This document package includes construction drawings and specifications for a federal construction project to relocate a Physical Medicine and Rehabilitation department to the fourth floor of a Veterans Affairs medical center. The project will involve demolishing existing mechanical, ductwork and piping systems and installing new air handling units, terminal units, ductwork, piping for hot water, medical gases and other utilities to serve the new department layout. Detailed drawings show demolition plans, new work plans, schematics and schedules for mechanical systems. Specifications reference compliance with asbestos abatement procedures and protocols for phasing work to maintain operation of an onsite pain clinic. The solicitation number is for the Department of Veterans Affairs project located in Columbia, Missouri, with a bid due date of February 15, 2023.
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. REFER TO M000 FOR MECHANICAL SYMBOLS AND
ABBREVIATIONS.
2. COORDINATE PHASING AND SHUTDOWN FOR SUPPLY
AIR, RETURN AIR, HEATING HOT WATER SUPPLY, AND
HEATING HOT WATER RETURN WITH OWNER.
SHUTDOWN AND REPLACEMENT TO OCCUR AFTER
HOURS OR OVER WEEKEND.
3. COORDINATE EXISTING CONDITIONS AND ASBESTOS
REMOVAL WITH EXISTING CONDITIONS. FOR EXISTING
ASBESTOS, REFER TO MOST RECENT REPORT
PROVIDED BY OWNER. COORDINATE ALL REMOVAL IN
COMPLIANCE WITH CURRENT VA ASBESTOS
ABATEMENT DESIGN MANUAL. REFER TO
SPECIFICATION 02 82 11 FOR ADDITIONAL
INFORMATION.
4. PAIN CLINIC - NORTHWEST QUADRANT OF THE FLOOR -
SHALL BE OPERATIONAL AT ALL WORKING DAYS &
HOURS (MON-FRI 7M - 5PM) DURING THE ENTIRE
CONSTRUCTION PERIOD. ANY REQUIRED WORK IN THIS
CLINIC SHALL BE COORDINATED CLOSELY W/ COR.
GENERAL NOTES#
EaFGGaHHbJJbKLLaMNNa H.5Ja F.1 EbMaNb
2.8
3.7
4.5
6.2
5.4
6.7
5.7
5.3
4.6
7.1
3.6
4.1
4.7
5.1
6.1
6.3
5.5
3.1
4.4
8x4
16x6 x
12x4
6x6
8x4
6x6
6x4
6x6
11x6
6x6
9x6
6x6
6x4
6x6
10x8
8x7
8x6
14x8
6x4
8ø 8ø
8x4 x x x x x
10x9
10x6
15ø
10x4
EX 15x25
7x6
6x7 6x7 6x7 6x7
9ø 10x4
16x6
10x4 9x4
11x4 ø
12x5
6x4
9x4
6x6
6x4
9x4
6x4
10x4
10x4 12x5
10x4
10x4
6x4
12x8 x
6x6
30x11
17x11 x
6x4
6x4 6x4
6x4
6x4
6x4
9x6
11x6
6x4 13x6
7x6
6x5
6x4
16x6
6x5
10x6
9x5
14ø
13ø
10ø
12x6
9x4 9x6
6x4
9x4
14x8
15x6
7x6
12x4
6x6
8x4
6x4
6x6
11ø
29x6 1 x
6x5
10x6
13x6
13ø
16ø
22x10
8x4
11x5
12x4
6x4
6x4 6x4
6x4
6x6 x
14x10
14x8
6x6
6x6
18x7
8x5
6x4
6x4 9x5
12x7 12x7
6x8
6x6
8x6 6x6
6x4
6x4
EX 45x12 RA UP
EX 24ø SA
UP & DN
EX 12x12
EA UP & DN
EX 9x12 EA
UP & DN
EX 14x12
EA UP & DN
EX 16ø
VENT UP &
DN
EX 26x24 SA
EX 12x10
EA UP & DN
EX 10x12 EA
EX 10x12 EA
EX 10x12 EA
EX 10x12 EA
EX 10x12 EA
EX 10x12 EA
EX 16ø SA UP
EX 22ø SA
UP & DN
EX 13ø OA UP
EX 15ø OA DN
(AC-S3)
(AC-S1)
(AC-ER-2)
(AC-ER-5)
(AC-S5)
(AC-S2)
(AC-ER-4)
EXCEPT AS
NOTED
(AC-S4)
(AC-ER-3)
(AC-S2)
(E-3)
17x14
17x13
NOT IN SCOPE
EX 30x31 RA
EX 36x30
RA UP & DN
EX 40x22
RA UP & DN
EX 34ø SA
UP & DN
EX 16ø SA UP
EX 24ø SA
UP & DN
EX 12ø
VENT UP &
DN
22 2 2 2 2
EX 20x20 SA
EX 20x20 RA
1. DEMOLISH ALL EXISTING TERMINAL UNITS AND
ASSOCIATED DUCTWORK, CONTROLS, AND
ACCESSORIES BACK TO DEMARCATION POINT SHOWN.
2. EXISTING INDUCTION UNIT TO BE REMOVED. REMOVE
CONTROLS AND ACCESSORIES. REMOVE DUCT BACK
TO TOP OF 5TH FLOOR SLAB AND PROVIDE CAP.
REMOVE ALL CONTROL WIRING BACK TO CENTRAL
PANEL IN 401C. REMOVE ALL PNEUMATIC CONTROL
TUBING.
3. RELOCATE EXISTING DIFFUSER AND FLEX DUCT TO
ALIGN WITH NEW CEILING GRID. SEE MH105 FOR
RELATED INFORMATION.
4. FIELD VERIFY EXISTING DUCT ROUTING PRIOR TO
CONSTRUCTION. RECORD DRAWINGS MAY NOT
REPRESENT CURRENT DUCT ROUTING.
5. DEMOLISH EXISTING DUCTWORK IN CHASE FROM 4TH
FLOOR UP TO THE FLOOR ABOVE. VERIFY DUCTWORK
IS INACTIVE WITH OWNER PRIOR TO DEMOLITION.
SHEET KEYNOTES#
FOURTH FLOOR KEY PLAN
AREA A
N
B
A
A
2 3 4 5 6
B
C
D
1 2 3 4 5 6
A
B
C
D
VA FORM 08-6231
o n e e ig h th in c o n e fo o t o n e q u a rt e r i n c e fo o t th re e e ig h th s in c e fo o t o n e h a lf in c e fo o t th re e q u a rt e rs e fo o t o n e in c e fo o t o n e a n d o n e h a lf in c h e s e fo o t th re e in c h e e fo o t
CONSULTANTS: ARCHITECT/ENGINEERS:
Drawing Title
Office of Construction and Facilities ManagementApproved: Project Director
Project Title
Location
Date Checked Drawn
Dwg.
Drawing Number
Building Number
Project Number
600 EAST 7TH STEET
SIOUX FALLS, SOUTH DAKOTA 57103
605.274.2893
6 SOUTH OLD ORCHARD
ST. LOUIS, MISSOURI 63119
800.404.7677
330 N MEAD
WICHITA, KANSAS 67202
316.262.2500
NOT FOR
CONSTRUCTION
JOHN SOMMERS, PE MO #2015028399
MD105
MECHANICAL DEMOLITION PLAN -
DUCTWORK - 4TH FLOOR - AREA A
RELOCATE PHYSICAL
MEDICINE & REHAB. TO THE
4TH FLOOR
800 HOSPITAL DRIVE COLUMBIA, MO 65201
02-15-2023
589A4-22-100
BID DOCUMENTS
RLCJES
3/16" = 1'-0"
MECHANICAL DEMOLITION PLAN - DUCTWORK - 4TH FLOOR - AREA A
# Revision Date
John Ernest Sommers, PE
PE-2015028399
02/13/2023
FE
F E
T
TT
T
TT
1. REFER TO M000 FOR MECHANICAL SYMBOLS AND
ABBREVIATIONS.
2. COORDINATE PHASING AND SHUTDOWN FOR SUPPLY
AIR, RETURN AIR, HEATING HOT WATER SUPPLY, AND
HEATING HOT WATER RETURN WITH OWNER.
SHUTDOWN AND REPLACEMENT TO OCCUR AFTER
HOURS OR OVER WEEKEND.
3. COORDINATE EXISTING CONDITIONS AND ASBESTOS
REMOVAL WITH EXISTING CONDITIONS. FOR EXISTING
ASBESTOS, REFER TO MOST RECENT REPORT
PROVIDED BY OWNER. COORDINATE ALL REMOVAL IN
COMPLIANCE WITH CURRENT VA ASBESTOS
ABATEMENT DESIGN MANUAL. REFER TO
SPECIFICATION 02 82 11 FOR ADDITIONAL
INFORMATION.
4. PAIN CLINIC - NORTHWEST QUADRANT OF THE FLOOR -
SHALL BE OPERATIONAL AT ALL WORKING DAYS &
HOURS (MON-FRI 7M - 5PM) DURING THE ENTIRE
CONSTRUCTION PERIOD. ANY REQUIRED WORK IN THIS
CLINIC SHALL BE COORDINATED CLOSELY W/ COR.
GENERAL NOTES#EaFGGaHHbJJbKLLaMNNa H.5Ja F.1 EbMaNb
7.3
8.2
9.1
6.7
9.8
8.9
8.3
7.2
7.1
8.0
7.5
12x4
8x4
6x4
6x6
6x6
8x4
6x4
6x4
16x5
12x5 24x14 x
12x4
6x6
8x4 x x 4 17x11 x
13ø 12x6
9x4 9x6
6x4
9x4
14x8
29x6
15x6
27x6
8ø
10x6
9x5 7ø
6x5
9ø
6x4 6x6
6x4
6x6 6x4
9x5
24x15
19x7
13x5
13x7
6x5
12x4
6x4
6x4
6x4 6x6
9x5
9x6
8x5 6x4
12x4
12x8
5x4
7x6
7x6
6x6 6x4
6x4
9x5
6x4 6x4
8x4
12x6
12x8
6x4 6x4 6x4
6x4 6x6
8x4
14x8
11x4
6x4 6x4
6ø
6x4
6x4 6x6
9x5 9x5
19x8
10x4
6x5
6x5
9x6 7ø
22x14 x
16x5
6x6
27x6
8ø
9ø
8x4
6x4 6x6 6x4
12x5
6x4
12x4
6x6
8x4
6x4
6x6
12x4
6x6
8x4
11ø
29x6
15x6 x
6x4
6x5
10x6
13x6
13ø
16ø
11x5
6x6
10x4 10x4
10x6 6x5
12x8
14x10
14x8
6x6
6x6
6x4 6x4
11x4
6x6
40x24 UP &
DN
34x24 UP &
DN
40x24 EA UP
34x20 EA DN
(AC-ER 7)
(AC-ER 8)
(E-2) 2735 CFM
8605 CFM
(E-1)
18x14
17x14
1 1
22222222222222
FOURTH FLOOR KEY PLAN
AREA B
N
B
A
1. DEMOLISH ALL EXISTING TERMINAL UNITS AND
ASSOCIATED DUCTWORK, CONTROLS, AND
ACCESSORIES BACK TO DEMARCATION POINT SHOWN.
2. EXISTING INDUCTION UNIT TO BE REMOVED. REMOVE
CONTROLS AND ACCESSORIES. REMOVE DUCT BACK
TO TOP OF 5TH FLOOR SLAB AND PROVIDE CAP.
REMOVE ALL CONTROL WIRING BACK TO CENTRAL
PANEL IN 401C. REMOVE ALL PNEUMATIC CONTROL
TUBING.
3. DEMOLISH EXISTING DUCTWORK IN CHASE FROM 4TH
FLOOR UP TO THE FLOOR ABOVE. VERIFY DUCTWORK
IS INACTIVE WITH OWNER PRIOR TO DEMOLITION.
SHEET KEYNOTES#
A
2 3 4 5 6
B
C
D
1 2 3 4 5 6
A
B
C
D
VA FORM 08-6231
o n e e ig e fo o t o n e q u a rt e r i n c e fo o t th re e e ig h th s in c e fo o t o n e h a lf in c e fo o t th re e q u a rt e fo o t o n e in c e fo o t o n e a n d o n e h a lf in c h e e fo o t th re e in c h e e fo o t
CONSULTANTS: ARCHITECT/ENGINEERS:
Drawing Title
Office of Construction and Facilities ManagementApproved: Project Director
Project Title
Location
Date Checked Drawn
Dwg.
Drawing Number
Building Number
Project Number
600 EAST 7TH STEET
SIOUX FALLS, SOUTH DAKOTA 57103
605.274.2893
6 SOUTH OLD ORCHARD
ST. LOUIS, MISSOURI 63119
800.404.7677
330 N MEAD
WICHITA, KANSAS 67202
316.262.2500
NOT FOR
CONSTRUCTION
JOHN SOMMERS, PE MO #2015028399
MD106
MECHANICAL DEMOLITION PLAN -
DUCTWORK - 4TH FLOOR - AREA B
RELOCATE PHYSICAL
MEDICINE & REHAB. TO THE
4TH FLOOR
800 HOSPITAL DRIVE COLUMBIA, MO 65201
02-15-2023
589A4-22-100
BID DOCUMENTS
RLCJES
3/16" = 1'-0"
MECHANICAL DEMOLITION PLAN - DUCTWORK - 4TH FLOOR - AREA B
# Revision Date
John Ernest Sommers, PE
EaFGGaHHbJJbKLLaMNNa H.5Ja F.1 EbMaNb
4.5
6.2
5.4
6.7
9.8
8.9
8.3
7.2
7.1
3.6
4.1
4.7
5.1
6.1
6.3
5.5
3.1
AC-S
AC-S
AHU
XAC
TEMP
E
AC-ER
E
E
E
E
E
HRU
E
EX 108x24 SA
E X ø
S A
E X x R
A
E X ø
S A
EX 24ø SA
E X ø
S A
E X ø
S A
E X ø
S A
E X x R
A
EX 30x48 RA
EX 60x40 RA
EX 48x28 RA
EX 56x24 RA
EX 44x24 SA EX 20x20 RA
EX 20x20 RA
EX 48x28 RA
EX 44x24 SA
EX 44x24 SA
EX 36x30 RA EX 108x22 RA
EX 30x48 RA
EX 30ø SA
16ø
EX 20x20 SA
EX 20x20 SA
TOP
BOTTOM
TOP
BOTTOM
EX 20x20 SA DN EX 20x20 RA DN
EX 42x32
SA UP & DN
EX 36x36
RA UP & DN
DN
EX 24x56 RA EX 28ø SA
EX 36x30 RA
16ø
EX 12x10
EA UP & DN
EX 14x24
EA UP & DN
EX 12x12
EA UP & DN
EX 12x18
EA UP & DN
EX 22ø SA
UP & DN
EX 14x12
EA UP & DN
TYP.
UNLESS
NOTED EX 40x22
RA UP & DN
EX 34ø SA
UP & DN
EX 24ø SA DN EX 12ø
VENT UP &
DN
EX 30x31
RA UP & DN
EX 24ø SA DN
EX 36x30 RA DN
EX 24ø SA DN
EX 24ø SA DN
EX 16ø
VENT UP &
DN
EX 56x24 RA DN
EX 17ø SA DN
EX 17ø SA DN
E
EX 96x16 SA
BOTTOM
TOP
EX 36x30 RA
16ø
EX 60x60 SA
EX 34x34 SA
UP
EX 30ø SA
DN
EX 34x34 SA
36x36 RA x R
A
36x36 RA
30x24 RA 54x24 RA DN
1. REFER TO M000 FOR MECHANICAL SYMBOLS AND
ABBREVIATIONS.
2. COORDINATE PHASING AND SHUTDOWN FOR SUPPLY
AIR, RETURN AIR, HEATING HOT WATER SUPPLY, AND
HEATING HOT WATER RETURN WITH OWNER.
SHUTDOWN AND REPLACEMENT TO OCCUR AFTER
HOURS OR OVER WEEKEND.
3. COORDINATE EXISTING CONDITIONS AND ASBESTOS
REMOVAL WITH EXISTING CONDITIONS. FOR EXISTING
ASBESTOS, REFER TO MOST RECENT REPORT
PROVIDED BY OWNER. COORDINATE ALL REMOVAL IN
COMPLIANCE WITH CURRENT VA ASBESTOS
ABATEMENT DESIGN MANUAL. REFER TO
SPECIFICATION 02 82 11 FOR ADDITIONAL
INFORMATION.
4. PAIN CLINIC - NORTHWEST QUADRANT OF THE FLOOR -
SHALL BE OPERATIONAL AT ALL WORKING DAYS &
HOURS (MON-FRI 7M - 5PM) DURING THE ENTIRE
CONSTRUCTION PERIOD. ANY REQUIRED WORK IN THIS
CLINIC SHALL BE COORDINATED CLOSELY W/ COR.
GENERAL NOTES#
1. DEMOLISH EXISTING DUCTWORK TO DEMARCATION
POINT SHOWN.
2. REMOVE INSULATION FROM DUCTWORK ON ROOF.
PREPARE FOR INSTALLATION OF NEW INSULATION. SEE
NEW WORK FOR RELATED INFORMATION.
SHEET KEYNOTES#
A
2 3 4 5 6
B
C
D
1 2 3 4 5 6
A
B
C
D
VA FORM 08-6231
o n e e ig e fo o t o n e q u a rt e r i n c e fo o t th re e e ig h th s in c e fo o t o n e h a lf in c e fo o t th re e q u a rt e fo o t o n e in c e fo o t o n e a n d o n e h a lf in c h e e fo o t th re e in c h e e fo o t
CONSULTANTS: ARCHITECT/ENGINEERS:
Drawing Title
Office of Construction and Facilities ManagementApproved: Project Director
Project Title
Location
Date Checked Drawn
Dwg.
Drawing Number
Building Number
Project Number
600 EAST 7TH STEET
SIOUX FALLS, SOUTH DAKOTA 57103
605.274.2893
6 SOUTH OLD ORCHARD
ST. LOUIS, MISSOURI 63119
800.404.7677
330 N MEAD
WICHITA, KANSAS 67202
316.262.2500
NOT FOR
CONSTRUCTION
JOHN SOMMERS, PE MO #2015028399
MD107
MECHANICAL DEMOLITION PLAN -
DUCTWORK - LOWER PENTHOUSE
RELOCATE PHYSICAL
MEDICINE & REHAB. TO THE
4TH FLOOR
800 HOSPITAL DRIVE COLUMBIA, MO 65201
02-15-2023
589A4-22-100
BID DOCUMENTS
RLCJES
1/8" = 1'-0"
MECHANICAL DEMOLITION PLAN - DUCTWORK - LOWER PENTHOUSE
# Revision Date
John Ernest Sommers, PE
FEC
FEC
F E
C
ABCDEEaFGGaHJJbK BaBbH.5Ja F.1 Eb Aa
2.8
3.7
6.2
5.4
5.7
5.3
4.6
3.6
4.1
4.7
5.1
6.1
6.3
1.9
5.5
1.1
3.1
4.4
NOT IN SCOPE
3" HCR UP
EX 1" MPS
EX 2" V
3" HCR
1. VERIFY EXISTING CONDITIONS PRIOR TO
CONSTRUCTION.
2. INSTALL NEW PIPING FROM FLOOR ABOVE TO
DEMARCATION POINT SHOWN.
SHEET KEYNOTES#
1. REFER TO M000 FOR MECHANICAL SYMBOLS AND
ABBREVIATIONS.
2. COORDINATE PHASING AND SHUTDOWN FOR SUPPLY
AIR, RETURN AIR, HEATING HOT WATER SUPPLY, AND
HEATING HOT WATER RETURN WITH OWNER.
SHUTDOWN AND REPLACEMENT TO OCCUR AFTER
HOURS OR OVER WEEKEND.
3. PAIN CLINIC - NORTHWEST QUADRANT OF THE FLOOR -
SHALL BE OPERATIONAL AT ALL WORKING DAYS &
HOURS (MON-FRI 7M - 5PM) DURING THE ENTIRE
CONSTRUCTION PERIOD. ANY REQUIRED WORK IN THIS
CLINIC SHALL BE COORDINATED CLOSELY W/ COR.
GENERAL NOTES#
A
2 3 4 5 6
B
C
D
1 2 3 4 5 6
A
B
C
D
VA FORM 08-6231
o n e e ig e fo o t o n e q u a rt e r i n c e fo o t th re e e ig h th s in c e fo o t o n e h a lf in c e fo o t th re e q u a rt e fo o t o n e in c e fo o t o n e a n d o n e h a lf in c h e e fo o t th re e in c h e e fo o t
CONSULTANTS: ARCHITECT/ENGINEERS:
Drawing Title
Office of Construction and Facilities ManagementApproved: Project Director
Project Title
Location
Date Checked Drawn
Dwg.
Drawing Number
Building Number
Project Number
600 EAST 7TH STEET
SIOUX FALLS, SOUTH DAKOTA 57103
605.274.2893
6 SOUTH OLD ORCHARD
ST. LOUIS, MISSOURI 63119
800.404.7677
330 N MEAD
WICHITA, KANSAS 67202
316.262.2500
NOT FOR
CONSTRUCTION
JOHN SOMMERS, PE MO #2015028399
MP101
MECHANICAL NEW WORK PLAN -
PIPING - 3RD FLOOR - AREA A
RELOCATE PHYSICAL
MEDICINE & REHAB. TO THE
4TH FLOOR
800 HOSPITAL DRIVE COLUMBIA, MO 65201
02-15-2023
589A4-22-100
BID DOCUMENTS
RLCJES
1/8" = 1'-0"
MECHANICAL NEW WORK PLAN - PIPING - 3RD FLOOR - AREA A
# Revision Date
John Ernest Sommers, PE
R E
F
F E
C
F E
C
F E
C
F E
C
F E
C
FEC
T
T
T
T
ABCDEEaFGGaHHbJJbKLLaMNNa BaBbH.5Ja F.1 Eb AaMaNb
2.8
3.7
7.3
8.2
9.1
10.4
4.5
6.2
5.4
6.7
5.7
5.3
4.6
10.2
9.8
8.9
8.3
7.2
7.1
3.6
4.1
4.7
5.1
6.1
6.3
8.0
1.9
5.5
7.5
1.1
3.1
4.4
EF
CU
4-2
ROOF TOP EQUIPMENT
EXISTING TO REMAIN
HE
HE
HE
HE
HE
HE
E
MP103
MP104
1 1 M-107
NOT IN SCOPE
x E
A
20x14 EA
1. ROUTE DUCTWORK FROM 453 – LAB CLEAN RM. TO
EXHAUST FAN. SEE SHEET MH-104 FOR ADDITIONAL
INFORMATION.
2. ROUTE REFRIGERANT LINES FROM MINI-SPLIT (ACU-4-2)
TO CONDENSING UNITS (CU-4-2). SEE SHEET MP104
FOR ADDITIONAL INFORMATION.
3. PROVIDE ROOF SUPPORT FOR DUCT MOUNTED
ACROSS ROOF. REFER TO DETAILS AND
SPECIFICATIONS FOR BRACING AND ADDITIONAL
INFORMATION.
4. ROOF MOUNTED FAN TO BE MOUNTED ON VIBRATION
ISOLATION EQUIPMENT SUPPORT. REFER TO DETAILS
AND SPECIFICATIONS FOR BRACING AND ADDITIONAL
INFORMATION.
SHEET KEYNOTES#
FOURTH FLOOR KEY PLAN
N
1. REFER TO M000 FOR MECHANICAL SYMBOLS AND
ABBREVIATIONS.
2. COORDINATE PHASING AND SHUTDOWN FOR SUPPLY
AIR, RETURN AIR, HEATING HOT WATER SUPPLY, AND
HEATING HOT WATER RETURN WITH OWNER.
SHUTDOWN AND REPLACEMENT TO OCCUR AFTER
HOURS OR OVER WEEKEND.
3. PAIN CLINIC - NORTHWEST QUADRANT OF THE FLOOR -
SHALL BE OPERATIONAL AT ALL WORKING DAYS &
HOURS (MON-FRI 7M - 5PM) DURING THE ENTIRE
CONSTRUCTION PERIOD. ANY REQUIRED WORK IN THIS
CLINIC SHALL BE COORDINATED CLOSELY W/ COR.
GENERAL NOTES#
A
2 3 4 5 6
B
C
D
1 2 3 4 5 6
A
B
C
D
VA FORM 08-6231
o n e e ig e fo o t o n e q u a rt e r i n c e fo o t th re e e ig h th s in c e fo o t o n e h a lf in c e fo o t th re e q u a rt e fo o t o n e in c e fo o t o n e a n d o n e h a lf in c h e e fo o t th re e in c h e e fo o t
CONSULTANTS: ARCHITECT/ENGINEERS:
Drawing Title
Office of Construction and Facilities ManagementApproved: Project Director
Project Title
Location
Date Checked Drawn
Dwg.
Drawing Number
Building Number
Project Number
600 EAST 7TH STEET
SIOUX FALLS, SOUTH DAKOTA 57103
605.274.2893
6 SOUTH OLD ORCHARD
ST. LOUIS, MISSOURI 63119
800.404.7677
330 N MEAD
WICHITA, KANSAS 67202
316.262.2500
NOT FOR
CONSTRUCTION
JOHN SOMMERS, PE MO #2015028399
MH102
MECHANICAL NEW WORK PLAN - 4TH
FLOOR - OVERALL
RELOCATE PHYSICAL
MEDICINE & REHAB. TO THE
4TH FLOOR
800 HOSPITAL DRIVE COLUMBIA, MO 65201
02-15-2023
589A4-22-100
BID DOCUMENTS
RLCJES
3/32" = 1'-0"
MECHANICAL NEW WORK PLAN - 4TH FLOOR - OVERALL
# Revision Date
John Ernest Sommers, PE
C
F E
C
FEC
EaFGGaHHbJJbKLLaMNNa H.5Ja F.1 EbMaNb
2.8
3.7
4.5
6.2
5.4
6.7
5.7
5.3
4.6
7.1
3.6
4.1
4.7
5.1
6.1
6.3
5.5
3.1
4.4
PROST. CHIEF
PROST. ASST. CHIEF
PROST. REP
STAFF TLT.
FUME RM.
PLASTER
MAINT.
421A
DUST RM.
STOR.
426A
CLEAN LAB
PER. CLNC. MASSAGE
PER. CLNC. GROUP RM.
HSKPG.
PROST. PURCHASING
FITTING/EXAM RM.
FITTING/EXAM RM.
PROST. WAIT.
CHIRO. EXAM
CHIRO. EXAM
PELVIC
PROST. STOCK RM.
BREAK RM.
WAIT.
455 WC STOR./SHOP
WOMEN'S TLT
MEN'S TLT
MSA CHECKIN/OUT
ANTE
FITTING/EXAM RM.
CORR.
C43
ELEV. LOBBY / CORR.
ELEV. LOBBY
SOILED DISP
401A
NOT IN SCOPE
6" HCS UP &
DN
2" AT.MOS.VENT
TO 6TH FL.
1" MPS(30#)
UP & DN
5"
3"
5" HCR UP
HCR
HCR
TU
4-2-1
TU
4-4-6
TU
4-4-20
TU
4-4-7
TU
4-4-16
TU
4-4-15
TU
4-4-14
TU
4-4-8
TU
4-4-9
TU
4-4-11
TU
4-4-10
TU
4-4-12
TU
4-4-13
TU
4-2-16
TU
4-2-17
TU
4-2-15
TU
4-4-17
TU
4-4-21
TU
4-4-22
TU
4-2-20
TU
4-4-25
TU
4-4-26
TU
4-4-24
TU
4-4-27
TU
4-4-23
EACV
3" HCR DN
3" HCR
1 1/2" HWR
1 1/2" HWS
1 1/4" HWR
1 1/4" HWS
1" HWR
1" HWS
3/4" HWR
3/4" HWS
2 1/2" HWS
2 1/2" HWS
2 1/2" HWR
2" HWS
2" HWR
1 1/4" HWS
1 1/4" HWR
3/4" HWS
3/4" HWR
3/4" HWS
3/4" HWR
3/4" HWS
3/4" HWR
3/4" HWS
3/4" HWR
3/4" HWR
3/4" HWS
3/4" HWS
3/4" HWR
3/4" HWR
3/4" HWS
3/4" HWR
3/4" HWS
3/4" HWS
3/4" HWR
3/4" HWS
3/4" HWR
3/4" HWR
3/4" HWS
3/4" HWR
3/4" HWS 3/4" HWR
3/4" HWS
3/4" HWS
3/4" HWR
3/4" HWS
3/4" HWR
3/4" HWR
3/4" HWS
3/4" HWS
3/4" HWR
3/4" HWS
3/4" HWR
3/4" HWS
3/4" HWR
3/4" HWR
3/4" HWS
3/4" HWS
3/4" HWR
3/4" HWS
3/4" HWR
3/4" HWR
3/4" HWS
3/4" HWS
3/4" HWR
1" HWS
1" HWR
3/4" HWS
3/4" HWR
3/4" HWR
3/4" HWS
1 1/4" HWS
1 1/4" HWR
1 1/4" HWS
1 1/4" HWR
3/4" HWS
3/4" HWR
2 1/2" HCS 2 1/2" HCS 2 1/2" HCS
2 1/2" HCS
2 1/2" HCS
2 1/2" HCS
2 1/2" HCS 2" HCS
2" HCS
2 1/2" HCS
2 1/2" HCS
2 1/2" HCS
2 1/2" HCS
2 1/2" HCS
2 1/2" HCS 2 1/2" HCS
4" HCS
4" HCS
2 32 32 32 3
2 3
2 3
2 3 2 3
2 3
2 3
4 5
EX 1/2" D
EX 1" HCS
EX 1" HCS
EX 1/2" D
EX 1" HCS
EX 1/2" D
EX 1" HCS
EX 1/2" D
EX 1" HCS
EX 1/2" D
EX 1" HCS
EX 1/2" D
EX 1" HCS
EX 1/2" D
EX 1/2" D
EX 1" HCS
EX 1" HCS
EX 1/2" D
EX 1" HCS
EX 1/2" D
1" D 1" D
1" D
1" D
1" D
1" D
1" D
1" D
1" D
1" D
1" D
1" D
1" D
1. INSTALL NEW PIPING FROM FLOOR BELOW TO
DEMARCATION POINT SHOWN. SEE SHEET M-101 FOR
RELATED INFORMATION.
2. CONNECT NEW INDUCTION UNIT SUPPLY PIPING TO
EXISTING RISER AT DEMARCATION POINT SHOWN.
INSTALL NEW INDUCTION UNIT SUPPLY AND
CONDENSATE PIPING PRIOR TO DEMOLITION OF
EXISTING PIPING. SEE DEMOLITION DRAWINGS FOR
RELATED INFORMATION.
3. CONNECT NEW CONDENSATE PIPING TO EXISTING
RISER AT DEMARCATION POINT SHOWN.
4. DISCHARGE CONDENSATE DRAIN INTO MOP SINK.
COORDINATE.
5. CONNECT CONDENSATE DRAIN TO LAVATORY TRAP.
COORDINATE WITH PLUMBING.
SHEET KEYNOTES#
FOURTH FLOOR KEY PLAN
AREA A
N
B
A
1. REFER TO M000 FOR MECHANICAL SYMBOLS AND
ABBREVIATIONS.
2. COORDINATE PHASING AND SHUTDOWN FOR SUPPLY
AIR, RETURN AIR, HEATING HOT WATER SUPPLY, AND
HEATING HOT WATER RETURN WITH OWNER.
SHUTDOWN AND REPLACEMENT TO OCCUR AFTER
HOURS OR OVER WEEKEND.
3. PAIN CLINIC - NORTHWEST QUADRANT OF THE FLOOR -
SHALL BE OPERATIONAL AT ALL WORKING DAYS &
HOURS (MON-FRI 7M - 5PM) DURING THE ENTIRE
CONSTRUCTION PERIOD. ANY REQUIRED WORK IN THIS
CLINIC SHALL BE COORDINATED CLOSELY W/ COR.
GENERAL NOTES#
A
2 3 4 5 6
B
C
D
1 2 3 4 5 6
A
B
C
D
VA FORM 08-6231
o n e e ig e fo o t o n e q u a rt e r i n c e fo o t th re e e ig h th s in c e fo o t o n e h a lf in c e fo o t th re e q u a rt e fo o t o n e in c e fo o t o n e a n d o n e h a lf in c h e e fo o t th re e in c h e e fo o t
CONSULTANTS: ARCHITECT/ENGINEERS:
Drawing Title
Office of Construction and Facilities ManagementApproved: Project Director
Project Title
Location
Date Checked Drawn
Dwg.
Drawing Number
Building Number
Project Number
600 EAST 7TH STEET
SIOUX FALLS, SOUTH DAKOTA 57103
605.274.2893
6 SOUTH OLD ORCHARD
ST. LOUIS, MISSOURI 63119
800.404.7677
330 N MEAD
WICHITA, KANSAS 67202
316.262.2500
NOT FOR
CONSTRUCTION
JOHN SOMMERS, PE MO #2015028399
MP103
MECHANICAL NEW WORK PLAN -
PIPING - 4TH FLOOR - AREA A
RELOCATE PHYSICAL
MEDICINE & REHAB. TO THE
4TH FLOOR
800 HOSPITAL DRIVE COLUMBIA, MO 65201
02-15-2023
589A4-22-100
BID DOCUMENTS
RLCJES
3/16" = 1'-0"
MECHANICAL NEW WORK PLAN - PIPING - 4TH FLOOR - AREA A
# Revision Date
John Ernest Sommers, PE
R
F
F E
C
F E
C
F E
C
T
TT
T
TT
FOURTH FLOOR KEY PLAN
AREA B
N
B
A
EaFGGaHHbJJbKLLaMNNa H.5Ja F.1 EbMaNb
7.3
8.2
9.1
6.7
9.8
8.9
8.3
7.2
7.1
8.0
7.5
CHIRO. EXAM
ACUPUNCTURE
ACUPUNCTURE
PT/OT EXAM
PT/OT EXAM
PELVIC
PELVIC
PT/OT EXAM BARIATRIC
PT/OT STOR.
PT TLT.
PROST. STOCK RM.
PT GYM
AO
OT SUPER.
BREAK RM.
STAFF TLT.
REHAB. COOR.
PSA
464 PT/OT SWAMP
CHIEF PM&R EXAM
WAIT.
OT TRAIN. RM.
OT TLT.
440A
CRASH CART ALCOVE
ELEC.
WC STOR./SHOP
CLEAN LINEN
450A
EQUIP.
CORR.
C43
CORR.
C44
ELEV. LOBBY / CORR.
ELEV. LOBBY
SOILED DISP
401A
TELE HEALTH
EX 6" MPS UP &
DN
EX 8" CWR UP
& DN
EX 3" HWS UP
& DN
EX 3" HWR UP
& DN
EX 8" CWS UP
& DN
4" - 5' 0" LG x 1'-6" VERT.
EXP.LOOP AT CLG
1' - 0" RAD. BEND -
UP & DN
TU
4-2-1
TU
4-2-2
TU
4-2-3
TU
4-2-4
TU
4-2-5
TU
4-2-6
TU
4-2-7
TU
4-2-9
TU
4-2-11
TU
4-2-12
TU
4-2-10
TU
4-2-18 TU
4-2-13
TU
4-4-1
TU
4-4-2
TU
4-4-3
TU
4-4-19
TU
4-4-18
TU
4-4-5
TU
4-4-4
TU
4-4-6
TU
4-2-14
TU
4-2-17
TU
4-2-15
TU
4-2-8
TU
4-4-17
TU
4-2-19
TU
4-4-21
ACU
4-2
EX 1 1/4" EXP
UP & DN
EX 4" MPC UP
& DN
3/4" HWS
3/4" HWR
3/4" HWS
3/4" HWR
1 1/4" HWS
1 1/4" HWR
2 1/2" HWS
2 1/2" HWR
2 1/2" HWR
2 1/2" HWR
2 1/2" HWS
3/4" HWR
3/4" HWS
3/4" HWS
3/4" HWR 3/4" HWS
3/4" HWR
3/4" HWS
3/4" HWR
3/4" HWR
3/4" HWS
3/4" HWS
3/4" HWR
3/4" HWR
3/4" HWS
3/4" HWR
3/4" HWS
3/4" HWS
3/4" HWR
3/4" HWS
3/4" HWR
3/4" HWS
3/4" HWR
3/4" HWR
3/4" HWS
3/4" HWS
3/4" HWR
3/4" HWR
3/4" HWS
3/4" HWS
3/4" HWR
3/4" HWR
3/4" HWS
3/4" HWS
3/4" HWR
3/4" HWR
3/4" HWS
3/4" HWR
3/4" HWS
3/4" HWS
3/4" HWR
3/4" HWS
3/4" HWR
3/4" HWR
3/4" HWS
3/4" HWS
3/4" HWR
3/4" HWR
3/4" HWS
3/4" HWR
3/4" HWS
3/4" HWR
3/4" HWS
3/4" HWR
3/4" HWS
3/4" HWS
3/4" HWR
3/4" HWS
3/4" HWR
3/4" HWR
3/4" HWS
3/4" HWR
3/4" HWS
3/4" HWS
3/4" HWR
3/4" HWR
3/4" HWS
2 1/2" HWS
2 1/2" HWR
1 1/4" HWR
3/4" HWR
1" HWS
1" HWR
2 1/2" HCS
2" HCS
2 1/2" HCS
2" HCS
1 1/2" HCS 2" HCS 1 1/2" HCS 1 1/4" HCS 1 1/4" HCS 1 1/4" HCS 1 1/4" HCS 1 1/2" HCS
1 1/2" HCS
2" HCS
2" HCS
2" HCS
2 3
2 3
2 3
2 3
2 3 2 3 2 3 2 3 2 3 2 3 2 3
EX 1" HCS
EX 1/2" D
EX 1" HCS
EX 1/2" D
EX 1" HCS
EX 1/2" D
EX 1" HCS
EX 1/2" D
EX 1" HCS
EX 1/2" D
EX 1" HCS
EX 1/2" D
EX 1" HCS
EX 1/2" D
EX 1" HCS
EX 1/2" D
EX 1" HCS
EX 1/2" D
EX 1" HCS
EX 1/2" D
EX 1/2" D
EX 1" HCS
1" D
1" D
1" D
1" D 1" D 1" D 1" D 1" D
1" D
1" D
1" D
1. ROUTE REFRIGERANT LINES FROM MINI-SPLIT (ACU-4-2)
TO CONDENSING UNIT (CU-4-2) ON ROOF. SEE SHEET
MH102 FOR ADDITIONAL INFORMATION.
2. CONNECT NEW INDUCTION UNIT SUPPLY PIPING TO
EXISTING RISER AT DEMARCATION POINT SHOWN.
INSTALL NEW INDUCTION UNIT SUPPLY AND
CONDENSATE PIPING PRIOR TO DEMOLITION OF
EXISTING PIPING. SEE DEMOLITION DRAWINGS FOR
RELATED INFORMATION.
3. CONNECT NEW CONDENSATE PIPING TO EXISTING
RISER AT DEMARCATION POINT SHOWN.
SHEET KEYNOTES#
1. REFER TO M000 FOR MECHANICAL SYMBOLS AND
ABBREVIATIONS.
2. COORDINATE PHASING AND SHUTDOWN FOR SUPPLY
AIR, RETURN AIR, HEATING HOT WATER SUPPLY, AND
HEATING HOT WATER RETURN WITH OWNER.
SHUTDOWN AND REPLACEMENT TO OCCUR AFTER
HOURS OR OVER WEEKEND.
3. PAIN CLINIC - NORTHWEST QUADRANT OF THE FLOOR -
SHALL BE OPERATIONAL AT ALL WORKING DAYS &
HOURS (MON-FRI 7M - 5PM) DURING THE ENTIRE
CONSTRUCTION PERIOD. ANY REQUIRED WORK IN THIS
CLINIC SHALL BE COORDINATED CLOSELY W/ COR.
GENERAL NOTES#
A
2 3 4 5 6
B
C
D
1 2 3 4 5 6
A
B
C
D
VA FORM 08-6231
o n e e ig e fo o t o n e q u a rt e r i n c e fo o t th re e e ig h th s in c e fo o t o n e h a lf in c e fo o t th re e q u a rt e fo o t o n e in c e fo o t o n e a n d o n e h a lf in c h e e fo o t th re e in c h e e fo o t
CONSULTANTS: ARCHITECT/ENGINEERS:
Drawing Title
Office of Construction and Facilities ManagementApproved: Project Director
Project Title
Location
Date Checked Drawn
Dwg.
Drawing Number
Building Number
Project Number
600 EAST 7TH STEET
SIOUX FALLS, SOUTH DAKOTA 57103
605.274.2893
6 SOUTH OLD ORCHARD
ST. LOUIS, MISSOURI 63119
800.404.7677
330 N MEAD
WICHITA, KANSAS 67202
316.262.2500
NOT FOR
CONSTRUCTION
JOHN SOMMERS, PE MO #2015028399
MP104
MECHANICAL NEW WORK PLAN -
PIPING - 4TH FLOOR - AREA B
RELOCATE PHYSICAL
MEDICINE & REHAB. TO THE
4TH FLOOR
800 HOSPITAL DRIVE COLUMBIA, MO 65201
02-15-2023
589A4-22-100
BID DOCUMENTS
RLCJES
3/16" = 1'-0"
MECHANICAL NEW WORK PLAN - PIPING - 4TH FLOOR - AREA B
# Revision Date
John Ernest Sommers, PE
C
F E
C
FEC
EaFGGaHHbJJbKLLaMNNa H.5Ja F.1 EbMaNb
2.8
3.7
4.5
6.2
5.4
6.7
5.7
5.3
4.6
7.1
3.6
4.1
4.7
5.1
6.1
6.3
5.5
3.1
4.4
PROST. CHIEF
PROST. ASST. CHIEF
PROST. REP
STAFF TLT.
FUME RM.
PLASTER
MAINT.
421ADUST RM.
STOR.
426A
CLEAN LAB
PER. CLNC. MASSAGE
PER. CLNC. GROUP RM.
HSKPG.
PROST. PURCHASING
FITTING/EXAM RM.
FITTING/EXAM RM.
PROST. WAIT.
410 CHIRO. EXAM
CHIRO. EXAM
ACUPUNCTURE
PELVIC
PROST. STOCK RM.
BREAK RM.
WAIT.
WC STOR./SHOP
WOMEN'S TLT
MEN'S TLT
MSA CHECKIN/OUT
ANTE
FITTING/EXAM RM.
CORR.
C43
ELEV. LOBBY / CORR.
ELEV. LOBBY
SOILED DISP
401A
TU
4-2-1
TU
4-4-6
TU
4-4-20
TU
4-4-7
TU
4-4-16
TU
4-4-15
TU
4-4-14 TU
4-4-8
TU
4-4-9
TU
4-4-11
TU
4-4-10TU
4-4-12
TU
4-4-13
TU
4-2-16
TU
4-2-17
TU
4-2-15
TU
4-4-17
TU
4-4-21
TU
4-4-22
TU
4-2-20
TU
4-4-25
TU
4-4-26
TU
4-4-24
TU
4-4-27
TU
4-4-23
EACV
NOT IN SCOPE
EX 10x12 EA
EX 13ø OA UP EX 15ø OA DN
EX 45x12 RA UP
EX 24ø SA
UP & DN
EX 12x12
EA UP & DN
EX 9x12 EA
UP & DN
EX 14x12
EA UP & DN
EX 26x24 SA
EX 12x10
EA UP & DN
EX 16ø SA UP
EX 22ø SA
UP & DN
(AC-S3)
(AC-S1)
(AC-ER-2)
(AC-ER-5)
(AC-S5)
(AC-S2)
(AC-ER-4)
EXCEPT AS
NOTED
(AC-S4)
(AC-ER-3)
(AC-S2)
EX 30x31 RA
EX 36x30
RA UP & DN
EX 40x22
RA UP & DN
EX 34ø SA
UP & DN
EX 16ø SA UP
EX 24ø SA
UP & DN
EX 16ø
VENT UP &
DN
EX 12ø
VENT UP &
DN
PROST. CHECKIN
405A
E X x E
A
E X x E
A
E X x E
A
E X x E
A
E X x E
A
E X x E
A
28x18 RA x R
A
30x16ø SA x ø
S A x ø
S A x E
A x E
A
16x7 EA 16x7 EA x ø
S A
14x14 RA
39x10ø SA 39x10ø SA
26x16ø SA
26x16ø SA
26x16ø SA x ø
S A x R
A
44x12 RA
20x16 RA 6ø SA
28x7 RA x R
A
28x7 RA x R
A
7ø SA
44x12 RA
EX 20x20 SA UP x ø
S A
20x14 EA x E
A
EX 20x20 RA UP x R
A
12x12 RA
20x8 RA
18x6 RA x R
A
20ø SA
30x12ø SA
30x12ø SA
12ø SA ø
S A
8ø SA
20x10ø SA
20x14 EA x ø
S A x ø
S A
23x10ø SA
12x8 SA
12x5 SA 12x8 SA
12x5 SA
12x8 SA x S
A
18x7 RA x S
A
DN
DN
DNUP
12x8 SA
8x4 EA
48x10 RA x R
A 12x12 RA
S-5
R-12
S-3
R-12
S-4
S-3
R-12
R-12
S-3
S-3
R-12
S-3
S-3
S-3
R-12
S-3
S-3
S-3
D N
R-12
S-5
D N
D N
S-3
S-3
S-3
8x8 RA 8x8 RA x R
A x S
A x S
A
6ø SA
8ø SA
R-12
R-12
S-4
R-12
R-12
S-3
R-12
S-3
R-12
S-3
S-3
S-3
R-12
10x8 RA
6x6 RA
6x6 RA x S
A
R-12
S-5
S-5
S-5
S-5
R-12
R-12 x S
A
12x10 SA
12x8 SA
S-3
S-3
S-3
S-3
S-3
S-3
S-3
S-3
R-12
R-12
R-12
S-3
S-3
R-12
R-12
R-12
DN
UPUP
D N
DN
R-12
CORR.
C46
CORR.
C47
CORR.
C45
CORR.
C41 x R
A x R
A
S-1
S-4
S-3
R-12
R-12
S-4
S-4
S-4
R-12
S-4
S-4
R-12
S-3
D N
DN
U P
8ø SA
39x10ø SA
SD
4-2-2 12ø SA
SD
4-4-1
SD
4-4-2
12x10 SA
12x8 SA x R
A
FSD
4-4-3
FSD
4-4-2
SD
4-2-3
SD
4-2-6
SD
4-2-7
SD
4-2-1
SD
4-2-8
SD
4-2-9
SD
4-2-10
SD
4-2-11
FSD
4-4-1 x R
A
1. ROUTE DUCTWORK FROM 453 – LAB CLEAN RM. TO
EXHAUST FAN (EF-1) ON ROOF. SEE SHEET MH102 FOR
ADDITIONAL INFORMATION.
2. RELOCATE EXISTING DIFFUSER AND FLEX DUCT TO
ALIGN WITH NEW CEILING GRID. SEE MD105 FOR
RELATED INFORMATION.
3. FIELD VERIFY EXISTING DUCTS IN CHASE PRIOR TO
CONSTRUCTION. RECORD DRAWINGS MAY NOT
REPRESENT CURRENT DUCT LOCATIONS.
SHEET KEYNOTES#
FOURTH FLOOR KEY PLAN
AREA A
N
B
A
1. REFER TO M000 FOR MECHANICAL SYMBOLS AND
ABBREVIATIONS.
2. COORDINATE PHASING AND SHUTDOWN FOR SUPPLY
AIR, RETURN AIR, HEATING HOT WATER SUPPLY, AND
HEATING HOT WATER RETURN WITH OWNER.
SHUTDOWN AND REPLACEMENT TO OCCUR AFTER
HOURS OR OVER WEEKEND.
3. PAIN CLINIC - NORTHWEST QUADRANT OF THE FLOOR -
SHALL BE OPERATIONAL AT ALL WORKING DAYS &
HOURS (MON-FRI 7M - 5PM) DURING THE ENTIRE
CONSTRUCTION PERIOD. ANY REQUIRED WORK IN THIS
CLINIC SHALL BE COORDINATED CLOSELY W/ COR.
GENERAL NOTES#
A
2 3 4 5 6
B
C
D
1 2 3 4 5 6
A
B
C
D
VA FORM 08-6231
o n e e ig e fo o t o n e q u a rt e r i n c e fo o t th re e e ig h th s in c e fo o t o n e h a lf in c e fo o t th re e q u a rt e fo o t o n e in c e fo o t o n e a n d o n e h a lf in c h e e fo o t th re e in c h e e fo o t
CONSULTANTS: ARCHITECT/ENGINEERS:
Drawing Title
Office of Construction and Facilities ManagementApproved: Project Director
Project Title
Location
Date Checked Drawn
Dwg.
Drawing Number
Building Number
Project Number
600 EAST 7TH STEET
SIOUX FALLS, SOUTH DAKOTA 57103
605.274.2893
6 SOUTH OLD ORCHARD
ST. LOUIS, MISSOURI 63119
800.404.7677
330 N MEAD
WICHITA, KANSAS 67202
316.262.2500
NOT FOR
CONSTRUCTION
JOHN SOMMERS, PE MO #2015028399
MH105
MECHANICAL NEW WORK PLAN -
DUCTWORK - 4TH FLOOR - AREA A
RELOCATE PHYSICAL
MEDICINE & REHAB. TO THE
4TH FLOOR
800 HOSPITAL DRIVE COLUMBIA, MO 65201
02-15-2023
589A4-22-100
BID DOCUMENTS
RLCJES
3/16" = 1'-0"
MECHANICAL NEW WORK PLAN - DUCTWORK - 4TH FLOOR - AREA A
# Revision Date
John Ernest Sommers, PE
File details come from the government source that posted it. Updated .