Drawings-589A4-22-100-2023-02-15 BID Set- Part9-pages 8.pdf

PDF 5 MB Posted

Attached to
Z2DA-- Relocate Physical Medicine and Rehabilitation to the 4th Floor PN: 589A4-22-100
Solicitation number
36C25523R0072
Issued by

About this file

This document package includes construction drawings and specifications for a federal construction project to relocate a Physical Medicine and Rehabilitation department to the fourth floor of a Veterans Affairs medical center. The project will involve demolishing existing mechanical, ductwork and piping systems and installing new air handling units, terminal units, ductwork, piping for hot water, medical gases and other utilities to serve the new department layout. Detailed drawings show demolition plans, new work plans, schematics and schedules for mechanical systems. Specifications reference compliance with asbestos abatement procedures and protocols for phasing work to maintain operation of an onsite pain clinic. The solicitation number is for the Department of Veterans Affairs project located in Columbia, Missouri, with a bid due date of February 15, 2023.

View the file

Other files

File Type Posted
36C25523R0072 0004.docx DOCX document
AMENDMENT 3 - Drawings.pdf PDF
AMENDMENT 3 - Specifications.pdf PDF
36C25523R0072 0003.docx DOCX document
Prebid-site visit attendee list.pdf PDF
36C25523R0072 0002.docx DOCX document
589A4-22-100 Volume 2 Specifications- 494 pages.pdf PDF
36C25523R0072 0001.docx DOCX document
Drawings-589A4-22-100-2023-02-15 BID Set- Part5-pages 10.pdf PDF
Drawings-589A4-22-100-BID Set -2-15-2023- Part1-7 pages.pdf PDF
Drawings-589A4-22-100-2023-02-15 BID Set -Part4-pages 10.pdf PDF
36C25523R0072.docx DOCX document
Drawings-589A4-22-100-2023-02-15 BID Set - Part12-pages 11.pdf PDF
Drawings-589A4-22-100- 2023-02-15 BID Set-Part2- Pages 6.pdf PDF
Drawings-589A4-22-100-2023-02-15 BID Set- Part13-pages 1.pdf PDF
Drawings-589A4-22-100-2023-02-15 BID Set-Part6-pages 6.pdf PDF
Drawings-589A4-22-100-2023-02-15 BID Set - Part3-pages-12.pdf PDF
Specifications-589A4-22-100-2023-02-15 BID Set - VOL 1- Pages 785.pdf PDF
Drawings-589A4-22-100-2023-02-15 BID Set-Part8-pages 9.pdf PDF
Drawings-589A4-22-100-2023-02-15 BID Set-Part11-pages 9.pdf PDF
Drawings-589A4-22-100-2023-02-15 BID Set-Part10-pages 13.pdf PDF
Drawings-589A4-22-100-2023-02-15 BID set - Part7-pages 9.pdf PDF
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. REFER TO M000 FOR MECHANICAL SYMBOLS AND

ABBREVIATIONS.

2. COORDINATE PHASING AND SHUTDOWN FOR SUPPLY

AIR, RETURN AIR, HEATING HOT WATER SUPPLY, AND

HEATING HOT WATER RETURN WITH OWNER.

SHUTDOWN AND REPLACEMENT TO OCCUR AFTER

HOURS OR OVER WEEKEND.

3. COORDINATE EXISTING CONDITIONS AND ASBESTOS

REMOVAL WITH EXISTING CONDITIONS. FOR EXISTING

ASBESTOS, REFER TO MOST RECENT REPORT

PROVIDED BY OWNER. COORDINATE ALL REMOVAL IN

COMPLIANCE WITH CURRENT VA ASBESTOS

ABATEMENT DESIGN MANUAL. REFER TO

SPECIFICATION 02 82 11 FOR ADDITIONAL

INFORMATION.

4. PAIN CLINIC - NORTHWEST QUADRANT OF THE FLOOR -

SHALL BE OPERATIONAL AT ALL WORKING DAYS &

HOURS (MON-FRI 7M - 5PM) DURING THE ENTIRE

CONSTRUCTION PERIOD. ANY REQUIRED WORK IN THIS

CLINIC SHALL BE COORDINATED CLOSELY W/ COR.

GENERAL NOTES#

EaFGGaHHbJJbKLLaMNNa H.5Ja F.1 EbMaNb

2.8

3.7

4.5

6.2

5.4

6.7

5.7

5.3

4.6

7.1

3.6

4.1

4.7

5.1

6.1

6.3

5.5

3.1

4.4

8x4

16x6 x

12x4

6x6

8x4

6x6

6x4

6x6

11x6

6x6

9x6

6x6

6x4

6x6

10x8

8x7

8x6

14x8

6x4

8ø 8ø

8x4 x x x x x

10x9

10x6

15ø

10x4

EX 15x25

7x6

6x7 6x7 6x7 6x7

9ø 10x4

16x6

10x4 9x4

11x4 ø

12x5

6x4

9x4

6x6

6x4

9x4

6x4

10x4

10x4 12x5

10x4

10x4

6x4

12x8 x

6x6

30x11

17x11 x

6x4

6x4 6x4

6x4

6x4

6x4

9x6

11x6

6x4 13x6

7x6

6x5

6x4

16x6

6x5

10x6

9x5

14ø

13ø

10ø

12x6

9x4 9x6

6x4

9x4

14x8

15x6

7x6

12x4

6x6

8x4

6x4

6x6

11ø

29x6 1 x

6x5

10x6

13x6

13ø

16ø

22x10

8x4

11x5

12x4

6x4

6x4 6x4

6x4

6x6 x

14x10

14x8

6x6

6x6

18x7

8x5

6x4

6x4 9x5

12x7 12x7

6x8

6x6

8x6 6x6

6x4

6x4

EX 45x12 RA UP

EX 24ø SA

UP & DN

EX 12x12

EA UP & DN

EX 9x12 EA

UP & DN

EX 14x12

EA UP & DN

EX 16ø

VENT UP &

DN

EX 26x24 SA

EX 12x10

EA UP & DN

EX 10x12 EA

EX 10x12 EA

EX 10x12 EA

EX 10x12 EA

EX 10x12 EA

EX 10x12 EA

EX 16ø SA UP

EX 22ø SA

UP & DN

EX 13ø OA UP

EX 15ø OA DN

(AC-S3)

(AC-S1)

(AC-ER-2)

(AC-ER-5)

(AC-S5)

(AC-S2)

(AC-ER-4)

EXCEPT AS

NOTED

(AC-S4)

(AC-ER-3)

(AC-S2)

(E-3)

17x14

17x13

NOT IN SCOPE

EX 30x31 RA

EX 36x30

RA UP & DN

EX 40x22

RA UP & DN

EX 34ø SA

UP & DN

EX 16ø SA UP

EX 24ø SA

UP & DN

EX 12ø

VENT UP &

DN

22 2 2 2 2

EX 20x20 SA

EX 20x20 RA

1. DEMOLISH ALL EXISTING TERMINAL UNITS AND

ASSOCIATED DUCTWORK, CONTROLS, AND

ACCESSORIES BACK TO DEMARCATION POINT SHOWN.

2. EXISTING INDUCTION UNIT TO BE REMOVED. REMOVE

CONTROLS AND ACCESSORIES. REMOVE DUCT BACK

TO TOP OF 5TH FLOOR SLAB AND PROVIDE CAP.

REMOVE ALL CONTROL WIRING BACK TO CENTRAL

PANEL IN 401C. REMOVE ALL PNEUMATIC CONTROL

TUBING.

3. RELOCATE EXISTING DIFFUSER AND FLEX DUCT TO

ALIGN WITH NEW CEILING GRID. SEE MH105 FOR

RELATED INFORMATION.

4. FIELD VERIFY EXISTING DUCT ROUTING PRIOR TO

CONSTRUCTION. RECORD DRAWINGS MAY NOT

REPRESENT CURRENT DUCT ROUTING.

5. DEMOLISH EXISTING DUCTWORK IN CHASE FROM 4TH

FLOOR UP TO THE FLOOR ABOVE. VERIFY DUCTWORK

IS INACTIVE WITH OWNER PRIOR TO DEMOLITION.

SHEET KEYNOTES#

FOURTH FLOOR KEY PLAN

AREA A

N

B

A

A

2 3 4 5 6

B

C

D

1 2 3 4 5 6

A

B

C

D

VA FORM 08-6231

o n e e ig h th in c o n e fo o t o n e q u a rt e r i n c e fo o t th re e e ig h th s in c e fo o t o n e h a lf in c e fo o t th re e q u a rt e rs e fo o t o n e in c e fo o t o n e a n d o n e h a lf in c h e s e fo o t th re e in c h e e fo o t

CONSULTANTS: ARCHITECT/ENGINEERS:

Drawing Title

Office of Construction and Facilities ManagementApproved: Project Director

Project Title

Location

Date Checked Drawn

Dwg.

Drawing Number

Building Number

Project Number

600 EAST 7TH STEET

SIOUX FALLS, SOUTH DAKOTA 57103

605.274.2893

6 SOUTH OLD ORCHARD

ST. LOUIS, MISSOURI 63119

800.404.7677

330 N MEAD

WICHITA, KANSAS 67202

316.262.2500

NOT FOR

CONSTRUCTION

JOHN SOMMERS, PE MO #2015028399

MD105

MECHANICAL DEMOLITION PLAN -

DUCTWORK - 4TH FLOOR - AREA A

RELOCATE PHYSICAL

MEDICINE & REHAB. TO THE

4TH FLOOR

800 HOSPITAL DRIVE COLUMBIA, MO 65201

02-15-2023

589A4-22-100

BID DOCUMENTS

RLCJES

3/16" = 1'-0"

MECHANICAL DEMOLITION PLAN - DUCTWORK - 4TH FLOOR - AREA A

# Revision Date

John Ernest Sommers, PE

PE-2015028399

02/13/2023

FE

F E

T

TT

T

TT

1. REFER TO M000 FOR MECHANICAL SYMBOLS AND

ABBREVIATIONS.

2. COORDINATE PHASING AND SHUTDOWN FOR SUPPLY

AIR, RETURN AIR, HEATING HOT WATER SUPPLY, AND

HEATING HOT WATER RETURN WITH OWNER.

SHUTDOWN AND REPLACEMENT TO OCCUR AFTER

HOURS OR OVER WEEKEND.

3. COORDINATE EXISTING CONDITIONS AND ASBESTOS

REMOVAL WITH EXISTING CONDITIONS. FOR EXISTING

ASBESTOS, REFER TO MOST RECENT REPORT

PROVIDED BY OWNER. COORDINATE ALL REMOVAL IN

COMPLIANCE WITH CURRENT VA ASBESTOS

ABATEMENT DESIGN MANUAL. REFER TO

SPECIFICATION 02 82 11 FOR ADDITIONAL

INFORMATION.

4. PAIN CLINIC - NORTHWEST QUADRANT OF THE FLOOR -

SHALL BE OPERATIONAL AT ALL WORKING DAYS &

HOURS (MON-FRI 7M - 5PM) DURING THE ENTIRE

CONSTRUCTION PERIOD. ANY REQUIRED WORK IN THIS

CLINIC SHALL BE COORDINATED CLOSELY W/ COR.

GENERAL NOTES#EaFGGaHHbJJbKLLaMNNa H.5Ja F.1 EbMaNb

7.3

8.2

9.1

6.7

9.8

8.9

8.3

7.2

7.1

8.0

7.5

12x4

8x4

6x4

6x6

6x6

8x4

6x4

6x4

16x5

12x5 24x14 x

12x4

6x6

8x4 x x 4 17x11 x

13ø 12x6

9x4 9x6

6x4

9x4

14x8

29x6

15x6

27x6

8ø

10x6

9x5 7ø

6x5

9ø

6x4 6x6

6x4

6x6 6x4

9x5

24x15

19x7

13x5

13x7

6x5

12x4

6x4

6x4

6x4 6x6

9x5

9x6

8x5 6x4

12x4

12x8

5x4

7x6

7x6

6x6 6x4

6x4

9x5

6x4 6x4

8x4

12x6

12x8

6x4 6x4 6x4

6x4 6x6

8x4

14x8

11x4

6x4 6x4

6ø

6x4

6x4 6x6

9x5 9x5

19x8

10x4

6x5

6x5

9x6 7ø

22x14 x

16x5

6x6

27x6

8ø

9ø

8x4

6x4 6x6 6x4

12x5

6x4

12x4

6x6

8x4

6x4

6x6

12x4

6x6

8x4

11ø

29x6

15x6 x

6x4

6x5

10x6

13x6

13ø

16ø

11x5

6x6

10x4 10x4

10x6 6x5

12x8

14x10

14x8

6x6

6x6

6x4 6x4

11x4

6x6

40x24 UP &

DN

34x24 UP &

DN

40x24 EA UP

34x20 EA DN

(AC-ER 7)

(AC-ER 8)

(E-2) 2735 CFM

8605 CFM

(E-1)

18x14

17x14

1 1

22222222222222

FOURTH FLOOR KEY PLAN

AREA B

N

B

A

1. DEMOLISH ALL EXISTING TERMINAL UNITS AND

ASSOCIATED DUCTWORK, CONTROLS, AND

ACCESSORIES BACK TO DEMARCATION POINT SHOWN.

2. EXISTING INDUCTION UNIT TO BE REMOVED. REMOVE

CONTROLS AND ACCESSORIES. REMOVE DUCT BACK

TO TOP OF 5TH FLOOR SLAB AND PROVIDE CAP.

REMOVE ALL CONTROL WIRING BACK TO CENTRAL

PANEL IN 401C. REMOVE ALL PNEUMATIC CONTROL

TUBING.

3. DEMOLISH EXISTING DUCTWORK IN CHASE FROM 4TH

FLOOR UP TO THE FLOOR ABOVE. VERIFY DUCTWORK

IS INACTIVE WITH OWNER PRIOR TO DEMOLITION.

SHEET KEYNOTES#

A

2 3 4 5 6

B

C

D

1 2 3 4 5 6

A

B

C

D

VA FORM 08-6231

o n e e ig e fo o t o n e q u a rt e r i n c e fo o t th re e e ig h th s in c e fo o t o n e h a lf in c e fo o t th re e q u a rt e fo o t o n e in c e fo o t o n e a n d o n e h a lf in c h e e fo o t th re e in c h e e fo o t

CONSULTANTS: ARCHITECT/ENGINEERS:

Drawing Title

Office of Construction and Facilities ManagementApproved: Project Director

Project Title

Location

Date Checked Drawn

Dwg.

Drawing Number

Building Number

Project Number

600 EAST 7TH STEET

SIOUX FALLS, SOUTH DAKOTA 57103

605.274.2893

6 SOUTH OLD ORCHARD

ST. LOUIS, MISSOURI 63119

800.404.7677

330 N MEAD

WICHITA, KANSAS 67202

316.262.2500

NOT FOR

CONSTRUCTION

JOHN SOMMERS, PE MO #2015028399

MD106

MECHANICAL DEMOLITION PLAN -

DUCTWORK - 4TH FLOOR - AREA B

RELOCATE PHYSICAL

MEDICINE & REHAB. TO THE

4TH FLOOR

800 HOSPITAL DRIVE COLUMBIA, MO 65201

02-15-2023

589A4-22-100

BID DOCUMENTS

RLCJES

3/16" = 1'-0"

MECHANICAL DEMOLITION PLAN - DUCTWORK - 4TH FLOOR - AREA B

# Revision Date

John Ernest Sommers, PE

EaFGGaHHbJJbKLLaMNNa H.5Ja F.1 EbMaNb

4.5

6.2

5.4

6.7

9.8

8.9

8.3

7.2

7.1

3.6

4.1

4.7

5.1

6.1

6.3

5.5

3.1

AC-S

AC-S

AHU

XAC

TEMP

E

AC-ER

E

E

E

E

E

HRU

E

EX 108x24 SA

E X ø

S A

E X x R

A

E X ø

S A

EX 24ø SA

E X ø

S A

E X ø

S A

E X ø

S A

E X x R

A

EX 30x48 RA

EX 60x40 RA

EX 48x28 RA

EX 56x24 RA

EX 44x24 SA EX 20x20 RA

EX 20x20 RA

EX 48x28 RA

EX 44x24 SA

EX 44x24 SA

EX 36x30 RA EX 108x22 RA

EX 30x48 RA

EX 30ø SA

16ø

EX 20x20 SA

EX 20x20 SA

TOP

BOTTOM

TOP

BOTTOM

EX 20x20 SA DN EX 20x20 RA DN

EX 42x32

SA UP & DN

EX 36x36

RA UP & DN

DN

EX 24x56 RA EX 28ø SA

EX 36x30 RA

16ø

EX 12x10

EA UP & DN

EX 14x24

EA UP & DN

EX 12x12

EA UP & DN

EX 12x18

EA UP & DN

EX 22ø SA

UP & DN

EX 14x12

EA UP & DN

TYP.

UNLESS

NOTED EX 40x22

RA UP & DN

EX 34ø SA

UP & DN

EX 24ø SA DN EX 12ø

VENT UP &

DN

EX 30x31

RA UP & DN

EX 24ø SA DN

EX 36x30 RA DN

EX 24ø SA DN

EX 24ø SA DN

EX 16ø

VENT UP &

DN

EX 56x24 RA DN

EX 17ø SA DN

EX 17ø SA DN

E

EX 96x16 SA

BOTTOM

TOP

EX 36x30 RA

16ø

EX 60x60 SA

EX 34x34 SA

UP

EX 30ø SA

DN

EX 34x34 SA

36x36 RA x R

A

36x36 RA

30x24 RA 54x24 RA DN

1. REFER TO M000 FOR MECHANICAL SYMBOLS AND

ABBREVIATIONS.

2. COORDINATE PHASING AND SHUTDOWN FOR SUPPLY

AIR, RETURN AIR, HEATING HOT WATER SUPPLY, AND

HEATING HOT WATER RETURN WITH OWNER.

SHUTDOWN AND REPLACEMENT TO OCCUR AFTER

HOURS OR OVER WEEKEND.

3. COORDINATE EXISTING CONDITIONS AND ASBESTOS

REMOVAL WITH EXISTING CONDITIONS. FOR EXISTING

ASBESTOS, REFER TO MOST RECENT REPORT

PROVIDED BY OWNER. COORDINATE ALL REMOVAL IN

COMPLIANCE WITH CURRENT VA ASBESTOS

ABATEMENT DESIGN MANUAL. REFER TO

SPECIFICATION 02 82 11 FOR ADDITIONAL

INFORMATION.

4. PAIN CLINIC - NORTHWEST QUADRANT OF THE FLOOR -

SHALL BE OPERATIONAL AT ALL WORKING DAYS &

HOURS (MON-FRI 7M - 5PM) DURING THE ENTIRE

CONSTRUCTION PERIOD. ANY REQUIRED WORK IN THIS

CLINIC SHALL BE COORDINATED CLOSELY W/ COR.

GENERAL NOTES#

1. DEMOLISH EXISTING DUCTWORK TO DEMARCATION

POINT SHOWN.

2. REMOVE INSULATION FROM DUCTWORK ON ROOF.

PREPARE FOR INSTALLATION OF NEW INSULATION. SEE

NEW WORK FOR RELATED INFORMATION.

SHEET KEYNOTES#

A

2 3 4 5 6

B

C

D

1 2 3 4 5 6

A

B

C

D

VA FORM 08-6231

o n e e ig e fo o t o n e q u a rt e r i n c e fo o t th re e e ig h th s in c e fo o t o n e h a lf in c e fo o t th re e q u a rt e fo o t o n e in c e fo o t o n e a n d o n e h a lf in c h e e fo o t th re e in c h e e fo o t

CONSULTANTS: ARCHITECT/ENGINEERS:

Drawing Title

Office of Construction and Facilities ManagementApproved: Project Director

Project Title

Location

Date Checked Drawn

Dwg.

Drawing Number

Building Number

Project Number

600 EAST 7TH STEET

SIOUX FALLS, SOUTH DAKOTA 57103

605.274.2893

6 SOUTH OLD ORCHARD

ST. LOUIS, MISSOURI 63119

800.404.7677

330 N MEAD

WICHITA, KANSAS 67202

316.262.2500

NOT FOR

CONSTRUCTION

JOHN SOMMERS, PE MO #2015028399

MD107

MECHANICAL DEMOLITION PLAN -

DUCTWORK - LOWER PENTHOUSE

RELOCATE PHYSICAL

MEDICINE & REHAB. TO THE

4TH FLOOR

800 HOSPITAL DRIVE COLUMBIA, MO 65201

02-15-2023

589A4-22-100

BID DOCUMENTS

RLCJES

1/8" = 1'-0"

MECHANICAL DEMOLITION PLAN - DUCTWORK - LOWER PENTHOUSE

# Revision Date

John Ernest Sommers, PE

FEC

FEC

F E

C

ABCDEEaFGGaHJJbK BaBbH.5Ja F.1 Eb Aa

2.8

3.7

6.2

5.4

5.7

5.3

4.6

3.6

4.1

4.7

5.1

6.1

6.3

1.9

5.5

1.1

3.1

4.4

NOT IN SCOPE

3" HCR UP

EX 1" MPS

EX 2" V

3" HCR

1. VERIFY EXISTING CONDITIONS PRIOR TO

CONSTRUCTION.

2. INSTALL NEW PIPING FROM FLOOR ABOVE TO

DEMARCATION POINT SHOWN.

SHEET KEYNOTES#

1. REFER TO M000 FOR MECHANICAL SYMBOLS AND

ABBREVIATIONS.

2. COORDINATE PHASING AND SHUTDOWN FOR SUPPLY

AIR, RETURN AIR, HEATING HOT WATER SUPPLY, AND

HEATING HOT WATER RETURN WITH OWNER.

SHUTDOWN AND REPLACEMENT TO OCCUR AFTER

HOURS OR OVER WEEKEND.

3. PAIN CLINIC - NORTHWEST QUADRANT OF THE FLOOR -

SHALL BE OPERATIONAL AT ALL WORKING DAYS &

HOURS (MON-FRI 7M - 5PM) DURING THE ENTIRE

CONSTRUCTION PERIOD. ANY REQUIRED WORK IN THIS

CLINIC SHALL BE COORDINATED CLOSELY W/ COR.

GENERAL NOTES#

A

2 3 4 5 6

B

C

D

1 2 3 4 5 6

A

B

C

D

VA FORM 08-6231

o n e e ig e fo o t o n e q u a rt e r i n c e fo o t th re e e ig h th s in c e fo o t o n e h a lf in c e fo o t th re e q u a rt e fo o t o n e in c e fo o t o n e a n d o n e h a lf in c h e e fo o t th re e in c h e e fo o t

CONSULTANTS: ARCHITECT/ENGINEERS:

Drawing Title

Office of Construction and Facilities ManagementApproved: Project Director

Project Title

Location

Date Checked Drawn

Dwg.

Drawing Number

Building Number

Project Number

600 EAST 7TH STEET

SIOUX FALLS, SOUTH DAKOTA 57103

605.274.2893

6 SOUTH OLD ORCHARD

ST. LOUIS, MISSOURI 63119

800.404.7677

330 N MEAD

WICHITA, KANSAS 67202

316.262.2500

NOT FOR

CONSTRUCTION

JOHN SOMMERS, PE MO #2015028399

MP101

MECHANICAL NEW WORK PLAN -

PIPING - 3RD FLOOR - AREA A

RELOCATE PHYSICAL

MEDICINE & REHAB. TO THE

4TH FLOOR

800 HOSPITAL DRIVE COLUMBIA, MO 65201

02-15-2023

589A4-22-100

BID DOCUMENTS

RLCJES

1/8" = 1'-0"

MECHANICAL NEW WORK PLAN - PIPING - 3RD FLOOR - AREA A

# Revision Date

John Ernest Sommers, PE

R E

F

F E

C

F E

C

F E

C

F E

C

F E

C

FEC

T

T

T

T

ABCDEEaFGGaHHbJJbKLLaMNNa BaBbH.5Ja F.1 Eb AaMaNb

2.8

3.7

7.3

8.2

9.1

10.4

4.5

6.2

5.4

6.7

5.7

5.3

4.6

10.2

9.8

8.9

8.3

7.2

7.1

3.6

4.1

4.7

5.1

6.1

6.3

8.0

1.9

5.5

7.5

1.1

3.1

4.4

EF

CU

4-2

ROOF TOP EQUIPMENT

EXISTING TO REMAIN

HE

HE

HE

HE

HE

HE

E

MP103

MP104

1 1 M-107

NOT IN SCOPE

x E

A

20x14 EA

1. ROUTE DUCTWORK FROM 453 – LAB CLEAN RM. TO

EXHAUST FAN. SEE SHEET MH-104 FOR ADDITIONAL

INFORMATION.

2. ROUTE REFRIGERANT LINES FROM MINI-SPLIT (ACU-4-2)

TO CONDENSING UNITS (CU-4-2). SEE SHEET MP104

FOR ADDITIONAL INFORMATION.

3. PROVIDE ROOF SUPPORT FOR DUCT MOUNTED

ACROSS ROOF. REFER TO DETAILS AND

SPECIFICATIONS FOR BRACING AND ADDITIONAL

INFORMATION.

4. ROOF MOUNTED FAN TO BE MOUNTED ON VIBRATION

ISOLATION EQUIPMENT SUPPORT. REFER TO DETAILS

AND SPECIFICATIONS FOR BRACING AND ADDITIONAL

INFORMATION.

SHEET KEYNOTES#

FOURTH FLOOR KEY PLAN

N

1. REFER TO M000 FOR MECHANICAL SYMBOLS AND

ABBREVIATIONS.

2. COORDINATE PHASING AND SHUTDOWN FOR SUPPLY

AIR, RETURN AIR, HEATING HOT WATER SUPPLY, AND

HEATING HOT WATER RETURN WITH OWNER.

SHUTDOWN AND REPLACEMENT TO OCCUR AFTER

HOURS OR OVER WEEKEND.

3. PAIN CLINIC - NORTHWEST QUADRANT OF THE FLOOR -

SHALL BE OPERATIONAL AT ALL WORKING DAYS &

HOURS (MON-FRI 7M - 5PM) DURING THE ENTIRE

CONSTRUCTION PERIOD. ANY REQUIRED WORK IN THIS

CLINIC SHALL BE COORDINATED CLOSELY W/ COR.

GENERAL NOTES#

A

2 3 4 5 6

B

C

D

1 2 3 4 5 6

A

B

C

D

VA FORM 08-6231

o n e e ig e fo o t o n e q u a rt e r i n c e fo o t th re e e ig h th s in c e fo o t o n e h a lf in c e fo o t th re e q u a rt e fo o t o n e in c e fo o t o n e a n d o n e h a lf in c h e e fo o t th re e in c h e e fo o t

CONSULTANTS: ARCHITECT/ENGINEERS:

Drawing Title

Office of Construction and Facilities ManagementApproved: Project Director

Project Title

Location

Date Checked Drawn

Dwg.

Drawing Number

Building Number

Project Number

600 EAST 7TH STEET

SIOUX FALLS, SOUTH DAKOTA 57103

605.274.2893

6 SOUTH OLD ORCHARD

ST. LOUIS, MISSOURI 63119

800.404.7677

330 N MEAD

WICHITA, KANSAS 67202

316.262.2500

NOT FOR

CONSTRUCTION

JOHN SOMMERS, PE MO #2015028399

MH102

MECHANICAL NEW WORK PLAN - 4TH

FLOOR - OVERALL

RELOCATE PHYSICAL

MEDICINE & REHAB. TO THE

4TH FLOOR

800 HOSPITAL DRIVE COLUMBIA, MO 65201

02-15-2023

589A4-22-100

BID DOCUMENTS

RLCJES

3/32" = 1'-0"

MECHANICAL NEW WORK PLAN - 4TH FLOOR - OVERALL

# Revision Date

John Ernest Sommers, PE

C

F E

C

FEC

EaFGGaHHbJJbKLLaMNNa H.5Ja F.1 EbMaNb

2.8

3.7

4.5

6.2

5.4

6.7

5.7

5.3

4.6

7.1

3.6

4.1

4.7

5.1

6.1

6.3

5.5

3.1

4.4

PROST. CHIEF

PROST. ASST. CHIEF

PROST. REP

STAFF TLT.

FUME RM.

PLASTER

MAINT.

421A

DUST RM.

STOR.

426A

CLEAN LAB

PER. CLNC. MASSAGE

PER. CLNC. GROUP RM.

HSKPG.

PROST. PURCHASING

FITTING/EXAM RM.

FITTING/EXAM RM.

PROST. WAIT.

CHIRO. EXAM

CHIRO. EXAM

PELVIC

PROST. STOCK RM.

BREAK RM.

WAIT.

455 WC STOR./SHOP

WOMEN'S TLT

MEN'S TLT

MSA CHECKIN/OUT

ANTE

FITTING/EXAM RM.

CORR.

C43

ELEV. LOBBY / CORR.

ELEV. LOBBY

SOILED DISP

401A

NOT IN SCOPE

6" HCS UP &

DN

2" AT.MOS.VENT

TO 6TH FL.

1" MPS(30#)

UP & DN

5"

3"

5" HCR UP

HCR

HCR

TU

4-2-1

TU

4-4-6

TU

4-4-20

TU

4-4-7

TU

4-4-16

TU

4-4-15

TU

4-4-14

TU

4-4-8

TU

4-4-9

TU

4-4-11

TU

4-4-10

TU

4-4-12

TU

4-4-13

TU

4-2-16

TU

4-2-17

TU

4-2-15

TU

4-4-17

TU

4-4-21

TU

4-4-22

TU

4-2-20

TU

4-4-25

TU

4-4-26

TU

4-4-24

TU

4-4-27

TU

4-4-23

EACV

3" HCR DN

3" HCR

1 1/2" HWR

1 1/2" HWS

1 1/4" HWR

1 1/4" HWS

1" HWR

1" HWS

3/4" HWR

3/4" HWS

2 1/2" HWS

2 1/2" HWS

2 1/2" HWR

2" HWS

2" HWR

1 1/4" HWS

1 1/4" HWR

3/4" HWS

3/4" HWR

3/4" HWS

3/4" HWR

3/4" HWS

3/4" HWR

3/4" HWS

3/4" HWR

3/4" HWR

3/4" HWS

3/4" HWS

3/4" HWR

3/4" HWR

3/4" HWS

3/4" HWR

3/4" HWS

3/4" HWS

3/4" HWR

3/4" HWS

3/4" HWR

3/4" HWR

3/4" HWS

3/4" HWR

3/4" HWS 3/4" HWR

3/4" HWS

3/4" HWS

3/4" HWR

3/4" HWS

3/4" HWR

3/4" HWR

3/4" HWS

3/4" HWS

3/4" HWR

3/4" HWS

3/4" HWR

3/4" HWS

3/4" HWR

3/4" HWR

3/4" HWS

3/4" HWS

3/4" HWR

3/4" HWS

3/4" HWR

3/4" HWR

3/4" HWS

3/4" HWS

3/4" HWR

1" HWS

1" HWR

3/4" HWS

3/4" HWR

3/4" HWR

3/4" HWS

1 1/4" HWS

1 1/4" HWR

1 1/4" HWS

1 1/4" HWR

3/4" HWS

3/4" HWR

2 1/2" HCS 2 1/2" HCS 2 1/2" HCS

2 1/2" HCS

2 1/2" HCS

2 1/2" HCS

2 1/2" HCS 2" HCS

2" HCS

2 1/2" HCS

2 1/2" HCS

2 1/2" HCS

2 1/2" HCS

2 1/2" HCS

2 1/2" HCS 2 1/2" HCS

4" HCS

4" HCS

2 32 32 32 3

2 3

2 3

2 3 2 3

2 3

2 3

4 5

EX 1/2" D

EX 1" HCS

EX 1" HCS

EX 1/2" D

EX 1" HCS

EX 1/2" D

EX 1" HCS

EX 1/2" D

EX 1" HCS

EX 1/2" D

EX 1" HCS

EX 1/2" D

EX 1" HCS

EX 1/2" D

EX 1/2" D

EX 1" HCS

EX 1" HCS

EX 1/2" D

EX 1" HCS

EX 1/2" D

1" D 1" D

1" D

1" D

1" D

1" D

1" D

1" D

1" D

1" D

1" D

1" D

1" D

1. INSTALL NEW PIPING FROM FLOOR BELOW TO

DEMARCATION POINT SHOWN. SEE SHEET M-101 FOR

RELATED INFORMATION.

2. CONNECT NEW INDUCTION UNIT SUPPLY PIPING TO

EXISTING RISER AT DEMARCATION POINT SHOWN.

INSTALL NEW INDUCTION UNIT SUPPLY AND

CONDENSATE PIPING PRIOR TO DEMOLITION OF

EXISTING PIPING. SEE DEMOLITION DRAWINGS FOR

RELATED INFORMATION.

3. CONNECT NEW CONDENSATE PIPING TO EXISTING

RISER AT DEMARCATION POINT SHOWN.

4. DISCHARGE CONDENSATE DRAIN INTO MOP SINK.

COORDINATE.

5. CONNECT CONDENSATE DRAIN TO LAVATORY TRAP.

COORDINATE WITH PLUMBING.

SHEET KEYNOTES#

FOURTH FLOOR KEY PLAN

AREA A

N

B

A

1. REFER TO M000 FOR MECHANICAL SYMBOLS AND

ABBREVIATIONS.

2. COORDINATE PHASING AND SHUTDOWN FOR SUPPLY

AIR, RETURN AIR, HEATING HOT WATER SUPPLY, AND

HEATING HOT WATER RETURN WITH OWNER.

SHUTDOWN AND REPLACEMENT TO OCCUR AFTER

HOURS OR OVER WEEKEND.

3. PAIN CLINIC - NORTHWEST QUADRANT OF THE FLOOR -

SHALL BE OPERATIONAL AT ALL WORKING DAYS &

HOURS (MON-FRI 7M - 5PM) DURING THE ENTIRE

CONSTRUCTION PERIOD. ANY REQUIRED WORK IN THIS

CLINIC SHALL BE COORDINATED CLOSELY W/ COR.

GENERAL NOTES#

A

2 3 4 5 6

B

C

D

1 2 3 4 5 6

A

B

C

D

VA FORM 08-6231

o n e e ig e fo o t o n e q u a rt e r i n c e fo o t th re e e ig h th s in c e fo o t o n e h a lf in c e fo o t th re e q u a rt e fo o t o n e in c e fo o t o n e a n d o n e h a lf in c h e e fo o t th re e in c h e e fo o t

CONSULTANTS: ARCHITECT/ENGINEERS:

Drawing Title

Office of Construction and Facilities ManagementApproved: Project Director

Project Title

Location

Date Checked Drawn

Dwg.

Drawing Number

Building Number

Project Number

600 EAST 7TH STEET

SIOUX FALLS, SOUTH DAKOTA 57103

605.274.2893

6 SOUTH OLD ORCHARD

ST. LOUIS, MISSOURI 63119

800.404.7677

330 N MEAD

WICHITA, KANSAS 67202

316.262.2500

NOT FOR

CONSTRUCTION

JOHN SOMMERS, PE MO #2015028399

MP103

MECHANICAL NEW WORK PLAN -

PIPING - 4TH FLOOR - AREA A

RELOCATE PHYSICAL

MEDICINE & REHAB. TO THE

4TH FLOOR

800 HOSPITAL DRIVE COLUMBIA, MO 65201

02-15-2023

589A4-22-100

BID DOCUMENTS

RLCJES

3/16" = 1'-0"

MECHANICAL NEW WORK PLAN - PIPING - 4TH FLOOR - AREA A

# Revision Date

John Ernest Sommers, PE

R

F

F E

C

F E

C

F E

C

T

TT

T

TT

FOURTH FLOOR KEY PLAN

AREA B

N

B

A

EaFGGaHHbJJbKLLaMNNa H.5Ja F.1 EbMaNb

7.3

8.2

9.1

6.7

9.8

8.9

8.3

7.2

7.1

8.0

7.5

CHIRO. EXAM

ACUPUNCTURE

ACUPUNCTURE

PT/OT EXAM

PT/OT EXAM

PELVIC

PELVIC

PT/OT EXAM BARIATRIC

PT/OT STOR.

PT TLT.

PROST. STOCK RM.

PT GYM

AO

OT SUPER.

BREAK RM.

STAFF TLT.

REHAB. COOR.

PSA

464 PT/OT SWAMP

CHIEF PM&R EXAM

WAIT.

OT TRAIN. RM.

OT TLT.

440A

CRASH CART ALCOVE

ELEC.

WC STOR./SHOP

CLEAN LINEN

450A

EQUIP.

CORR.

C43

CORR.

C44

ELEV. LOBBY / CORR.

ELEV. LOBBY

SOILED DISP

401A

TELE HEALTH

EX 6" MPS UP &

DN

EX 8" CWR UP

& DN

EX 3" HWS UP

& DN

EX 3" HWR UP

& DN

EX 8" CWS UP

& DN

4" - 5' 0" LG x 1'-6" VERT.

EXP.LOOP AT CLG

1' - 0" RAD. BEND -

UP & DN

TU

4-2-1

TU

4-2-2

TU

4-2-3

TU

4-2-4

TU

4-2-5

TU

4-2-6

TU

4-2-7

TU

4-2-9

TU

4-2-11

TU

4-2-12

TU

4-2-10

TU

4-2-18 TU

4-2-13

TU

4-4-1

TU

4-4-2

TU

4-4-3

TU

4-4-19

TU

4-4-18

TU

4-4-5

TU

4-4-4

TU

4-4-6

TU

4-2-14

TU

4-2-17

TU

4-2-15

TU

4-2-8

TU

4-4-17

TU

4-2-19

TU

4-4-21

ACU

4-2

EX 1 1/4" EXP

UP & DN

EX 4" MPC UP

& DN

3/4" HWS

3/4" HWR

3/4" HWS

3/4" HWR

1 1/4" HWS

1 1/4" HWR

2 1/2" HWS

2 1/2" HWR

2 1/2" HWR

2 1/2" HWR

2 1/2" HWS

3/4" HWR

3/4" HWS

3/4" HWS

3/4" HWR 3/4" HWS

3/4" HWR

3/4" HWS

3/4" HWR

3/4" HWR

3/4" HWS

3/4" HWS

3/4" HWR

3/4" HWR

3/4" HWS

3/4" HWR

3/4" HWS

3/4" HWS

3/4" HWR

3/4" HWS

3/4" HWR

3/4" HWS

3/4" HWR

3/4" HWR

3/4" HWS

3/4" HWS

3/4" HWR

3/4" HWR

3/4" HWS

3/4" HWS

3/4" HWR

3/4" HWR

3/4" HWS

3/4" HWS

3/4" HWR

3/4" HWR

3/4" HWS

3/4" HWR

3/4" HWS

3/4" HWS

3/4" HWR

3/4" HWS

3/4" HWR

3/4" HWR

3/4" HWS

3/4" HWS

3/4" HWR

3/4" HWR

3/4" HWS

3/4" HWR

3/4" HWS

3/4" HWR

3/4" HWS

3/4" HWR

3/4" HWS

3/4" HWS

3/4" HWR

3/4" HWS

3/4" HWR

3/4" HWR

3/4" HWS

3/4" HWR

3/4" HWS

3/4" HWS

3/4" HWR

3/4" HWR

3/4" HWS

2 1/2" HWS

2 1/2" HWR

1 1/4" HWR

3/4" HWR

1" HWS

1" HWR

2 1/2" HCS

2" HCS

2 1/2" HCS

2" HCS

1 1/2" HCS 2" HCS 1 1/2" HCS 1 1/4" HCS 1 1/4" HCS 1 1/4" HCS 1 1/4" HCS 1 1/2" HCS

1 1/2" HCS

2" HCS

2" HCS

2" HCS

2 3

2 3

2 3

2 3

2 3 2 3 2 3 2 3 2 3 2 3 2 3

EX 1" HCS

EX 1/2" D

EX 1" HCS

EX 1/2" D

EX 1" HCS

EX 1/2" D

EX 1" HCS

EX 1/2" D

EX 1" HCS

EX 1/2" D

EX 1" HCS

EX 1/2" D

EX 1" HCS

EX 1/2" D

EX 1" HCS

EX 1/2" D

EX 1" HCS

EX 1/2" D

EX 1" HCS

EX 1/2" D

EX 1/2" D

EX 1" HCS

1" D

1" D

1" D

1" D 1" D 1" D 1" D 1" D

1" D

1" D

1" D

1. ROUTE REFRIGERANT LINES FROM MINI-SPLIT (ACU-4-2)

TO CONDENSING UNIT (CU-4-2) ON ROOF. SEE SHEET

MH102 FOR ADDITIONAL INFORMATION.

2. CONNECT NEW INDUCTION UNIT SUPPLY PIPING TO

EXISTING RISER AT DEMARCATION POINT SHOWN.

INSTALL NEW INDUCTION UNIT SUPPLY AND

CONDENSATE PIPING PRIOR TO DEMOLITION OF

EXISTING PIPING. SEE DEMOLITION DRAWINGS FOR

RELATED INFORMATION.

3. CONNECT NEW CONDENSATE PIPING TO EXISTING

RISER AT DEMARCATION POINT SHOWN.

SHEET KEYNOTES#

1. REFER TO M000 FOR MECHANICAL SYMBOLS AND

ABBREVIATIONS.

2. COORDINATE PHASING AND SHUTDOWN FOR SUPPLY

AIR, RETURN AIR, HEATING HOT WATER SUPPLY, AND

HEATING HOT WATER RETURN WITH OWNER.

SHUTDOWN AND REPLACEMENT TO OCCUR AFTER

HOURS OR OVER WEEKEND.

3. PAIN CLINIC - NORTHWEST QUADRANT OF THE FLOOR -

SHALL BE OPERATIONAL AT ALL WORKING DAYS &

HOURS (MON-FRI 7M - 5PM) DURING THE ENTIRE

CONSTRUCTION PERIOD. ANY REQUIRED WORK IN THIS

CLINIC SHALL BE COORDINATED CLOSELY W/ COR.

GENERAL NOTES#

A

2 3 4 5 6

B

C

D

1 2 3 4 5 6

A

B

C

D

VA FORM 08-6231

o n e e ig e fo o t o n e q u a rt e r i n c e fo o t th re e e ig h th s in c e fo o t o n e h a lf in c e fo o t th re e q u a rt e fo o t o n e in c e fo o t o n e a n d o n e h a lf in c h e e fo o t th re e in c h e e fo o t

CONSULTANTS: ARCHITECT/ENGINEERS:

Drawing Title

Office of Construction and Facilities ManagementApproved: Project Director

Project Title

Location

Date Checked Drawn

Dwg.

Drawing Number

Building Number

Project Number

600 EAST 7TH STEET

SIOUX FALLS, SOUTH DAKOTA 57103

605.274.2893

6 SOUTH OLD ORCHARD

ST. LOUIS, MISSOURI 63119

800.404.7677

330 N MEAD

WICHITA, KANSAS 67202

316.262.2500

NOT FOR

CONSTRUCTION

JOHN SOMMERS, PE MO #2015028399

MP104

MECHANICAL NEW WORK PLAN -

PIPING - 4TH FLOOR - AREA B

RELOCATE PHYSICAL

MEDICINE & REHAB. TO THE

4TH FLOOR

800 HOSPITAL DRIVE COLUMBIA, MO 65201

02-15-2023

589A4-22-100

BID DOCUMENTS

RLCJES

3/16" = 1'-0"

MECHANICAL NEW WORK PLAN - PIPING - 4TH FLOOR - AREA B

# Revision Date

John Ernest Sommers, PE

C

F E

C

FEC

EaFGGaHHbJJbKLLaMNNa H.5Ja F.1 EbMaNb

2.8

3.7

4.5

6.2

5.4

6.7

5.7

5.3

4.6

7.1

3.6

4.1

4.7

5.1

6.1

6.3

5.5

3.1

4.4

PROST. CHIEF

PROST. ASST. CHIEF

PROST. REP

STAFF TLT.

FUME RM.

PLASTER

MAINT.

421ADUST RM.

STOR.

426A

CLEAN LAB

PER. CLNC. MASSAGE

PER. CLNC. GROUP RM.

HSKPG.

PROST. PURCHASING

FITTING/EXAM RM.

FITTING/EXAM RM.

PROST. WAIT.

410 CHIRO. EXAM

CHIRO. EXAM

ACUPUNCTURE

PELVIC

PROST. STOCK RM.

BREAK RM.

WAIT.

WC STOR./SHOP

WOMEN'S TLT

MEN'S TLT

MSA CHECKIN/OUT

ANTE

FITTING/EXAM RM.

CORR.

C43

ELEV. LOBBY / CORR.

ELEV. LOBBY

SOILED DISP

401A

TU

4-2-1

TU

4-4-6

TU

4-4-20

TU

4-4-7

TU

4-4-16

TU

4-4-15

TU

4-4-14 TU

4-4-8

TU

4-4-9

TU

4-4-11

TU

4-4-10TU

4-4-12

TU

4-4-13

TU

4-2-16

TU

4-2-17

TU

4-2-15

TU

4-4-17

TU

4-4-21

TU

4-4-22

TU

4-2-20

TU

4-4-25

TU

4-4-26

TU

4-4-24

TU

4-4-27

TU

4-4-23

EACV

NOT IN SCOPE

EX 10x12 EA

EX 13ø OA UP EX 15ø OA DN

EX 45x12 RA UP

EX 24ø SA

UP & DN

EX 12x12

EA UP & DN

EX 9x12 EA

UP & DN

EX 14x12

EA UP & DN

EX 26x24 SA

EX 12x10

EA UP & DN

EX 16ø SA UP

EX 22ø SA

UP & DN

(AC-S3)

(AC-S1)

(AC-ER-2)

(AC-ER-5)

(AC-S5)

(AC-S2)

(AC-ER-4)

EXCEPT AS

NOTED

(AC-S4)

(AC-ER-3)

(AC-S2)

EX 30x31 RA

EX 36x30

RA UP & DN

EX 40x22

RA UP & DN

EX 34ø SA

UP & DN

EX 16ø SA UP

EX 24ø SA

UP & DN

EX 16ø

VENT UP &

DN

EX 12ø

VENT UP &

DN

PROST. CHECKIN

405A

E X x E

A

E X x E

A

E X x E

A

E X x E

A

E X x E

A

E X x E

A

28x18 RA x R

A

30x16ø SA x ø

S A x ø

S A x E

A x E

A

16x7 EA 16x7 EA x ø

S A

14x14 RA

39x10ø SA 39x10ø SA

26x16ø SA

26x16ø SA

26x16ø SA x ø

S A x R

A

44x12 RA

20x16 RA 6ø SA

28x7 RA x R

A

28x7 RA x R

A

7ø SA

44x12 RA

EX 20x20 SA UP x ø

S A

20x14 EA x E

A

EX 20x20 RA UP x R

A

12x12 RA

20x8 RA

18x6 RA x R

A

20ø SA

30x12ø SA

30x12ø SA

12ø SA ø

S A

8ø SA

20x10ø SA

20x14 EA x ø

S A x ø

S A

23x10ø SA

12x8 SA

12x5 SA 12x8 SA

12x5 SA

12x8 SA x S

A

18x7 RA x S

A

DN

DN

DNUP

12x8 SA

8x4 EA

48x10 RA x R

A 12x12 RA

S-5

R-12

S-3

R-12

S-4

S-3

R-12

R-12

S-3

S-3

R-12

S-3

S-3

S-3

R-12

S-3

S-3

S-3

D N

R-12

S-5

D N

D N

S-3

S-3

S-3

8x8 RA 8x8 RA x R

A x S

A x S

A

6ø SA

8ø SA

R-12

R-12

S-4

R-12

R-12

S-3

R-12

S-3

R-12

S-3

S-3

S-3

R-12

10x8 RA

6x6 RA

6x6 RA x S

A

R-12

S-5

S-5

S-5

S-5

R-12

R-12 x S

A

12x10 SA

12x8 SA

S-3

S-3

S-3

S-3

S-3

S-3

S-3

S-3

R-12

R-12

R-12

S-3

S-3

R-12

R-12

R-12

DN

UPUP

D N

DN

R-12

CORR.

C46

CORR.

C47

CORR.

C45

CORR.

C41 x R

A x R

A

S-1

S-4

S-3

R-12

R-12

S-4

S-4

S-4

R-12

S-4

S-4

R-12

S-3

D N

DN

U P

8ø SA

39x10ø SA

SD

4-2-2 12ø SA

SD

4-4-1

SD

4-4-2

12x10 SA

12x8 SA x R

A

FSD

4-4-3

FSD

4-4-2

SD

4-2-3

SD

4-2-6

SD

4-2-7

SD

4-2-1

SD

4-2-8

SD

4-2-9

SD

4-2-10

SD

4-2-11

FSD

4-4-1 x R

A

1. ROUTE DUCTWORK FROM 453 – LAB CLEAN RM. TO

EXHAUST FAN (EF-1) ON ROOF. SEE SHEET MH102 FOR

ADDITIONAL INFORMATION.

2. RELOCATE EXISTING DIFFUSER AND FLEX DUCT TO

ALIGN WITH NEW CEILING GRID. SEE MD105 FOR

RELATED INFORMATION.

3. FIELD VERIFY EXISTING DUCTS IN CHASE PRIOR TO

CONSTRUCTION. RECORD DRAWINGS MAY NOT

REPRESENT CURRENT DUCT LOCATIONS.

SHEET KEYNOTES#

FOURTH FLOOR KEY PLAN

AREA A

N

B

A

1. REFER TO M000 FOR MECHANICAL SYMBOLS AND

ABBREVIATIONS.

2. COORDINATE PHASING AND SHUTDOWN FOR SUPPLY

AIR, RETURN AIR, HEATING HOT WATER SUPPLY, AND

HEATING HOT WATER RETURN WITH OWNER.

SHUTDOWN AND REPLACEMENT TO OCCUR AFTER

HOURS OR OVER WEEKEND.

3. PAIN CLINIC - NORTHWEST QUADRANT OF THE FLOOR -

SHALL BE OPERATIONAL AT ALL WORKING DAYS &

HOURS (MON-FRI 7M - 5PM) DURING THE ENTIRE

CONSTRUCTION PERIOD. ANY REQUIRED WORK IN THIS

CLINIC SHALL BE COORDINATED CLOSELY W/ COR.

GENERAL NOTES#

A

2 3 4 5 6

B

C

D

1 2 3 4 5 6

A

B

C

D

VA FORM 08-6231

o n e e ig e fo o t o n e q u a rt e r i n c e fo o t th re e e ig h th s in c e fo o t o n e h a lf in c e fo o t th re e q u a rt e fo o t o n e in c e fo o t o n e a n d o n e h a lf in c h e e fo o t th re e in c h e e fo o t

CONSULTANTS: ARCHITECT/ENGINEERS:

Drawing Title

Office of Construction and Facilities ManagementApproved: Project Director

Project Title

Location

Date Checked Drawn

Dwg.

Drawing Number

Building Number

Project Number

600 EAST 7TH STEET

SIOUX FALLS, SOUTH DAKOTA 57103

605.274.2893

6 SOUTH OLD ORCHARD

ST. LOUIS, MISSOURI 63119

800.404.7677

330 N MEAD

WICHITA, KANSAS 67202

316.262.2500

NOT FOR

CONSTRUCTION

JOHN SOMMERS, PE MO #2015028399

MH105

MECHANICAL NEW WORK PLAN -

DUCTWORK - 4TH FLOOR - AREA A

RELOCATE PHYSICAL

MEDICINE & REHAB. TO THE

4TH FLOOR

800 HOSPITAL DRIVE COLUMBIA, MO 65201

02-15-2023

589A4-22-100

BID DOCUMENTS

RLCJES

3/16" = 1'-0"

MECHANICAL NEW WORK PLAN - DUCTWORK - 4TH FLOOR - AREA A

# Revision Date

John Ernest Sommers, PE

File details come from the government source that posted it. Updated .