Text version
.0
-0 u
.c u
.0
-0
Cl ui
N
N
.c
Project Location
WASHINGTON KEY MAP
TYPE OF CONSTRUCTION:
Bridge Abutments, Bridge Construction, Approach Roads, and MSE Walls.
DESIGN DESIGNATION:
ADT (2015)
ADT (2035)
V e (max)
20MPH
0.020
SPECIFICATION:
Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-14
PLANS PREPARED BY
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
W E STERN FEDERAL LAND S HIGHWAY DIV ISION
VANCOUV ER, WAS HINGTON
j._P_R _O-JE_
CT
_M_A_N _A _G_E _R�
Vl
M. TRAFFALIS
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
PROJECT
LOCATION
N
2 1
PLANS FOR PROPOSED PROJECT
WA RRP RIDG 100(2)
RIVER S BRIDGE REPLACEMENT
RIDGEFIELD NATIONAL WILDLIFE REFUGE
CLARK COUNTY
WASHINGTON
LENGTH 0.569 MILES
Scale in miles
0 2 4
STATE PROJECT
WA RRP RIDG 100(2)
INDEX TO SHEETS
A. GENERAL INFORMATION
A.1 TITLE SHEET
A.2 PLAN SYMBOLS AND ABBREVIATIONS
A.3 VICINITY MAP
A.4 SITE MAP
A.5 RIGHT OF WAY
B. SUMMARIES
B.1-2 SUMMARY OF QUANTITIES
C. TYPICAL SECTION
C.1-3 TYPICAL SECTIONS
D. PLAN-PROFILE
D.1-6 PLAN AND PROFILE
D.7 SURVEY CONTROL
E. BRIDGE
E.1-33 BRIDGE PLANS
F. APPROACH SLAB
F.1 APPROACH SLAB
G. MSE WALL
G.1 MSE WALL DETAILS
G.2 SETTLEMENT PLATE ASSEMBLY DETAIL
H.GROUND IMPROVEMENTS
H.1 GROUND IMPROVEMENT ZONE
I. UTILITES
I.1 UTILITY DETAILS
J. SEDIMENTATION AND EROSION CONTROL
J.l SEDIMENTATION AND EROSION CONTROL PLAN
J.2-3 STANDARD DRAWINGS
K. DRAINAGE
K.1 TABULATION OF DRAINAGE QUANTITIES
K.2 DRAINAGE DETAIL
K.3-9 STANDARD DRAWINGS
L. SAFETY FEATURES
L.1-2 GUARDRAIL STANDARD DRAWINGS
L.3 MISCELLANEOUS DETAILS
A:ZU:id Chief of Engineering, Project Delivery, Western Federal Lands Highway Division
SHEET
NUMBER
A.1
Sheet and Description
Section C Section D Section E Section F Section G Section H Section J Section K
Typical Section Plan & Profile Bridge Approach Slab MSE Wall Ground Improvements Erosion Control Drainage Allowance Bid
Schedule
A0020 15101-0000 MOBILIZATION LPSM ALL
A0040 15201-0000 CONSTRUCTION SURVEY AND
STAKING LPSM ALL
A0060 15301-0000 CONTRACTOR QUALITY CONTROL LPSM ALL
A0080 15401-0000 CONTRACTOR TESTING LPSM ALL
A0100 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL
A0120 15705-0100 SOIL EROSION CONTROL, SILT
FENCE LNFT 1,880 170 2,050
A0140 15705-1400 SOIL EROSION CONTROL, FIBER
ROLL LNFT 420 180 600
A0160 20101-0000 CLEARING AND GRUBBING ACRE 2.1 0.4 2.5
A0180 20301-1900 REMOVAL OF PIPE CULVERT EACH 2 2
A0200 20301-2400 REMOVAL OF SIGN EACH 3 3
A0220 20302-1200 REMOVAL OF GUARDRAIL LNFT 180 20 200
A0240 20304-2000 REMOVAL OF BRIDGE LPSM ALL ALL
A0260 20420-0000 EMBANKMENT CONSTRUCTION CUYD 7,995 505 8,500
A0280 21101-1000 ROADWAY OBLITERATION, METHOD 1 SQYD 455 45 500
A0300 25101-0300 PLACED RIPRAP, METHOD A,
CLASS 3 CUYD 27 27
A0320 25501-1000 MECHANICALLY STABILIZED EARTH Contract Quantity
WALL, WELDED WIRE FACE SQFT 10,950 10,950
A0340 25701-0200 CONTRACTOR FURNISHED
MECHANICALLY STABILIZED EARTH
WALL DESIGN LPSM ALL ALL
A0360 27601-0000 GEOTECHNICAL GROUND Contract Quantity
IMPROVEMENT SQYD 254 254
A0380 30202-2000 ROADWAY AGGREGATE, METHOD 2 TON 1,114 86 1,200
A0400 55201-0200 STRUCTURAL CONCRETE, CLASS A Contract Quantity
(AE) CUYD 827 827
A0420 55202-1000 STRUCTURAL CONCRETE, CLASS D Contract Quantity
(AE), FOR APPROACH SLABS,
TYPE 1 SQYD 107 107
A0440 55235-0000 EXPANSION JOINTS LNFT 48 48 Contract Quantity
A0460 55302-3200 PRECAST, PRESTRESSED CONCRETE Contract Quantity
GIRDER LNFT 1,524 1,524
A0480 55401-1000 REINFORCING STEEL LB 73,747 73,747 Contract Quantity
A0500 55401-2000 REINFORCING STEEL, EPOXY Contract Quantity
COATED LB 148,470 148,470
A0520 55601-0900 BRIDGE RAILING, STEEL LNFT 1,128 1,128 Contract Quantity
A0540 56401-1000 BEARING DEVICE, ELASTOMERIC EACH 6 6 Contract Quantity
-J ul -2
7:
A M
C
U se rs \s co tt
.b uc ek \D es kt op
_E
E- W
A R
ID
G R
R P
0(
2) .x ls x]
S he et
SUMMARY OF QUANTITIES
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
Estimated Quantities
Remarks and/or Determination of Estimated
Quantity
STATE PROJECT
B.1RRP RIDG 100(2)WA
SHEET
Sheet and Description
Section C Section D Section E Section F Section G Section H Section J Section K
Typical Section Plan & Profile Bridge Approach Slab MSE Wall Ground Improvements Erosion Control Drainage Allowance Bid
Schedule
A0560 56501-0000 DRILLED SHAFT (120-INCH Contract Quantity
DIAMETER) LNFT 344 344
A0580 56501-0800 DRILLED SHAFT, 60-INCH Contract Quantity
DIAMETER LNFT 330 330
A0600 57501-0000 MINOR BRIDGE WORK LPSM ALL ALL
A0620 60103-0180 CONCRETE, HEADWALL FOR
36-INCH PIPE CULVERT EACH 1 1
A0640 60201-0800 24-INCH PIPE CULVERT LNFT 80 20 100
A0660 60201-1000 36-INCH PIPE CULVERT LNFT 265 25 290
A0680 60210-1000 END SECTION FOR 36-INCH PIPE
CULVERT EACH 1 1
A0700 60403-0000 INLET EACH 2 2
A0720 60510-0800 6-INCH OUTLET PIPE LNFT 100 50 150
A0740 61701-1950 GUARDRAIL SYSTEM G4, TYPE 4,
CLASS B STEEL POSTS LNFT 488 488
A0760 61702-0800 TERMINAL SECTION TYPE TANGENT EACH 4 4
A0780 61707-0000 STRUCTURE TRANSITION RAILING LNFT 84 84
A0800 61901-1300 FENCE, CHAIN LINK LNFT 231 231 Contract Quantity
A0820 61901-1300 FENCE, CHAIN LINK (35-INCH Contract Quantity
HEIGHT) LNFT 890 25 915
A0840 61901-1300 FENCE, CHAIN LINK (42-INCH Contract Quantity
HEIGHT) LNFT 475 475
A0860 61902-0000 GATE EACH 1 1
A0880 62401-0300 FURNISHING AND PLACING
TOPSOIL, 4-INCH DEPTH SQYD 2,713 287 3,000
A0900 62502-0000 TURF ESTABLISHMENT SQYD 2,796 204 3,000
A0920 63301-0000 SIGN SYSTEM EACH 2 2
A0940 63501-0000 TEMPORARY TRAFFIC CONTROL LPSM ALL
A0960 63503-1000 TEMPORARY TRAFFIC CONTROL,
PLASTIC FENCE LNFT 2,010 190 2,200
A0980 63610-1600 CONDUIT, 2-INCH, PVC LNFT 2,640 115 2,755
A1000 63621-1000 UTILITY BOX, PULLBOX EACH 1 1
A1020 63621-3000 UTILITY BOX, JUNCTION BOX EACH 2 2
A1040 63622-0000 UTILITY TRENCH LNFT 1,105 105 1,210
Estimated Quantities
Remarks and/or Determination of Estimated
Quantity
-J ul -2
7:
A M
C
U se rs \s co tt
.b uc ek \D es kt op
_E
E- W
A R
ID
G R
R P
0(
2) .x ls x]
S he et
2)
SUMMARY OF QUANTITIES
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
STATE PROJECT
B.2RRP RIDG 100(2)WA
2% Crown
TYPICAL SECTION
2% Crown
2% Crown
4+00 to 8+02.16
TYPICAL SECTION
S REFUGE RD
3+60 to 4+00
TYPICAL SECTION
S REFUGE RD
C.1
STATE PROJECT
NUMBER
SHEET
U
S S u r ft
D c m y fi le s p w p r o d u c ti o n d w a r r id g c a .d g n
WA RRP RIDG 100(2)
P
M
O c to b e r
C h e c k e d b y
D e s ig n e d b y
1:3 2% Crown
1:3
10'
TYPICAL SECTION - GUARDRAIL
1:3
Variable
S lo p e s ta k e
ROUNDING DETAIL
FILL SLOPE
C le a r in g l im it
D
2% Crown
1:
LC
LC
NOTE:
1:3
C o n s tr u c ti o n l im it
C o n s tr u c ti o n l im it
C le a r in g l im it
5'
C o n s tr u c ti o n l im it
Varies
Turf establishm ent
Parking area
Varies
NO SCALE
3.
2.
1.
Profile grade traveled way Edge of
Guardrail, where required
0.25 D
Existing ground
Existing centerline
Existing ground
Existing ground
Profile grade
Embankment construction
6-inch compacted depth
Roadway aggregate, method 2
6-inch compacted depth
Roadway aggregate, method 2
4-inch depth
Furnishing and placing topsoil, Traveled way
10'2' Shoulder
2' Shoulder 2' Shoulder
5' 5'
0.5'
3.6'
Traveled way
10'
Traveled way
10'
Traveled way
10'
Roadway obliteration, method 2
See Sheet G.1 for S Refuge Rd stations 13+49.50 thru 17+00.00.
13+42.34 thru 13+67.33.
See Sheet F.1 for S Refuge Rd stations 8+02.16 thru 8+17.16 and
See Bridge Sheets for S Refuge Rd stations 8+16.33 to 13+43.17.
TYPICAL SECTION
2% crown
1+00 to 1+73.48
TYPICAL SECTION
AUTO TOUR ROUTE
1+00 to 3+71.19
TYPICAL SECTION
ACCESS RD
2% crown
15+85 to 17+20.00
TYPICAL SECTION
S REFUGE RD
C.2
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d w a r r id g c b .d g n
WA RRP RIDG 100(2)
S e p te m b e r
C h e c k e d b y
D e s ig n e d b y
1:3 2% Crown
1:3
Profile grade
LC
1:3
Traveled way
Varies
12'
1:
M S
E W a ll
Existing ground
Existing ground
C o n s tr u c ti o n l im it
C o n s tr u c ti o n l im it profile grade Point of rotation and
Varies
C le a r in g l im it
5'
Tu rf e st ab lis hm en t
Match existing width
1:3 2% Crown
1:3
Profile grade
LC
Existing ground
C o n s tr u c ti o n l im it
C o n s tr u c ti o n l im it
Traveled way
10'
Traveled way
10'Shoulder width varies Shoulder width varies
Embankment construction
Traveled way
6-inch compacted depth
Roadway aggregate, method 2
6-inch compacted depth
Roadway aggregate, method 2
6-inch compacted depth
Roadway aggregate, method 2
4-inch depth
Furnishing and placing topsoil, GPK FILE DATED 4/10/2013
PROJECT COORDINATES GEO COORDINATES
POINT
NUMBER NORTH EAST ELEVATION LATITUDE LONGITUDE ELLIPSOID
HEIGHT
COMBINED
FACTOR DESCRIPTION
12101 181223.709 1070888.364 264.172 47°28'24.417897"N 123°08'11.464629"W 194.9727 0.99999574 FOUND ALUM.CAP AT 1/4 CORNER
12102 180933.784 1070809.066 264.997 47°28'21.534383"N 123°08'12.492096"W 195.7878 0.99999586 5/8" IR w/FHWA alum cap
12999 180945.464 1070826.024 266.319 47°28'21.654614"N 123°08'12.250453"W 197.1098 0.99999579 5/8" IR w/FHWA alum cap
13551 181002.068 1069271.101 41.621 47°28'21.753123"N 123°08'34.898583"W -27.4898 1.00000652 5/8" IR w/FHWA alum cap
13552 181011.749 1069595.710 57.638 47°28'21.944736"N 123°08'30.179895"W -11.4924 1.00000574 5/8" IR w/FHWA alum cap
13553 180706.976 1069868.308 113.483 47°28'19.018841"N 123°08'26.080726"W 44.3198 1.00000323 5/8" IR w/FHWA alum cap
13554 180423.617 1070047.237 161.893 47°28'16.276451"N 123°08'23.353826"W 92.7068 1.00000107 5/8" IR w/FHWA alum cap
13555 180407.934 1070243.023 185.080 47°28'16.179634"N 123°08'20.498470"W 115.8807 0.99999997 5/8" IR w/FHWA alum cap
13556 180553.569 1070654.325 226.655 47°28'17.737873"N 123°08'14.577835"W 157.4393 0.9999979 5/8" IR w/FHWA alum cap
22101 181299.814 1068394.267 21.278 47°28'24.430474"N 123°08'47.786357"W -47.7671 1.00000734 1/2" IR W/YPC
22102 180675.690 1068530.174 31.705 47°28'18.313856"N 123°08'45.535973"W -37.3762 1.00000717 1/2" IR W/YPC
22103 180888.025 1068631.528 30.844 47°28'20.438575"N 123°08'44.154198"W -38.2339 1.0000071 1/2" IR W/YPC
Note:
PROJECT : River S bridge Replacement DATE OF FIELD WORK :Multiple Entries
DATE OF FINAL ADJUSTMENT :4/10/2013
PROJECT UNITS : US SURVEY FOOT
COORDINATE SYSTEM : SPCS NAD83 CORS96; WA North
EPOCH DATE : 2002.0000
VERTICAL DATUM : NAVD88 based on Geoid 09
To precisely check distances between points as measured on the ground, inverse the state plane coordinates and divide the computed distance by a mean combined factor of the two points.
STATE PROJECT
WA RRP RIDG 100(2) D.7WA
c:
\m yf ile s\ pw _p ro du ct io n\ d0
R iv er _S
_C on tr ol
Sh ee t.
xl sx ]S he et
1- S ep
-2
2:
P
M W
FL
H
D
D av ie s
D es ig ne d by
C he ck ed b y:
NUMBER
SURVEY CONTROL
ELECTRONIC SIGNATURE
2018.06.15 14:53:05-07'00'
2018.06.15 14:53:25-07'00'
2018.06.15 14:53:46-07'00'
2018.06.15 14:54:48-07'00'
2018.06.15 14:55:05-07'00'
2018.06.15 14:55:54-07'00'
2018.06.15 14:56:14-07'00'
2018.06.15 14:56:39-07'00'
2018.06.15 14:57:07-07'00'
2018.06.15 14:57:42-07'00'
2018.06.15 14:58:00-07'00'
2018.06.15 14:58:27-07'00'
2018.06.15 14:59:04-07'00'
2018.06.15 15:04:13-07'00'
2018.06.15 15:03:31-07'00'
2018.06.15 15:03:15-07'00'
2018.06.15 15:03:00-07'00'
2018.06.15 15:02:45-07'00'
2018.06.15 15:02:30-07'00'
2018.06.15
15:02:15-07'00'
2018.06.15 15:02:00-07'00'
2018.06.15 15:01:45-07'00'
2018.06.15 15:01:27-07'00'
2018.06.15 15:01:11-07'00'
2018.06.15 15:00:53-07'00'
2018.06.15 15:00:34-07'00'
2018.06.15 15:00:17-07'00'
2018.06.15 14:59:57-07'00'
2018.06.15 14:59:40-07'00'
2018.06.15 14:59:21-07'00'
2018.06.15 14:58:46-07'00'
2018.06.15 14:57:26-07'00'
2018.06.15 14:54:10-07'00'
Wingwall
A
No Scale
A
Wingwall
SECTION B-B
2" 5" 5" c lr c lr
SECTION A-A
joint material
" Preformed expansion2 reinforcement details and "DECK" Dwg. for
See "BRIDGE RAILING"
APPROACH SLAB SECTION
PLAN
Notes:
2% grade
Match profile
2%
A p p r o a c h S la b
A p p r o a c h S la b
BENDING DIAGRAM
15'-0" - Approach Slab 1
25'-0" - Approach Slab 2
Wingwall
Dwg. for details)
Dowel (see Abutment
24'-0"
1'-0"
#5AP2
14'-8" - Approach Slab 1
24'-8" - Approach Slab 2
23'-8"
#5AP6
#5AP4
#5AP3
#5AP3 (Bottom) @ 9" max.
#5AP4 (Top) @ 12" max.
#8AP1
#5AP2
#5AP5
#5AP2 (Top) @ 5" max.
#8AP1 (Bottom) @ 5" max.
#5AP4
#5AP3
#5AP6#5AP4
5.
4.
3.
2.
1.
for approval according to Subsection 104.03.
for intlet dimensions and down drain layout. Submit shop drawings
Install inlets in the approach slab at abutment 1. See Sheets K.8-9
See bridge plans for utility hanger, rail, and fence details.
slab reinforcing steel.
Provide epoxy coated reinforing according to ASTM A775 for all approach
Approach slab details adapted from WSDOT Std Dwg 10.6-A1-1 (1/21/16)
Wingwalls only present at Abutment 1
APPROACH SLAB
F.1
STATE PROJECT
NUMBER
SHEET
D e fa u lt m y fi le s p w p r o d u c ti o n d F .1 W
A R
R P R I D
G
A p p r o a c h S la b .d g n
WA RRP RIDG 100(2)
J u n e
C h e c k e d b y
D e s ig n e d b y
PLAN VIEW
ELEVATION VIEW
:1
:1
MSE WALL DETAILS
Select granular backfill
(NTS)
TYPICAL SECTION
G.1
STATE PROJECT
WA
RRP RIDG 100(2)
J u l-
A
M w a r r id g g a .d g n
U
S S u r
D h e c k e d b y e s ig n e d b y
LT1
LT3 LT4 LT5 LT6
RT1
LT2
RT2 RT3 RT4 RT5 RT6 RT7 RT8
LB1 LB2 LB3
LB4
LB5
LB6
RB1 RB2 RB3
RB4
RB5
RB6 RB7
RB8
LT1
RB1
RB8
LT6
LB1 RB1
LT1 RT1
Lane
10'
Lane
10'
2' Shld.2' Shld.
Varies
24:1 wall batter
Structural backfill
Existing ground
6" Surface course structural backfill 6" leveling pad
13+49.50
Begin MSE Wall
Slope stake limits
S Refuge Rd
Clearing Limits
Centerline S Refuge Rd
(17.60' left of centerline)
Existing ground
(17.60' right of centerline)
Existing ground
24'-0"
Elev. 75.57Existing ground
A
B
C
UTILITY DETAILS
I.1
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d w a r r id g u ti li ty .d g n
WA RRP RIDG 100(2)
J u n e
C h e c k e d b y
D e s ig n e d b y
THREE PHASE
PRIMARY JUNCTION BOX
PULL BOX
NO SCALE
LEGEND:
X
X
X unclassified borrow
Conduit for CPU
Conduit for CenturyLink backfill Gravel for trench m a x
X
24"
Road
LCLC
A p p r o x
(Approx.)
72"
(A pp ro x.
A p p r o x
12"
"4
20"
"8
"4
"8
"2
"8 118 "16
"8
"2 bolt down lid
Steel Diamond Plate
Lifting hole
Standard Hex-head bolts steel welded frame
Galvanized
TRENCH DETAIL
Note:
and construction standards book. See Sections 157 and 636.
1. Conform to the utility owners material lists, specifications and details, WA RRP RIDG 100(2) J.2
WA RRP RIDG 100(2) J.3
10.4 x 16 20301 -1900
25101 -0300
60103 -0180
60201 -0800
60201 -1000
60210 -1000
60403 -0000
60510 -0800
Station
ES
TI
M
A
TE
D M
A X
IM
U M
C O
V
ER
S
TR
U C
TU
R A L
EX
C A V A
TI
O N
R
EM
O V A L
O F
PI
PE
C U
LV
ER
T
PL
A C
ED
R
IP
R A P, M
ET
H O
D A
C
LA
S S
C O
N C R
ET
E, H
EA
D
W A
LL
F O
R
6-
IN
C H
P
IP
E C U
LV
ER
T
-I
N C
H P
IP
E
C U
LV
ER
T
-I
N C
H P
IP
E
C U
LV
ER
T
EN
D
S
EC
TI
O
N F
O R
6-
IN
H
PI
PE
C
U
LV
ER
T
IN
LE
T
6-
IN
C H
O U
TL
ET
P
IP
E
S K
EW
A N
G
LE
A llo w ab le P ip e
M at er ia l (S ee k ey b el ow
REMARKS
See below for numbered notes
FEET CUYD EACH CUYD EACH LNFT LNFT EACH EACH LNFT
8+09 (LT) 9 1 50 P
8+09 (RT) 9 1 50 P
13+60.79 1 80 25.2 AS
14+48.93 1
14+66.18 9 1 265 1 53.5 AS
PROJECT TOTAL 0 2 27 1 80 265 1 2 100
Allowable Pipe Material
NOTE: A Aluminum
1. Aluminized steel pipe culvert minimum wall thickness is the thickness required by the Std. 602-1 fill height table (steel). AS Aluminized steel
C Concrete GS Galvanized steel P Plastic (blank) Any appropriate material x/__ Any appropriate material except __
PAY ITEM NUMBER
TABULATION OF DRAINAGE QUANTITIES
c:
\m yf ile s\ pw _p ro du ct io n\ d0
D ra in ag e.
xl sx ]S he et
-J un -2
9:
A M
D es ig ne d by
C he ck ed b y:
STATE PROJECT
K.1
SHEET
NUMBER
WA RRP RIDG 100(2)WA
Note: The quantities shown hereon are approximate and are subject to field adjustments.
WA RRP RIDG 100(2) K.3
WA RRP RIDG 100(2) K.4
WA RRP RIDG 100(2) K.5
WA RRP RIDG 100(2) K.6
WA RRP RIDG 100(2) K.7
.0 "O u
<LI
.c u
.0 "O
<LI
C:
Cl "iii
<LI
¾"0x10" anchor stud (typ.)
Drill and tap fo
(4) ¾ - 10unc threaded holes
Anchor stud spa.
r-
1'-71/s"
7¾"
II
i\t
II
I
4½"+
I Ita :
c:p
3'-91/s"
3'-4¾"
6¾"
-i
(,' I (,')
II
0 I
2'-47/s" (�)
(:, I (:,) II
1 '-0" I
3 spa. @ 1 '-0" = 3'-0" ½"+
PLAN VIEW
3'-7¾"
3'-4¾" I ii er I � I \.0 � " 0\
I
. lz_ SECTION ('-J '
DECK DRAIN DETAILS
TYPICAL SECTION
SIDE VIEW
¾"0x 10" anchor stud (typ.)
¾"
-i
1- � I I f;;;j ..,, .
STATE PROJECT
WA RRP RIOG 100(2)
2'-47/s"
-i
(4) core holes and recessed for¾ - 10 s.s. hex bolt and washer
PLAN VIEW SIDE VIEW
3'-71/s"
1-1 1½"
8" 3'YJ.5" -
I 1- -1 f;;;j f;;;j
I I � ..,.., SECTION
DRAIN GRATE DETAILS
NO SCALE
DECK DRAINAGE
DETAILS
SHEET
K.8
PLAN SECTION A-A
PROTECTIVE APRON
DOWN DRAIN DETAIL
NOTE:
approved by the CO.
1. Adjust approach slab reinforcement to clear drain as
K.9
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d S u r ft
D .d g n
WA RRP RIDGE 100(2)
J u n e
C h e c k e d b y
D e s ig n e d b y
NO SCALE
6" Ø pipe
Wingwall
Fill slope
Approach slab
Drain and grate Bridge railing
Approach slab
Wingwall
Drain and grate
Bridge railing
Protective apron
Class 2 riprap
AA
4'
1'
1'
6" Ø pipe
1.5'
WA RRP RIDG 100(2) L.1
WA RRP RIDG 100(2) L.2