21a_Asbestos_Inspection_and_Reporting.pdf

PDF 413 KB Posted

Attached to
WA RRP RIDG 100(2), RIVER S BRIDGE REPLACEMENT Federal contract opportunity
Solicitation number
DTFH7017B00007
Issued by
Department of Transportation Federal Highway Administration

About this file

21a_Asbestos Inspection and Reporting

View the file

Other files for this federal contract opportunity

Other files attached to WA RRP RIDG 100(2), RIVER S BRIDGE REPLACEMENT, newest first.
File Type Posted
Bid_Opening_Summary.pdf PDF
Q&A_10-1-18.pdf PDF
Amendment_A007.pdf PDF
Original_Permit_ACOE_1958.pdf PDF
Public_Notice_1958.pdf PDF
(6)_Ridgefield_WQDataTracker_FINAL_081815_ToClient.xlsx XLSX spreadsheet
Public_Notice_1981.pdf PDF
Finding_of_Fact_1958.pdf PDF
Finding_of_Fact_1981.pdf PDF
Permit_amendment_dated_1982.pdf PDF
River_S_Revised_Cross-Sections_Line_RS1_Sta_13+50_to_17+00.pdf PDF
Amendment_A006.pdf PDF
Q&A_9-26-18.pdf PDF
Amendment_A005.pdf PDF
Revised_RiverS_APP_C.pdf PDF
Revised_RiverS_APP_E.pdf PDF
Revised_RiverS_APP_D.pdf PDF
FIS_Vol_1_of_2_-_53011CV001A.pdf PDF
RiverS_APP_C.pdf PDF
RiverS_APP_E.pdf PDF
RiverS_APP_A.pdf PDF
A0004_River_S.pdf PDF
RiverS_APP_D.pdf PDF
FIS_Vol_2_of_2_-_53011CV002A.pdf PDF
RiverS_APP_B.pdf PDF
Q&A_9-20-18.pdf PDF
Q&A_9-14-18.pdf PDF
Amendment_A003.pdf PDF
Amendment_A002.pdf PDF
Q&A_9-13-18.pdf PDF
Amendment_A001.pdf PDF
Q&A_9-5-18.pdf PDF
Q&A_9-4-18.pdf PDF
20c_GR14-15_Geotech_Report.pdf PDF
Draft_20170919_WQMPP_Plan_WA_RRP_RIFG_100(2)_River_S_Bridge_Replace.pdf PDF
21c_Hydraulics_Report.pdf PDF
IFB.pdf PDF
19_Cross_Sections-WA_RRP_RIDG_100(2).pdf PDF
20d_GR14-15_River_S_Bridge_Replacement,_Final_Geotech_Report,_Aug_2016.pdf PDF
20a_GM_08-12_Geotech_Memo.pdf PDF
20b_GM_08-12_Ridgefield_Existing_Condition_Assessment.pdf PDF
22b_Auto_Tour_Rt_Geometry.xml XML file
09_Bridge_and_Seismic_Design_Standards-WA_RRP_RIDG_100(2).pdf PDF
21d_Navigation_Report.pdf PDF
22c_Access_Rd_Geometry.xml XML file
19a_River_'S'_Earthwork.pdf PDF
SWPPP_WA_RRP_RIDG_100(2).pdf PDF
01b_Plan_Set-WA_RRP_RIDG_100(2)_Updated_07242018.pdf PDF
22a_S_Refuge_Rd_Geometry.xml XML file
21b_Bridge_Inspection_Report.pdf PDF
Show all 50

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CERTIFIED ENVIRONMENTAL CONSULTING, LLC

615 SE CHKALOV DRIVE, SUITE 12, VANCOUVER, WASHINGTON, 98683

503-221-7904 (OR) * 360-254-9385 (WA) * 360-571-7175 (FAX) * don@pacifier.com Page 1

Mr. Douglas G. Taylor November 2nd 2015

FHWA-WFLHD

Simplified Acquisition 610 E 5th Street Vancouver, WA 98661 douglas.g.taylor@dot.gov

RE: Asbestos Inspection and Reporting for River S Access Bridge in Ridgefield Wildlife

Refuge, Ridgefield, WA per EPA Requirements.

Greetings Mr. Taylor, This inspection was in accordance with and as required by the Occupational Safety and Health Administration (OSHA) and Labor and Industries (L & I) in their regulations that govern the exposure of workers to asbestos. The Environmental Protection Agency (EPA) regulates asbestos in or on bridges and require an inspection (survey) prior to demolition/renovation.

Location:

River S Access Bridge is located off Hillhurst Road South of Ridgefield, Washington.

Bridge Description:

Built in 1970 and rebuilt in 1980. Main Structure Type is steel with timber deck, timber surface, with steel stringers on timber pile bents and abutments. The bridge is on a dead-end road providing FWS and public access in the central portion of the refuge. The one-lane bridge carries two-way traffic.

Asbestos Inspection:

If and/or when a suspect building materials are identified, they will be categorized, numbered, and placed into homogeneous areas for sample collection and laboratory analysis.

No suspect Asbestos-Containing Materials (ACM) were identified within the field inspection.

Recommendations:

No suspect ACMs were identified, thus no abatement is necessary.

Limitations:

This ACM inspection report was prepared based on information gathered during one site visit.

The inspection report has been prepared to provide information concerning the various types of bridge materials that were considered suspect ACM and to inform the owner of the inspection results.

mailto:douglas.g.taylor@dot.gov

503-221-7904 (OR) * 360-254-9385 (WA) * 360-571-7175 (FAX) * don@pacifier.com Page 2

Most of the bridge components were visible and accessible at the time of the inspection. While highly unlikely, additional suspect materials may be encountered during demolition. This asbestos inspection report is intended for the use by the Federal Highway Administration and their clients. The scope of services performed by Certified Environmental Consulting, LLC, may not be appropriate to satisfy the needs of other users, and any use or re-use of this document, or the findings presented herein is at the sole risk of the user.

Should you have any furthers questions, please contact me at your earliest convenience.

Certified Environmental Consulting, LLC Don Young, Principal

Don Young

Attachments: Accreditation Site Photographs

503-221-7904 (OR) * 360-254-9385 (WA) * 360-571-7175 (FAX) * don@pacifier.com Page 3

503-221-7904 (OR) * 360-254-9385 (WA) * 360-571-7175 (FAX) * don@pacifier.com Page 4

Photographic Log

1. View of Bridge.

2. View of Bridge.