FIS_Vol_2_of_2_-_53011CV002A.pdf

PDF 2 MB Posted

Attached to
WA RRP RIDG 100(2), RIVER S BRIDGE REPLACEMENT
Solicitation number
DTFH7017B00007
Issued by

About this file

Physical Data FIS Vol 2 of 2

View the file

Other files

File Type Posted
Bid_Opening_Summary.pdf PDF
Q&A_10-1-18.pdf PDF
(6)_Ridgefield_WQDataTracker_FINAL_081815_ToClient.xlsx XLSX spreadsheet
Amendment_A007.pdf PDF
Public_Notice_1981.pdf PDF
Finding_of_Fact_1958.pdf PDF
Public_Notice_1958.pdf PDF
Finding_of_Fact_1981.pdf PDF
Original_Permit_ACOE_1958.pdf PDF
Permit_amendment_dated_1982.pdf PDF
River_S_Revised_Cross-Sections_Line_RS1_Sta_13+50_to_17+00.pdf PDF
Amendment_A006.pdf PDF
Q&A_9-26-18.pdf PDF
Revised_RiverS_APP_D.pdf PDF
Revised_RiverS_APP_E.pdf PDF
Amendment_A005.pdf PDF
Revised_RiverS_APP_C.pdf PDF
A0004_River_S.pdf PDF
RiverS_APP_B.pdf PDF
RiverS_APP_C.pdf PDF
FIS_Vol_1_of_2_-_53011CV001A.pdf PDF
RiverS_APP_A.pdf PDF
RiverS_APP_E.pdf PDF
RiverS_APP_D.pdf PDF
Q&A_9-20-18.pdf PDF
Q&A_9-14-18.pdf PDF
Amendment_A003.pdf PDF
Amendment_A002.pdf PDF
Q&A_9-13-18.pdf PDF
Amendment_A001.pdf PDF
Q&A_9-5-18.pdf PDF
Q&A_9-4-18.pdf PDF
09_Bridge_and_Seismic_Design_Standards-WA_RRP_RIDG_100(2).pdf PDF
19_Cross_Sections-WA_RRP_RIDG_100(2).pdf PDF
20d_GR14-15_River_S_Bridge_Replacement,_Final_Geotech_Report,_Aug_2016.pdf PDF
20a_GM_08-12_Geotech_Memo.pdf PDF
20b_GM_08-12_Ridgefield_Existing_Condition_Assessment.pdf PDF
21a_Asbestos_Inspection_and_Reporting.pdf PDF
21c_Hydraulics_Report.pdf PDF
20c_GR14-15_Geotech_Report.pdf PDF
Draft_20170919_WQMPP_Plan_WA_RRP_RIFG_100(2)_River_S_Bridge_Replace.pdf PDF
22b_Auto_Tour_Rt_Geometry.xml XML file
IFB.pdf PDF
22c_Access_Rd_Geometry.xml XML file
19a_River_'S'_Earthwork.pdf PDF
22a_S_Refuge_Rd_Geometry.xml XML file
21b_Bridge_Inspection_Report.pdf PDF
SWPPP_WA_RRP_RIDG_100(2).pdf PDF
21d_Navigation_Report.pdf PDF
01b_Plan_Set-WA_RRP_RIDG_100(2)_Updated_07242018.pdf PDF
Show all 50

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VOLUME 2 OF 2

CLARK COUNTY,

WASHINGTON

AND INCORPORATED AREAS

COMMUNITY NAME COMMUNITY NUMBER

BATTLE GROUND, CITY OF 530025

CAMAS, CITY OF 530026

CLARK COUNTY

(UNINCORPORATED AREAS) 530024

LA CENTER, CITY OF 530248

RIDGEFIELD, CITY OF 530298

VANCOUVER, CITY OF 530027

WASHOUGAL, CITY OF 530028

YACOLT, TOWN OF 530269

FLOOD INSURANCE STUDY NUMBER

53011CV002A

CLARK COUNTY

EFFECTIVE DATE: SEPTEMBER 5, 2012

http://www.google.com/imgres?q=clark+county+washington+map&um=1&hl=en&sa=N&rls=com.microsoft:en-us:IE-SearchBox&biw=1179&bih=774&tbm=isch&tbnid=h8YBkQo0DumDiM:&imgrefurl=http://en.wikipedia.org/wiki/File:Map_of_Washington_highlighting_Clark_County.svg&docid=YJnayiMdd97vkM&imgurl=http://upload.wikimedia.org/wikipedia/commons/thumb/a/a8/Map_of_Washington_highlighting_Clark_County.svg/800px-Map_of_Washington_highlighting_Clark_County.svg.png&w=800&h=521&ei=6Yb8TvzXMpKTtweqyZWlDg&zoom=1�

NOTICE TO

FLOOD INSURANCE STUDY USERS

Communities participating in the National Flood Insurance Program have established repositories of flood hazard data for floodplain management and flood insurance purposes. This Flood

Insurance Study (FIS) report may not contain all data available within the Community Map

Repository. Please contact the Community Map Repository for any additional data.

Selected Flood Insurance Rate Map (FIRM) panels for this community contain information that was previously shown separately on the corresponding Flood Boundary and Floodway Map

(FBFM) panels (e.g., floodways, cross sections). In addition, former flood hazard zone designations have been changed as follows:

Old Zone(s) New Zone

Al through A30 AE

Vl through V30 VE

B X

C X

Part or all of this Flood Insurance Study may be revised and republished at any time. In addition, part of this Flood Insurance Study may be revised by the Letter of Map Revision process, which does not involve republication or redistribution of the Flood Insurance Study. It is, therefore, the responsibility of the user to consult with community officials and to check the community repository to obtain the most current Flood Insurance Study components.

FIS Effective Date: September 5, 2012 i

TABLE OF CONTENTS

1.0 INTRODUCTION

1.1 Purpose of Study

1.2 Authority and Acknowledgments

1.3 Coordination

2.0 AREA STUDIED

2.1 Scope of Study

2.2 Community Description

2.3 Principal Flood Problems

2.4 Flood Protection Measures

3.0 ENGINEERING METHODS

3.1 Hydrologic Analyses

3.2 Hydraulic Analyses

3.3 Vertical Datum

4.0 FLOODPLAIN MANAGEMENT APPLICATIONS

4.1 Floodplain Boundaries

4.2 Floodways

5.0 INSURANCE APPLICATIONS

6.0 FLOOD INSURANCE RATE MAP

7.0 OTHER STUDIES

8.0 LOCATION OF DATA

9.0 BIBLIOGRAPHY AND REFERENCES

ii

TABLE OF CONTENTS

FIGURES

Figure 1 – Floodway Schematic

TABLES

Table 1 – Initial and Final CCO Meeting Dates Table 2 – Letters of Map Change (LOMCs) Table 3 – Comparison of Major Columbia River Floods Table 4 – Summary of Discharges Table 5 – Manning’s “n” Values Table 6 – Floodway Data Table 7 – Community Map History

Exhibit 1 - Flood Profiles

EXHIBITS

Burnt Bridge Creek Panels 01P-12P China Ditch Panels 13P-15P Columbia River Panels 16P-24P Curtin Creek Panels 25P-28P East Fork Lewis River Panels 29P-40P

VOLUME 2

EXHIBITS

East Fork Lewis River Lower Split Panels 41P East Fork Lewis River Path 2 Panels 42P East Fork Lewis River Path 3 Panels 43P Fifth Plain Creek Panels 44P-47P Gee Creek Panels 48P-55P Lacamas Creek Panels 56P-65P Lewis River Panels 66P-80P Mill Creek Panels 81P-86P Packard Creek Panels 87P-92P Padden Creek Panel 93P Salmon Creek Panels 94P-111P Spring Branch Creek Panel 112P Unnamed Tributary to Gee Creek Panel 113P Washougal River Panels 114P-118P Weaver Creek Panels 119P-123P Whipple Creek Panels 124P-130P ii

PUBLISHED SEPARATELY:

Exhibit 2 - Flood Insurance Rate Map Index Flood Insurance Rate Map

EXHIBITS

File details come from the government source that posted it.