UPS SEC-J ATT J.2 CDRL.doc

DOC document 1 MB Posted

Attached to
Uninterruptible Power Supply (UPS) equipment, Integrated Logistics and Technical Services
Solicitation number
DTFAAC-17-R-00013
Issued by

About this file

UPS SEC-J ATT J.2 CDRL (doc)

View the file

Other files

File Type Posted
UPS SEC-J ATT J.6 MBP EXH C.xlsx XLSX spreadsheet
UPS SEC-L ATT L.2 Performance.docx DOCX document
UPS SEC-J ATT J.23 SCADA Comp.xls XLS spreadsheet
UPS SEC-J ATT J.22 UPS Comp.xls XLS spreadsheet
UPS SEC-J ATT J.20 UPS Performance.doc DOC document
UPS SEC-G Admin.docx DOCX document
DTFAAC-17-R-00013.pdf PDF
UPS SEC-J ATT J.5 Exhibit B FCB.xlsx XLSX spreadsheet
UPS SEC-D Pkg.doc DOC document
Questions as of 01_31_2018.docx DOCX document
UPS SEC-J ATT J.17 DID M002 ATT 2 Warranty Report.xls XLS spreadsheet
UPS SEC-E Insp.doc DOC document
UPS SEC-J ATT J.12 Load Bank Site Spares EXH I.xlsx XLSX spreadsheet
UPS SEC-J ATT J.10 Load Bank RSPL EXH G.xlsx XLSX spreadsheet
UPS SEC-M Evaluation_02142018.docx DOCX document
UPS SEC-J ATT J.15 CDLS User Guide 103008.pdf PDF
UPS SEC-J ATT J.1a SCADA_02142018.doc DOC document
Q&As11162017.xlsx XLSX spreadsheet
UPS SEC-J ATT J.11 UPS Site Spares EXH H.xlsx XLSX spreadsheet
UPS SEC-J ATT J.21 Spec Comp.xls XLS spreadsheet
UPS Section-M ATT M.2 Log-Train.doc DOC document
UPS SEC-L ATT L.3 Ltr.doc DOC document
UPS SEC-J ATT J.7 Bat Disc EXH D.xlsx XLSX spreadsheet
UPS SEC-L Instructions 02142018.docx DOCX document
UPS SEC-J ATT J.19 BOM CLINs 020142018.xls XLS spreadsheet
UPS SEC-J ATT J.24 SCADA Comp.xls XLS spreadsheet
UPS SEC-J ATT J.4 Exhibit A VRLA_02142018.xlsx XLSX spreadsheet
UPS SEC-J ATT J.3 DID.doc DOC document
UPS SEC-J ATT J.8 Load Bank EXH E_02142018.xlsx XLSX spreadsheet
UPS SEC-L ATT L.1 Expereince.docx DOCX document
DTFAAC-17-R-00013 amendment 0002.pdf PDF
UPS SEC-J ATT J.1 SPEC_02142018.docx DOCX document
UPS SEC-J ATT J.16 DID M002 ATT 1 Cost Report.xls XLS spreadsheet
UPS SEC-J ATT J.13 SECL EXH J.xlsx XLSX spreadsheet
UPS SEC-J ATT J.18 Alber Monitor BVM-40 User's Guide.pdf PDF
UPS SEC-J ATT J.1b MBP.doc DOC document
DTFAAC-17-R-00013_Amendment 0001.pdf PDF
UPS Section-M ATT M.1 Test.doc DOC document
UPS SEC-J ATT J.14 STD 028C 11-16-2000.pdf PDF
Q_A_11202017.docx DOCX document
DTFAAC-17-R-00013 Questions.xlsx XLSX spreadsheet
QA's from draft solicitation.xlsx XLSX spreadsheet
UPS SEC-J ATT J.9 UPS RSPL EXH F.xlsx XLSX spreadsheet
UPS SEC-L ATT L.3 Ltr.doc DOC document
UPS SEC-E Insp.doc DOC document
UPS SEC-J ATT J.6 MBP EXH C.xlsx XLSX spreadsheet
DTFAAC-17-R-00013_Amendment 0001.pdf PDF
UPS Section-M ATT M.1 Test.doc DOC document
UPS SEC-J ATT J.17 DID M002 ATT 2 Warranty Report.xls XLS spreadsheet
UPS SEC-J ATT J.21 Spec Comp.xls XLS spreadsheet
Show 40 more

Latest 50 of 198 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Contract Data Requirements List (1 Data Item) Form Approved OMB No. 0704-0188

a. Contract Line Item No.
b. Exhibit
c. Category

0015A, 1015A, 2015A, 3015A, 4015A

FORMCHECKBOX

tdp FORMCHECKBOX tm FORMCHECKBOX other ( Contract Base Award)

d. System / Item
e. Contract / PR No.
f. Contractor

Uninterruptible Power Supply (UPS) systems, and all Associated Software

1. Data Item No.
2. Title of Data Item
3. Subtitle of Data Item
E001
Monitoring Software/Firmware Interface Document
N/A
4. Authority (Data Acquisition Document No.)
5. Contract Reference
6. Requiring Office
SOW para., 3.3.1.1
NAS Power Systems Group, Technical Operations Service
7. DD 250 Required
8. App Code
9. Dist Statement Required
10. Frequency

N/A

None
As Changes Occur
11. As Of Date
12. Date of first submission
13. Date of subsequent submission
See Block 16
See Block 16

D I S T R I B U T I O N

b. Copies

b. Copies

a. Addressee

Final
a. Addressee

Final

14.
Draft
Reg
Electronic
Draft
Reg
Electronic

Contracting Officer *LTO

0
1

Power Services Group

0
1
(a) Total (
0
0
2
(b) Total (
15. Total of A & B (
2

16. Remarks:

Block 10 - One TIME submission unless UPS and associated equipment processor/control and monitoring software is changed.

Block 12 - The contractor shall provide software interface documents 10 calendar days following receipt of Delivery Order.

Block 13 - If UPS and associated equipment processor/control and monitoring software is changed or reconfigured the contractor shall update and submit the revised Software Interface Document.

g. Prepared By
h. Date
i. Approved By
j. Date
Marilyn Jarvis, NAS Power Systems Group
9/9/16
Peter Megna, NAS Power Systems Group
9/9/16

Contract Data Requirements List

Form Approved OMB No. 0704-0188

a. Contract Line Item No.
b. Exhibit
c. Category

0015A, 1015A, 2015A, 3015A, 4015A

FORMCHECKBOX

tdp FORMCHECKBOX tm FORMCHECKBOX other ( Contract Base Award)

d. System / Item
e. Contract / PR No.
f. Contractor

Uninterruptible Power Supply (UPS) systems, and all Associated Software

1. Data Item No.
2. Title of Data Item
3. Subtitle of Data Item
E002
Software/Firmware Interface Document
N/A
4. Authority (Data Acquisition Document No.)
5. Contract Reference
6. Requiring Office
SOW para., 3.3.1.2
NAS Power Systems Group, Technical Operations Service
7. DD 250 Required
8. App Code
9. Dist Statement Required
10. Frequency

N/A

None
As Changes Occur
11. As Of Date
12. Date of first submission
13. Date of subsequent submission
See Block 16
See Block 16

D I S T R I B U T I O N

b. Copies

b. Copies

a. Addressee

Final
a. Addressee

Final

14.
Draft
Reg
Electronic
Draft
Reg
Electronic

Contracting Officer *LTO

0
1

Power Services Group

0
1
(a) Total (
0
0
2
(b) Total (
15. Total of A & B (
2

16. Remarks:

Block 10 - One TIME submission unless UPS and associated equipment processor/control and monitoring software is changed.

Block 12 - The contractor shall provide software interface documents 10 calendar days following receipt of Delivery Order.

Block 13 - If UPS and associated equipment processor/control and monitoring software is changed or reconfigured the contractor shall update and submit the revised Software Interface Document.

g. Prepared By
h. Date
i. Approved By
j. Date
Marilyn Jarvis, NAS Power Systems Group
9/9/16
Peter Megna, NAS Power Systems Group
9/9/16

Contract Data Requirements List

Form Approved OMB No. 0704-0188

a. Contract Line Item No.
b. Exhibit
c. Category
0015A, 1015A, 2015A, 3015A, 4015A
A
FORMCHECKBOX

tdp FORMCHECKBOX tm FORMCHECKBOX other (Training)

d. System / Item
e. Contract / PR No.
f. Contractor

Uninterruptible Power Supply (UPS) systems, and all Associated Software

1. Data Item No.
2. Title of Data Item
3. Subtitle of Data Item
E003
UPS Maintenance Diagnostic and Analysis Software
4. Authority (Data Acquisition Document No.)
5. Contract Reference
6. Requiring Office
SOW Para. 3.3.1.3
NAS Power Systems Group, Technical Operations Service
7. DD 250 Required
8. App Code
9. Dist Statement Required
10. Frequency

No

None
See Block 16
11. As Of Date
12. Date of first submission
13. Date of subsequent submission
N/A
See Block 16
See Block 16

D I S T R I B U T I O N

b. Copies

b. Copies

a. Addressee

Final
a. Addressee

Final

Draft
Reg
ELECTRONIC
Draft
Reg
ELECTRONIC

Contracting Officer *LTO

1

Power Services Group

1

(a) Total (

2
(b) Total (
15. Total of A & B (
2

16. Remarks:

Block 10: Submit UPS Maintenance Diagnostic and Analysis Software data sheets 30-calendar days following FAA approval to PURCHASE NEW UPS configurations.

Block 12: Submit UPS Maintenance Diagnostic and Analysis Software on all UPS models in CLINs 0001 and 0002 30-calendar days after contract award.

Block 13: Submit UPS Maintenance Diagnostic and Analysis Software 30-calendar days following FAA approval to purchase new UPS configurations.

17. Price Group:

18. Estimated Total Price:

g. Prepared By
h. Date
i. Approved By
j. Date
Marilyn Jarvis, Power Services Group
9/9/16
Peter Megna, Power Services Group
9/9/16

Contract Data Requirements List

Form Approved OMB No. 0704-0188

a. Contract Line Item No.
b. Exhibit
c. Category
0015A, 1015A, 2015A, 3015A, 4015A
A
FORMCHECKBOX

tdp FORMCHECKBOX tm FORMCHECKBOX other (Training)

d. System / Item
e. Contract / PR No.
f. Contractor

Uninterruptible Power Supply (UPS) systems, and Associated Equipment

1. Data Item No.
2. Title of Data Item
3. Subtitle of Data Item
E004
UPS and associated Equipment

Data and Drawing Sheets

4. Authority (Data Acquisition Document No.)
5. Contract Reference
6. Requiring Office
SOW Para. 3.3.2
NAS Power Systems Group, Technical Operations Service
7. DD 250 Required
8. App Code
9. Dist Statement Required
10. Frequency

No

None
See Block 16
11. As Of Date
12. Date of first submission
13. Date of subsequent submission
N/A
See Block 16
See Block 16

D I S T R I B U T I O N

b. Copies

b. Copies

a. Addressee

Final
a. Addressee

Final

Draft
Reg
ELECTRONIC
Draft
Reg
ELECTRONIC

Contracting Officer *LTO

1

Power Services Group

1

(a) Total (

2
(b) Total (
15. Total of A & B (
2

16. Remarks:

Block 10: Submit UPS and associated equipment data and drawing sheets 30-calendar days following FAA approval to purchase new UPS and associated equipment configurations.

Block 12: Submit UPS and associated equipment data and drawing sheets on all CLINs 0001 through 0008 30-calendar days after contract award.

Block 13: Submit UPS and associated equipment data sheet 30-calendar days following FAA approval to purchase new UPS and associated equipment configurations.

17. Price Group:

18. Estimated Total Price:

g. Prepared By
h. Date
i. Approved By
j. Date
Marilyn Jarvis, Power Services Group
9/9/16
Peter Megna, Power Services Group
9/9/16

Contract Data Requirements List

Form Approved OMB No. 0704-0188

a. Contract Line Item No.
b. Exhibit
c. Category
0015A, 1015A, 2015A, 3015A, 4015A
A
FORMCHECKBOX

tdp FORMCHECKBOX tm FORMCHECKBOX other (Training)

d. System / Item
e. Contract / PR No.
f. Contractor

Uninterruptible Power Supply (UPS) systems, and Associated Equipment

1. Data Item No.
2. Title of Data Item
3. Subtitle of Data Item
E005
UPS LRU Lifecycle/Replacement Frequency
4. Authority (Data Acquisition Document No.)
5. Contract Reference
6. Requiring Office
SOW Para. 3.3.2
NAS Power Systems Group, Technical Operations Service
7. DD 250 Required
8. App Code
9. Dist Statement Required
10. Frequency

No

None
See Block 16
11. As Of Date
12. Date of first submission
13. Date of subsequent submission
N/A
See Block 16
See Block 16

D I S T R I B U T I O N

b. Copies

b. Copies

a. Addressee

Final
a. Addressee

Final

Draft
Reg
ELECTRONIC
Draft
Reg
ELECTRONIC

Contracting Officer *LTO

1

Power Services Group

1

(a) Total (

2
(b) Total (
15. Total of A & B (
2

16. Remarks:

Block 10: Submit UPS LRU Lifecycle/Replacement Frequency report 30-calendar days following FAA approval to purchase new UPS and associated equipment configurations.

Block 12: Submit UPS LRU Lifecycle/Replacement Frequency report all CLIN 0001 and 0002 UPSs 30-calendar days after contract award.

Block 13: Submit UPS LRU Lifecycle/Replacement Frequency report 30-calendar days following FAA approval to purchase new UPSs.

17. Price Group:

18. Estimated Total Price:

g. Prepared By
h. Date
i. Approved By
j. Date
Marilyn Jarvis, Power Services Group
11/26/16
Peter Megna, Power Services Group
11/26/16

Contract Data Requirements List

Form Approved OMB No. 0704-0188

a. Contract Line Item No.
b. Exhibit
c. Category

0016, 1016, 2016, 3016, 4016

FORMCHECKBOX

tdp FORMCHECKBOX tm FORMCHECKBOX other ( Contract Base Award)

d. System / Item
e. Contract / PR No.
f. Contractor

Uninterruptible Power Supply (UPS) and all Associated Equipment

1. Data Item No.
2. Title of Data Item
3. Subtitle of Data Item
L001
Integrated Support Plan (ISP)
N/A
4. Authority (Data Acquisition Document No.)
5. Contract Reference
6. Requiring Office
DI-FAA-L001
SOW Para. 3.4.1.1
NAS Power Services Group, Technical Operations Service
7. DD 250 Required
8. App Code
9. Dist Statement Required
10. Frequency
N/A
N/A
N/A
One/Revisions
11. As Of Date
12. Date of first submission
13. Date of subsequent submission
See Block 16
See Block 16

D I S T R I B U T I O N

b. Copies

b. Copies

a. Addressee

Final
a. Addressee

Final

14.
Draft
Reg
Electronic
Draft
Reg
Electronic

Contracting Officer *LTO

0
1

Power Services Group

0
1

FAALC (AML-8050)

0
1
(a) Total (
0
0
3
(b) Total (
15. Total of A & B (
6

16. Remarks:

Block 12: The contractor must submit the ISP or the applicable portions of their ISO 9000 series documentation or a copy of internal documentation that support both the scope and intent of the ISP not later than 10 calendar days after receiving delivery order.

The Government will review and comment or approve the ISP, ISO 9000 series documentation, or internal corporate documentation within 30 calendar days after receipt from contractor.

Block 13: The contractor must update and resubmit the ISP or substituted corporate documentation, as revisions occur or 10 calendar days following receipt of Government comments.

* LTO = “Letter of Transmittal Only”

g. Prepared By:
h. Date
i. Approved By:
j. Date
Marilyn Jarvis, NAS Power Services Group
5/10/17
Peter Megna, NAS Power Services Group
5/10/17

Contract Data Requirements List

Form Approved OMB No. 0704-0188

a. Contract Line Item No.
b. Exhibit
c. Category

0016, 1016, 2016, 3016, 4016

FORMCHECKBOX

tdp FORMCHECKBOX tm FORMCHECKBOX other ( Contract Base Award)

d. System / Item
e. Contract / PR No.
f. Contractor

Uninterruptible Power Supply (UPS) and all Associated Equipment

1. Data Item No.
2. Title of Data Item
3. Subtitle of Data Item
L002
Recommended Spare Parts List (RSPL),

Site Spare Parts List (SSPL), Spare Parts Peculiar List (SPPL)

Complete Parts List (CPL) N/A

4. Authority (Data Acquisition Document No.)
5. Contract Reference
6. Requiring Office
SOW Para. 3.4.2.1-3
NAS Power Services Group, Technical Operations Service
7. DD 250 Required
8. App Code
9. Dist Statement Required
10. Frequency
No
N/A
No
As Equipment Changes
11. As Of Date
12. Date of first submission
13. Date of subsequent submission
See Block 16
See Block 16

D I S T R I B U T I O N

b. Copies

b. Copies

a. Addressee

Final
a. Addressee

Final

14.
Draft
Reg
Electronic
Draft
Reg
Electronic

Contracting Officer *LTO

0*
1

Power Services Group

0
1*

FAALC (AML-8050)

0
1

(a) Total (

0
3
(b) Total (
15. Total of A & B (
3

16. Remarks:

Block 12: The first Submittals are with the vendor’s Bid proposal as directed in CONTRACT Section-L.

The Government will review, comment, approve/disapprove the se Lists and provide the vender with COMMENTS during the Post Award Conference.

Block 13: The contractor must update and resubmit these Lists every 90 calendar days prior to revisions in equipment, and when the vendor introduces a new product line of equipment.

g. Prepared By:
h. Date
i. Approved By:
j. Date
Marilyn Jarvis, NAS Power Services Group
5/10/17
Peter Megna, NAS Power Services Group
5/10/17

Contract Data Requirements List

Form Approved OMB No. 0704-0188

a. Contract Line Item No.
b. Exhibit
c. Category

0016, 1016, 2016, 3016, 4016

FORMCHECKBOX

tdp FORMCHECKBOX tm FORMCHECKBOX other ( Contract Base Award)

d. System / Item
e. Contract / PR No.
f. Contractor

Uninterruptible Power Supply (UPS) and all Associated Equipment

1. Data Item No.
2. Title of Data Item
3. Subtitle of Data Item
L003
Support Equipment Candidate List (SECL)
N/A
4. Authority (Data Acquisition Document No.)
5. Contract Reference
6. Requiring Office
SOW Para. 3.4.2.4
NAS Power Services Group, Technical Operations Service
7. DD 250 Required
8. App Code
9. Dist Statement Required
10. Frequency
No
N/A
No
As Equipment Changes
11. As Of Date
12. Date of first submission
13. Date of subsequent submission
See Block 16
See Block 16
See Block 16

D I S T R I B U T I O N

b. Copies

b. Copies

a. Addressee

Final
a. Addressee

Final

14.
Draft
Reg
Electronic
Draft
Reg
Electronic

Contracting Officer *LTO

0*
1

Power Services Group

0
1*

FAALC (AML-8050)

0
1
(a) Total (
0
0
3
(b) Total (
15. Total of A & B (
3

16. Remarks:

Block 12: The First Support Equipment Candidate List submittal is with the vendor’s Bid proposal as directed in SIR/RFO Section-L The SECL must include test and tools list for the UPS and associated equipment that is listed in the SIR/RFO Section-B.

The Government will review, comment, approve/disapprove the Support Equipment Candidate List(s) and provide the vendor with COMMENTS during the Post Award Conference.

Block 13: The Contractor must update and resubmit the Support Equipment Candidate List 90 calendar days prior to revisions to existing UPS and associated equipment, and when the vendor introduces a new product line of UPS or associated equipment.

g. Prepared By:
h. Date
i. Approved By:
j. Date
Marilyn Jarvis, NAS Power Services Group
5/10/17
Peter Megna, NAS Power Services Group
5/10/17

Contract Data Requirements List

Form Approved OMB No. 0704-0188

a. Contract Line Item No.
b. Exhibit
c. Category

0016, 1016, 2016, 3016, 4016

FORMCHECKBOX

tdp FORMCHECKBOX tm FORMCHECKBOX other Contract Base Award

d. System / Item
e. Contract / PR No.
f. Contractor

Uninterruptible Power Supply (UPS)

1. Data Item No.
2. Title of Data Item
3. Subtitle of Data Item
L004
Program Management Reports & Documentation
Various
4. Authority (Data Acquisition Document No.)
5. Contract Reference
6. Requiring Office
DI-FAA-L005
SOW 3.4.3.3
NAS Power Services Group, Technical Operations Service
7. DD 250 Required
8. App Code
9. Dist Statement Required
10. Frequency

No

No
See Block 16
11. As Of Date
12. Date of first submission
13. Date of subsequent submission
See Block 16
See Block 16
See Block 16

14. D I S T R I B U T I O N

b. Copies

b. Copies

a. Addressee

Final
a. Addressee

Final

Draft
Reg
Electronic
Draft
Reg
Electronic

Contracting Officer *LTO

0*
1

Power Services Group

0
1*

FAALC (AML-8050)

0
1
(a) Total (
0
0
3
(b) Total (
15. Total of A & B (
3

16. Remarks:

Block 10 – monthly, or as described in the body of the Data Item Description (DID).

Block 12 – Date of 1st sumbission of all reports shall be:

60 working days after the First month after contract award.

Block 13 – Date of subsequent submissions must be:

monthly: 10 working days after the month the data was collected for.

* LTO = Letter of Transmittal Only

Due to size considerations, the repair status report may be submitted in electronic format or zipped transmittal email. The report must be delivered to the FAA Contracting Officer, and must be dispersed to the appropriate FAA Offices as requested by the Contracting Officer.

g. Prepared By:
h. Date
i. Approved By:
j. Date
Marilyn Jarvis, NAS Power Services Group
5/10/17
Peter Megna, NAS Power Services Group
5/10/17

Contract Data Requirements List

Form Approved OMB No. 0704-0188

a. Contract Line Item No.
b. Exhibit
c. Category

0016, 1016, 2016, 3016, 4016

FORMCHECKBOX

tdp FORMCHECKBOX tm FORMCHECKBOX other Contract Base Award

d. System / Item
e. Contract / PR No.
f. Contractor

Uninterruptible Power Supply (UPS)

1. Data Item No.
2. Title of Data Item
3. Subtitle of Data Item
L005
Summary of Repaired Items Report
N/A
4. Authority (Data Acquisition Document No.)
5. Contract Reference
6. Requiring Office
DI-FAA-L005
SOW Para. 3.4.3.4 and 3.5.12
NAS Power Services Group, Technical Operations Service
7. DD 250 Required
8. App Code
9. Dist Statement Required
10. Frequency

No

No
See Block 16
11. As Of Date
12. Date of first submission
13. Date of subsequent submission
See Block 16
See Block 16
See Block 16

14. D I S T R I B U T I O N

b. Copies

b. Copies

a. Addressee

Final
a. Addressee

Final

Draft
Reg
Electronic
Draft
Reg
Electronic

Contracting Officer *LTO

0*
1

Power Services Group

0
1*

FAALC (AML-8050)

0
1
(a) Total (
0
0
3
(b) Total (
15. Total of A & B (
3

16. Remarks:

Block 10 – monthly, as described in the body of the Data Item Description (DID).

Block 12 – Date of 1st sumbission of all reports shall be:

60 working days after the First month after contract award.

Block 13 – Date of subsequent submissions must be:

monthly: 10 working days after the month the data was collected for.

Due to size considerations, the repair status report may be submitted in electronic format or zipped transmittal email. The report must be delivered to the FAA Contracting Officer, and must be dispersed to the appropriate FAA Offices as requested by the Contracting Officer.

g. Prepared By:
h. Date
i. Approved By:
j. Date
Marilyn Jarvis, NAS Power Services Group
5/10/17
Peter Megna, NAS Power Services Group
5/10/17

Contract Data Requirements List

Form Approved OMB No. 0704-0188

a. Contract Line Item No.
b. Exhibit
c. Category

0017, 1017, 2017, 3017, 4017

FORMCHECKBOX

tdp FORMCHECKBOX tm FORMCHECKBOX other ( Contract Base Award)

d. System / Item
e. Contract / PR No.
f. Contractor

Uninterruptible Power Supply (UPS)

1. Data Item No.
2. Title of Data Item
3. Subtitle of Data Item
L006
Contractor Depot Logistics Support (CDLS) Invoice, Summary, and Reports
Various
4. Authority (Data Acquisition Document No.)
5. Contract Reference
6. Requiring Office
DI-FAA-L006
SOW Para. 3.4.3.5
NAS Power Services Group, Technical Operations Service
7. DD 250 Required
8. App Code
9. Dist Statement Required
10. Frequency
No
N/A
No
See Block 16
11. As Of Date
12. Date of first submission
13. Date of subsequent submission
See Block 16
See Block 16
See Block 16

D I S T R I B U T I O N

b. Copies

b. Copies

a. Addressee

Final
a. Addressee

Final

14.
Draft
Reg
Electronic
Draft
Reg
Repro

Contracting Officer *LTO

1*

Power Services Group

1

FAALC (AML-8050)

1
(a) Total (
0
0
3
(b) Total (
15. Total of A & B (
3

16. Remarks:

Block 10 – monthly

Block 11 – 15th Calendar Day of the Month

Block 12 – Date of 1st submission of all reports shall be:

monthly: 15 Calendar days after the first month after contract award.

Block 13 – Date of subsequent submissions shall be:

monthly: 15 Calendar days after the month the data was collected for.

* LTO = Letter of Transmittal For Invoice Only

Block 14 (b) Contractor shall provide the Government with an electronic copy via email.

g. Prepared By
h. Date
i. Approved By
j. Date
Marilyn Jarvis, NAS Power Services Group
5/10/17
Peter Megna, NAS Power Services Group
5/10/17

Contract Data Requirements List

Form Approved OMB No. 0704-0188

a. Contract Line Item No.
b. Exhibit
c. Category

0017, 1017, 2017, 3017, 4017

FORMCHECKBOX

tdp FORMCHECKBOX tm FORMCHECKBOX other ( Contract Base Award)

d. System / Item
e. Contract / PR No.
f. Contractor

Uninterruptible Power Supply (UPS)

1. Data Item No.
2. Title of Data Item
3. Subtitle of Data Item
L007
Logistics Management Information (LMI) Data Products
N/A
4. Authority (Data Acquisition Document No.)
5. Contract Reference
6. Requiring Office
DI-FAA-L007
SOW Para. 3.5.10
NAS Power Services Group, Technical Operations Service
7. DD 250 Required
8. App Code
9. Dist Statement Required
10. Frequency

No

See Block 16

11. As Of Date
12. Date of first submission
13. Date of subsequent submission
See Block 16
See Block 16
As Required

D I S T R I B U T I O N

b. Copies

b. Copies

a. Addressee

Final
a. Addressee

Final

14.
Draft
Reg
Electronic
Draft
Reg
Electronic

Contracting Officer *LTO

1

Power Services Group

1*

FAALC (AML-8050)

1
(a) Total (
0
0
2
(b) Total (
15. Total of A & B (
2

16. Remarks:

Block 11: 30 days after Contract Award

Block 12: 30 Days After Contract Award

Block 13: At time of Technical Interchange Meetings (TIMs), Program Management Reviews and Integrated Logistics Management Team Meetings.

g. Prepared By:
h. Date
i. Approved By:
j. Date
Marilyn Jarvis, NAS Power Services Group
5/10/17
Peter Megna, NAS Power Services Group
5/10/17

Contract Data Requirements List

Form Approved OMB No. 0704-0188

a. Contract Line Item No.
b. Exhibit
c. Category

0015B, 1015B, 2015B, 3015B, 4015B

FORMCHECKBOX

tdp FORMCHECKBOX tm FORMCHECKBOX other ( Contract Base Award)

d. System / Item
e. Contract / PR No.
f. Contractor

Uninterruptible Power Supply (UPS) and all Associated Equipment

1. Data Item No.
2. Title of Data Item
3. Subtitle of Data Item
M001
Program Plan
N/A
4. Authority (Data Acquisition Document No.)
5. Contract Reference
6. Requiring Office
SOW Para., 3.1.1
NAS Power Services Group, Technical Operations Service
7. DD 250 Required
8. App Code
9. Dist Statement Required
10. Frequency
N/A
N/A
None
One Time
11. As Of Date
12. Date of first submission
13. Date of subsequent submission
See Block 16
See Block 16

D I S T R I B U T I O N

b. Copies

b. Copies

a. Addressee

Final
a. Addressee

Final

14.
Draft
Reg
Repro
Draft
Reg
Repro

Contracting Officer *LTO

1

Power Services Group

1
(a) Total (
0
0
2
(b) Total (
15. Total of A & B (
2

16. Remarks:

Block 12 - The contractor shall submit the Program Plan 10 calendar days following receipt of delivery order.

Block 13 - The contractor shall update and submit the Program Plan as revisions to the Program management structure occur.

Block 14b – Repo means emailed soft copy.

g. Prepared By
h. Date
i. Approved By
j. Date
Marilyn Jarvis, NAS Power Services Group
9/9/16
Peter Megna, NAS Power Services Group
9/9/16

Contract Data Requirements List

Form Approved OMB No. 0704-0188

a. Contract Line Item No.
b. Exhibit
c. Category

0015C, 1015C, 2015C, 3015C, 4015C

FORMCHECKBOX

tdp FORMCHECKBOX tm FORMCHECKBOX other ( Contract Base Award)

d. System / Item
e. Contract / PR No.
f. Contractor

Uninterruptible Power Supply (UPS) and all Associated Equipment

1. Data Item No.
2. Title of Data Item
3. Subtitle of Data Item
M002
Program Management Report
N/A
4. Authority (Data Acquisition Document No.)
5. Contract Reference
6. Requiring Office
SOW Para. 3.1.2
NAS Power Systems Group, Technical Operations Service
7. DD 250 Required
8. App Code
9. Dist Statement Required
10. Frequency
N/A
N/A
None
Quarterly
11. As Of Date
12. Date of first submission
13. Date of subsequent submission
See Block 16
See Block 16
See Block 16

D I S T R I B U T I O N

b. Copies

b. Copies

a. Addressee

Final
a. Addressee

Final

14.
Draft
Reg
Repro
Draft
Reg
Repro

Contracting Officer *LTO

1

Power Services Group

1
(a) Total (
0
0
2
(b) Total (
15. Total of A & B (
2

16. Remarks:

Block 12 - The contractor shall submit the Program Management Report not later than 30 calendar days following the first Task or Delivery Order.

Block 13 - The contractor shall update and submit the Program management Report at least once every quarter unless otherwise directed by the Government.

Block 14b – Repo means emailed soft copy.

g. Prepared By
h. Date
i. Approved By
j. Date
Marilyn Jarvis, NAS Power Services Group
9/9/16
Peter Megna, NAS Power Services Group
9/9/16

Contract Data Requirements List

Form Approved OMB No. 0704-0188

a. Contract Line Item No..
b. Exhibit
c. Category

0015A, 1015A, 2015A, 3015A, 4015A

FORMCHECKBOX

tdp FORMCHECKBOX tm FORMCHECKBOX other Contract Base Award

d. System / Item
e. Contract / PR No.
f. Contractor

Uninterruptible Power Supply (UPS) and all Associated Equipment

1. Data Item No.
2. Title of Data Item
3. Subtitle of Data Item
M003
BAR CODE ASSET TRACKING SYSTEM
Asset Identification Report (Barcoding)
4. Authority (Data Acquisition Document No.)
5. Contract Reference
6. Requiring Office
DI-FAA-M003
SOW 3.1.3.1
NAS Power Services Group
7. DD 250 Required
8. App Code
9. Dist Statement Required
10. Frequency
N/A
N/A

See Block 16

11. As Of Date
12. Date of first submission
13. Date of subsequent submission
See Block 16
See Block 16
See Block 16

14. D I S T R I B U T I O N

b. Copies

b. Copies

a. Addressee

Final
a. Addressee

Final

Draft
Reg
Electronic
Draft
Reg
Electronic
Contracting Officer *LTO
0
0
1*
Power Service Group
0
0
1
0
0
(a) Total (
0
0
2
(b) Total (
15. Total of A & B (
4/0 & LTO

16. Remarks:

Block 10: When UPS and associated equipment units are shipped from factory floor to the FAA site.

Block 11, 12 and 13: Date of SHIPMENT.

Block 14: Softcopy must be in MS Excel or ASCII test as appropriate on electronic media.

Government comment and acceptance of the submission is required

Prepared By:

Marilyn Jarvis, NAS Power Services Group

11/22/16
Approved By :

Peter Megna, NAS Power Service Group 11/22/16

Contract Data Requirements List

Form Approved OMB No. 0704-0188

a. Contract Line Item No..
b. Exhibit
c. Category

0015A, 1015A, 2015A, 3015A, 4015A

FORMCHECKBOX

tdp FORMCHECKBOX tm FORMCHECKBOX other Contract Base Award

d. System / Item
e. Contract / PR No.
f. Contractor

Uninterruptible Power Supply (UPS) and all Associated Equipment

1. Data Item No.
2. Title of Data Item
3. Subtitle of Data Item
M004
SHIPPING DOCUMENTATION
Asset Identification Report (Barcoding)
4. Authority (Data Acquisition Document No.)
5. Contract Reference
6. Requiring Office
DI-FAA-M004
SOW 3.1.3.2
NAS Power Services Group
7. DD 250 Required
8. App Code
9. Dist Statement Required
10. Frequency
N/A
N/A

See Block 16

11. As Of Date
12. Date of first submission
13. Date of subsequent submission
See Block 16
See Block 16
See Block 16

14. D I S T R I B U T I O N

b. Copies

b. Copies

a. Addressee

Final
a. Addressee

Final

Draft
Reg
Electronic
Draft
Reg
Electronic
Contracting Officer *LTO
0
0
1*
Power Service Group
0
0
1
0
0
(a) Total (
0
0
2
(b) Total (
15. Total of A & B (
4/0 & LTO

16. Remarks:

Block 10: When UPS and associated equipment units are shipped from factory to an FAA site or e-Stock Warehouse. And, when shipped from e-Stock warehouse to an FAA site Block 11, 12 and 13: Date of SHIPMENT.

Block 14: SCAN EVendor SHIPPING DOCUMENTATION REFLECTING ORIGIN AND DESTINATION. SEND SOFTCOPY TO ADDRESSEES IN BLOCK 14.

Government comment and acceptance of the submission is required

Prepared By:

Marilyn Jarvis, NAS Power Services Group

11/22/16
Approved By :

Peter Megna, NAS Power Service Group 11/22/16

Contract Data Requirements List

Form Approved OMB No. 0704-0188

a. Contract Line Item No.
b. Exhibit
c. Category
0018, 1018, 2018, 3018, 4018
A
FORMCHECKBOX

tdp FORMCHECKBOX tm FORMCHECKBOX other (Training)

d. System / Item
e. Contract / PR No.
f. Contractor

Uninterruptible Power Supply (UPS)

1. Data Item No.
2. Title of Data Item
3. Subtitle of Data Item
M005
Conference Agenda
4. Authority (Data Acquisition Document No.)
5. Contract Reference
6. Requiring Office
SOW Para. 3.1.6
NAS Power Systems Group, Technical Operations Service
7. DD 250 Required
8. App Code
9. Dist Statement Required
10. Frequency
No
N/A
None
As Requested
11. As Of Date
12. Date of first submission
13. Date of subsequent submission
N/A
See Block 16
See Block 16

D I S T R I B U T I O N

b. Copies

b. Copies

a. Addressee

Final
a. Addressee

Final

Draft
Reg
Repro
Draft
Reg
Repro

Contracting Officer *LTO

1

Power Services Group

1

(a) Total (

2
(b) Total (
15. Total of A & B (
2

16. Remarks:

AGENDAs

Block 12 and 13: The contractor shall submit conference/meeting agenda to the Government a minimum of 15 working days prior to each scheduled conference for which the contractor has responsibility.

The Government reserves the right to add or delete agenda items. The Government will respond to the contractor within five (5) working days after receipt of the agenda, if required. The Government may respond by telephone, letter, e-mail, or FAX..

17. Price Group:

18. Estimated Total Price:

g. Prepared By
h. Date
i. Approved By
j. Date
Marilyn Jarvis, Power Services Group
11/22/16
Peter Megna, Power Services Group
11/22/16

Contract Data Requirements List

Form Approved OMB No. 0704-0188

a. Contract Line Item No.
b. Exhibit
c. Category
0018, 1018, 2018, 3018, 4018
A
FORMCHECKBOX

tdp FORMCHECKBOX tm FORMCHECKBOX other (Training)

d. System / Item
e. Contract / PR No.
f. Contractor

Uninterruptible Power Supply (UPS)

1. Data Item No.
2. Title of Data Item
3. Subtitle of Data Item
M006
Conference Minutes
4. Authority (Data Acquisition Document No.)
5. Contract Reference
6. Requiring Office
SOW Para. 3.1.6
NAS Power Systems Group, Technical Operations Service
7. DD 250 Required
8. App Code
9. Dist Statement Required
10. Frequency

No

None
As Requested
11. As Of Date
12. Date of first submission
13. Date of subsequent submission
N/A
See Block 16
See Block 16

D I S T R I B U T I O N

b. Copies

b. Copies

a. Addressee

Final
a. Addressee

Final

Draft
Reg
Repro
Draft
Reg
Repro

Contracting Officer *LTO

1

Power Services Group

1

(a) Total (

2
(b) Total (
15. Total of A & B (
2

16. Remarks:

MEETING MINUTES

Block 12 and 13: The contractor shall submit conference/meeting minutes, for which the contractor has responsibility, to the Government for approval within 5 working days after each conference/meeting.

The Government reserves the right to redline, clarify, or add/delete items from the minutes before granting approval.

The contractor shall resubmit minuets, if required, to the Government for approval within five (5) working days after receipt of redlines.

Block 14: Additional copies of the minutes shall be distributed per the attendance list.

17. Price Group:

18. Estimated Total Price:

g. Prepared By
h. Date
i. Approved By
j. Date
Marilyn Jarvis, Power Services Group
11/22/16
Peter Megna, Power Services Group
11/22/16

Contract Data Requirements List

Form Approved OMB No. 0704-0188

a. Contract Line Item No.
b. Exhibit
c. Category

0015A, 1015A, 2015A, 3015A, 4015A

FORMCHECKBOX

tdp FORMCHECKBOX tm FORMCHECKBOX other ( Contract Base Award)

d. System / Item
e. Contract / PR No.
f. Contractor

Uninterruptible Power Supply (UPS) and all Associated Equipment

1. Data Item No.
2. Title of Data Item
3. Subtitle of Data Item
Q001
Quality Assurance Plan
QA Plan
4. Authority (Data Acquisition Document No.)
5. Contract Reference
6. Requiring Office
SOW Para., 3.1.6.1
NAS Power Services group, Technical Operations Service
7. DD 250 Required
8. App Code
9. Dist Statement Required
10. Frequency
N/A
N/A
None
As Changes Occur
11. As Of Date
12. Date of first submission
13. Date of subsequent submission
See Block 16
See Block 16

D I S T R I B U T I O N

b. Copies

b. Copies

a. Addressee

Final
a. Addressee

Final

14.
Draft
Reg
Repro
Draft
Reg
Repro

Contracting Officer *LTO

1

Power Services Group

1
(a) Total (
0
0
2
(b) Total (
15. Total of A & B (
2

16. Remarks:

Block 12 - The contractor shall submit to the Government the contractor’s QA Plan 10 calendar days following receipt of delivery order. If the Contractor is ISO 9000 certified, the Contractor will be required to submit his/her current ISO certification, to the Government.

Block 13 - The contractor shall update and submit the QA Plan as revisions to the QA Plan occur.

Block 14b – Repo will designate electronic copies, emailed to the Government.

g. Prepared By
h. Date
i. Approved By
j. Date
Marilyn Jarvis, NAS Power Services Group
9/9/16
Peter Megna, NAS Power Services Group
9/9/16

Contract Data Requirements List

Form Approved OMB No. 0704-0188

a. Contract Line Item No.
b. Exhibit
c. Category

0015A, 1015A, 2015A, 3015A, 4015A

FORMCHECKBOX

tdp FORMCHECKBOX tm FORMCHECKBOX other ( Contract Base Award)

d. System / Item
e. Contract / PR No.
f. Contractor

Uninterruptible Power Supply (UPS) and all Associated Equipment

1. Data Item No.
2. Title of Data Item
3. Subtitle of Data Item
Q002
Contractor’s Configuration Management Plan
N/A
4. Authority (Data Acquisition Document No.)
5. Contract Reference
6. Requiring Office
SOW Para., 3.1.6.2
NAS Power Services Group, Technical Operations Service
7. DD 250 Required
8. App Code
9. Dist Statement Required
10. Frequency
N/A
N/A
None
One Time
11. As Of Date
12. Date of first submission
13. Date of subsequent submission
N/A
See Block 16
See Block 16

D I S T R I B U T I O N

14.
b. Copies

b. Copies

a. Addressee

Final
a. Addressee

Final

Draft
Reg
Repro
Draft
Reg
Repro

Contracting Officer *LTO

1

Power Services Group

1
(a) Total (
0
0
2
(b) Total (
15. Total of A & B (
2

16. Remarks:

Block 12 - The contractor shall deliver the Contractors Configuration Management Plan 10 calendar days after receipt of delivery order. If the Contractor is ISO 9000 certified, the contractor will be required to provide his/her latest certification to the Government.

Block 13 - The contractor shall update and submit the Contractor’s Configuration Management Plan as revisions occur.

Block 14b – Repo will designate electronic copies.

g. Prepared By
h. Date
i. Approved By
j. Date
Marilyn Jarvis, NAS Power Services Group
9/9/16
Peter Megna, NAS Power Services Group
9/9/16

Contract Data Requirements List

Form Approved OMB No. 0704-0188

a. Contract Line Item No.
b. Exhibit
c. Category

0014A, 1014A, 2014A, 3014A, 4014A

FORMCHECKBOX

tdp FORMCHECKBOX tm FORMCHECKBOX other (Training)

d. System / Item
e. Contract / PR No.
f. Contractor

Uninterruptible Power Supply (UPS) and all Associated Equipment

1. Data Item No.
2. Title of Data Item CDRL T001
3. Subtitle of Data Item
T001
Personnel Qualifications Report
4. Authority (Data Acquisition Document No.)
5. Contract Reference
6. Requiring Office
FAA-STD-028C
SOW Para 3.6.4.1
NAS Power Services Group, Technical operations Service
7. DD 250 Required
8. App Code
9. Dist Statement Required
10. Frequency

N/A

See Block 16

11. As Of Date
12. Date of first submission
13. Date of subsequent submission
See Block 16
See Block 16

D I S T R I B U T I O N

b. Copies

b. Copies

a. Addressee

Final
a. Addressee

Final

14.
Draft
Reg
Electronic
Draft
Reg
Electronic
Technical Training and Development Office
0
0
1
power Services Group
0
0
1
Contracting Officer
0
0
1
COTR
0
0
1
FAA Academy
0
0
1
(a) Total (
0
0
5
(b) Total (
15. Total of A & B (
5

16. Remarks:

Block 4 - Guidance for content can be found in FAA-STD-028C, Contract Training Programs, STD 028C Para. 2-7 and Appendix 1, DID–1, Personnel Qualifications Report.

Note: One software copy of FAA-STD-028C will be provided by the Government.

Block 10 – When instructors leave or new instructors hired.

Block 12 – Original submittal 10 calendar days from RECEIPT of delivery order.

Block 13 - 5 Calendar days following receipt of Government review comments.

Block 14 - Email any subsequent re-submission to each Addressee.

g. Prepared By:
h. Date
i. Approved By:
j. Date
Marilyn Jarvis, NAS Power Services Group
9/9/16
Peter Megna, NAS Power Services Group
9/9/16

Contract Data Requirements List

Form Approved OMB No. 0704-0188

a. Contract Line Item No.
b. Exhibit
c. Category

0014A, 1014A, 2014A, 3014A, 4014A

FORMCHECKBOX

tdp FORMCHECKBOX tm FORMCHECKBOX other (Training)

d. System / Item
e. Contract / PR No.
f. Contractor

Uninterruptible Power Supply (UPS) and all Associated Equipment

1. Data Item No.
2. Title of Data Item CDRL T002
3. Subtitle of Data Item
T002
Task and Skills Analysis (TASA) Report
TASA for Second Level Engineering Training Course (SLETC)
4. Authority (Data Acquisition Document No.)
5. Contract Reference
6. Requiring Office
FAA-STD-028C
SOW Para. 3.6.4.2
NAS Power Systems Group, Technical operations Service
7. DD 250 Required
8. App Code
9. Dist Statement Required
10. Frequency

N/A

See Block 16

11. As Of Date
12. Date of first submission
13. Date of subsequent submission
N/A
See Block 16
See Block 16

D I S T R I B U T I O N

b. Copies

b. Copies

a. Addressee

Final
a. Addressee

Final

14.
Draft
Reg
Electronic
Draft
Reg
Electronic
Technical Training and Development Office
0
0
1
Power Services Group
0
0
1
Contracting Officer
0
0
1
COTR
0
0
1
FAA Academy
0
0
1
(a) Total (
0
0
5
(b) Total (
15. Total of A & B (
5

16. Remarks:

Block 10 – Original and two re-submittals.

Block 12 – Original Submittal 45 calendar days from RECEIPT of delivery order.

Block 13 – Re-submittals 10 calendar days following RECEIPT of FAA review COMMENTS. And, final version submitted prior to CDRL T013, DID-16 First Course Conduct.

Block 14 - Email to each addressee one softcopy of the original and re-submittal task and skills analysis report.

g. Prepared By:
h. Date
i. Approved By:
j. Date
Marilyn Jarvis, NAS Power Services Group
9/9/16
Peter Megna, NAS Power Services Group
9/9/16

Contract Data Requirements List

Form Approved OMB No. 0704-0188

a. Contract Line Item No.
b. Exhibit
c. Category

0014A, 1014A, 2014A, 3014A, 4014A

FORMCHECKBOX

tdp FORMCHECKBOX tm FORMCHECKBOX other (Training)

d. System / Item
e. Contract / PR No.
f. Contractor

Uninterruptible Power Supply (UPS) and all Associated Equipment

1. Data Item No.
2. Title of Data Item CDRL T005
3. Subtitle of Data Item
T005
Training Development Plan
Training Development Plan for Second Level Engineering Training Course (SLETC)
4. Authority (Data Acquisition Document No.)
5. Contract Reference
6. Requiring Office
FAA-STD-028C
SOW Para. 3.6.4.6
NAS Power Services Group, Technical operations Service
7. DD 250 Required
8. App Code
9. Dist Statement Required
10. Frequency

N/A

None
See Block 16
11. As Of Date
12. Date of first submission
13. Date of subsequent submission
See Block 16
See Block 16

D I S T R I B U T I O N

b. Copies

b. Copies

a. Addressee

Final
a. Addressee

Final

14.
Draft
Reg
Electronic
Draft
Reg
Electronic
Technical Training and Development Office
0
0
1
Power Services Group
0
0
1
Contracting Officer
0
0
1
COTR
0
0
1
FAA Academy
0
0
1
(a) Total (
0
0
5
(b) Total (
15. Total of A & B (
5

16. Remarks:

Block 4 - Guidance for content can be found in FAA-STD-028C, Contract Training Programs, STD 028C Ch 7, Appendix 1, DID 5, Training Development Plan.

Note: Soft copy of FAA-STD-028C provided by the Government.

Block 10 – original and two re-submittals.

Block 12 – Original Submitted 30 calendar days following delivery order. .

Block 13 – two re-submittals each 7 calendar days after RECEIPT of review COMMENTS from FAA.

Block 14 - Deliver to each addressee 1 softcopy.

g. Prepared By:
h. Date
i. Approved By:
j. Date
Marilyn Jarvis, NAS Power Services Group
9/9/16
Peter Megna, NAS Power Services Group
9/9/16

Contract Data Requirements List

Form Approved OMB No. 0704-0188

a. Contract Line Item No.
b. Exhibit
c. Category

0014A, 1014A, 2014A, 3014A, 4014A

FORMCHECKBOX

tdp FORMCHECKBOX tm FORMCHECKBOX other (Training)

d. System / Item
e. Contract / PR No.
f. Contractor

Uninterruptible Power Supply (UPS) and all Associated Equipment

1. Data Item No.
2. Title of Data Item CDRL T006
3. Subtitle of Data Item
T006
Course Design Guide
COTS Training Materials Report for Second Level Engineering Training Course (SLETC)
4. Authority (Data Acquisition Document No.)
5. Contract Reference
6. Requiring Office
FAA-STD-028C
SOW Para. 3.6.4.6
NAS Power Services Group, Technical operations Service
7. DD 250 Required
8. App Code
9. Dist Statement Required
10. Frequency

N/A

None
See Block 16
11. As Of Date
12. Date of first submission
13. Date of subsequent submission
See Block 16
See Block 16

D I S T R I B U T I O N

14.
b. Copies

b. Copies

a. Addressee

Final
a. Addressee

Final

Draft
Reg
Electronic
Draft
Reg
Electronic
Technical Training and Development Office
0
0
1
Power Services Group
0
0
1
Contracting officer
0
0
1
COTR
0
0
1
FAA Academy
0
0
1
(a) Total (
0
0
5
(b) Total (
15. Total of A & B (
5

16. Remarks:

Block 4 - Guidance for content can be found in FAA-STD-028C, Contract Training Programs, STD 028C Ch 5, Appendix 1, DID 6, COTS Training Materials Report .

Note: Soft copy of FAA-STD-028C provided by the Government.

Block 10 – Original and two re-submittals.

Block 12 – Original Submittal 60 calendar days from RECEIPT of delivery order. And, final version submitted prior to CDRL T013, DID-16 First Course Conduct.

Block 13 – Re-submittals 10 calendar days following RECEIPT of FAA review COMMENTS.

g. Prepared By:
h. Date
i. Approved By:
j. Date
Marilyn Jarvis, NAS Power Services Group
9/9/16
Peter Megna, NAS Power Services Group
9/9/16

Contract Data Requirements List

Form Approved OMB No. 0704-0188

a. Contract Line Item No.
b. Exhibit
c. Category
0014B, 1014B, 2014B, 3014B, 4014B
A
FORMCHECKBOX

tdp FORMCHECKBOX tm FORMCHECKBOX other (Training)

d. System / Item
e. Contract / PR No.
f. Contractor

Uninterruptible Power Supply (UPS) and all Associated Equipment

1. Data Item No.
2. Title of Data Item CDRL T007
3. Subtitle of Data Item
T007
Tests, Written
Tests for Second Level Engineering Training Course (SLETC)
4. Authority (Data Acquisition Document No.)
5. Contract Reference
6. Requiring Office
FAA-STD-028C
Section C 3.6.4.4 and 3.6.4.5
NAS Power Services Group, Technical operations Service
7. DD 250 Required
8. App Code
9. Dist Statement Required
10. Frequency
None
See Block 16
11. As Of Date
12. Date of first submission
13. Date of subsequent submission
See Block 16
See Block 16

D I S T R I B U T I O N

b. Copies

b. Copies

a. Addressee

Final
a. Addressee

Final

Draft
Reg
Electronic
Draft
Reg
Electronic
Technical Training and Development Office
0
0
1
Power Services Group
0
0
1
FAA Academy
0
0
1
Contracting officer
0
0
1
COTR
0
0
1
(a) Total (
0
0
5
(b) Total (
15. Total of A & B (
5

16. Remarks:

Note: Tests must be controlled documents.

Block 4 - Guidance for content can be found in FAA-STD-028C, Contract Training Programs, STD 028C Ch 7, Appendix 1, DID 7, Tests.

Note: Soft copy of FAA-STD-028C provided by the Government.

Block 10 – Original and two re-submittals.

Block 12 – Original Submittal 30 calendar days from RECEIPT of delivery order.

Block 13 – Re-submittals 10 calendar days following RECEIPT of FAA review COMMENTS.

Block 14 - Deliver to each addressee 1 softcopy.

g. Prepared By:
h. Date
i. Approved By:
j. Date
Marilyn Jarvis, NAS Power Services Group
9/9/16
Peter Megna, NAS Power Services Group
9/9/16

Contract Data Requirements List

Form Approved OMB No. 0704-0188

a. Contract Line Item No.
b. Exhibit
c. Category

0014A, 1014A, 2014A, 3014A, 4014A

FORMCHECKBOX

tdp FORMCHECKBOX tm FORMCHECKBOX other (Training)

d. System / Item
e. Contract / PR No.
f. Contractor

Uninterruptible Power Supply (UPS) and all Associated Equipment

1. Data Item No.
2. Title of Data Item CDRL T008
3. Subtitle of Data Item
T008
Classroom training Materials
COTS Training Materials Report for Second Level Engineering Training Course (SLETC)
4. Authority (Data Acquisition Document No.)
5. Contract Reference
6. Requiring Office
FAA-STD-028C
SOW Para. 3.6.4.6
NAS Power Services Group, Technical operations Service
7. DD 250 Required
8. App Code
9. Dist Statement Required
10. Frequency

N/A

None
See Block 16
11. As Of Date
12. Date of first submission
13. Date of subsequent submission
See Block 16
See Block 16

D I S T R I B U T I O N

14.
b. Copies

b. Copies

a. Addressee

Final
a. Addressee

Final

Draft
Reg
Electronic
Draft
Reg
Electronic
Technical Training and Development Office
0
0
1
Power Services Group
0
0
1
Contracting Officer
0
0
1
COTR
0
0
1
FAA Academy
0
0
1
(a) Total (
0
0
5
(b) Total (
15. Total of A & B (
5

16. Remarks:

Block 4 - Guidance for content can be found in FAA-STD-028C, Contract Training Programs, STD 028C Ch 5, Appendix 1, DID 8, COTS Training Materials Report .

Note: Soft copy of FAA-STD-028C provided by the Government.

Block 10 – Original and two re-submittals.

Block 12 – Original Submittal 90 calendar days from RECEIPT of delivery order.

Block 13 – Re-submittals 10 calendar days following RECEIPT of FAA review COMMENTS; final version submitted prior to CDRL T013, DID-16 First Course Conduct.

g. Prepared By:
h. Date
i. Approved By:
j. Date
Marilyn Jarvis, NAS Power Services Group
9/9/16
Peter Megna, NAS Power Services Group
9/9/16

Contract Data Requirements List

Form Approved OMB No. 0704-0188

a. Contract Line Item No.
b. Exhibit
c. Category

0014G, 1014G, 2014G, 3014G, 4014G

FORMCHECKBOX

tdp FORMCHECKBOX tm FORMCHECKBOX other (Training)

d. System / Item
e. Contract / PR No.
f. Contractor

Uninterruptible Power Supply (UPS) and all Associated Equipment

1. Data Item No.
2. Title of Data Item CDRL T011
3. Subtitle of Data Item
T011
Video Training Materials
COTS Training Materials Report for Second Level Engineering Training Course (SLETC)
4. Authority (Data Acquisition Document No.)
5. Contract Reference
6. Requiring Office
FAA-STD-028C
SOW Para. 3.6.4.6
NAS Power Services Group, Technical operations Service
7. DD 250 Required
8. App Code
9. Dist Statement Required
10. Frequency

N/A

None
See Block 16
11. As Of Date
12. Date of first submission
13. Date of subsequent submission
See Block 16
See Block 16

D I S T R I B U T I O N

14.
b. Copies

b. Copies

a. Addressee

Final
a. Addressee

Final

Draft
Reg
Electronic
Draft
Reg
Electronic
Technical Training and Development Office
0
0
1
Power Services Group
0
0
1
Contracting Officer
0
0
1
COTR
0
0
1
FAA Academy
0
0
1
(a) Total (
0
0
5
(b) Total (
15. Total of A & B (
5

16. Remarks:

Block 4 - Guidance for content can be found in FAA-STD-028C, Contract Training Programs, STD 028C Ch 5, Appendix 1, DID 8, COTS Training Materials Report .

Note: Soft copy of FAA-STD-028C provided by the Government.

Block 10 – Original and two re-submittals.

Block 12 – Original Submittal 90 calendar days from RECEIPT of delivery order.

Block 13 – Re-submittals 10 calendar days following RECEIPT of FAA review COMMENTS; final version submitted prior to CDRL T013, DID-16 First Course Conduct.

g. Prepared By:
h. Date
i. Approved By:
j. Date
Marilyn Jarvis, NAS Power Services Group
9/9/16
Peter Megna, NAS Power Services Group
9/9/16

Contract Data Requirements List

Form Approved OMB No. 0704-0188

a. Contract Line Item No.
b. Exhibit
c. Category

0014D, 1014D, 2014D, 3014D, 4014D

FORMCHECKBOX

tdp FORMCHECKBOX tm FORMCHECKBOX other (Training)

d. System / Item
e. Contract / PR No.
f. Contractor

Uninterruptible Power Supply (UPS) and all Associated Equipment

1. Data Item No.
2. Title Of Data Item CDRL T014
3. Subtitle of Data Item
T014
Contractor's Presentation
CP for Second Level Engineering Training Course (SLETC)
4. Authority (Data Acquisition Document No.)
5. Contract Reference
6. Requiring Office
FAA-STD-028C
SOW Para. 3.6.4.8.1
NAS Power Services Group, Technical operations Service
7. DD 250 Required
8. App Code
9. Dist Statement Required
10. Frequency

N/A one time

11. As Of Date
12. Date of first submission
13. Date of subsequent submission
See Block 16
See Block 16

D I S T R I B U T I O N

14.
b. Copies

b. Copies

a. Addressee

Final
a. Addressee

Final

Draft
Reg
Electronic
Draft
Reg
Electronic
Technical Training and Development Office
0
0
1
FAA Academy
0
0
1
Contracting Officer
0
0
*1
Power Services Group
0
0
*1
COTR
0
0
1
(a) Total (
0
0
3
(b) Total (
15. Total of A & B (
3

16. Remarks:

Block 4 - Guidance for content can be found in FAA-STD-028C, Contract Training Programs, Appendix 1, DID–14, Contractor's Presentation.

Note: Contractor’s Presentation is an ABBREVIATED version of the actual training course. Prior to presenting the course to FAA evaluators the vender will submit supporting documentation.

Note:: Soft copy of FAA-STD-028C provided by the Government.

Block 12 – No later than 30 calendar days prior to scheduled presentation submit deliverables to the FAA for review.

Block 13 – Re-submit deliverables during operational tryout, incorporate FAA COMMENTS into submittal.

Block 14 - Deliver to each addressee 1 softcopy.

*LTO = Letter of Transmittal Only

g. Prepared By:
h. Date
i. Approved By:
j. Date
Marilyn Jarvis, NAS Power Services Group
9/9/16
Peter Megna, NAS power Services Group
9/9/16

Contract Data Requirements List

Form Approved OMB No. 0704-0188

a. Contract Line Item No.
b. Exhibit
c. Category

0014E, 1014E, 2014E, 3014E, 4014E

FORMCHECKBOX

tdp FORMCHECKBOX tm FORMCHECKBOX other (Training)

d. System / Item
e. Contract / PR No.
f. Contractor

Uninterruptible Power Supply (UPS) and all Associated Equipment

1. Data Item No.
2. Title of Data Item CDRL T015
3. Subtitle of Data Item
T015
Operational Tryout
OT for Second Level Engineering Training Course (SLETC)
4. Authority (Data Acquisition Document No.)
5. Contract Reference
6. Requiring Office
FAA-STD-028C
SOW Para. 3.6.4.8.2
NAS Power Services Group, Technical operations Service
7. DD 250 Required
8. App Code
9. Dist Statement Required
10. Frequency

N/A

None
One Time
11. As Of Date
12. Date of first submission
13. Date of subsequent submission
See Block 16
See Block 16

D I S T R I B U T I O N

14.
b. Copies

b. Copies

a. Addressee

Final
a. Addressee

Final

Draft
Reg
Electronic
Draft
Reg
Electronic
Technical Training and Development Office
0
0
1
FAA Academy
0
0
1
Power Services Group
0
0
*1
COTR
0
0
1
Contracting Officer
0
0
*1
(a) Total (
0
0
3
(b) Total (
15. Total of A & B (
3

16. Remarks:

Block 4 - Guidance for content can be found in FAA-STD-028C, Contract Training Programs, Appendix 1, DID-15, Operational Tryout.

Note: a softcopy of FAA-STD-028C will be provided by the Government.

Note: Contractor’s operational tryout is APPROXIMATELY 1 ½ times the proposed course length. Prior to PERFORMING the operational tryout for FAA evaluators the vendor will submit supporting documentation.

Note:: Soft copy of FAA-STD-028C provided by the Government.

Block 12 – No later than 15 calendar days prior to scheduled operational tryout submit plan for operational tryout and all instructional MATERIAL to the FAA. The instructional material is course material revised after presenting the Contractor’s presentation and receiving FAA review COMMENTS.

Block 13 – Re-submit deliverables during first course conduct, incorporate FAA review COMMENTS.

Block 14 - Deliver to each addressee 1 softcopy.

Block 14 - Deliver to each addressee 1 softcopy of the course materials when requested by the Government.

*LTO = Letter of Transmittal Only

g. Prepared By:
h. Date
i. Approved By:
j. Date
Marilyn Jarvis, NAS Power Services Group
9/9/16
Peter Megna, NAS Power Services Group
9/9/16

Contract Data Requirements List

Form Approved OMB No. 0704-0188

a. Contract Line Item No.
b. Exhibit
c. Category

0014F, 1014F, 2014F, 3014F, 4014F

FORMCHECKBOX

tdp FORMCHECKBOX tm FORMCHECKBOX other (Training)

d. System / Item
e. Contract / PR No.
f. Contractor

Uninterruptible Power Supply (UPS) and all Associated Equipment

1. Data Item No.
2. Title of Data Item CDRL T016
3. Subtitle of Data Item
T016
First Course Conduct
FCC for Second Level Engineering Training Course (SLETC)
4. Authority (Data Acquisition Document No.)
5. Contract Reference
6. Requiring Office
FAA-STD-028C
SOW Para. 3.6.4.8.3
NAS Power Services Group, Technical operations Service
7. DD 250 Required
8. App Code
9. Dist Statement Required
10. Frequency

N/A

None
One Time
11. As Of Date
12. Date of first submission
13. Date of subsequent submission
See Block 16
See Block 16

D I S T R I B U T I O N

b. Copies

b. Copies

a. Addressee

Final
a. Addressee

Final

Draft
Reg
Electronic
Draft
Reg
Electronic
Technical Training and Development Office
0
0
1
FAA Academy
0
0
1
Contracting Officer
0
0
*1
COTR
0
0
1
Power Services Group
0
0
*1
(a) Total (
0
0
3
(b) Total (
15. Total of A & B (
1

16. Remarks:

Block 4 - Guidance for content can be found in FAA-STD-028C, Contract Training Programs, Appendix 1, DID-16 , First Course Conduct.

Note: Soft copy of FAA-STD-028C will be provided by the Government.

Note: First Course Conduct is first full length course taught by the vendor. Prior to performing the first course conduct the vendor must submit deliverables.

Note:: Soft copy of FAA-STD-028C provided by the Government.

Block 12 – No later than 30 calendar days prior to scheduled First Course Conduct submit plan for deliverables as required in DID -16. Before submitting documents revise documents by incorporating FAA review comments generated from operational tryout. These document deliverables include final TASA and Course Design Guide.

Block 13 – 10 calendar days following receipt of FAA review comments, from first course conduct, re-submit documents to FAA with revisions.

g. Prepared By
h. Date
i. Approved By:
j. Date
Marilyn Jarvis, NAS Power Services Group