Q&As11162017.xlsx
XLSX spreadsheet 14 KB Posted
- Attached to
- Uninterruptible Power Supply (UPS) equipment, Integrated Logistics and Technical Services
- Solicitation number
- DTFAAC-17-R-00013
About this file
Q&As11162017 (xlsx)
View the file
Other files
Show 40 more
Latest 50 of 198 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Document | Page | Reference | Question | Answer |
| Solicitation | 12, 24 | C.3.1.5, C3.5.3 | Both sections call for a minimum of 2500 square feet of warehouse space. Are these to be summed for a total of 5000 square feet to accomodate e-Stock and CDLS requirements? Are the square footage requirements for floor space or total storage space (i.e. floor space plus rack storage space)? | Total of 5000 square feet of warehouse floor space will accommodate both e-stock and CDLS requirements, does not include rack space. |
| Attachment J.1 | 2 | 1.1.b | VRLA battery system; Is it intended for the battery cabinets to ship completely assembled or separate components of the battery system to be integrated on site? | Battery cabinets should ship assembled |
| Attachment J.19 | 7 | CLIN 0003L | CLIN 0003L has space to provide pricing for Medium Duty Battery Maintenance Lift, specified in J.1 section 2.13.4.b (page 19). Is J1 section 2.13.4.a (page 19) specification for a Light Duty Battery Maintenance Lift to be ignored? Or will provisions be made in J.19 for pricing of a Light Duty Battery Maintenance Lift? | Light-Duty Battery Maintenance Lift has been removed from J.1 |
| Attachment J.19 | 10 | CLIN 0008B | Please verify/clarify the estimated quantity listed for CLIN 8B - Referencing Attachment J.7, Exhibit D. J.7, Exhibit D, UPS CLIN 0002J (500-600kVA UPS) lists an estimated quantity of 54. This number times the J.19 CLIN 0008B estimated quantity of 43 = 2322 battery circuit breakers. | These numbers are unrelated. CLIN 0008B reflects total possible number of battery circuit breakers per option. |
| Attachment J.19 | 13 | CLIN 0015A | For the designated Program Manager, are the 1560 hours listed for the base period and for each option period or for each year of the base period and option periods? | Each year (Base and options) will have 1,560 hours |
| Section L, Instructions | 2 | L.2.(e)(6) | Please clarify the level of resolution required for identification of manufacturing or assembly location. Is country of origin sufficient? | Country of origin and assembly is required. Verbiage has been revised. |
| Section L, Instructions | 3 | L.2.(e)(6)(b) | Refers to Section K - Clause K.3, UPS System Component Origin. Please clarify what clause this refers to - there is no K.3 in the package, nor are any of the referenced clauses in the package titled "UPS System Component Origin". | Removed Section K reference. |
| Section L, Instructions | 3 | L.2(f)(1)(b) | Please clarify reference to Section M, "paragraph M.3 - Relevant Past Performance and Experience Factor." Section M, paragraph M.3 is "Price Analysis". | Reference should be M.2 - Relevant Past Performance and Experience Factor |
| Section L, Instructions | 4 | L.2(2)(g) | In regards to the 200 page limit for Volume III equipment proposal, is anything excluded from the total page count, such as catalog cuts? | No |
| Attachment J.20 | Under what conditions should the inrush information be provided? That is, startup of the unit on bypass or on inverter? Is this input or output inrush current? | Information is based on startup of the unit on inverter. Input inrush current. |