Contract Data Requirements List (1 Data Item) Form Approved OMB No. 0704-0188
| a. Contract Line Item No. |
| b. Exhibit |
| c. Category |
0015A, 1015A, 2015A, 3015A, 4015A
FORMCHECKBOX
tdp FORMCHECKBOX tm FORMCHECKBOX other ( Contract Base Award)
| d. System / Item |
| e. Contract / PR No. |
| f. Contractor |
Uninterruptible Power Supply (UPS) systems, and all Associated Software
| 1. Data Item No. |
| 2. Title of Data Item |
| 3. Subtitle of Data Item |
| E001 |
| Monitoring Software/Firmware Interface Document |
| N/A |
| 4. Authority (Data Acquisition Document No.) |
| 5. Contract Reference |
| 6. Requiring Office |
| SOW para., 3.3.1.1 |
| NAS Power Systems Group, Technical Operations Service |
| 7. DD 250 Required |
| 8. App Code |
| 9. Dist Statement Required |
| 10. Frequency |
N/A
| 11. As Of Date |
| 12. Date of first submission |
| 13. Date of subsequent submission |
| See Block 16 |
| See Block 16 |
D I S T R I B U T I O N
b. Copies
b. Copies
a. Addressee
Final
Contracting Officer *LTO
Power Services Group
| (a) Total ( |
| 0 |
| 0 |
| 2 |
| (b) Total ( |
16. Remarks:
Block 10 - One TIME submission unless UPS and associated equipment processor/control and monitoring software is changed.
Block 12 - The contractor shall provide software interface documents 10 calendar days following receipt of Delivery Order.
Block 13 - If UPS and associated equipment processor/control and monitoring software is changed or reconfigured the contractor shall update and submit the revised Software Interface Document.
| g. Prepared By |
| h. Date |
| i. Approved By |
| j. Date |
| Marilyn Jarvis, NAS Power Systems Group |
| 9/9/16 |
| Peter Megna, NAS Power Systems Group |
| 9/9/16 |
Contract Data Requirements List
Form Approved OMB No. 0704-0188
| a. Contract Line Item No. |
| b. Exhibit |
| c. Category |
0015A, 1015A, 2015A, 3015A, 4015A
FORMCHECKBOX
tdp FORMCHECKBOX tm FORMCHECKBOX other ( Contract Base Award)
| d. System / Item |
| e. Contract / PR No. |
| f. Contractor |
Uninterruptible Power Supply (UPS) systems, and all Associated Software
| 1. Data Item No. |
| 2. Title of Data Item |
| 3. Subtitle of Data Item |
| E002 |
| Software/Firmware Interface Document |
| N/A |
| 4. Authority (Data Acquisition Document No.) |
| 5. Contract Reference |
| 6. Requiring Office |
| SOW para., 3.3.1.2 |
| NAS Power Systems Group, Technical Operations Service |
| 7. DD 250 Required |
| 8. App Code |
| 9. Dist Statement Required |
| 10. Frequency |
N/A
| 11. As Of Date |
| 12. Date of first submission |
| 13. Date of subsequent submission |
| See Block 16 |
| See Block 16 |
D I S T R I B U T I O N
b. Copies
b. Copies
a. Addressee
Final
Contracting Officer *LTO
Power Services Group
| (a) Total ( |
| 0 |
| 0 |
| 2 |
| (b) Total ( |
16. Remarks:
Block 10 - One TIME submission unless UPS and associated equipment processor/control and monitoring software is changed.
Block 12 - The contractor shall provide software interface documents 10 calendar days following receipt of Delivery Order.
Block 13 - If UPS and associated equipment processor/control and monitoring software is changed or reconfigured the contractor shall update and submit the revised Software Interface Document.
| g. Prepared By |
| h. Date |
| i. Approved By |
| j. Date |
| Marilyn Jarvis, NAS Power Systems Group |
| 9/9/16 |
| Peter Megna, NAS Power Systems Group |
| 9/9/16 |
Contract Data Requirements List
Form Approved OMB No. 0704-0188
| a. Contract Line Item No. |
| b. Exhibit |
| c. Category |
| 0015A, 1015A, 2015A, 3015A, 4015A |
| A |
| FORMCHECKBOX |
tdp FORMCHECKBOX tm FORMCHECKBOX other (Training)
| d. System / Item |
| e. Contract / PR No. |
| f. Contractor |
Uninterruptible Power Supply (UPS) systems, and all Associated Software
| 1. Data Item No. |
| 2. Title of Data Item |
| 3. Subtitle of Data Item |
| E003 |
| UPS Maintenance Diagnostic and Analysis Software |
| 4. Authority (Data Acquisition Document No.) |
| 5. Contract Reference |
| 6. Requiring Office |
| SOW Para. 3.3.1.3 |
| NAS Power Systems Group, Technical Operations Service |
| 7. DD 250 Required |
| 8. App Code |
| 9. Dist Statement Required |
| 10. Frequency |
No
| 11. As Of Date |
| 12. Date of first submission |
| 13. Date of subsequent submission |
| N/A |
| See Block 16 |
| See Block 16 |
D I S T R I B U T I O N
b. Copies
b. Copies
a. Addressee
Final
Contracting Officer *LTO
Power Services Group
(a) Total (
16. Remarks:
Block 10: Submit UPS Maintenance Diagnostic and Analysis Software data sheets 30-calendar days following FAA approval to PURCHASE NEW UPS configurations.
Block 12: Submit UPS Maintenance Diagnostic and Analysis Software on all UPS models in CLINs 0001 and 0002 30-calendar days after contract award.
Block 13: Submit UPS Maintenance Diagnostic and Analysis Software 30-calendar days following FAA approval to purchase new UPS configurations.
17. Price Group:
18. Estimated Total Price:
| g. Prepared By |
| h. Date |
| i. Approved By |
| j. Date |
| Marilyn Jarvis, Power Services Group |
| 9/9/16 |
| Peter Megna, Power Services Group |
| 9/9/16 |
Contract Data Requirements List
Form Approved OMB No. 0704-0188
| a. Contract Line Item No. |
| b. Exhibit |
| c. Category |
| 0015A, 1015A, 2015A, 3015A, 4015A |
| A |
| FORMCHECKBOX |
tdp FORMCHECKBOX tm FORMCHECKBOX other (Training)
| d. System / Item |
| e. Contract / PR No. |
| f. Contractor |
Uninterruptible Power Supply (UPS) systems, and Associated Equipment
| 1. Data Item No. |
| 2. Title of Data Item |
| 3. Subtitle of Data Item |
| E004 |
| UPS and associated Equipment |
Data and Drawing Sheets
| 4. Authority (Data Acquisition Document No.) |
| 5. Contract Reference |
| 6. Requiring Office |
| SOW Para. 3.3.2 |
| NAS Power Systems Group, Technical Operations Service |
| 7. DD 250 Required |
| 8. App Code |
| 9. Dist Statement Required |
| 10. Frequency |
No
| 11. As Of Date |
| 12. Date of first submission |
| 13. Date of subsequent submission |
| N/A |
| See Block 16 |
| See Block 16 |
D I S T R I B U T I O N
b. Copies
b. Copies
a. Addressee
Final
Contracting Officer *LTO
Power Services Group
(a) Total (
16. Remarks:
Block 10: Submit UPS and associated equipment data and drawing sheets 30-calendar days following FAA approval to purchase new UPS and associated equipment configurations.
Block 12: Submit UPS and associated equipment data and drawing sheets on all CLINs 0001 through 0008 30-calendar days after contract award.
Block 13: Submit UPS and associated equipment data sheet 30-calendar days following FAA approval to purchase new UPS and associated equipment configurations.
17. Price Group:
18. Estimated Total Price:
| g. Prepared By |
| h. Date |
| i. Approved By |
| j. Date |
| Marilyn Jarvis, Power Services Group |
| 9/9/16 |
| Peter Megna, Power Services Group |
| 9/9/16 |
Contract Data Requirements List
Form Approved OMB No. 0704-0188
| a. Contract Line Item No. |
| b. Exhibit |
| c. Category |
| 0015A, 1015A, 2015A, 3015A, 4015A |
| A |
| FORMCHECKBOX |
tdp FORMCHECKBOX tm FORMCHECKBOX other (Training)
| d. System / Item |
| e. Contract / PR No. |
| f. Contractor |
Uninterruptible Power Supply (UPS) systems, and Associated Equipment
| 1. Data Item No. |
| 2. Title of Data Item |
| 3. Subtitle of Data Item |
| E005 |
| UPS LRU Lifecycle/Replacement Frequency |
| 4. Authority (Data Acquisition Document No.) |
| 5. Contract Reference |
| 6. Requiring Office |
| SOW Para. 3.3.2 |
| NAS Power Systems Group, Technical Operations Service |
| 7. DD 250 Required |
| 8. App Code |
| 9. Dist Statement Required |
| 10. Frequency |
No
| 11. As Of Date |
| 12. Date of first submission |
| 13. Date of subsequent submission |
| N/A |
| See Block 16 |
| See Block 16 |
D I S T R I B U T I O N
b. Copies
b. Copies
a. Addressee
Final
Contracting Officer *LTO
Power Services Group
(a) Total (
16. Remarks:
Block 10: Submit UPS LRU Lifecycle/Replacement Frequency report 30-calendar days following FAA approval to purchase new UPS and associated equipment configurations.
Block 12: Submit UPS LRU Lifecycle/Replacement Frequency report all CLIN 0001 and 0002 UPSs 30-calendar days after contract award.
Block 13: Submit UPS LRU Lifecycle/Replacement Frequency report 30-calendar days following FAA approval to purchase new UPSs.
17. Price Group:
18. Estimated Total Price:
| g. Prepared By |
| h. Date |
| i. Approved By |
| j. Date |
| Marilyn Jarvis, Power Services Group |
| 11/26/16 |
| Peter Megna, Power Services Group |
| 11/26/16 |
Contract Data Requirements List
Form Approved OMB No. 0704-0188
| a. Contract Line Item No. |
| b. Exhibit |
| c. Category |
0016, 1016, 2016, 3016, 4016
FORMCHECKBOX
tdp FORMCHECKBOX tm FORMCHECKBOX other ( Contract Base Award)
| d. System / Item |
| e. Contract / PR No. |
| f. Contractor |
Uninterruptible Power Supply (UPS) and all Associated Equipment
| 1. Data Item No. |
| 2. Title of Data Item |
| 3. Subtitle of Data Item |
| L001 |
| Integrated Support Plan (ISP) |
| N/A |
| 4. Authority (Data Acquisition Document No.) |
| 5. Contract Reference |
| 6. Requiring Office |
| DI-FAA-L001 |
| SOW Para. 3.4.1.1 |
| NAS Power Services Group, Technical Operations Service |
| 7. DD 250 Required |
| 8. App Code |
| 9. Dist Statement Required |
| 10. Frequency |
| N/A |
| N/A |
| N/A |
| One/Revisions |
| 11. As Of Date |
| 12. Date of first submission |
| 13. Date of subsequent submission |
| See Block 16 |
| See Block 16 |
D I S T R I B U T I O N
b. Copies
b. Copies
a. Addressee
Final
Contracting Officer *LTO
Power Services Group
FAALC (AML-8050)
| (a) Total ( |
| 0 |
| 0 |
| 3 |
| (b) Total ( |
16. Remarks:
Block 12: The contractor must submit the ISP or the applicable portions of their ISO 9000 series documentation or a copy of internal documentation that support both the scope and intent of the ISP not later than 10 calendar days after receiving delivery order.
The Government will review and comment or approve the ISP, ISO 9000 series documentation, or internal corporate documentation within 30 calendar days after receipt from contractor.
Block 13: The contractor must update and resubmit the ISP or substituted corporate documentation, as revisions occur or 10 calendar days following receipt of Government comments.
* LTO = “Letter of Transmittal Only”
| g. Prepared By: |
| h. Date |
| i. Approved By: |
| j. Date |
| Marilyn Jarvis, NAS Power Services Group |
| 5/10/17 |
| Peter Megna, NAS Power Services Group |
| 5/10/17 |
Contract Data Requirements List
Form Approved OMB No. 0704-0188
| a. Contract Line Item No. |
| b. Exhibit |
| c. Category |
0016, 1016, 2016, 3016, 4016
FORMCHECKBOX
tdp FORMCHECKBOX tm FORMCHECKBOX other ( Contract Base Award)
| d. System / Item |
| e. Contract / PR No. |
| f. Contractor |
Uninterruptible Power Supply (UPS) and all Associated Equipment
| 1. Data Item No. |
| 2. Title of Data Item |
| 3. Subtitle of Data Item |
| L002 |
| Recommended Spare Parts List (RSPL), |
Site Spare Parts List (SSPL), Spare Parts Peculiar List (SPPL)
Complete Parts List (CPL) N/A
| 4. Authority (Data Acquisition Document No.) |
| 5. Contract Reference |
| 6. Requiring Office |
| SOW Para. 3.4.2.1-3 |
| NAS Power Services Group, Technical Operations Service |
| 7. DD 250 Required |
| 8. App Code |
| 9. Dist Statement Required |
| 10. Frequency |
| No |
| N/A |
| No |
| As Equipment Changes |
| 11. As Of Date |
| 12. Date of first submission |
| 13. Date of subsequent submission |
| See Block 16 |
| See Block 16 |
D I S T R I B U T I O N
b. Copies
b. Copies
a. Addressee
Final
Contracting Officer *LTO
Power Services Group
FAALC (AML-8050)
(a) Total (
16. Remarks:
Block 12: The first Submittals are with the vendor’s Bid proposal as directed in CONTRACT Section-L.
The Government will review, comment, approve/disapprove the se Lists and provide the vender with COMMENTS during the Post Award Conference.
Block 13: The contractor must update and resubmit these Lists every 90 calendar days prior to revisions in equipment, and when the vendor introduces a new product line of equipment.
| g. Prepared By: |
| h. Date |
| i. Approved By: |
| j. Date |
| Marilyn Jarvis, NAS Power Services Group |
| 5/10/17 |
| Peter Megna, NAS Power Services Group |
| 5/10/17 |
Contract Data Requirements List
Form Approved OMB No. 0704-0188
| a. Contract Line Item No. |
| b. Exhibit |
| c. Category |
0016, 1016, 2016, 3016, 4016
FORMCHECKBOX
tdp FORMCHECKBOX tm FORMCHECKBOX other ( Contract Base Award)
| d. System / Item |
| e. Contract / PR No. |
| f. Contractor |
Uninterruptible Power Supply (UPS) and all Associated Equipment
| 1. Data Item No. |
| 2. Title of Data Item |
| 3. Subtitle of Data Item |
| L003 |
| Support Equipment Candidate List (SECL) |
| N/A |
| 4. Authority (Data Acquisition Document No.) |
| 5. Contract Reference |
| 6. Requiring Office |
| SOW Para. 3.4.2.4 |
| NAS Power Services Group, Technical Operations Service |
| 7. DD 250 Required |
| 8. App Code |
| 9. Dist Statement Required |
| 10. Frequency |
| No |
| N/A |
| No |
| As Equipment Changes |
| 11. As Of Date |
| 12. Date of first submission |
| 13. Date of subsequent submission |
| See Block 16 |
| See Block 16 |
| See Block 16 |
D I S T R I B U T I O N
b. Copies
b. Copies
a. Addressee
Final
Contracting Officer *LTO
Power Services Group
FAALC (AML-8050)
| (a) Total ( |
| 0 |
| 0 |
| 3 |
| (b) Total ( |
16. Remarks:
Block 12: The First Support Equipment Candidate List submittal is with the vendor’s Bid proposal as directed in SIR/RFO Section-L The SECL must include test and tools list for the UPS and associated equipment that is listed in the SIR/RFO Section-B.
The Government will review, comment, approve/disapprove the Support Equipment Candidate List(s) and provide the vendor with COMMENTS during the Post Award Conference.
Block 13: The Contractor must update and resubmit the Support Equipment Candidate List 90 calendar days prior to revisions to existing UPS and associated equipment, and when the vendor introduces a new product line of UPS or associated equipment.
| g. Prepared By: |
| h. Date |
| i. Approved By: |
| j. Date |
| Marilyn Jarvis, NAS Power Services Group |
| 5/10/17 |
| Peter Megna, NAS Power Services Group |
| 5/10/17 |
Contract Data Requirements List
Form Approved OMB No. 0704-0188
| a. Contract Line Item No. |
| b. Exhibit |
| c. Category |
0016, 1016, 2016, 3016, 4016
FORMCHECKBOX
tdp FORMCHECKBOX tm FORMCHECKBOX other Contract Base Award
| d. System / Item |
| e. Contract / PR No. |
| f. Contractor |
Uninterruptible Power Supply (UPS)
| 1. Data Item No. |
| 2. Title of Data Item |
| 3. Subtitle of Data Item |
| L004 |
| Program Management Reports & Documentation |
| Various |
| 4. Authority (Data Acquisition Document No.) |
| 5. Contract Reference |
| 6. Requiring Office |
| DI-FAA-L005 |
| SOW 3.4.3.3 |
| NAS Power Services Group, Technical Operations Service |
| 7. DD 250 Required |
| 8. App Code |
| 9. Dist Statement Required |
| 10. Frequency |
No
| 11. As Of Date |
| 12. Date of first submission |
| 13. Date of subsequent submission |
| See Block 16 |
| See Block 16 |
| See Block 16 |
14. D I S T R I B U T I O N
b. Copies
b. Copies
a. Addressee
Final
Contracting Officer *LTO
Power Services Group
FAALC (AML-8050)
| (a) Total ( |
| 0 |
| 0 |
| 3 |
| (b) Total ( |
16. Remarks:
Block 10 – monthly, or as described in the body of the Data Item Description (DID).
Block 12 – Date of 1st sumbission of all reports shall be:
60 working days after the First month after contract award.
Block 13 – Date of subsequent submissions must be:
monthly: 10 working days after the month the data was collected for.
* LTO = Letter of Transmittal Only
Due to size considerations, the repair status report may be submitted in electronic format or zipped transmittal email. The report must be delivered to the FAA Contracting Officer, and must be dispersed to the appropriate FAA Offices as requested by the Contracting Officer.
| g. Prepared By: |
| h. Date |
| i. Approved By: |
| j. Date |
| Marilyn Jarvis, NAS Power Services Group |
| 5/10/17 |
| Peter Megna, NAS Power Services Group |
| 5/10/17 |
Contract Data Requirements List
Form Approved OMB No. 0704-0188
| a. Contract Line Item No. |
| b. Exhibit |
| c. Category |
0016, 1016, 2016, 3016, 4016
FORMCHECKBOX
tdp FORMCHECKBOX tm FORMCHECKBOX other Contract Base Award
| d. System / Item |
| e. Contract / PR No. |
| f. Contractor |
Uninterruptible Power Supply (UPS)
| 1. Data Item No. |
| 2. Title of Data Item |
| 3. Subtitle of Data Item |
| L005 |
| Summary of Repaired Items Report |
| N/A |
| 4. Authority (Data Acquisition Document No.) |
| 5. Contract Reference |
| 6. Requiring Office |
| DI-FAA-L005 |
| SOW Para. 3.4.3.4 and 3.5.12 |
| NAS Power Services Group, Technical Operations Service |
| 7. DD 250 Required |
| 8. App Code |
| 9. Dist Statement Required |
| 10. Frequency |
No
| 11. As Of Date |
| 12. Date of first submission |
| 13. Date of subsequent submission |
| See Block 16 |
| See Block 16 |
| See Block 16 |
14. D I S T R I B U T I O N
b. Copies
b. Copies
a. Addressee
Final
Contracting Officer *LTO
Power Services Group
FAALC (AML-8050)
| (a) Total ( |
| 0 |
| 0 |
| 3 |
| (b) Total ( |
16. Remarks:
Block 10 – monthly, as described in the body of the Data Item Description (DID).
Block 12 – Date of 1st sumbission of all reports shall be:
60 working days after the First month after contract award.
Block 13 – Date of subsequent submissions must be:
monthly: 10 working days after the month the data was collected for.
Due to size considerations, the repair status report may be submitted in electronic format or zipped transmittal email. The report must be delivered to the FAA Contracting Officer, and must be dispersed to the appropriate FAA Offices as requested by the Contracting Officer.
| g. Prepared By: |
| h. Date |
| i. Approved By: |
| j. Date |
| Marilyn Jarvis, NAS Power Services Group |
| 5/10/17 |
| Peter Megna, NAS Power Services Group |
| 5/10/17 |
Contract Data Requirements List
Form Approved OMB No. 0704-0188
| a. Contract Line Item No. |
| b. Exhibit |
| c. Category |
0017, 1017, 2017, 3017, 4017
FORMCHECKBOX
tdp FORMCHECKBOX tm FORMCHECKBOX other ( Contract Base Award)
| d. System / Item |
| e. Contract / PR No. |
| f. Contractor |
Uninterruptible Power Supply (UPS)
| 1. Data Item No. |
| 2. Title of Data Item |
| 3. Subtitle of Data Item |
| L006 |
| Contractor Depot Logistics Support (CDLS) Invoice, Summary, and Reports |
| Various |
| 4. Authority (Data Acquisition Document No.) |
| 5. Contract Reference |
| 6. Requiring Office |
| DI-FAA-L006 |
| SOW Para. 3.4.3.5 |
| NAS Power Services Group, Technical Operations Service |
| 7. DD 250 Required |
| 8. App Code |
| 9. Dist Statement Required |
| 10. Frequency |
| 11. As Of Date |
| 12. Date of first submission |
| 13. Date of subsequent submission |
| See Block 16 |
| See Block 16 |
| See Block 16 |
D I S T R I B U T I O N
b. Copies
b. Copies
a. Addressee
Final
Contracting Officer *LTO
Power Services Group
FAALC (AML-8050)
| (a) Total ( |
| 0 |
| 0 |
| 3 |
| (b) Total ( |
16. Remarks:
Block 10 – monthly
Block 11 – 15th Calendar Day of the Month
Block 12 – Date of 1st submission of all reports shall be:
monthly: 15 Calendar days after the first month after contract award.
Block 13 – Date of subsequent submissions shall be:
monthly: 15 Calendar days after the month the data was collected for.
* LTO = Letter of Transmittal For Invoice Only
Block 14 (b) Contractor shall provide the Government with an electronic copy via email.
| g. Prepared By |
| h. Date |
| i. Approved By |
| j. Date |
| Marilyn Jarvis, NAS Power Services Group |
| 5/10/17 |
| Peter Megna, NAS Power Services Group |
| 5/10/17 |
Contract Data Requirements List
Form Approved OMB No. 0704-0188
| a. Contract Line Item No. |
| b. Exhibit |
| c. Category |
0017, 1017, 2017, 3017, 4017
FORMCHECKBOX
tdp FORMCHECKBOX tm FORMCHECKBOX other ( Contract Base Award)
| d. System / Item |
| e. Contract / PR No. |
| f. Contractor |
Uninterruptible Power Supply (UPS)
| 1. Data Item No. |
| 2. Title of Data Item |
| 3. Subtitle of Data Item |
| L007 |
| Logistics Management Information (LMI) Data Products |
| N/A |
| 4. Authority (Data Acquisition Document No.) |
| 5. Contract Reference |
| 6. Requiring Office |
| DI-FAA-L007 |
| SOW Para. 3.5.10 |
| NAS Power Services Group, Technical Operations Service |
| 7. DD 250 Required |
| 8. App Code |
| 9. Dist Statement Required |
| 10. Frequency |
No
See Block 16
| 11. As Of Date |
| 12. Date of first submission |
| 13. Date of subsequent submission |
| See Block 16 |
| See Block 16 |
| As Required |
D I S T R I B U T I O N
b. Copies
b. Copies
a. Addressee
Final
Contracting Officer *LTO
Power Services Group
FAALC (AML-8050)
| (a) Total ( |
| 0 |
| 0 |
| 2 |
| (b) Total ( |
16. Remarks:
Block 11: 30 days after Contract Award
Block 12: 30 Days After Contract Award
Block 13: At time of Technical Interchange Meetings (TIMs), Program Management Reviews and Integrated Logistics Management Team Meetings.
| g. Prepared By: |
| h. Date |
| i. Approved By: |
| j. Date |
| Marilyn Jarvis, NAS Power Services Group |
| 5/10/17 |
| Peter Megna, NAS Power Services Group |
| 5/10/17 |
Contract Data Requirements List
Form Approved OMB No. 0704-0188
| a. Contract Line Item No. |
| b. Exhibit |
| c. Category |
0015B, 1015B, 2015B, 3015B, 4015B
FORMCHECKBOX
tdp FORMCHECKBOX tm FORMCHECKBOX other ( Contract Base Award)
| d. System / Item |
| e. Contract / PR No. |
| f. Contractor |
Uninterruptible Power Supply (UPS) and all Associated Equipment
| 1. Data Item No. |
| 2. Title of Data Item |
| 3. Subtitle of Data Item |
| 4. Authority (Data Acquisition Document No.) |
| 5. Contract Reference |
| 6. Requiring Office |
| SOW Para., 3.1.1 |
| NAS Power Services Group, Technical Operations Service |
| 7. DD 250 Required |
| 8. App Code |
| 9. Dist Statement Required |
| 10. Frequency |
| 11. As Of Date |
| 12. Date of first submission |
| 13. Date of subsequent submission |
| See Block 16 |
| See Block 16 |
D I S T R I B U T I O N
b. Copies
b. Copies
a. Addressee
Final
Contracting Officer *LTO
Power Services Group
| (a) Total ( |
| 0 |
| 0 |
| 2 |
| (b) Total ( |
16. Remarks:
Block 12 - The contractor shall submit the Program Plan 10 calendar days following receipt of delivery order.
Block 13 - The contractor shall update and submit the Program Plan as revisions to the Program management structure occur.
Block 14b – Repo means emailed soft copy.
| g. Prepared By |
| h. Date |
| i. Approved By |
| j. Date |
| Marilyn Jarvis, NAS Power Services Group |
| 9/9/16 |
| Peter Megna, NAS Power Services Group |
| 9/9/16 |
Contract Data Requirements List
Form Approved OMB No. 0704-0188
| a. Contract Line Item No. |
| b. Exhibit |
| c. Category |
0015C, 1015C, 2015C, 3015C, 4015C
FORMCHECKBOX
tdp FORMCHECKBOX tm FORMCHECKBOX other ( Contract Base Award)
| d. System / Item |
| e. Contract / PR No. |
| f. Contractor |
Uninterruptible Power Supply (UPS) and all Associated Equipment
| 1. Data Item No. |
| 2. Title of Data Item |
| 3. Subtitle of Data Item |
| M002 |
| Program Management Report |
| N/A |
| 4. Authority (Data Acquisition Document No.) |
| 5. Contract Reference |
| 6. Requiring Office |
| SOW Para. 3.1.2 |
| NAS Power Systems Group, Technical Operations Service |
| 7. DD 250 Required |
| 8. App Code |
| 9. Dist Statement Required |
| 10. Frequency |
| 11. As Of Date |
| 12. Date of first submission |
| 13. Date of subsequent submission |
| See Block 16 |
| See Block 16 |
| See Block 16 |
D I S T R I B U T I O N
b. Copies
b. Copies
a. Addressee
Final
Contracting Officer *LTO
Power Services Group
| (a) Total ( |
| 0 |
| 0 |
| 2 |
| (b) Total ( |
16. Remarks:
Block 12 - The contractor shall submit the Program Management Report not later than 30 calendar days following the first Task or Delivery Order.
Block 13 - The contractor shall update and submit the Program management Report at least once every quarter unless otherwise directed by the Government.
Block 14b – Repo means emailed soft copy.
| g. Prepared By |
| h. Date |
| i. Approved By |
| j. Date |
| Marilyn Jarvis, NAS Power Services Group |
| 9/9/16 |
| Peter Megna, NAS Power Services Group |
| 9/9/16 |
Contract Data Requirements List
Form Approved OMB No. 0704-0188
| a. Contract Line Item No.. |
| b. Exhibit |
| c. Category |
0015A, 1015A, 2015A, 3015A, 4015A
FORMCHECKBOX
tdp FORMCHECKBOX tm FORMCHECKBOX other Contract Base Award
| d. System / Item |
| e. Contract / PR No. |
| f. Contractor |
Uninterruptible Power Supply (UPS) and all Associated Equipment
| 1. Data Item No. |
| 2. Title of Data Item |
| 3. Subtitle of Data Item |
| M003 |
| BAR CODE ASSET TRACKING SYSTEM |
| Asset Identification Report (Barcoding) |
| 4. Authority (Data Acquisition Document No.) |
| 5. Contract Reference |
| 6. Requiring Office |
| DI-FAA-M003 |
| SOW 3.1.3.1 |
| NAS Power Services Group |
| 7. DD 250 Required |
| 8. App Code |
| 9. Dist Statement Required |
| 10. Frequency |
See Block 16
| 11. As Of Date |
| 12. Date of first submission |
| 13. Date of subsequent submission |
| See Block 16 |
| See Block 16 |
| See Block 16 |
14. D I S T R I B U T I O N
b. Copies
b. Copies
a. Addressee
Final
| Contracting Officer *LTO |
| 0 |
| 0 |
| 1* |
| Power Service Group |
| 0 |
| 0 |
| 1 |
| (a) Total ( |
| 0 |
| 0 |
| 2 |
| (b) Total ( |
| 15. Total of A & B ( |
| 4/0 & LTO |
16. Remarks:
Block 10: When UPS and associated equipment units are shipped from factory floor to the FAA site.
Block 11, 12 and 13: Date of SHIPMENT.
Block 14: Softcopy must be in MS Excel or ASCII test as appropriate on electronic media.
Government comment and acceptance of the submission is required
Prepared By:
Marilyn Jarvis, NAS Power Services Group
Peter Megna, NAS Power Service Group 11/22/16
Contract Data Requirements List
Form Approved OMB No. 0704-0188
| a. Contract Line Item No.. |
| b. Exhibit |
| c. Category |
0015A, 1015A, 2015A, 3015A, 4015A
FORMCHECKBOX
tdp FORMCHECKBOX tm FORMCHECKBOX other Contract Base Award
| d. System / Item |
| e. Contract / PR No. |
| f. Contractor |
Uninterruptible Power Supply (UPS) and all Associated Equipment
| 1. Data Item No. |
| 2. Title of Data Item |
| 3. Subtitle of Data Item |
| M004 |
| SHIPPING DOCUMENTATION |
| Asset Identification Report (Barcoding) |
| 4. Authority (Data Acquisition Document No.) |
| 5. Contract Reference |
| 6. Requiring Office |
| DI-FAA-M004 |
| SOW 3.1.3.2 |
| NAS Power Services Group |
| 7. DD 250 Required |
| 8. App Code |
| 9. Dist Statement Required |
| 10. Frequency |
See Block 16
| 11. As Of Date |
| 12. Date of first submission |
| 13. Date of subsequent submission |
| See Block 16 |
| See Block 16 |
| See Block 16 |
14. D I S T R I B U T I O N
b. Copies
b. Copies
a. Addressee
Final
| Contracting Officer *LTO |
| 0 |
| 0 |
| 1* |
| Power Service Group |
| 0 |
| 0 |
| 1 |
| (a) Total ( |
| 0 |
| 0 |
| 2 |
| (b) Total ( |
| 15. Total of A & B ( |
| 4/0 & LTO |
16. Remarks:
Block 10: When UPS and associated equipment units are shipped from factory to an FAA site or e-Stock Warehouse. And, when shipped from e-Stock warehouse to an FAA site Block 11, 12 and 13: Date of SHIPMENT.
Block 14: SCAN EVendor SHIPPING DOCUMENTATION REFLECTING ORIGIN AND DESTINATION. SEND SOFTCOPY TO ADDRESSEES IN BLOCK 14.
Government comment and acceptance of the submission is required
Prepared By:
Marilyn Jarvis, NAS Power Services Group
Peter Megna, NAS Power Service Group 11/22/16
Contract Data Requirements List
Form Approved OMB No. 0704-0188
| a. Contract Line Item No. |
| b. Exhibit |
| c. Category |
| 0018, 1018, 2018, 3018, 4018 |
| A |
| FORMCHECKBOX |
tdp FORMCHECKBOX tm FORMCHECKBOX other (Training)
| d. System / Item |
| e. Contract / PR No. |
| f. Contractor |
Uninterruptible Power Supply (UPS)
| 1. Data Item No. |
| 2. Title of Data Item |
| 3. Subtitle of Data Item |
| 4. Authority (Data Acquisition Document No.) |
| 5. Contract Reference |
| 6. Requiring Office |
| SOW Para. 3.1.6 |
| NAS Power Systems Group, Technical Operations Service |
| 7. DD 250 Required |
| 8. App Code |
| 9. Dist Statement Required |
| 10. Frequency |
| 11. As Of Date |
| 12. Date of first submission |
| 13. Date of subsequent submission |
| N/A |
| See Block 16 |
| See Block 16 |
D I S T R I B U T I O N
b. Copies
b. Copies
a. Addressee
Final
Contracting Officer *LTO
Power Services Group
(a) Total (
16. Remarks:
AGENDAs
Block 12 and 13: The contractor shall submit conference/meeting agenda to the Government a minimum of 15 working days prior to each scheduled conference for which the contractor has responsibility.
The Government reserves the right to add or delete agenda items. The Government will respond to the contractor within five (5) working days after receipt of the agenda, if required. The Government may respond by telephone, letter, e-mail, or FAX..
17. Price Group:
18. Estimated Total Price:
| g. Prepared By |
| h. Date |
| i. Approved By |
| j. Date |
| Marilyn Jarvis, Power Services Group |
| 11/22/16 |
| Peter Megna, Power Services Group |
| 11/22/16 |
Contract Data Requirements List
Form Approved OMB No. 0704-0188
| a. Contract Line Item No. |
| b. Exhibit |
| c. Category |
| 0018, 1018, 2018, 3018, 4018 |
| A |
| FORMCHECKBOX |
tdp FORMCHECKBOX tm FORMCHECKBOX other (Training)
| d. System / Item |
| e. Contract / PR No. |
| f. Contractor |
Uninterruptible Power Supply (UPS)
| 1. Data Item No. |
| 2. Title of Data Item |
| 3. Subtitle of Data Item |
| 4. Authority (Data Acquisition Document No.) |
| 5. Contract Reference |
| 6. Requiring Office |
| SOW Para. 3.1.6 |
| NAS Power Systems Group, Technical Operations Service |
| 7. DD 250 Required |
| 8. App Code |
| 9. Dist Statement Required |
| 10. Frequency |
No
| 11. As Of Date |
| 12. Date of first submission |
| 13. Date of subsequent submission |
| N/A |
| See Block 16 |
| See Block 16 |
D I S T R I B U T I O N
b. Copies
b. Copies
a. Addressee
Final
Contracting Officer *LTO
Power Services Group
(a) Total (
16. Remarks:
MEETING MINUTES
Block 12 and 13: The contractor shall submit conference/meeting minutes, for which the contractor has responsibility, to the Government for approval within 5 working days after each conference/meeting.
The Government reserves the right to redline, clarify, or add/delete items from the minutes before granting approval.
The contractor shall resubmit minuets, if required, to the Government for approval within five (5) working days after receipt of redlines.
Block 14: Additional copies of the minutes shall be distributed per the attendance list.
17. Price Group:
18. Estimated Total Price:
| g. Prepared By |
| h. Date |
| i. Approved By |
| j. Date |
| Marilyn Jarvis, Power Services Group |
| 11/22/16 |
| Peter Megna, Power Services Group |
| 11/22/16 |
Contract Data Requirements List
Form Approved OMB No. 0704-0188
| a. Contract Line Item No. |
| b. Exhibit |
| c. Category |
0015A, 1015A, 2015A, 3015A, 4015A
FORMCHECKBOX
tdp FORMCHECKBOX tm FORMCHECKBOX other ( Contract Base Award)
| d. System / Item |
| e. Contract / PR No. |
| f. Contractor |
Uninterruptible Power Supply (UPS) and all Associated Equipment
| 1. Data Item No. |
| 2. Title of Data Item |
| 3. Subtitle of Data Item |
| Q001 |
| Quality Assurance Plan |
| QA Plan |
| 4. Authority (Data Acquisition Document No.) |
| 5. Contract Reference |
| 6. Requiring Office |
| SOW Para., 3.1.6.1 |
| NAS Power Services group, Technical Operations Service |
| 7. DD 250 Required |
| 8. App Code |
| 9. Dist Statement Required |
| 10. Frequency |
| N/A |
| N/A |
| None |
| As Changes Occur |
| 11. As Of Date |
| 12. Date of first submission |
| 13. Date of subsequent submission |
| See Block 16 |
| See Block 16 |
D I S T R I B U T I O N
b. Copies
b. Copies
a. Addressee
Final
Contracting Officer *LTO
Power Services Group
| (a) Total ( |
| 0 |
| 0 |
| 2 |
| (b) Total ( |
16. Remarks:
Block 12 - The contractor shall submit to the Government the contractor’s QA Plan 10 calendar days following receipt of delivery order. If the Contractor is ISO 9000 certified, the Contractor will be required to submit his/her current ISO certification, to the Government.
Block 13 - The contractor shall update and submit the QA Plan as revisions to the QA Plan occur.
Block 14b – Repo will designate electronic copies, emailed to the Government.
| g. Prepared By |
| h. Date |
| i. Approved By |
| j. Date |
| Marilyn Jarvis, NAS Power Services Group |
| 9/9/16 |
| Peter Megna, NAS Power Services Group |
| 9/9/16 |
Contract Data Requirements List
Form Approved OMB No. 0704-0188
| a. Contract Line Item No. |
| b. Exhibit |
| c. Category |
0015A, 1015A, 2015A, 3015A, 4015A
FORMCHECKBOX
tdp FORMCHECKBOX tm FORMCHECKBOX other ( Contract Base Award)
| d. System / Item |
| e. Contract / PR No. |
| f. Contractor |
Uninterruptible Power Supply (UPS) and all Associated Equipment
| 1. Data Item No. |
| 2. Title of Data Item |
| 3. Subtitle of Data Item |
| Q002 |
| Contractor’s Configuration Management Plan |
| N/A |
| 4. Authority (Data Acquisition Document No.) |
| 5. Contract Reference |
| 6. Requiring Office |
| SOW Para., 3.1.6.2 |
| NAS Power Services Group, Technical Operations Service |
| 7. DD 250 Required |
| 8. App Code |
| 9. Dist Statement Required |
| 10. Frequency |
| 11. As Of Date |
| 12. Date of first submission |
| 13. Date of subsequent submission |
| N/A |
| See Block 16 |
| See Block 16 |
D I S T R I B U T I O N
b. Copies
a. Addressee
Final
Contracting Officer *LTO
Power Services Group
| (a) Total ( |
| 0 |
| 0 |
| 2 |
| (b) Total ( |
16. Remarks:
Block 12 - The contractor shall deliver the Contractors Configuration Management Plan 10 calendar days after receipt of delivery order. If the Contractor is ISO 9000 certified, the contractor will be required to provide his/her latest certification to the Government.
Block 13 - The contractor shall update and submit the Contractor’s Configuration Management Plan as revisions occur.
Block 14b – Repo will designate electronic copies.
| g. Prepared By |
| h. Date |
| i. Approved By |
| j. Date |
| Marilyn Jarvis, NAS Power Services Group |
| 9/9/16 |
| Peter Megna, NAS Power Services Group |
| 9/9/16 |
Contract Data Requirements List
Form Approved OMB No. 0704-0188
| a. Contract Line Item No. |
| b. Exhibit |
| c. Category |
0014A, 1014A, 2014A, 3014A, 4014A
FORMCHECKBOX
tdp FORMCHECKBOX tm FORMCHECKBOX other (Training)
| d. System / Item |
| e. Contract / PR No. |
| f. Contractor |
Uninterruptible Power Supply (UPS) and all Associated Equipment
| 1. Data Item No. |
| 2. Title of Data Item CDRL T001 |
| 3. Subtitle of Data Item |
| T001 |
| Personnel Qualifications Report |
| 4. Authority (Data Acquisition Document No.) |
| 5. Contract Reference |
| 6. Requiring Office |
| FAA-STD-028C |
| SOW Para 3.6.4.1 |
| NAS Power Services Group, Technical operations Service |
| 7. DD 250 Required |
| 8. App Code |
| 9. Dist Statement Required |
| 10. Frequency |
N/A
See Block 16
| 11. As Of Date |
| 12. Date of first submission |
| 13. Date of subsequent submission |
| See Block 16 |
| See Block 16 |
D I S T R I B U T I O N
b. Copies
b. Copies
a. Addressee
Final
| Technical Training and Development Office |
| 0 |
| 0 |
| 1 |
| power Services Group |
| 0 |
| 0 |
| 1 |
| Contracting Officer |
| 0 |
| 0 |
| 1 |
| (a) Total ( |
| 0 |
| 0 |
| 5 |
| (b) Total ( |
16. Remarks:
Block 4 - Guidance for content can be found in FAA-STD-028C, Contract Training Programs, STD 028C Para. 2-7 and Appendix 1, DID–1, Personnel Qualifications Report.
Note: One software copy of FAA-STD-028C will be provided by the Government.
Block 10 – When instructors leave or new instructors hired.
Block 12 – Original submittal 10 calendar days from RECEIPT of delivery order.
Block 13 - 5 Calendar days following receipt of Government review comments.
Block 14 - Email any subsequent re-submission to each Addressee.
| g. Prepared By: |
| h. Date |
| i. Approved By: |
| j. Date |
| Marilyn Jarvis, NAS Power Services Group |
| 9/9/16 |
| Peter Megna, NAS Power Services Group |
| 9/9/16 |
Contract Data Requirements List
Form Approved OMB No. 0704-0188
| a. Contract Line Item No. |
| b. Exhibit |
| c. Category |
0014A, 1014A, 2014A, 3014A, 4014A
FORMCHECKBOX
tdp FORMCHECKBOX tm FORMCHECKBOX other (Training)
| d. System / Item |
| e. Contract / PR No. |
| f. Contractor |
Uninterruptible Power Supply (UPS) and all Associated Equipment
| 1. Data Item No. |
| 2. Title of Data Item CDRL T002 |
| 3. Subtitle of Data Item |
| T002 |
| Task and Skills Analysis (TASA) Report |
| TASA for Second Level Engineering Training Course (SLETC) |
| 4. Authority (Data Acquisition Document No.) |
| 5. Contract Reference |
| 6. Requiring Office |
| FAA-STD-028C |
| SOW Para. 3.6.4.2 |
| NAS Power Systems Group, Technical operations Service |
| 7. DD 250 Required |
| 8. App Code |
| 9. Dist Statement Required |
| 10. Frequency |
N/A
See Block 16
| 11. As Of Date |
| 12. Date of first submission |
| 13. Date of subsequent submission |
| N/A |
| See Block 16 |
| See Block 16 |
D I S T R I B U T I O N
b. Copies
b. Copies
a. Addressee
Final
| Technical Training and Development Office |
| 0 |
| 0 |
| 1 |
| Power Services Group |
| 0 |
| 0 |
| 1 |
| Contracting Officer |
| 0 |
| 0 |
| 1 |
| (a) Total ( |
| 0 |
| 0 |
| 5 |
| (b) Total ( |
16. Remarks:
Block 10 – Original and two re-submittals.
Block 12 – Original Submittal 45 calendar days from RECEIPT of delivery order.
Block 13 – Re-submittals 10 calendar days following RECEIPT of FAA review COMMENTS. And, final version submitted prior to CDRL T013, DID-16 First Course Conduct.
Block 14 - Email to each addressee one softcopy of the original and re-submittal task and skills analysis report.
| g. Prepared By: |
| h. Date |
| i. Approved By: |
| j. Date |
| Marilyn Jarvis, NAS Power Services Group |
| 9/9/16 |
| Peter Megna, NAS Power Services Group |
| 9/9/16 |
Contract Data Requirements List
Form Approved OMB No. 0704-0188
| a. Contract Line Item No. |
| b. Exhibit |
| c. Category |
0014A, 1014A, 2014A, 3014A, 4014A
FORMCHECKBOX
tdp FORMCHECKBOX tm FORMCHECKBOX other (Training)
| d. System / Item |
| e. Contract / PR No. |
| f. Contractor |
Uninterruptible Power Supply (UPS) and all Associated Equipment
| 1. Data Item No. |
| 2. Title of Data Item CDRL T005 |
| 3. Subtitle of Data Item |
| T005 |
| Training Development Plan |
| Training Development Plan for Second Level Engineering Training Course (SLETC) |
| 4. Authority (Data Acquisition Document No.) |
| 5. Contract Reference |
| 6. Requiring Office |
| FAA-STD-028C |
| SOW Para. 3.6.4.6 |
| NAS Power Services Group, Technical operations Service |
| 7. DD 250 Required |
| 8. App Code |
| 9. Dist Statement Required |
| 10. Frequency |
N/A
| 11. As Of Date |
| 12. Date of first submission |
| 13. Date of subsequent submission |
| See Block 16 |
| See Block 16 |
D I S T R I B U T I O N
b. Copies
b. Copies
a. Addressee
Final
| Technical Training and Development Office |
| 0 |
| 0 |
| 1 |
| Power Services Group |
| 0 |
| 0 |
| 1 |
| Contracting Officer |
| 0 |
| 0 |
| 1 |
| (a) Total ( |
| 0 |
| 0 |
| 5 |
| (b) Total ( |
16. Remarks:
Block 4 - Guidance for content can be found in FAA-STD-028C, Contract Training Programs, STD 028C Ch 7, Appendix 1, DID 5, Training Development Plan.
Note: Soft copy of FAA-STD-028C provided by the Government.
Block 10 – original and two re-submittals.
Block 12 – Original Submitted 30 calendar days following delivery order. .
Block 13 – two re-submittals each 7 calendar days after RECEIPT of review COMMENTS from FAA.
Block 14 - Deliver to each addressee 1 softcopy.
| g. Prepared By: |
| h. Date |
| i. Approved By: |
| j. Date |
| Marilyn Jarvis, NAS Power Services Group |
| 9/9/16 |
| Peter Megna, NAS Power Services Group |
| 9/9/16 |
Contract Data Requirements List
Form Approved OMB No. 0704-0188
| a. Contract Line Item No. |
| b. Exhibit |
| c. Category |
0014A, 1014A, 2014A, 3014A, 4014A
FORMCHECKBOX
tdp FORMCHECKBOX tm FORMCHECKBOX other (Training)
| d. System / Item |
| e. Contract / PR No. |
| f. Contractor |
Uninterruptible Power Supply (UPS) and all Associated Equipment
| 1. Data Item No. |
| 2. Title of Data Item CDRL T006 |
| 3. Subtitle of Data Item |
| T006 |
| Course Design Guide |
| COTS Training Materials Report for Second Level Engineering Training Course (SLETC) |
| 4. Authority (Data Acquisition Document No.) |
| 5. Contract Reference |
| 6. Requiring Office |
| FAA-STD-028C |
| SOW Para. 3.6.4.6 |
| NAS Power Services Group, Technical operations Service |
| 7. DD 250 Required |
| 8. App Code |
| 9. Dist Statement Required |
| 10. Frequency |
N/A
| 11. As Of Date |
| 12. Date of first submission |
| 13. Date of subsequent submission |
| See Block 16 |
| See Block 16 |
D I S T R I B U T I O N
b. Copies
a. Addressee
Final
| Technical Training and Development Office |
| 0 |
| 0 |
| 1 |
| Power Services Group |
| 0 |
| 0 |
| 1 |
| Contracting officer |
| 0 |
| 0 |
| 1 |
| (a) Total ( |
| 0 |
| 0 |
| 5 |
| (b) Total ( |
16. Remarks:
Block 4 - Guidance for content can be found in FAA-STD-028C, Contract Training Programs, STD 028C Ch 5, Appendix 1, DID 6, COTS Training Materials Report .
Note: Soft copy of FAA-STD-028C provided by the Government.
Block 10 – Original and two re-submittals.
Block 12 – Original Submittal 60 calendar days from RECEIPT of delivery order. And, final version submitted prior to CDRL T013, DID-16 First Course Conduct.
Block 13 – Re-submittals 10 calendar days following RECEIPT of FAA review COMMENTS.
| g. Prepared By: |
| h. Date |
| i. Approved By: |
| j. Date |
| Marilyn Jarvis, NAS Power Services Group |
| 9/9/16 |
| Peter Megna, NAS Power Services Group |
| 9/9/16 |
Contract Data Requirements List
Form Approved OMB No. 0704-0188
| a. Contract Line Item No. |
| b. Exhibit |
| c. Category |
| 0014B, 1014B, 2014B, 3014B, 4014B |
| A |
| FORMCHECKBOX |
tdp FORMCHECKBOX tm FORMCHECKBOX other (Training)
| d. System / Item |
| e. Contract / PR No. |
| f. Contractor |
Uninterruptible Power Supply (UPS) and all Associated Equipment
| 1. Data Item No. |
| 2. Title of Data Item CDRL T007 |
| 3. Subtitle of Data Item |
| T007 |
| Tests, Written |
| Tests for Second Level Engineering Training Course (SLETC) |
| 4. Authority (Data Acquisition Document No.) |
| 5. Contract Reference |
| 6. Requiring Office |
| FAA-STD-028C |
| Section C 3.6.4.4 and 3.6.4.5 |
| NAS Power Services Group, Technical operations Service |
| 7. DD 250 Required |
| 8. App Code |
| 9. Dist Statement Required |
| 10. Frequency |
| 11. As Of Date |
| 12. Date of first submission |
| 13. Date of subsequent submission |
| See Block 16 |
| See Block 16 |
D I S T R I B U T I O N
b. Copies
b. Copies
a. Addressee
Final
| Technical Training and Development Office |
| 0 |
| 0 |
| 1 |
| Power Services Group |
| 0 |
| 0 |
| 1 |
| Contracting officer |
| 0 |
| 0 |
| 1 |
| (a) Total ( |
| 0 |
| 0 |
| 5 |
| (b) Total ( |
16. Remarks:
Note: Tests must be controlled documents.
Block 4 - Guidance for content can be found in FAA-STD-028C, Contract Training Programs, STD 028C Ch 7, Appendix 1, DID 7, Tests.
Note: Soft copy of FAA-STD-028C provided by the Government.
Block 10 – Original and two re-submittals.
Block 12 – Original Submittal 30 calendar days from RECEIPT of delivery order.
Block 13 – Re-submittals 10 calendar days following RECEIPT of FAA review COMMENTS.
Block 14 - Deliver to each addressee 1 softcopy.
| g. Prepared By: |
| h. Date |
| i. Approved By: |
| j. Date |
| Marilyn Jarvis, NAS Power Services Group |
| 9/9/16 |
| Peter Megna, NAS Power Services Group |
| 9/9/16 |
Contract Data Requirements List
Form Approved OMB No. 0704-0188
| a. Contract Line Item No. |
| b. Exhibit |
| c. Category |
0014A, 1014A, 2014A, 3014A, 4014A
FORMCHECKBOX
tdp FORMCHECKBOX tm FORMCHECKBOX other (Training)
| d. System / Item |
| e. Contract / PR No. |
| f. Contractor |
Uninterruptible Power Supply (UPS) and all Associated Equipment
| 1. Data Item No. |
| 2. Title of Data Item CDRL T008 |
| 3. Subtitle of Data Item |
| T008 |
| Classroom training Materials |
| COTS Training Materials Report for Second Level Engineering Training Course (SLETC) |
| 4. Authority (Data Acquisition Document No.) |
| 5. Contract Reference |
| 6. Requiring Office |
| FAA-STD-028C |
| SOW Para. 3.6.4.6 |
| NAS Power Services Group, Technical operations Service |
| 7. DD 250 Required |
| 8. App Code |
| 9. Dist Statement Required |
| 10. Frequency |
N/A
| 11. As Of Date |
| 12. Date of first submission |
| 13. Date of subsequent submission |
| See Block 16 |
| See Block 16 |
D I S T R I B U T I O N
b. Copies
a. Addressee
Final
| Technical Training and Development Office |
| 0 |
| 0 |
| 1 |
| Power Services Group |
| 0 |
| 0 |
| 1 |
| Contracting Officer |
| 0 |
| 0 |
| 1 |
| (a) Total ( |
| 0 |
| 0 |
| 5 |
| (b) Total ( |
16. Remarks:
Block 4 - Guidance for content can be found in FAA-STD-028C, Contract Training Programs, STD 028C Ch 5, Appendix 1, DID 8, COTS Training Materials Report .
Note: Soft copy of FAA-STD-028C provided by the Government.
Block 10 – Original and two re-submittals.
Block 12 – Original Submittal 90 calendar days from RECEIPT of delivery order.
Block 13 – Re-submittals 10 calendar days following RECEIPT of FAA review COMMENTS; final version submitted prior to CDRL T013, DID-16 First Course Conduct.
| g. Prepared By: |
| h. Date |
| i. Approved By: |
| j. Date |
| Marilyn Jarvis, NAS Power Services Group |
| 9/9/16 |
| Peter Megna, NAS Power Services Group |
| 9/9/16 |
Contract Data Requirements List
Form Approved OMB No. 0704-0188
| a. Contract Line Item No. |
| b. Exhibit |
| c. Category |
0014G, 1014G, 2014G, 3014G, 4014G
FORMCHECKBOX
tdp FORMCHECKBOX tm FORMCHECKBOX other (Training)
| d. System / Item |
| e. Contract / PR No. |
| f. Contractor |
Uninterruptible Power Supply (UPS) and all Associated Equipment
| 1. Data Item No. |
| 2. Title of Data Item CDRL T011 |
| 3. Subtitle of Data Item |
| T011 |
| Video Training Materials |
| COTS Training Materials Report for Second Level Engineering Training Course (SLETC) |
| 4. Authority (Data Acquisition Document No.) |
| 5. Contract Reference |
| 6. Requiring Office |
| FAA-STD-028C |
| SOW Para. 3.6.4.6 |
| NAS Power Services Group, Technical operations Service |
| 7. DD 250 Required |
| 8. App Code |
| 9. Dist Statement Required |
| 10. Frequency |
N/A
| 11. As Of Date |
| 12. Date of first submission |
| 13. Date of subsequent submission |
| See Block 16 |
| See Block 16 |
D I S T R I B U T I O N
b. Copies
a. Addressee
Final
| Technical Training and Development Office |
| 0 |
| 0 |
| 1 |
| Power Services Group |
| 0 |
| 0 |
| 1 |
| Contracting Officer |
| 0 |
| 0 |
| 1 |
| (a) Total ( |
| 0 |
| 0 |
| 5 |
| (b) Total ( |
16. Remarks:
Block 4 - Guidance for content can be found in FAA-STD-028C, Contract Training Programs, STD 028C Ch 5, Appendix 1, DID 8, COTS Training Materials Report .
Note: Soft copy of FAA-STD-028C provided by the Government.
Block 10 – Original and two re-submittals.
Block 12 – Original Submittal 90 calendar days from RECEIPT of delivery order.
Block 13 – Re-submittals 10 calendar days following RECEIPT of FAA review COMMENTS; final version submitted prior to CDRL T013, DID-16 First Course Conduct.
| g. Prepared By: |
| h. Date |
| i. Approved By: |
| j. Date |
| Marilyn Jarvis, NAS Power Services Group |
| 9/9/16 |
| Peter Megna, NAS Power Services Group |
| 9/9/16 |
Contract Data Requirements List
Form Approved OMB No. 0704-0188
| a. Contract Line Item No. |
| b. Exhibit |
| c. Category |
0014D, 1014D, 2014D, 3014D, 4014D
FORMCHECKBOX
tdp FORMCHECKBOX tm FORMCHECKBOX other (Training)
| d. System / Item |
| e. Contract / PR No. |
| f. Contractor |
Uninterruptible Power Supply (UPS) and all Associated Equipment
| 1. Data Item No. |
| 2. Title Of Data Item CDRL T014 |
| 3. Subtitle of Data Item |
| T014 |
| Contractor's Presentation |
| CP for Second Level Engineering Training Course (SLETC) |
| 4. Authority (Data Acquisition Document No.) |
| 5. Contract Reference |
| 6. Requiring Office |
| FAA-STD-028C |
| SOW Para. 3.6.4.8.1 |
| NAS Power Services Group, Technical operations Service |
| 7. DD 250 Required |
| 8. App Code |
| 9. Dist Statement Required |
| 10. Frequency |
N/A one time
| 11. As Of Date |
| 12. Date of first submission |
| 13. Date of subsequent submission |
| See Block 16 |
| See Block 16 |
D I S T R I B U T I O N
b. Copies
a. Addressee
Final
| Technical Training and Development Office |
| 0 |
| 0 |
| 1 |
| Contracting Officer |
| 0 |
| 0 |
| *1 |
| Power Services Group |
| 0 |
| 0 |
| *1 |
| (a) Total ( |
| 0 |
| 0 |
| 3 |
| (b) Total ( |
16. Remarks:
Block 4 - Guidance for content can be found in FAA-STD-028C, Contract Training Programs, Appendix 1, DID–14, Contractor's Presentation.
Note: Contractor’s Presentation is an ABBREVIATED version of the actual training course. Prior to presenting the course to FAA evaluators the vender will submit supporting documentation.
Note:: Soft copy of FAA-STD-028C provided by the Government.
Block 12 – No later than 30 calendar days prior to scheduled presentation submit deliverables to the FAA for review.
Block 13 – Re-submit deliverables during operational tryout, incorporate FAA COMMENTS into submittal.
Block 14 - Deliver to each addressee 1 softcopy.
*LTO = Letter of Transmittal Only
| g. Prepared By: |
| h. Date |
| i. Approved By: |
| j. Date |
| Marilyn Jarvis, NAS Power Services Group |
| 9/9/16 |
| Peter Megna, NAS power Services Group |
| 9/9/16 |
Contract Data Requirements List
Form Approved OMB No. 0704-0188
| a. Contract Line Item No. |
| b. Exhibit |
| c. Category |
0014E, 1014E, 2014E, 3014E, 4014E
FORMCHECKBOX
tdp FORMCHECKBOX tm FORMCHECKBOX other (Training)
| d. System / Item |
| e. Contract / PR No. |
| f. Contractor |
Uninterruptible Power Supply (UPS) and all Associated Equipment
| 1. Data Item No. |
| 2. Title of Data Item CDRL T015 |
| 3. Subtitle of Data Item |
| T015 |
| Operational Tryout |
| OT for Second Level Engineering Training Course (SLETC) |
| 4. Authority (Data Acquisition Document No.) |
| 5. Contract Reference |
| 6. Requiring Office |
| FAA-STD-028C |
| SOW Para. 3.6.4.8.2 |
| NAS Power Services Group, Technical operations Service |
| 7. DD 250 Required |
| 8. App Code |
| 9. Dist Statement Required |
| 10. Frequency |
N/A
| 11. As Of Date |
| 12. Date of first submission |
| 13. Date of subsequent submission |
| See Block 16 |
| See Block 16 |
D I S T R I B U T I O N
b. Copies
a. Addressee
Final
| Technical Training and Development Office |
| 0 |
| 0 |
| 1 |
| Power Services Group |
| 0 |
| 0 |
| *1 |
| Contracting Officer |
| 0 |
| 0 |
| *1 |
| (a) Total ( |
| 0 |
| 0 |
| 3 |
| (b) Total ( |
16. Remarks:
Block 4 - Guidance for content can be found in FAA-STD-028C, Contract Training Programs, Appendix 1, DID-15, Operational Tryout.
Note: a softcopy of FAA-STD-028C will be provided by the Government.
Note: Contractor’s operational tryout is APPROXIMATELY 1 ½ times the proposed course length. Prior to PERFORMING the operational tryout for FAA evaluators the vendor will submit supporting documentation.
Note:: Soft copy of FAA-STD-028C provided by the Government.
Block 12 – No later than 15 calendar days prior to scheduled operational tryout submit plan for operational tryout and all instructional MATERIAL to the FAA. The instructional material is course material revised after presenting the Contractor’s presentation and receiving FAA review COMMENTS.
Block 13 – Re-submit deliverables during first course conduct, incorporate FAA review COMMENTS.
Block 14 - Deliver to each addressee 1 softcopy.
Block 14 - Deliver to each addressee 1 softcopy of the course materials when requested by the Government.
*LTO = Letter of Transmittal Only
| g. Prepared By: |
| h. Date |
| i. Approved By: |
| j. Date |
| Marilyn Jarvis, NAS Power Services Group |
| 9/9/16 |
| Peter Megna, NAS Power Services Group |
| 9/9/16 |
Contract Data Requirements List
Form Approved OMB No. 0704-0188
| a. Contract Line Item No. |
| b. Exhibit |
| c. Category |
0014F, 1014F, 2014F, 3014F, 4014F
FORMCHECKBOX
tdp FORMCHECKBOX tm FORMCHECKBOX other (Training)
| d. System / Item |
| e. Contract / PR No. |
| f. Contractor |
Uninterruptible Power Supply (UPS) and all Associated Equipment
| 1. Data Item No. |
| 2. Title of Data Item CDRL T016 |
| 3. Subtitle of Data Item |
| T016 |
| First Course Conduct |
| FCC for Second Level Engineering Training Course (SLETC) |
| 4. Authority (Data Acquisition Document No.) |
| 5. Contract Reference |
| 6. Requiring Office |
| FAA-STD-028C |
| SOW Para. 3.6.4.8.3 |
| NAS Power Services Group, Technical operations Service |
| 7. DD 250 Required |
| 8. App Code |
| 9. Dist Statement Required |
| 10. Frequency |
N/A
| 11. As Of Date |
| 12. Date of first submission |
| 13. Date of subsequent submission |
| See Block 16 |
| See Block 16 |
D I S T R I B U T I O N
b. Copies
b. Copies
a. Addressee
Final
| Technical Training and Development Office |
| 0 |
| 0 |
| 1 |
| Contracting Officer |
| 0 |
| 0 |
| *1 |
| Power Services Group |
| 0 |
| 0 |
| *1 |
| (a) Total ( |
| 0 |
| 0 |
| 3 |
| (b) Total ( |
16. Remarks:
Block 4 - Guidance for content can be found in FAA-STD-028C, Contract Training Programs, Appendix 1, DID-16 , First Course Conduct.
Note: Soft copy of FAA-STD-028C will be provided by the Government.
Note: First Course Conduct is first full length course taught by the vendor. Prior to performing the first course conduct the vendor must submit deliverables.
Note:: Soft copy of FAA-STD-028C provided by the Government.
Block 12 – No later than 30 calendar days prior to scheduled First Course Conduct submit plan for deliverables as required in DID -16. Before submitting documents revise documents by incorporating FAA review comments generated from operational tryout. These document deliverables include final TASA and Course Design Guide.
Block 13 – 10 calendar days following receipt of FAA review comments, from first course conduct, re-submit documents to FAA with revisions.
| g. Prepared By |
| h. Date |
| i. Approved By: |
| j. Date |
| Marilyn Jarvis, NAS Power Services Group |
| 9/9/16 |
| Peter Megna, NAS Power Services Group |
| 9/9/16 |
This is the start of the file's text. The full file is on GovTribe.