DTFAAC-17-R-00013 Questions.xlsx

XLSX spreadsheet 17 KB Posted

Attached to
Uninterruptible Power Supply (UPS) equipment, Integrated Logistics and Technical Services
Solicitation number
DTFAAC-17-R-00013
Issued by

About this file

DTFAAC-17-R-00013 Questions (xlsx)

View the file

Other files

File Type Posted
UPS SEC-J ATT J.6 MBP EXH C.xlsx XLSX spreadsheet
UPS SEC-L ATT L.2 Performance.docx DOCX document
UPS SEC-J ATT J.23 SCADA Comp.xls XLS spreadsheet
UPS SEC-J ATT J.22 UPS Comp.xls XLS spreadsheet
UPS SEC-J ATT J.20 UPS Performance.doc DOC document
UPS SEC-G Admin.docx DOCX document
DTFAAC-17-R-00013.pdf PDF
UPS SEC-J ATT J.5 Exhibit B FCB.xlsx XLSX spreadsheet
UPS SEC-J ATT J.2 CDRL.doc DOC document
UPS SEC-D Pkg.doc DOC document
Questions as of 01_31_2018.docx DOCX document
UPS SEC-J ATT J.17 DID M002 ATT 2 Warranty Report.xls XLS spreadsheet
UPS SEC-E Insp.doc DOC document
UPS SEC-J ATT J.12 Load Bank Site Spares EXH I.xlsx XLSX spreadsheet
UPS SEC-J ATT J.10 Load Bank RSPL EXH G.xlsx XLSX spreadsheet
UPS SEC-M Evaluation_02142018.docx DOCX document
UPS SEC-J ATT J.15 CDLS User Guide 103008.pdf PDF
UPS SEC-J ATT J.1a SCADA_02142018.doc DOC document
Q&As11162017.xlsx XLSX spreadsheet
UPS SEC-J ATT J.11 UPS Site Spares EXH H.xlsx XLSX spreadsheet
UPS SEC-J ATT J.21 Spec Comp.xls XLS spreadsheet
UPS Section-M ATT M.2 Log-Train.doc DOC document
UPS SEC-L ATT L.3 Ltr.doc DOC document
UPS SEC-J ATT J.7 Bat Disc EXH D.xlsx XLSX spreadsheet
UPS SEC-L Instructions 02142018.docx DOCX document
UPS SEC-J ATT J.19 BOM CLINs 020142018.xls XLS spreadsheet
UPS SEC-J ATT J.24 SCADA Comp.xls XLS spreadsheet
UPS SEC-J ATT J.4 Exhibit A VRLA_02142018.xlsx XLSX spreadsheet
UPS SEC-J ATT J.3 DID.doc DOC document
UPS SEC-J ATT J.8 Load Bank EXH E_02142018.xlsx XLSX spreadsheet
UPS SEC-L ATT L.1 Expereince.docx DOCX document
DTFAAC-17-R-00013 amendment 0002.pdf PDF
UPS SEC-J ATT J.1 SPEC_02142018.docx DOCX document
UPS SEC-J ATT J.16 DID M002 ATT 1 Cost Report.xls XLS spreadsheet
UPS SEC-J ATT J.13 SECL EXH J.xlsx XLSX spreadsheet
UPS SEC-J ATT J.18 Alber Monitor BVM-40 User's Guide.pdf PDF
UPS SEC-J ATT J.1b MBP.doc DOC document
DTFAAC-17-R-00013_Amendment 0001.pdf PDF
UPS Section-M ATT M.1 Test.doc DOC document
UPS SEC-J ATT J.14 STD 028C 11-16-2000.pdf PDF
Q_A_11202017.docx DOCX document
QA's from draft solicitation.xlsx XLSX spreadsheet
UPS SEC-J ATT J.9 UPS RSPL EXH F.xlsx XLSX spreadsheet
UPS SEC-L ATT L.3 Ltr.doc DOC document
UPS SEC-E Insp.doc DOC document
UPS SEC-J ATT J.6 MBP EXH C.xlsx XLSX spreadsheet
DTFAAC-17-R-00013_Amendment 0001.pdf PDF
UPS Section-M ATT M.1 Test.doc DOC document
UPS SEC-J ATT J.17 DID M002 ATT 2 Warranty Report.xls XLS spreadsheet
UPS SEC-J ATT J.21 Spec Comp.xls XLS spreadsheet
Show 40 more

Latest 50 of 198 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

DocumentPageReferenceQuestionFinal Answer
Solicitation5Section B IntroIntroduction paragraph refers to "Section G, G.1 for ordering procedures." There is no section G.1 - please clarify.Change to state " Also see Attachment Section G-Admin, G.1 for ordering procedures." Its an attachment to the SIR
Solicitation7B.2(c)(3)The estimated quantities listed in Exhibits A & B, Attachments J.4 & J.5 do not match the corresponding quantities listed for Exhibits A & B in J.19, therefore, while the individual pricing for a sub-CLIN would be consistent between the Exhibits and J.19, the total price on the exhibits will be different than that listed in J.19 for the contract as required in B.1. Will J.19 quantities be modified to match the exhibits?J.4 and J.8 are updated/upload to FAACO
Attachment J.121.1.aSection 1.1.a reads "with exception of system components listed in b. through h. below." Will 1.1.a be amended to read "with exception of system components listed in b. through k."?changed to reference "b. through k."
Attachment J.1A8J.1-2.4.17Attachment J.1A refers to SOW paragraph 3.5.3.8., Please provide referenced paragraph.Changed to 3.3.1 in Attached J.1a
Attachment J.197CLIN 0003MPlease specify size and type of battery string for quotation of installation. Also, please specify a location to provide baseline pricing for installation of example battery string; and an option for a multiplier for each of the other 19 locations once they are identified; or please provide a list of the 20 sites where installation services would be required.The quanity was changed to 0. It will be on an as needed basis, as the FAA has a contract for installation.
Attachment J.199, 15CLIN's 0005D, 0019 & 0020Refers to "H.5". Section H "Special Contract Requirements" does not contain an H.5, nor is there reference to Federal Travel Regulations. Please clarify.Changed to state "IAW AMS 3.3.2-2 Reimbursement for Travel and

Subsistence (April 2010)" for base and all options

Attachment J.1912CLIN 0012CLIN's 0012A, 0012B, & 0012C refer to "H.3" - Section H "Special Contract Requirements" does not contain an H.3. Please clarify. CLIN 0012A "Ground Level Delivery" refers to "F.12". CLIN 0012B "Inside Delivery" refers to "F.13". CLIN 0012C "Delivery outside the contiguous 48 United States" refers to "F.14". Please clarify.Removed H.3 refence and added verbiage in B.3 © regarding contractor's cost. For the F.12, F.13 and F.14 referenced items, please refer to the SIR attachment "Section F-Deliveries"
Attachment J.1912CLIN 0013A, BWhat training specifically is included in the CLIN? The CLIN references CDRL 21-24 only.Please review SOW C.3.6.4 TRAINING DEVELOPMENT
Attachment J.1913CLIN 0015AFor the designated Program Manager, are the 1560 hours listed for the base period and for each option period or for each year of the base period and option periods? Clarification requested. Please confirm; each option period is two years therefore CLIN 0015A will be 3120 HRS. Will FAA modify J.19 with this change?PM hours listed are total for option years. 1560 hours per (2) year option. FAA will not change J.19 as it reflects the correct amount for the base year. Base year (2 year) 1560; Option year 1 (2 years) 1560; Option year 2 (2 years) 1560; etc.
Attachment J.1916CLIN 0022Refers to "H.6". Section H "Special Contract Requirements" does not contain an H.6, Please provide.Reworded CLIN 0022 and removed 0022A, 0022B and 0022C, same for the option years
Attachment J.1916Attachments J.4, J.5, J.6, J.7, J.8Attachment J.19, Price Exhibit A, Section-J, Attachment J.4 includes pricing for UPS CLINS 0001A-0001J, yet Attachment J.4 only lists pricing for UPS CLINS 0001A-0001I. Please clarify if pricing for UPS CLIN 0001J should be added to Attachment J.4. Please also clarify if the pricing for UPS CLINS 0001J should be added to Attachments J.5, J.6, J.7, & J.8; the same issues exists.J.4 and J.8 are updated/upload to FAACO
Attachment J.226J.1 - 2.12.10Attachment J.22 refers to Attachment J.24, there is not a J.24 attachment included in the package. Please clarify.Attachment J.24 is uploaded to FAACO
Section L, Instructions4Vol II (2)Will the FAA provide attachment L.3 sample Client Authorization letter as described in the paragraph.L.3 Ltr is uploaded to FAACO
Attachment J.9When a depot spare parts kit is applicable to more than one UPS CLIN, shall pricing be submitted for a single kit for multiple CLIN's?Price it as a single kit for mutiple CLINs
Section L, Instructions2L.2(e)(3)(a)Please identify which UPS CLIN's qualify as "small" UPS units that may have "self-contained battery units".Small UPS are CLINs 0001A, 0001AA, 0001J and 0001JJ and applicable option CLINS.
Attachment J.19AllWill cell reference and formula issues be changed to reflect correct calculations? Multiple cell reference errors exists.A complete evaluation of the cells will be done, to ensure correct calculations.
Attachment J.197CLIN 0003MFlooded-cell battery systems installation; what kVA system should be quoted?The quanity was changed to 0. It will be on an as needed basis, as the FAA has a contract for installation.
Attachment J.19MHCThe J.19 files in dated 5.24.2017 and includes the Material Handling Charge. This is the correct J.19 form?Ensure you are using J.19 dated 02/14/2018
SCADA J.1aWill the FAA provide a simple one line overview of the SCADA system, indicating: the number of SCADA Enclosures, the number of remote SCADA screens, communication with UPS and PCMS systems and power requirements.The FAA does not have a simple one line overview of the SCADA system to provide at this time
SCADA J.1a2Will SCADA system operate on the 125Vdc power system currently present in the ACEPS II system?Yes
SCADA J.1a3Please define how SCADA will utilize the Radio Modem and Telephone modem communications.Removed form J.1a
SCADA J.1a32.3What will the parallel port be used for?(1) parallel port removed from J.1a
SCADA J.1a42.4.2.2Power Flow: Will the FAA revise the SCADA spec to delete the requirement of monitor components not integral to the UPS; Input Breaker, Bypass Breakers, Maintenance Bypass and System isolation breaker, Maintenance Bypass Power, Generator Power; (changes per Q&A)Changes made to 2.4.2.2 pg. 4 of J.1a
SCADA J.1a62.4.2.6.4Will FAA delete the diagnostic aids pertaining to equipment not integral to the UPS? (changes per Q&A)Requirements stays as is. UPS sytem is capable monitoring the points.
SCADA J.1a62.4.2.6.4Web based monitoring and control; Is the FAA intention to allow remote access to the UPS SCADA system?No
I understand that a UPS is required to provide conditioned, uninterruptible electrical power to support critical National Air Space electronic systems. May I know what Make/Model and what kilowatts (kW) or kilo-volt-amperes (kVA) UPS System is required?Make/Model is part of Section L requirements. All UPS sizes can be found on J.19, CLIN 0001 and 0002.
UPS SEC-L InstructionsL.2.BPlease confirm that no hard copies are required. If hard copies are required, please clarify how many originals/copies/electronic copies are required for each volume.Electronic Only (CD/Flash Drive) the # of copies is referenced on page 1 of Section L, under L.2
UPS SEC-L InstructionsL.2.E.4Please clarify what information must be provided on the referenced Business Declaration Form.Business Declaration Form requirement has been removed.
UPS SEC-L InstructionsL.2.F.2This section references Attachment L.3. Please provide Attachment L.3.L.3 Ltr is uploaded to FAACO
PS SEC-L InstructionsL.2.BPlease clarify what information is to be provided in the referenced Consent Letter.It’s the same thing as Attachment L.3 "Client Authorization Letter. Offeror format—one (1) 8.5” x 11” page for each commercial client for which a Past Performance Questionnaire was prepared. See Attachment L.3 for sample letter"
UPS SEC-L InstructionsL.2.E.7Please confirm that this section should include SBA 8(A) certification letters for any 8(A) subcontractors, if any are utilized. If this is incorrect, please clarify what is to be included in this section.Correct. If a 8(A) subcontractor is ultilized, then the certification letter needs to be provided.
UPS SEC-L InstructionsL.2.3.2Instructions state that the offeror should complete boxes 12-18 on the SF33. On the form itself, Box 18 is listed as being completed by the contract authority. Please confirm that the offeror is NOT required to complete Box 18 on the SF33.Corrected to state 12-16
UPS SEC-L InstructionsL.2.G.1.AInstructions state that Attachment J.21 must be completed referencing paragraphs in Attachment J.1. However, it appears that paragraph numbers in Attachment J.1 do not correspond with those listed on Attachment J.21. Will the Government please update attachment J.21 or the Sec-L Instructions to accurately reflect what the offeror should be referencing in our compliance review?Documents reflect the correct information
UPS SEC-L InstructionsL.2.G.1.BInstructions state that Attachment J.22 must be completed referencing paragraphs in Attachment J.1. However, it appears that paragraph numbers in Attachment J.1 do not correspond with those listed on Attachment J.22. Will the Government please update Attachment J.22 or the Sec-L Instructions to accurately reflect what the offeror should be referencing in our compliance review?Documents reflect the correct information
UPS SEC-L InstructionsL.2.G.2Instructions state that Attachment J.23 must be completed referencing paragraphs in Attachment J.1. However, it appears that paragraph numbers in Attachment J.1 do not correspond with those listed on Attachment J.23. Will the Government please update attachment J.22 or the Sec-L Instructions to accurately reflect what the offeror should be referencing in our compliance review?Documents reflect the correct information
UPS SEC-L ATT L.1 Experience; UPS SEC-M EvaluationJ.1; Subfactor 1.B.2Instructions on the L.1 form state that offeror must “demonstrate availability to support sites within the time constraints specified in the SOW Paragraphs C.3.4.3.6 and C.3.5.7. However, SEC-M states that offeror must “demonstrate availability to support within the time constraints specified in SOW Section C.3.4.4”. Please confirm that SOW Paragraphs C.3.4.3.6 and C.3.5.7 contain the applicable time constraints.Section M was corrected
UPS SEC-L ATT L.1 Experience; UPS SEC-M EvaluationJ.2; Subfactor A.B.3Instructions on the L.1 form state that offeror must “demonstrate ability to provide UPS spare parts within the time constraints specified in the SOW Section C.3.4.2 and C.3.5.6. However, SEC-M states that offeror must “demonstrate availability to support within the time constraints specified in SOW Section C.3.5.4.4”. Please confirm that SOW Paragraphs C.3.4.2 and C.3.5.6 contain the applicable time constraints.Section M was corrected
UPS SEC-L InstructionsL.2.F.2Would the Government accept completed CPARS in lieu of PPQs?In accordance with Section M, "If no PPQs are submitted for any Attachment L.1 the vendor will be assigned a neutral rating of “2”. "
UPS SEC-L ATT L.1 Experience; UPS SEC-M EvaluationAllAttachment L.1 points to Evaluation Factor Reference, Section M, Paragraph M.3 as evaluation criteria for the various narratives. Paragraph M.3 references Price Analysis. Please confirm that all references to M.3 in Attachment L.1 are actually referencing M.2.M.3 is price anlysis. M.2 is for technical evaluation
DTFAAC-17-R-00013Section I – Contract ClausesContract Clauses incorporates Clause 3.6.4-5 Buy American- Steel and Manufactured Products (Jul 2010). We request that the Trade Agreement Act (TAA) be added and incorporated in this RFP language, for the following reasons:The FAA is exempt from the FAR and as such has its own policy, guidance and clauses. The FAA uses Acquisition Management System (AMS). The TAA is not a clause in the AMS.
1. The BAA significantly limits competition among UPS manufacturers.
2.Incorporating the TAA language into the RFP would increase competition, allowing all major UPS manufacturers to propose technical solutions and pricing in response to the RFP
3. The TAA enables the FAA to consider both Original Equipment Manufacturers (OEMs) and System Integrators as potential Prime contractors. A Systems Integrator is vendor agnostic and offers the FAA the opportunity to choose the best equipment/solution among multiple UPS OEMs, a major advantage.
4. The TAA would enable the FAA to build a more agile, cross-trained technical staff, able to maintain and sustain UPSs from multiple OEMs.
5. The TAA would not limit the FAA to technology from only a select few OEM’s throughout the 10 year contract term, but instead offer the FAA the agility and flexibility to choose the best solutions from OEMs who may have advanced technologies, which the FAA desires.
6. Other Federal agencies, including the Department of Defense, the General Services Administration, and various agencies in the Intelligence Community incorporate TAA language in their RFP’s in order to provide procurement agility and flexibility to obtain better pricing through increased OEM selection.
Therefore, in order to increase competition for the requirements covered by this RFP, we request that the FAA consider adding and incorporating TAA language to the BAA language in Section I of this RFP.