Q&As11162017.xlsx

XLSX spreadsheet 14 KB Posted

Attached to
Uninterruptible Power Supply (UPS) equipment, Integrated Logistics and Technical Services
Solicitation number
DTFAAC-17-R-00013
Issued by

About this file

Q&As11162017 (xlsx)

View the file

Other files

File Type Posted
UPS SEC-J ATT J.6 MBP EXH C.xlsx XLSX spreadsheet
UPS SEC-L ATT L.2 Performance.docx DOCX document
UPS SEC-J ATT J.23 SCADA Comp.xls XLS spreadsheet
UPS SEC-J ATT J.22 UPS Comp.xls XLS spreadsheet
UPS SEC-J ATT J.20 UPS Performance.doc DOC document
UPS SEC-G Admin.docx DOCX document
DTFAAC-17-R-00013.pdf PDF
UPS SEC-J ATT J.5 Exhibit B FCB.xlsx XLSX spreadsheet
UPS SEC-J ATT J.2 CDRL.doc DOC document
UPS SEC-D Pkg.doc DOC document
Questions as of 01_31_2018.docx DOCX document
UPS SEC-J ATT J.17 DID M002 ATT 2 Warranty Report.xls XLS spreadsheet
UPS SEC-E Insp.doc DOC document
UPS SEC-J ATT J.12 Load Bank Site Spares EXH I.xlsx XLSX spreadsheet
UPS SEC-J ATT J.10 Load Bank RSPL EXH G.xlsx XLSX spreadsheet
UPS SEC-M Evaluation_02142018.docx DOCX document
UPS SEC-J ATT J.15 CDLS User Guide 103008.pdf PDF
UPS SEC-J ATT J.1a SCADA_02142018.doc DOC document
UPS SEC-J ATT J.11 UPS Site Spares EXH H.xlsx XLSX spreadsheet
UPS SEC-J ATT J.21 Spec Comp.xls XLS spreadsheet
UPS Section-M ATT M.2 Log-Train.doc DOC document
UPS SEC-L ATT L.3 Ltr.doc DOC document
UPS SEC-J ATT J.7 Bat Disc EXH D.xlsx XLSX spreadsheet
UPS SEC-L Instructions 02142018.docx DOCX document
UPS SEC-J ATT J.19 BOM CLINs 020142018.xls XLS spreadsheet
UPS SEC-J ATT J.24 SCADA Comp.xls XLS spreadsheet
UPS SEC-J ATT J.4 Exhibit A VRLA_02142018.xlsx XLSX spreadsheet
UPS SEC-J ATT J.3 DID.doc DOC document
UPS SEC-J ATT J.8 Load Bank EXH E_02142018.xlsx XLSX spreadsheet
UPS SEC-L ATT L.1 Expereince.docx DOCX document
DTFAAC-17-R-00013 amendment 0002.pdf PDF
UPS SEC-J ATT J.1 SPEC_02142018.docx DOCX document
UPS SEC-J ATT J.16 DID M002 ATT 1 Cost Report.xls XLS spreadsheet
UPS SEC-J ATT J.13 SECL EXH J.xlsx XLSX spreadsheet
UPS SEC-J ATT J.18 Alber Monitor BVM-40 User's Guide.pdf PDF
UPS SEC-J ATT J.1b MBP.doc DOC document
DTFAAC-17-R-00013_Amendment 0001.pdf PDF
UPS Section-M ATT M.1 Test.doc DOC document
UPS SEC-J ATT J.14 STD 028C 11-16-2000.pdf PDF
Q_A_11202017.docx DOCX document
DTFAAC-17-R-00013 Questions.xlsx XLSX spreadsheet
QA's from draft solicitation.xlsx XLSX spreadsheet
UPS SEC-J ATT J.9 UPS RSPL EXH F.xlsx XLSX spreadsheet
UPS SEC-L ATT L.3 Ltr.doc DOC document
UPS SEC-E Insp.doc DOC document
UPS SEC-J ATT J.6 MBP EXH C.xlsx XLSX spreadsheet
DTFAAC-17-R-00013_Amendment 0001.pdf PDF
UPS Section-M ATT M.1 Test.doc DOC document
UPS SEC-J ATT J.17 DID M002 ATT 2 Warranty Report.xls XLS spreadsheet
UPS SEC-J ATT J.21 Spec Comp.xls XLS spreadsheet
Show 40 more

Latest 50 of 198 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

DocumentPageReferenceQuestionAnswer
Solicitation12, 24C.3.1.5, C3.5.3Both sections call for a minimum of 2500 square feet of warehouse space. Are these to be summed for a total of 5000 square feet to accomodate e-Stock and CDLS requirements? Are the square footage requirements for floor space or total storage space (i.e. floor space plus rack storage space)?Total of 5000 square feet of warehouse floor space will accommodate both e-stock and CDLS requirements, does not include rack space.
Attachment J.121.1.bVRLA battery system; Is it intended for the battery cabinets to ship completely assembled or separate components of the battery system to be integrated on site?Battery cabinets should ship assembled
Attachment J.197CLIN 0003LCLIN 0003L has space to provide pricing for Medium Duty Battery Maintenance Lift, specified in J.1 section 2.13.4.b (page 19). Is J1 section 2.13.4.a (page 19) specification for a Light Duty Battery Maintenance Lift to be ignored? Or will provisions be made in J.19 for pricing of a Light Duty Battery Maintenance Lift?Light-Duty Battery Maintenance Lift has been removed from J.1
Attachment J.1910CLIN 0008BPlease verify/clarify the estimated quantity listed for CLIN 8B - Referencing Attachment J.7, Exhibit D. J.7, Exhibit D, UPS CLIN 0002J (500-600kVA UPS) lists an estimated quantity of 54. This number times the J.19 CLIN 0008B estimated quantity of 43 = 2322 battery circuit breakers.These numbers are unrelated. CLIN 0008B reflects total possible number of battery circuit breakers per option.
Attachment J.1913CLIN 0015AFor the designated Program Manager, are the 1560 hours listed for the base period and for each option period or for each year of the base period and option periods?Each year (Base and options) will have 1,560 hours
Section L, Instructions2L.2.(e)(6)Please clarify the level of resolution required for identification of manufacturing or assembly location. Is country of origin sufficient?Country of origin and assembly is required. Verbiage has been revised.
Section L, Instructions3L.2.(e)(6)(b)Refers to Section K - Clause K.3, UPS System Component Origin. Please clarify what clause this refers to - there is no K.3 in the package, nor are any of the referenced clauses in the package titled "UPS System Component Origin".Removed Section K reference.
Section L, Instructions3L.2(f)(1)(b)Please clarify reference to Section M, "paragraph M.3 - Relevant Past Performance and Experience Factor." Section M, paragraph M.3 is "Price Analysis".Reference should be M.2 - Relevant Past Performance and Experience Factor
Section L, Instructions4L.2(2)(g)In regards to the 200 page limit for Volume III equipment proposal, is anything excluded from the total page count, such as catalog cuts?No
Attachment J.20Under what conditions should the inrush information be provided? That is, startup of the unit on bypass or on inverter? Is this input or output inrush current?Information is based on startup of the unit on inverter. Input inrush current.

Sheet2

Sheet3

File details come from the government source that posted it.