Questions as of 01_31_2018.docx

DOCX document 16 KB Posted

Attached to
Uninterruptible Power Supply (UPS) equipment, Integrated Logistics and Technical Services
Solicitation number
DTFAAC-17-R-00013
Issued by

About this file

Questions as of 01_31_2018 (docx)

View the file

Other files

File Type Posted
UPS SEC-J ATT J.6 MBP EXH C.xlsx XLSX spreadsheet
UPS SEC-L ATT L.2 Performance.docx DOCX document
UPS SEC-J ATT J.23 SCADA Comp.xls XLS spreadsheet
UPS SEC-J ATT J.22 UPS Comp.xls XLS spreadsheet
UPS SEC-J ATT J.20 UPS Performance.doc DOC document
UPS SEC-G Admin.docx DOCX document
DTFAAC-17-R-00013.pdf PDF
UPS SEC-J ATT J.5 Exhibit B FCB.xlsx XLSX spreadsheet
UPS SEC-J ATT J.2 CDRL.doc DOC document
UPS SEC-D Pkg.doc DOC document
UPS SEC-J ATT J.17 DID M002 ATT 2 Warranty Report.xls XLS spreadsheet
UPS SEC-E Insp.doc DOC document
UPS SEC-J ATT J.12 Load Bank Site Spares EXH I.xlsx XLSX spreadsheet
UPS SEC-J ATT J.10 Load Bank RSPL EXH G.xlsx XLSX spreadsheet
UPS SEC-M Evaluation_02142018.docx DOCX document
UPS SEC-J ATT J.15 CDLS User Guide 103008.pdf PDF
UPS SEC-J ATT J.1a SCADA_02142018.doc DOC document
Q&As11162017.xlsx XLSX spreadsheet
UPS SEC-J ATT J.11 UPS Site Spares EXH H.xlsx XLSX spreadsheet
UPS SEC-J ATT J.21 Spec Comp.xls XLS spreadsheet
UPS Section-M ATT M.2 Log-Train.doc DOC document
UPS SEC-L ATT L.3 Ltr.doc DOC document
UPS SEC-J ATT J.7 Bat Disc EXH D.xlsx XLSX spreadsheet
UPS SEC-L Instructions 02142018.docx DOCX document
UPS SEC-J ATT J.19 BOM CLINs 020142018.xls XLS spreadsheet
UPS SEC-J ATT J.24 SCADA Comp.xls XLS spreadsheet
UPS SEC-J ATT J.4 Exhibit A VRLA_02142018.xlsx XLSX spreadsheet
UPS SEC-J ATT J.3 DID.doc DOC document
UPS SEC-J ATT J.8 Load Bank EXH E_02142018.xlsx XLSX spreadsheet
UPS SEC-L ATT L.1 Expereince.docx DOCX document
DTFAAC-17-R-00013 amendment 0002.pdf PDF
UPS SEC-J ATT J.1 SPEC_02142018.docx DOCX document
UPS SEC-J ATT J.16 DID M002 ATT 1 Cost Report.xls XLS spreadsheet
UPS SEC-J ATT J.13 SECL EXH J.xlsx XLSX spreadsheet
UPS SEC-J ATT J.18 Alber Monitor BVM-40 User's Guide.pdf PDF
UPS SEC-J ATT J.1b MBP.doc DOC document
DTFAAC-17-R-00013_Amendment 0001.pdf PDF
UPS Section-M ATT M.1 Test.doc DOC document
UPS SEC-J ATT J.14 STD 028C 11-16-2000.pdf PDF
Q_A_11202017.docx DOCX document
DTFAAC-17-R-00013 Questions.xlsx XLSX spreadsheet
QA's from draft solicitation.xlsx XLSX spreadsheet
UPS SEC-J ATT J.9 UPS RSPL EXH F.xlsx XLSX spreadsheet
UPS SEC-L ATT L.3 Ltr.doc DOC document
UPS SEC-E Insp.doc DOC document
UPS SEC-J ATT J.6 MBP EXH C.xlsx XLSX spreadsheet
DTFAAC-17-R-00013_Amendment 0001.pdf PDF
UPS Section-M ATT M.1 Test.doc DOC document
UPS SEC-J ATT J.17 DID M002 ATT 2 Warranty Report.xls XLS spreadsheet
UPS SEC-J ATT J.21 Spec Comp.xls XLS spreadsheet
Show 40 more

Latest 50 of 198 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1Q.Rating of UPS is given in range for eg. 10-19 KVA but table shows 10 kVA ( page 1-6). Please confirm if we should quote based on the table.
1A.Quote based on the table.

2Q. Item 0001F: Difference in Quantity ( page 2 ) Qty- 12 but the table on page 16 shows Qty.-5.

2A. Page 2 is the UPS system and page 16 is the battery rack associated with the UPS system. We do not always need a battery rack when a system is requested.

3Q.Item 0002JJJ ( page 6) : N+1 ( 500-600KVA) Is the UPS requirement modular type or SCR type?
3A:The current 550kVA UPS is a modular unit consisting of two 275 kVA modules with a common output bus for a total UPS rating of 550 kVA.
4Q.Item 0003 A ( page 6): The battery requirements for UPS is Valve Regulated Lead Acid or Flooded Lead Acid batteries ?
4A.VRLA are covered under CLINs 0003A and 00003B. Flooded Cells are covered under CLINs 0003C, 0003D, and 0003E.
5Q.Item 0009 ( page 10): Load bank- What type of load bank ( resistive, inductive or capacitive) and what is the load size ( KW or KVA)?
5A.Refer to “Price Exhibit E, Section-J, Attachment J.8” for load size.
6Q.On Page 21 and 22: DC disconnect breaker ( page 21) and DC Battery breaker ( page 22) are they same?
6A.Refer to J.1 paragraph 2.13.2.3 for clarification.

7Q.What is the preferred DC bus voltage. Are they same for all UPS?

7A.Current UPS design used in ACEPS PO for 480VAC Input/output UPS has a DC bus voltage of 480 VDC open cell, 540-545 VDC float (based upon battery cut sheet), and can equalize up to 576 VDC. Brandon may have other configurations.

The current UPS design used in PO-UPS replacement projects For 480VAC UPS system: From 40KVA to 160KVA the DC bus voltage is 432VDC; from 225 to 1100KVA the DC bus voltage is 480 VDC For 208VAC UPS system: For 40, 50, 65, 100, 160KVA the DC bus voltage is 384VDC; 80KVA and 120KVA the DC bus voltage is 432VDC

· The float voltage for the VRLA is 2.25 V.P.C (+/-) 0.01 V.P.C (Range 13.44 to 13.56 v/cell)

· The Nominal Voltage for the VRLA (12V/370 W.P.C ) @ 15 min rate to 1.67 V.P.C

· The DC BUS rating will change based on the number of the batteries installed per facility.

8Q.In Section I – Contract Clauses on page 63 of the draft? RFP references the Buy American Act (BAA). It’s referenced in 3.6.4-2 BUY AMERICAN ACT - SUPPLIES (OCT 2014), in 3.6.4-5 BUY AMERICAN - STEEL AND MANUFACTURED PRODUCTS (JUL 2010), and in 3.6.4-8 BUY AMERICAN ACT - NAFTA IMPLEMENTATION ACT - BALANCE OF PAYMENTS. We request that the Trade Agreement Act (TAA) be added and incorporated in this RFP language.
8A.The FAA is exempt from the FAR and as such has its own policy, guidance and clauses. The FAA uses Acquisition Management System (AMS). The TAA is not a clause in the AMS.
9Q:For items 0007A-0007I, is the EST QTY correct?
9A.See revised J.19 for the correct quantity.

10Q. Regarding file J.19. These days we cannot hold battery pricing for one year, let alone 2 or 10 years.

It is due to the volatility of lead pricing. Please review this link for examples of the lead pricing index from 1 week to the past 20 years.

http://www.infomine.com/investment/metal-prices/lead/ The price of lead is one of, if not the strongest indicator of battery price.

How would the FAA suggest we approach this issue?

10A. 3.2.4-2 FIXED-PRICED CONTRACTS WITH ECONOMIC PRICE ADJUSTMENT-STANDARD SUPPLIES (APR 1996) is in the solicitation

File details come from the government source that posted it.