days in addition to the period originally allowed for acceptance of the bid.
WITNESS:
The Principal and Surety(ies) executed this bid bond and affixed their seals on the above date.
DATE BOND EXECUTED (Must not be later than bid opening date)
Paperwork Reduction Act Statement - This information collection meets the requirements of 44 USC § 3507, as amended by section 2 of the Paperwork Reduction Act of
1995. You do not need to answer these questions unless we display a valid Office of Management and Budget (OMB) control number. The OMB control number for this collection is
9000-0045. We estimate that it will take 25 minutes to read the instructions, gather the facts, and answer the questions. Send only comments relating to our time estimate, including suggestions for reducing this burden, or any other aspects of this collection of information to: General Services Administration, Regulatory Secretariat Division (M1V1CB), 1800 F Street, NW, Washington, DC 20405.
JOINT VENTURE
OTHER (Specify)
PARTNERSHIPINDIVIDUAL
CORPORATION
DTFH7017B00007
WA RRP RIDG 100(2), RIVER S BRIDGE REPLACEMENT
INSTRUCTIONS
1. This form is authorized for use when a bid guaranty is required. Any deviation from this form will require the written approval of the Administrator of General
Services.
2. Insert the full legal name and business address of the Principal in the space designated "Principal" on the face of the form. An authorized person shall sign the bond. Any person signing in a representative capacity (e.g., an attorney-in-fact) must furnish evidence of authority if that representative is not a member of the firm, partnership, or joint venture, or an officer of the corporation involved.
3. The bond may express penal sum as a percentage of the bid price. In these cases, the bond may state a maximum dollar limitation (e.g., 20% of the bid price but the amount not to exceed dollars).
4. (a) Corporations executing the bond as sureties must appear on the Department of the Treasury's list of approved sureties and must act within the limitations listed therein. The value put into the LIABILITY LIMIT block is the penal sum (i.e., the face value) of the bond, unless a co-surety arrangement is proposed.
(b) When multiple corporate sureties are involved, their names and addresses shall appear in the spaces (Surety A, Surety B, etc.) headed "CORPORATE
SURETY(IES)." In the space designated "SURETY(IES)" on the face of the form, insert only the letter identifier corresponding to each of the sureties. Moreover, when co-surety arrangements exist, the parties may allocate their respective limitations of liability under the bond, provided that the sum total of their liability equals 100% of the bond penal sum.
(c) When individual sureties are involved, a completed Affidavit of Individual Surety (Standard Form 28) for each individual surety, shall accompany the bond.
The Government may require the surety to furnish additional substantiating information concerning its financial capability.
5. Corporations executing the bond shall affix their corporate seals. Individuals shall execute the bond opposite the word "Corporate Seal"; and shall affix an adhesive seal if executed in Maine, New Hampshire, or any other jurisdiction requiring adhesive seals.
6. Type the name and title of each person signing this bond in the space provided.
7. In its application to negotiated contracts, the terms "bid" and "bidder" shall include "proposal" and "offeror."
S U
R E
T Y
B
NAME &
ADDRESS
STATE OF INCORPORATION LIABILITY LIMIT ($)
SIGNATURE(S)
NAME(S) &
TITLE(S)
(Typed)
1.
1.
2.
2. Corporate
Seal
Corporate
Seal
LIABILITY LIMIT ($)STATE OF INCORPORATION
2.
2.
1.
1.NAME(S) &
TITLE(S)
(Typed)
SIGNATURE(S)
NAME &
ADDRESS
S U
R E
T Y
C
Corporate
Seal
LIABILITY LIMIT ($)
2.
2.
STATE OF INCORPORATION
1.
1.
NAME(S) &
TITLE(S)
(Typed)
SIGNATURE(S)
NAME &
ADDRESS
S U
R E
T Y
D
Corporate
Seal
LIABILITY LIMIT ($)
2.
2.
STATE OF INCORPORATION
1.
1.
NAME(S) &
TITLE(S)
(Typed)
SIGNATURE(S)
NAME &
ADDRESS
S U
R E
T Y
E
Corporate
Seal
LIABILITY LIMIT ($)
2.
2.
STATE OF INCORPORATION
1.
1.
NAME(S) &
TITLE(S)
(Typed)
SIGNATURE(S)
NAME &
ADDRESS
S U
R E
T Y
F
Corporate
Seal
LIABILITY LIMIT ($)
2.
2.
STATE OF INCORPORATION
1.
1.
NAME(S) &
TITLE(S)
(Typed)
SIGNATURE(S)
NAME &
ADDRESS
S U
R E
T Y
G
STANDARD FORM 24 (REV. 8/2016) BACK
Table of Contents
TABLE OF CONTENTS
08/01/14–FP14
DESCRIPTION PAGE
Notice to Bidders ........................................................................................................................ A-1
Solicitation, Offer, and Award (SF 1442) ................................................................................... A-3
Bid Schedule ............................................................................................................................... A-7
Solicitation Provisions ................................................................................................................ B-1
Contract Clauses ......................................................................................................................... C-1
General Wage Decision .............................................................................................................. D-1
SCRs Table of Contents
SPECIAL CONTRACT REQUIREMENTS (SCR)
The following Special Contract Requirements amend and supplement the Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects (FP-14), U.S. Department of Transportation, Federal Highway Administration.
Division 100 ..................................................................................................................... E-1
Division 150 ................................................................................................................... E-32
Division 200 ..................................................................................................................... F-1
Division 250 .................................................................................................................... F- 6
Division 550 ................................................................................................................... F-19
Division 600 ................................................................................................................... F-40
Division 700 .................................................................................................................... G-1
Permits ........................................................................................................................................ H-1
RESERVED .................................................................................................................................. I-1
Fire Protection and Suppression Plan .......................................................................................... J-1
BNSF Overpass Agreement ........................................................................................................ K-1
Table of Contents
(This page intentionally left blank)
A-1
Notice to Bidders Project: WA RRP RIDG 100(2), River S Bridge Replacement
NOTICE TO BIDDERS
7/21/17–FP14
THIS PROJECT IS BEING SOLICITED AND AWARDED UNDER FP-14.
The FP-14 is a new release of FLH’s Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects. Carefully review the entire FP-14 as significant modifications have been made and new requirements added. Additionally, sections from the previous FP version may have shifted or been deleted.
To view the FP-14 electronically go to:
https://flh.fhwa.dot.gov/business/resources/specs/
The FP-14 is a dual unit document with U.S. Customary units being the primary unit shown. Metric equivalents are shown in parenthesis.
When submitting bids, drawings, calculations, and other construction documents, use only U.S. Customary units of measure, unless otherwise stated.
I. Project Location
General Location. The project work is located near Ridgefield, WA in Clark County.
Approximate Global Positioning System (GPS) coordinates for the beginning of the project are 45.807433, -122.740104.
Project Limits. Signs have not been erected to identify the project limits. No Government personnel will be available for show-me tours.
II. Pre‐bid Information.
GENERAL AND TECHNICAL QUESTIONS REGARDING PROPOSED WORK FOR
THIS PROJECT WILL BE ACCEPTED UNTIL CLOSE-OF-BUSINESS ON September 19, 2018.
Refer to page A-5 for information on how to submit questions related to General Information and Technical Information. Answers to General and Technical Questions will be posted at https://www.fbo.gov/spg/DOT/FHWA/WFL/DTFH7017B00007/listing.html
Every attempt to respond to questions will be made. However, response to questions received after the above posted date is not guaranteed.
Electronic Plan Sheets. This solicitation includes electronic plan sheets available at https://www.fbo.gov/spg/DOT/FHWA/WFL/DTFH7017B00007/listing.html
A paper copy of the plan sheets is available by submitting the form posted with this solicitation.
A-2
Project: WA RRP RIDG 100(2), River S Bridge Replacement
Physical Data. Physical data applicable to this project is listed in FAR Clause 52.236-4 Physical Data.
Representations & Certifications. Submit or update Representations and Certifications online at https://www.sam.gov/portal/public/SAM/ before bid submittal. For more details go to FAR Provision 52.204-8 Annual Representations and Certifications (see page B-2.). If you have previously registered on-line and the NAICS code for this solicitation is different than the code listed in your online file, please note the amended changes on the lines provided in FAR 52.204- 8.
Requests for Information. Requests for technical information (Plan and Division 100 – 700 Specification questions only) about this project will only be accepted in writing (see Block 9 on page A-5).
Price Evaluation Factor. This solicitation contains a Price Evaluation Factor. In accordance with 13 CFR subsection 126.613, we will apply a factor of 10% to an apparent low bid submitted by a large business when we also receive a bid from a HUBZone small business; the 10% factor does not apply to an apparent low bid submitted by a small business.
HUBZone. If the contract is awarded after applying the price preference for HUBZone small business concerns under FAR clause 52.219-4; at least 50 percent of the cost of the contract performance incurred for personnel must be spent on the prime Contractor’s employees or the employees of other qualified HUBZone small business concerns.
SF 1442, Solicitation, Offer, and Award. Particular attention should be paid to Standard Form l442, Solicitation, Offer and Award, to assure that Blocks 14, 15, 16, 19, 20A, and 20C are completed correctly. Sign Block 20B according to the instructions in Subsection 102.02. You must submit a completed ‘Authority to Sign’ document. You must also complete the representations and certifications contained in the Contract Provisions beginning on page B-1.
Failure to furnish or complete any of the above may result in your bid being considered nonresponsive and being rejected.
Facsimile and email bids, modifications, and withdrawals. Facsimile and email bids are not authorized for this solicitation. Bids may be modified or withdrawn by facsimile, if such notice is received by the time specified for receipt of bids. The Government will not be responsible for any failure attributable to the transmission or receipt of facsimile data. See FAR Provision 52.214-5, Submission of Bids. FAX 360.619.7932. To confirm receipt, call 360.619.7520.
Surety Bond Guarantee Program. Small businesses that need surety bonds can qualify for U.S.
Small Business Administration (SBA) backed surety bonds. SBA assistance in locating a participating surety company or agent, and completing application forms is available online. For more information on the U.S. SBA’s Surety Bond Guarantee program, go online to http://www.sba.gov/content/contractors or call 1-800-U-ASK-SBA.
A-2a
Project: WA RRP RIDG 100(2), River S Bridge Replacement
Fraud Alert. Current and potential U.S. Department of Transportation (DOT) Contractors have recently been receiving fraudulent letters purporting to be issued by DOT. These fraudulent letters request that the Contractors resubmit their banking information to DOT. If you receive such a letter, please DO NOT complete the requested worksheet that is attached to the letters and DO NOT release any information. To register or update information, Contractors are required to go directly through the System for Award Management (SAM) website and never through a third party. You can access SAM at https://www.sam.gov/portal/public/SAM/.
III. Post Award Information.
Insurance. Insurance requirements are described in Subsection 107.05 and specific BNSF Insurance requirements describe in Section K
Contractor Performance Evaluations. This office posts performance evaluations in the Contractor Performance Assessment Reporting System (CPARS); for additional information see http://www.cpars.gov/index.htm. Upon receiving an email notice of evaluation availability, you will have 14-60 days to review the evaluation online and submit comments. If you are unable to access the system, call 360.619.7520 for assistance or for a copy of the evaluation.
IV. Specifications and Permits.
Specifications. This solicitation and subsequent contract are governed by the Federal Acquisition Regulation (FAR), agency supplemental regulations, and the Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-14. An electronic version may be found at http://flh.fhwa.dot.gov/business/resources/specs/. A single paper copy can also be obtained from the Research & Technology Product Distribution Center (RTPDC) by e-mail to:
report.center@dot.gov, or by phone 814-239-1160, or fax 814-239-2156.
Electronic Documentation. Requires all documents (including but not limited to correspondence, notifications, submittals, reports, and pay notes) to be submitted in a pdf format, or an approved fixed-layout electronic format. See Subsection 103.06.
Brand Name or Equal. Section 725, MISCELLANEOUS MATERIALS, specifies a proprietary product. See FAR Provision 52.211-6, Brand Name or Equal, when opting to use alternate products. If your offer is based on a brand name different than that listed in the Special Contract Requirements, the proposed "equal" must be identified in the space provided on the Bid Schedule.
Include with your offer all documentation needed by the Government to determine if the proposed product meets the requirements listed in the appropriate Section. The evaluation of offers and the determination as to equality of the product offered is the responsibility of the Government and will be based on information furnished by the Offeror as well as other information reasonably available to the contracting office. If the proposed “equal” is determined by the government to be “not equal”, the bid will be considered nonresponsive.
A-2b
Project: WA RRP RIDG 100(2), River S Bridge Replacement
Carefully Review Section 563 and 725 of the Special Contract requirements, and account for all material lead time(s).
Material Sources. Sources have not been identified for this project. Secure all permits and clearances for Contractor-located sites and sources. See Subsection 105.02(c).
BNSF Railroad Coordination. BNSF will not respond to any bidder questions. The awarded contractor will need to secure an agreement directly with BNSF for work within, over and adjacent to BNSF Right of Way. See Subsection 107.04.
US Coast Guard Coordination. The awarded contractor will need to secure directly with the US Coast Guard a work plan to ensure the safety of the mariner and ensure the reasonable needs of navigation are maintained. See Subsection 156.04A and Section H.
See Page A-5 520
9 2
HFLWCO1700000047
A-3
Unique Entity Identifier: (aka Duns) # Cage Code:
See Bid Schedule
All Items on Bid Schedule
See Page A-5 x
Federal Highway Administration Western Federa Lands Highway Div.
610 East Fifth Street Vancouver, WA 98661-3801 ATTN: Finance
21. ITEMS ACCEPTED
All Items on Bid Schedule
A-4
A-5
Continuation SF 1442 Project: WA RRP RIDG 100(2), RIVER S BRIDGE REPLACEMENT
Block 9 FOR GENERAL INFORMATION, call 360.619.7520 from the hours of 8:00 a.m. to 4:00 p.m. local time or e-mail us at wfl.contracts@dot.gov.
FOR TECHNICAL INFORMATION (plan and specification questions only), requests for technical information about this project will only be accepted in writing.
Submit questions via fax (360.619.7932) or e-mail at wfl.plans-spec@dot.gov.
QUESTIONS/ANSWERS POSTED ONLINE. You can view questions and answers on the Federal Business Opportunities (FBO) Website https://www.fbo.gov/ .
Insert the solicitation number in “Keyword / Solicitation #:”
Scroll to the project.
Make sure you are on the most recent view and look in the right section of the page for the most recent Q&A document.
FOR DAVIS-BACON WAGE RATE INFORMATION call the Department of Labor at 415.625.7716 (DRBA - Western Region)
FOR PHYSICAL DATA, See FAR Contract Clause 52.236-4, Physical Data, (clauses begin on page C-1) for a listing of available data. Physical Data will be posted with the solicitation on the Federal Business Opportunities website.
FOR BID RESULTS, Bid opening summary will be posted on the Federal Business Opportunities (FBO) Website https://www.fbo.gov/ shortly after bid opening. Bid tabulations will be available on our website approximately 3 work days after the bid opening. Our website is located at: http://flh.fhwa.dot.gov/business/construction/bids/ filter by WFL Division and applicable state.
Block 11 COMPLETION DATE: Work shall be completed on or before the date specified in
FAR Clause 52.211-10, Commencement, Prosecution, and Completion of Work, subject to such extensions as may be authorized by the terms of the contract and the specifications made a part thereof. Contract Clauses begin on pages C-1.
Block 12A PERFORMANCE & PAYMENT BONDS: See FAR Clause, 52.228-15, Performance and Payment Bonds - Construction (clauses begin on page C-1) and Subsection 102.06 of the Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-14, U.S. Customary Units.
Block 13B BID BOND AMOUNT: See FAR Clause 52.228-1, Bid Guarantee (clauses begin on page C-1).
ADDITIONAL INFORMATION: See Subsections 102.03 and 102.04 of Standard
Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP- 14, U.S. Customary Units.
Block 24 SUBMITTING INVOICES: See Subsection 109.08 of the Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects FP-14, U.S. Customary Units.
A-6
Continuation SF 1442 Project: WA RRP RIDG 100(2), RIVER S BRIDGE REPLACEMENT
ESTIMATED PRICE RANGE. The price range of the project work is between $5,000,000 and $7,000,000.
SUBCONTRACTING PLAN. This invitation for bids requires a low bidder who is a LARGE business to submit an acceptable subcontracting plan prior to contract award. Do not submit this form with your bid. A large business is one whose average gross annual receipts over the past 3 years equal $36.5 million or more. For your information the subcontracting plan form is included beginning on page A-6a.
This requirement does not apply to SMALL businesses.
A-6a
SUBCONTRACTING PLAN for solicitation number DTFH________________
1. INSTRUCTIONS:
Where subcontracting opportunities will not exist for the solicitation, the bidder/offeror shall submit a response outlining the rationale for making this determination with its proposal/bid.
The statement shall be signed by an official authorized to make decisions on behalf of the firm.
The following information shall be provided in the bidder/offeror subcontracting plan submission and shall be expressed in terms of goal percentages of the total planned subcontracting dollars.
Text lines may be added to this format as needed.
SUBCONTRACTING PLAN for solicitation number DTFH7017B00007
a. Total prime contract amount: $
RATIO GOALS
PERCENT b. Total planned subcontract awards: $
c. Total planned subcontract awards to other than small business concerns (i.e., large, non-profit, etc.) $ (c/b) %
d. Total planned subcontract awards to Small Business concerns (SB) (not elsewhere counted in e. f. g. or h.
below) $ (d/b) %
e. Total planned subcontract awards to Service-Disabled Veteran Owned Small Business concerns (SDVOSB):
NOTE: The Small Business Act has established a statutory minimum goal of 3% for SDVOSB. Please provide rationale below if establishing a lower goal. $ (e/b) %
f. Total planned subcontract awards to Small Business concerns located in Historically Underutilized Business Zones (HUBZone):
NOTE: The Small Business Act has established a statutory minimum goal of 3% for HUBZone concerns. Please provide rationale below if establishing a lower goal. $ (f/b) %
g. Total planned subcontract awards to Small Disadvantaged Business (SDB) concerns (includes 8(a)s, Alaska Native Corporations (ANC) and Indian Tribes):
NOTE: The Small Business Act has established a statutory minimum goal of 5% for SDB. Please provide rationale below if establishing a lower goal. $ (g/b) %
A-6b
e. Offeror/bidder rationale if establishing a goal lower than 3% for SDVOSB:
f. Offeror/bidder rationale if establishing a goal lower than 3% for HUBZone:
g. Offeror/bidder rationale if establishing a goal lower than 5% for SDB:
h. Offeror/bidder rationale if establishing a goal lower than 5% for WOSB:
i. Offeror/bidder rationale if establishing a goal lower than 50% for SB:
1 The term WOSB includes Economically Disadvantaged WOSB (EDWOSB) concerns.
h. Total planned subcontract awards to Women-Owned Small Business concerns (WOSB)1 concerns:
NOTE: The Small Business Act has established a statutory minimum goal of 5% for WOSB. Please provide rationale below if establishing a lower goal. $ (h/b) %
i. Combined total planned subcontract awards to all small business (SB) concerns:
NOTE: The U.S. Small Business Administration (SBA) has established a minimum goal of 50% for SB (to include all categories noted above) for the US Department Of Transportation (USDOT). Please provide rationale in the narrative section below if establishing a lower goal.
NOTE: If a subcontractor qualifies in more than one sub-category of SB above, show that amount in each applicable sub-category, but include that amount only once in this line. $ (d+e+f+g+h)/b %
A-6c
2. The following principal types of supplies and/or services are planned to be subcontracted under this contract. (Indicate if planned to subcontract to other than business concerns, SB, SDVOSB, HUBZone, SDB, or WOSB/EDWOSB.
Type of Supply/Service to be
Subcontracted Company/Firm Name Address
Subcontractor Size Standard (Other Than SB, SB, SDVOSB, HUBZone, SDB, WOSB)2
3. The following method was used to develop the subcontract percentage goals:
4. The following methods were used to identify potential subcontract sources for solicitation purposes. (i.e., source lists used and organizations contacted to identify potential SB concerns, such as the System for Award Management (SAM), Dynamic Small Business Search (DSBS), trade associations, industry conferences/fairs, etc.)
5. [Select appropriate option.] Indirect costs [were] [were not] included in establishing the subcontracting goals specified in the table above.
6. If indirect costs were included, the following method was used to determine the proportionate share of indirect costs to be incurred with SB, SDVOSB, HUBZone, SDB and WOSB/EDWOSB subcontractors:
7. The following individual will administer the subcontracting program:
Name: _______________________________________________ Title: ________________________________________________ Address: ____________________________________________________________________
2 Please list all applicable size standards for each proposed subcontractor.
A-6d
Telephone & e-mail:____________________________________________________________
This individual's specific duties, as they relate to the subcontracting program, are as follows:
8. The following efforts will be taken to ensure that SB, SDVOSB, HUBZone, SDB, and WOSB subcontractors will have an equitable opportunity to compete for subcontracts:
It is agreed that FAR Clause 52.219-8, Utilization of Small Business Concerns, will be included in all subcontracts, which offer further subcontracting opportunities. It is further agreed that all subcontractors (except small business concerns) at all tiers below the prime contractor who receive subcontracts in excess of $700,000 ($1.5M for construction of any public facility with further subcontracting possibilities) will be required to adopt and comply with a subcontracting plan in accordance with FAR Clause 52.219-9.
9. The following types of records will be maintained concerning procedures that have been adopted to comply with the requirements and goals in the plan (i.e., establishment of source lists, guides and other data that identify SB, SDVOSB, HUBZone, SDB and WOSB concerns; a description of the offeror’s efforts to locate SB, SDVOSB, HUBZone, SDB and WOSB concerns and to award subcontracts to them, etc.) and shall be maintained through completion of the contract:
10. In accordance with FAR Subpart 19.704(a)(10) through (15), the Contractor further agrees to:
a. Cooperate in any studies or surveys as may be required;
b. Submit periodic reports as may be required so that the Government can determine the extent of compliance by the Contractor with the subcontracting plan;
c. After November 30, 2017, include subcontracting data for each order when reporting subcontracting achievements for indefinite-delivery, indefinite-quantity contracts intended for use by multiple agencies;
d. Submit the Individual Subcontract Report (ISR), and the Summary Subcontract Report (SSR) using the Electronic Subcontracting Reporting System (eSRS) at http://www.esrs.gov/ within the timeframes identified at FAR Subpart 19.704(a)(10)(iv);
e. Ensure that other than small business subcontractors with subcontracting plans agree to submit eSRS documents online as required;
f. Provide its prime contract number and its unique entity identifier, and the e-mail address of
A-6e the offeror’s official responsible for acknowledging receipt of or rejecting the ISRs to all first-tier subcontractors with subcontracting plans so they can enter this information into the eSRS when submitting their ISRs;
g. Require that each subcontractor with a subcontracting plan provide the prime contract number, its own unique entity identifier, and the e-mail address of the subcontractor’s official responsible for acknowledging receipt of or rejecting the ISRs, to its subcontractors with subcontracting plans;
h. Make a good faith effort to acquire articles, equipment, supplies, services, or materials, or obtain the performance of construction work from the small business concerns that the offeror used in preparing the bid or proposal, in the same or greater scope, amount, and quality used in preparing and submitting the bid or proposal;
i. Provide the contracting officer with a written explanation if the contractor fails to acquire articles, equipment, supplies, services or materials or obtain the performance of construction work as described in FAR 19.704(a)(12) of this section. This written explanation will be submitted to the contracting officer within 30 days of contract completion;
j. Will not prohibit a subcontractor from discussing with the contracting officer any material matter pertaining to payment to or utilization of a subcontractor; and
k. Pay its small business subcontractors on time and in accordance with the terms and conditions of the subcontract, and notify the contracting officer if the offeror pays a reduced or an untimely payment to a small business subcontractor (see FAR 52.242-5).
Submitted by:
Signed Title
Printed Name Email Address
Company Name and Address
Date
A-7
Bid Schedule
Bid Schedule
Project: WA RRP RIDG 100(2)
River ‘S’ Bridge Replacement
Bidders please note: Before preparing the bid, carefully read the Solicitation Provisions.
Insert a unit bid price, in figures, for each pay item for which a quantity appears in the bid schedule. Multiply the unit bid price by the quantity for each pay item and show the amount bid. Should any mathematical check made by the Government show a mistake in the amount bid, the Amount Bid for the item will be based on the Unit Bid Price.
When a “LPSM” (Lump Sum) appears as a unit bid price, insert an amount for each lump sum pay item.
When a sum based on a fixed rate appears for any pay item in the amount bid column, include the Government inserted amount bid for the item in the total bid amount.
Total the amounts bid for all pay items and insert the total bid amount.
Do not include an amount to protect against contingent cost increases to prices subject to the escalation coverage.
BRAND NAME OR EQUAL NOTIFICATION
If providing other than the listed brand name products, complete the following (See FAR Provision 52.211-6, Brand Name or Equal):
A. For Section 563, Painting, which is incidental , our firm offers in lieu of the brand name Natina® Steel manufactured by Natina Products, LLC specified in Subsection
725.19 Weathering Agent:
Brand: __________________________________________
Manufacturer’s Name: _____________________________
Include with your bid all documents needed by the Government to determine if the proposed product meets the requirements listed in the appropriate Section. The determination as to the equality of the product offered is the responsibility of the Government and will be based on the information furnished by the bidder as well as other information reasonably available to the contracting office. If proposed “equal” is determined by the government to be “not equal”, bid will be considered nonresponsive.
A-8
B I D S C H E D U L E Account: ALL
Project No: WA RRP RIDG 100(2)
Name: RIVER 'S' BRIDGE REPLACEMENT CQ = "Contract Quantity"
Item No. Quantity Unit Unit Price Amount
15101-0000 Line A0020 ALL LPSM $
15201-0000 Line A0040 ALL LPSM $
15301-0000 Line A0060 ALL LPSM $
15401-0000 Line A0080 ALL LPSM $
15501-0000 Line A0100 ALL LPSM $
15705-0100 Line A0120 2,050 LNFT $ $
15705-1400 Line A0140 600 LNFT $ $
20101-0000 Line A0160 2.5 ACRE $ $
20301-1900 Line A0180 2 EACH $ $
20301-2400 Line A0200 3 EACH $ $
20302-1200 Line A0220 200 LNFT $ $
20304-2000 Line A0240 ALL LPSM $
20420-0000 Line A0260 8,500 CUYD $ $
21101-1000 Line A0280 500 SQYD $ $
25101-0300 Line A0300 27 CUYD $ $
25501-1000 Line A0320 10,950 SQFT (CQ) $ $
25701-0200 Line A0340 ALL LPSM $
27601-0000 Line A0360 254 SQYD (CQ) $ $
30202-2000 Line A0380 1,200 TON $ $
MOBILIZATION
CONSTRUCTION SURVEY AND STAKING
CONTRACTOR QUALITY CONTROL
CONTRACTOR TESTING
CONSTRUCTION SCHEDULE
SOIL EROSION CONTROL, SILT FENCE
ROADWAY AGGREGATE, METHOD 2
EMBANKMENT CONSTRUCTION
ROADWAY OBLITERATION, METHOD 1
PLACED RIPRAP, METHOD A, CLASS 3
SOIL EROSION CONTROL, FIBER ROLL
CLEARING AND GRUBBING
REMOVAL OF PIPE CULVERT
REMOVAL OF SIGN
REMOVAL OF GUARDRAIL
REMOVAL OF BRIDGE
MECHANICALLY STABILIZED EARTH WALL, WELDED WIRE FACE
CONTRACTOR FURNISHED MECHANICALLY STABILIZED EARTH WALL DESIGN
GEOTECHNICAL GROUND IMPROVEMENT
A-9
Account: ALL
Project No: WA RRP RIDG 100(2)
Name: RIVER 'S' BRIDGE REPLACEMENT CQ = "Contract Quantity"
Item No. Quantity Unit Unit Price Amount
55201-0200 Line A0400 827 CUYD (CQ) $ $
55202-1000 Line A0420 107 SQYD (CQ) $ $
55235-0000 Line A0440 48 LNFT (CQ) $ $
55302-3200 Line A0460 1,524 LNFT (CQ) $ $
55401-1000 Line A0480 73,747 LB (CQ) $ $
55401-2000 Line A0500 148,470 LB (CQ) $ $
55601-0900 Line A0520 1,128 LNFT (CQ) $ $
56401-1000 Line A0540 6 EACH (CQ) $ $
56501-0000 Line A0560 344 LNFT (CQ) $ $
56501-0800 Line A0580 330 LNFT (CQ) $ $
57501-0000 Line A0600 ALL LPSM $
60103-0180 Line A0620 1 EACH $ $
60201-0800 Line A0640 100 LNFT $ $
60201-1000 Line A0660 290 LNFT $ $
60210-1000 Line A0680 1 EACH $ $
60403-0000 Line A0700 2 EACH $ $
60510-0800 Line A0720 150 LNFT $ $
61701-1950 Line A0740 488 LNFT $ $
61702-0800 Line A0760 4 EACH $ $
CONCRETE, HEADWALL FOR 36-INCH PIPE CULVERT
24-INCH PIPE CULVERT
36-INCH PIPE CULVERT
STRUCTURAL CONCRETE, CLASS A (AE)
STRUCTURAL CONCRETE, CLASS D (AE), FOR APPROACH SLABS, TYPE 1
REINFORCING STEEL, EPOXY COATED
BRIDGE RAILING, STEEL
BEARING DEVICE, ELASTOMERIC
DRILLED SHAFT (120-INCH DIAMETER)
DRILLED SHAFT, 60-INCH DIAMETER
MINOR BRIDGE WORK
EXPANSION JOINTS
PRECAST, PRESTRESSED CONCRETE GIRDER
REINFORCING STEEL
GUARDRAIL SYSTEM G4, TYPE 4, CLASS B STEEL POSTS
TERMINAL SECTION TYPE TANGENT
END SECTION FOR 36-INCH PIPE CULVERT
INLET
6-INCH OUTLET PIPE
A-10
Account: ALL
Project No: WA RRP RIDG 100(2)
Name: RIVER 'S' BRIDGE REPLACEMENT CQ = "Contract Quantity"
Item No. Quantity Unit Unit Price Amount
Schedule Total: ________________________
Submitted by: _________________________
61707-0000 Line A0780 84 LNFT $ $
61901-1300 Line A0800 231 LNFT (CQ) $ $
61901-1300 Line A0820 915 LNFT (CQ) $ $
61901-1300 Line A0840 475 LNFT (CQ) $ $
61902-0000 Line A0860 1 EACH $ $
62401-0300 Line A0880 3,000 SQYD $ $
62502-0000 Line A0900 3,000 SQYD $ $
63301-0000 Line A0920 2 EACH $ $
63501-0000 Line A0940 ALL LPSM $
63503-1000 Line A0960 2,200 LNFT $ $
63610-1600 Line A0980 2,755 LNFT $ $
63621-1000 Line A1000 1 EACH $ $
63621-3000 Line A1020 2 EACH $ $
63622-0000 Line A1040 1,210 LNFT $ $
STRUCTURE TRANSITION RAILING
FENCE, CHAIN LINK
FENCE, CHAIN LINK (35-INCH HEIGHT)
FENCE, CHAIN LINK (42-INCH HEIGHT)
CONDUIT, 2-INCH, PVC
UTILITY BOX, PULLBOX
UTILITY BOX, JUNCTION BOX
UTILITY TRENCH
GATE
FURNISHING AND PLACING TOPSOIL, 4-INCH DEPTH
TURF ESTABLISHMENT
SIGN SYSTEM
TEMPORARY TRAFFIC CONTROL
TEMPORARY TRAFFIC CONTROL, PLASTIC FENCE
B-1
Solicitation Provisions
FEDERAL ACQUISITION REGULATION
SOLICITATION PROVISIONS
Representations, Certifications and Other Statements of Bidders
The bidder makes the following representations and certifications as a part of its bid.
52.203-18 Prohibition on Contracting with Entities that Require Certain Internal Confidentiality Agreements or Statements-Representation (Jan 2017)
(a) Definition.
“Internal confidentiality agreement or statement,” “subcontract”, and “subcontractor”, as used in this provision, are defined in the clause at 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements.
(b) In accordance with section 743 of Division E, Title VII, of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L. 113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions), Government agencies are not permitted to use funds appropriated (or otherwise made available) for contracts with an entity that requires employees or subcontractors of such entity seeking to report waste, fraud, or abuse to sign internal confidentiality agreements or statements prohibiting or otherwise restricting such employees or subcontractors from lawfully reporting such waste, fraud, or abuse to a designated investigative or law enforcement representative of a Federal department or agency authorized to receive such information.
(c) The prohibition in paragraph (b) of this provision does not contravene requirements applicable to Standard Form 312, (Classified Information Nondisclosure Agreement), Form 4414 (Sensitive Compartmented Information Nondisclosure Agreement), or any other form issued by a Federal department or agency governing the nondisclosure of classified information.
(d) Representation. By submission of its offer, the Offeror represents that it will not require its employees or subcontractors to sign or comply with internal confidentiality agreements or statements prohibiting or otherwise restricting such employees or subcontractors from lawfully reporting waste, fraud, or abuse related to the performance of a Government contract to a designated investigative or law enforcement representative of a Federal department or agency authorized to receive such information (e.g., agency Office of the Inspector General).
Completing FAR provision 52.204-8 Annual Representation and Certifications.
This solicitation is issued under NAICS 237310 – Highway, Street & Bridge Construction with a small business size standard of $36.5 million. If your average annual gross receipts for the past 3 years are above $36.5 million you are a large business for this solicitation. If they are below $36.5 million you are a small business. Please complete the certification listed in paragraph (d).
Before submitting bids, please ensure you have completed your annual representations and certifications electronically at the System for Award Management (SAM) website: https://www.sam.gov/portal/public/SAM/.
B-2
52.204-8 Annual Representations and Certifications. (Jan 2018)
(a) (1) The North American Industry Classification (NAICS) code for this solicitation is 237310 – Highway, Street & Bridge construction.
(2) The small business size standard is $36.5 million.
(3) The small business size standard for a concern which submits an offer in its own name, other than on a construction or service contract, but which proposes to furnish a product which it did not itself manufacture, is 500 employees.
(b)(1) If the provision at 52.204-7, System for Award Management, is included in this solicitation, paragraph (d) of this provision applies.
(2) If the provision at 52.204-7 is not included in this solicitation, and the offeror is currently registered in the System for Award Management (SAM), and has completed the Representations and Certifications section of SAM electronically, the offeror may choose to use paragraph (d) of this provision instead of completing the corresponding individual representations and certifications in the solicitation. The offeror shall indicate which option applies by checking one of the following boxes:
(i) Paragraph (d) applies.
(ii) Paragraph (d) does not apply and the offeror has completed the individual representations and certifications in the solicitation.
(c)(1) The following representations or certifications in SAM are applicable to this solicitation as indicated:
(i) 52.203-2, Certificate of Independent Price Determination. This provision applies to solicitations when a firm-fixed-price contract or fixed-price contract with economic price adjustment is contemplated, unless—
(A) The acquisition is to be made under the simplified acquisition procedures in Part 13;
(B) The solicitation is a request for technical proposals under two-step sealed bidding procedures; or
(C) The solicitation is for utility services for which rates are set by law or regulation.
(ii) 52.203-11, Certification and Disclosure Regarding Payments to Influence Certain Federal Transactions. This provision applies to solicitations expected to exceed $150,000.
(iii) 52.203-18, Prohibition on Contracting with Entities that Require Certain Internal Confidentiality Agreements or Statements-Representation. This provision applies to all solicitations.
(iv) 52.204-3, Taxpayer Identification. This provision applies to solicitations that do not include the provision at 52.204-7, System for Award Management.
(v) 52.204-5, Women-Owned Business (Other Than Small Business). This provision applies to solicitations that—
(A) Are not set aside for small business concerns;
(B) Exceed the simplified acquisition threshold; and
(C) Are for contracts that will be performed in the United States or its outlying areas.
(vi) 52.209-2, Prohibition on Contracting with Inverted Domestic Corporations—Representation.
(vii) 52.209-5, Certification Regarding Responsibility Matters.