WA RRP ridg 100(2), river s bridge replacement

Closed Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
DTFH7017B00007
Agency
Federal Highway Administration Department of Transportation
Responses due
Set-aside
No set-aside

Opportunity facts

Contract number
69056719C000001 Federal contract award
NAICS code
237310 Highway, Street, and Bridge Construction
PSC
Not on record
Place of performance
Ridgefield, Washington, United States

Notice details come from SAM.gov. Updated .

Notice text

6 versions

Update #6 · Latest ·

PROJECT: WA RRP RIDG 100(2) / RIVER S BRIDGE REPLACEMENT, CLARK County, Washington.
LOCATION: 0.6 Miles S of City of Ridgefield WA
WORK: This project consists of bridge construction over a navigable water way and BNSF mainline railroad tracks, MSE retaining walls, approach embankments, soft ground improvements, culverts, utility line relocations, bridge demolition, and surfacing gravels. and other small items of work. See "Description of Work" for additional details
LENGTH: 0.68 miles long.
TENTATIVE COMPLETION DATE: Winter 2018.
ESTIMATED PRICE RANGE: Between $5 million and $7 million.


To view the INTERESTED VENDORS LIST you must register as an FBO user. Go to https://www.fbo.gov/. Scroll down to the "Vendors/Citizens" box. Click on "Register Now" and follow the directions.


i. THIS SOLICITATION IS OFFERED FOR FULL AND OPEN COMPETITION ON AN UNRESTRICTED BASIS

.

Update #5 ·

Added: Dec 14, 2016 1:54 pm Modified: Aug 30, 2018 3:09 pmTrack Changes

PROJECT: WA RRP RIDG 100(2) / RIVER S BRIDGE REPLACEMENT, CLARK County, Washington.
LOCATION: 0.6 Miles S of City of Ridgefield WA
WORK: This project consists of bridge construction over a navigable water way and BNSF mainline railroad tracks, MSE retaining walls, approach embankments, soft ground improvements, culverts, utility line relocations, bridge demolition, and surfacing gravels. and other small items of work. See "Description of Work" for additional details
LENGTH: 0.68 miles long.
TENTATIVE COMPLETION DATE: Winter 2018.
ESTIMATED PRICE RANGE: Between $5 million and $7 million.


To view the INTERESTED VENDORS LIST you must register as an FBO user. Go to https://www.fbo.gov/. Scroll down to the "Vendors/Citizens" box. Click on "Register Now" and follow the directions.


i. THIS SOLICITATION IS OFFERED FOR FULL AND OPEN COMPETITION ON AN UNRESTRICTED BASIS

Update #4 ·

This solicitation is a "REQUEST FOR INFORMATION" only for the proposed contract work listed in the requirements section below. This Sources Sought Notice is not a request for formal proposals or quotes. Plans and specifications are not available at this time. Responses to this Sources Sought must be received by email or fax no later than the date specified in the response section. This intent of this sources sought is for market research to make appropriate acquisition decisions and to gain knowledge of potential qualified Service Disabled Veteran Owned Small Businesses, 8(a), HUBZone and other Small Businesses interested and capable of performing the proposed contract work. Documentation of technical expertise must be presented in sufficient detail for the Government to determine that your company has the capability and experience to compete for this acquisition. Responses to this notice shall include the following:

(a) Company Name
(b) Address
(c) Point of contact
(d) Phone, fax, and email
(e) Unique Entity Identifier (DUNS number)
(f) Bonding Capacity (per contract)
(g) Type of small business, e.g. Services Disabled Veteran Owned Small Business, 8(a), HUBZone, Women Owned Small Business, Small Disadvantaged Business, or Small Business HUBZone business:
(h) Provide a Listing of your highway/bridge construction experience within the last 3 years where you were the prime contractor for work of similar type and scope. Include contract numbers, titles, locations, dollar amounts.


Requirement
The proposed contract action is for a firm-fixed-priced construction contract. The primary objective of the proposed project is to construct a new bridge for access to refuge located in Ridgefield, WA. The project is 0.68 miles long and includes bridge construction over a navigable water way and BNSF mainline tracks, MSE retaining walls, approach embankments, soft ground improvements, culverts, utility line relocations, bridge demolition, and surfacing gravels.


Some of the technical requirements may include but are not limited to the following:


Bridge is built over Mainline BNSF track:
• Sole access road to the site has to cross these track via a public crossing.
• Awarded contractor will need to obtain a permit directly from BNSF for working over and near their tracks.
• BNSF tracks permit will require insurance requirements, drug testing, flagging, track time, work attire, three levels of certifications for safety of each employee, etc.


In-water work:
• Acoustical monitoring will need to be performed.
• PH along with a suite of other waters quality parameters will need to monitored and recording during shaft installations.
• US Coast Guard permit that is there to protect the rights of River Users and preserve river navigation. River traffic control will need to be setup and managed during construction. Closures of waterway will need to coordinated through US Coast.
• If temporary work bridges are utilized, contractor will need to submit a separate navigation bridge permit which is estimated to take 6 to 9 months.
• Seasonal restrictions on various construction operations due to presence of ESA fish species.
• Shafts in the river are over 100 feet deep and 10 foot in diameter. Shaft will need to build via barge, work bridge, work platform, or other means selected by the contractor.


NAICS Code 237310, Highway, Street, and Bridge Construction apply to this procurement with a size standard of $36.5 million.


Estimated Price Range: Between $5 million and $7 million.


Response:
Responses to this Sources Sought Notice should include all information requested in (a) through (h) above.


Determination by the Government not to compete this proposed contract action based on responses to this notice is solely within the discretion of the Government.


The Government is not obligated to nor will it pay for or reimburse any costs associated with responding to this sources sought synopsis request. This notice shall not be construed as a commitment by the Government to issue a solicitation or ultimately award a contract, nor does it restrict the Government to a particular acquisition approach.


Any offeror capable of providing this service shall respond to this sources sought by e-mail to wfl.contracts@dot.gov or by FAX to 360-619-7932 no later than January 3, 2017, 1400 PT.

.

Update #3 ·

Added: Dec 14, 2016 1:54 pm Modified: Aug 29, 2018 2:39 pmTrack Changes This solicitation is a "REQUEST FOR INFORMATION" only for the proposed contract work listed in the requirements section below. This Sources Sought Notice is not a request for formal proposals or quotes. Plans and specifications are not available at this time. Responses to this Sources Sought must be received by email or fax no later than the date specified in the response section. This intent of this sources sought is for market research to make appropriate acquisition decisions and to gain knowledge of potential qualified Service Disabled Veteran Owned Small Businesses, 8(a), HUBZone and other Small Businesses interested and capable of performing the proposed contract work. Documentation of technical expertise must be presented in sufficient detail for the Government to determine that your company has the capability and experience to compete for this acquisition. Responses to this notice shall include the following:

(a) Company Name
(b) Address
(c) Point of contact
(d) Phone, fax, and email
(e) Unique Entity Identifier (DUNS number)
(f) Bonding Capacity (per contract)
(g) Type of small business, e.g. Services Disabled Veteran Owned Small Business, 8(a), HUBZone, Women Owned Small Business, Small Disadvantaged Business, or Small Business HUBZone business:
(h) Provide a Listing of your highway/bridge construction experience within the last 3 years where you were the prime contractor for work of similar type and scope. Include contract numbers, titles, locations, dollar amounts.


Requirement
The proposed contract action is for a firm-fixed-priced construction contract. The primary objective of the proposed project is to construct a new bridge for access to refuge located in Ridgefield, WA. The project is 0.68 miles long and includes bridge construction over a navigable water way and BNSF mainline tracks, MSE retaining walls, approach embankments, soft ground improvements, culverts, utility line relocations, bridge demolition, and surfacing gravels.


Some of the technical requirements may include but are not limited to the following:


Bridge is built over Mainline BNSF track:
• Sole access road to the site has to cross these track via a public crossing.
• Awarded contractor will need to obtain a permit directly from BNSF for working over and near their tracks.
• BNSF tracks permit will require insurance requirements, drug testing, flagging, track time, work attire, three levels of certifications for safety of each employee, etc.


In-water work:
• Acoustical monitoring will need to be performed.
• PH along with a suite of other waters quality parameters will need to monitored and recording during shaft installations.
• US Coast Guard permit that is there to protect the rights of River Users and preserve river navigation. River traffic control will need to be setup and managed during construction. Closures of waterway will need to coordinated through US Coast.
• If temporary work bridges are utilized, contractor will need to submit a separate navigation bridge permit which is estimated to take 6 to 9 months.
• Seasonal restrictions on various construction operations due to presence of ESA fish species.
• Shafts in the river are over 100 feet deep and 10 foot in diameter. Shaft will need to build via barge, work bridge, work platform, or other means selected by the contractor.


NAICS Code 237310, Highway, Street, and Bridge Construction apply to this procurement with a size standard of $36.5 million.


Estimated Price Range: Between $5 million and $7 million.


Response:
Responses to this Sources Sought Notice should include all information requested in (a) through (h) above.


Determination by the Government not to compete this proposed contract action based on responses to this notice is solely within the discretion of the Government.


The Government is not obligated to nor will it pay for or reimburse any costs associated with responding to this sources sought synopsis request. This notice shall not be construed as a commitment by the Government to issue a solicitation or ultimately award a contract, nor does it restrict the Government to a particular acquisition approach.


Any offeror capable of providing this service shall respond to this sources sought by e-mail to wfl.contracts@dot.gov or by FAX to 360-619-7932 no later than January 3, 2017, 1400 PT.

Update #2 ·

This solicitation is a "REQUEST FOR INFORMATION" only for the proposed contract work listed in the requirements section below. This Sources Sought Notice is not a request for formal proposals or quotes. Plans and specifications are not available at this time. Responses to this Sources Sought must be received by email or fax no later than the date specified in the response section. This intent of this sources sought is for market research to make appropriate acquisition decisions and to gain knowledge of potential qualified Service Disabled Veteran Owned Small Businesses, 8(a), HUBZone and other Small Businesses interested and capable of performing the proposed contract work. Documentation of technical expertise must be presented in sufficient detail for the Government to determine that your company has the capability and experience to compete for this acquisition. Responses to this notice shall include the following:

(a) Company Name
(b) Address
(c) Point of contact
(d) Phone, fax, and email
(e) Unique Entity Identifier (DUNS number)
(f) Bonding Capacity (per contract)
(g) Type of small business, e.g. Services Disabled Veteran Owned Small Business, 8(a), HUBZone, Women Owned Small Business, Small Disadvantaged Business, or Small Business HUBZone business:
(h) Provide a Listing of your highway/bridge construction experience within the last 3 years where you were the prime contractor for work of similar type and scope. Include contract numbers, titles, locations, dollar amounts.


Requirement
The proposed contract action is for a firm-fixed-priced construction contract. The primary objective of the proposed project is to construct a new bridge for access to refuge located in Ridgefield, WA. The project is 0.68 miles long and includes bridge construction over a navigable water way and BNSF mainline tracks, MSE retaining walls, approach embankments, soft ground improvements, culverts, utility line relocations, bridge demolition, and surfacing gravels.


Some of the technical requirements may include but are not limited to the following:


Bridge is built over Mainline BNSF track:
• Sole access road to the site has to cross these track via a public crossing.
• Awarded contractor will need to obtain a permit directly from BNSF for working over and near their tracks.
• BNSF tracks permit will require insurance requirements, drug testing, flagging, track time, work attire, three levels of certifications for safety of each employee, etc.


In-water work:
• Acoustical monitoring will need to be performed.
• PH along with a suite of other waters quality parameters will need to monitored and recording during shaft installations.
• US Coast Guard permit that is there to protect the rights of River Users and preserve river navigation. River traffic control will need to be setup and managed during construction. Closures of waterway will need to coordinated through US Coast.
• If temporary work bridges are utilized, contractor will need to submit a separate navigation bridge permit which is estimated to take 6 to 9 months.
• Seasonal restrictions on various construction operations due to presence of ESA fish species.
• Shafts in the river are over 100 feet deep and 10 foot in diameter. Shaft will need to build via barge, work bridge, work platform, or other means selected by the contractor.


NAICS Code 237310, Highway, Street, and Bridge Construction apply to this procurement with a size standard of $36.5 million.


Estimated Price Range: Between $5 million and $7 million.


Response:
Responses to this Sources Sought Notice should include all information requested in (a) through (h) above.


Determination by the Government not to compete this proposed contract action based on responses to this notice is solely within the discretion of the Government.


The Government is not obligated to nor will it pay for or reimburse any costs associated with responding to this sources sought synopsis request. This notice shall not be construed as a commitment by the Government to issue a solicitation or ultimately award a contract, nor does it restrict the Government to a particular acquisition approach.


Any offeror capable of providing this service shall respond to this sources sought by e-mail to wfl.contracts@dot.gov or by FAX to 360-619-7932 no later than January 3, 2017, 1400 PT.


.

Update #1 ·

Added: Dec 14, 2016 1:54 pm This solicitation is a "REQUEST FOR INFORMATION" only for the proposed contract work listed in the requirements section below. This Sources Sought Notice is not a request for formal proposals or quotes. Plans and specifications are not available at this time. Responses to this Sources Sought must be received by email or fax no later than the date specified in the response section. This intent of this sources sought is for market research to make appropriate acquisition decisions and to gain knowledge of potential qualified Service Disabled Veteran Owned Small Businesses, 8(a), HUBZone and other Small Businesses interested and capable of performing the proposed contract work. Documentation of technical expertise must be presented in sufficient detail for the Government to determine that your company has the capability and experience to compete for this acquisition. Responses to this notice shall include the following:

(a) Company Name
(b) Address
(c) Point of contact
(d) Phone, fax, and email
(e) Unique Entity Identifier (DUNS number)
(f) Bonding Capacity (per contract)
(g) Type of small business, e.g. Services Disabled Veteran Owned Small Business, 8(a), HUBZone, Women Owned Small Business, Small Disadvantaged Business, or Small Business HUBZone business:
(h) Provide a Listing of your highway/bridge construction experience within the last 3 years where you were the prime contractor for work of similar type and scope. Include contract numbers, titles, locations, dollar amounts.


Requirement
The proposed contract action is for a firm-fixed-priced construction contract. The primary objective of the proposed project is to construct a new bridge for access to refuge located in Ridgefield, WA. The project is 0.68 miles long and includes bridge construction over a navigable water way and BNSF mainline tracks, MSE retaining walls, approach embankments, soft ground improvements, culverts, utility line relocations, bridge demolition, and surfacing gravels.


Some of the technical requirements may include but are not limited to the following:


Bridge is built over Mainline BNSF track:
• Sole access road to the site has to cross these track via a public crossing.
• Awarded contractor will need to obtain a permit directly from BNSF for working over and near their tracks.
• BNSF tracks permit will require insurance requirements, drug testing, flagging, track time, work attire, three levels of certifications for safety of each employee, etc.


In-water work:
• Acoustical monitoring will need to be performed.
• PH along with a suite of other waters quality parameters will need to monitored and recording during shaft installations.
• US Coast Guard permit that is there to protect the rights of River Users and preserve river navigation. River traffic control will need to be setup and managed during construction. Closures of waterway will need to coordinated through US Coast.
• If temporary work bridges are utilized, contractor will need to submit a separate navigation bridge permit which is estimated to take 6 to 9 months.
• Seasonal restrictions on various construction operations due to presence of ESA fish species.
• Shafts in the river are over 100 feet deep and 10 foot in diameter. Shaft will need to build via barge, work bridge, work platform, or other means selected by the contractor.


NAICS Code 237310, Highway, Street, and Bridge Construction apply to this procurement with a size standard of $36.5 million.


Estimated Price Range: Between $5 million and $7 million.


Response:
Responses to this Sources Sought Notice should include all information requested in (a) through (h) above.


Determination by the Government not to compete this proposed contract action based on responses to this notice is solely within the discretion of the Government.


The Government is not obligated to nor will it pay for or reimburse any costs associated with responding to this sources sought synopsis request. This notice shall not be construed as a commitment by the Government to issue a solicitation or ultimately award a contract, nor does it restrict the Government to a particular acquisition approach.


Any offeror capable of providing this service shall respond to this sources sought by e-mail to wfl.contracts@dot.gov or by FAX to 360-619-7932 no later than January 3, 2017, 1400 PT.


Attachments

Files attached to this notice, newest first
File Type Posted
Bid_Opening_Summary.pdf PDF
Q&A_10-1-18.pdf PDF
River_S_Revised_Cross-Sections_Line_RS1_Sta_13+50_to_17+00.pdf PDF
Public_Notice_1981.pdf PDF
Finding_of_Fact_1958.pdf PDF
Amendment_A007.pdf PDF
Original_Permit_ACOE_1958.pdf PDF
Public_Notice_1958.pdf PDF
(6)_Ridgefield_WQDataTracker_FINAL_081815_ToClient.xlsx XLSX spreadsheet
Finding_of_Fact_1981.pdf PDF
Permit_amendment_dated_1982.pdf PDF
Amendment_A006.pdf PDF
Q&A_9-26-18.pdf PDF
Revised_RiverS_APP_D.pdf PDF
Revised_RiverS_APP_C.pdf PDF
Amendment_A005.pdf PDF
Revised_RiverS_APP_E.pdf PDF
RiverS_APP_D.pdf PDF
FIS_Vol_2_of_2_-_53011CV002A.pdf PDF
RiverS_APP_B.pdf PDF
FIS_Vol_1_of_2_-_53011CV001A.pdf PDF
RiverS_APP_C.pdf PDF
RiverS_APP_E.pdf PDF
RiverS_APP_A.pdf PDF
A0004_River_S.pdf PDF
Q&A_9-20-18.pdf PDF
Q&A_9-14-18.pdf PDF
Amendment_A003.pdf PDF
Amendment_A002.pdf PDF
Q&A_9-13-18.pdf PDF
Amendment_A001.pdf PDF
Q&A_9-5-18.pdf PDF
Q&A_9-4-18.pdf PDF
21d_Navigation_Report.pdf PDF
22c_Access_Rd_Geometry.xml XML file
19a_River_'S'_Earthwork.pdf PDF
SWPPP_WA_RRP_RIDG_100(2).pdf PDF
01b_Plan_Set-WA_RRP_RIDG_100(2)_Updated_07242018.pdf PDF
22a_S_Refuge_Rd_Geometry.xml XML file
21b_Bridge_Inspection_Report.pdf PDF
19_Cross_Sections-WA_RRP_RIDG_100(2).pdf PDF
20d_GR14-15_River_S_Bridge_Replacement,_Final_Geotech_Report,_Aug_2016.pdf PDF
20c_GR14-15_Geotech_Report.pdf PDF
Draft_20170919_WQMPP_Plan_WA_RRP_RIFG_100(2)_River_S_Bridge_Replace.pdf PDF
21c_Hydraulics_Report.pdf PDF
IFB.pdf PDF
20a_GM_08-12_Geotech_Memo.pdf PDF
21a_Asbestos_Inspection_and_Reporting.pdf PDF
20b_GM_08-12_Ridgefield_Existing_Condition_Assessment.pdf PDF
22b_Auto_Tour_Rt_Geometry.xml XML file
Show all 50

This notice has more attachments on GovTribe.

Notice history

Notices posted for this opportunity, newest first
Notice Type Posted
WA RRP ridg 100(2) / river s bridge replacement Award Award Notice
WA RRP ridg 100(2), river s bridge replacement This notice · Latest solicitation Solicitation

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity