Drawings-589A4-22-100-2023-02-15 BID Set-Part10-pages 13.pdf

PDF 5 MB Posted

Attached to
Z2DA-- Relocate Physical Medicine and Rehabilitation to the 4th Floor PN: 589A4-22-100
Solicitation number
36C25523R0072
Issued by

About this file

This solicitation is for relocating Physical Medicine and Rehabilitation to the 4th floor at 800 Hospital Drive in Columbia, Missouri. The solicitation number is 36C25523R0072 and involves renovation work under project number 589A4-22-100. The work includes relocating Physical Medicine and Rehabilitation from various locations on the first floor to a new space on the 4th floor. The solicitation is seeking bids from contractors to perform the renovation work. The agency issuing this solicitation is the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 15. The solicitation provides relevant project details such as location, scope of work, and responsible agencies to assist contractors in preparing bids for the relocation project.

View the file

Other files

File Type Posted
36C25523R0072 0004.docx DOCX document
AMENDMENT 3 - Drawings.pdf PDF
AMENDMENT 3 - Specifications.pdf PDF
36C25523R0072 0003.docx DOCX document
Prebid-site visit attendee list.pdf PDF
36C25523R0072 0002.docx DOCX document
589A4-22-100 Volume 2 Specifications- 494 pages.pdf PDF
36C25523R0072 0001.docx DOCX document
Drawings-589A4-22-100-2023-02-15 BID Set- Part5-pages 10.pdf PDF
Drawings-589A4-22-100-BID Set -2-15-2023- Part1-7 pages.pdf PDF
Drawings-589A4-22-100-2023-02-15 BID Set -Part4-pages 10.pdf PDF
36C25523R0072.docx DOCX document
Drawings-589A4-22-100-2023-02-15 BID Set - Part12-pages 11.pdf PDF
Drawings-589A4-22-100- 2023-02-15 BID Set-Part2- Pages 6.pdf PDF
Drawings-589A4-22-100-2023-02-15 BID Set- Part13-pages 1.pdf PDF
Drawings-589A4-22-100-2023-02-15 BID Set-Part6-pages 6.pdf PDF
Drawings-589A4-22-100-2023-02-15 BID Set- Part9-pages 8.pdf PDF
Drawings-589A4-22-100-2023-02-15 BID Set - Part3-pages-12.pdf PDF
Specifications-589A4-22-100-2023-02-15 BID Set - VOL 1- Pages 785.pdf PDF
Drawings-589A4-22-100-2023-02-15 BID Set-Part8-pages 9.pdf PDF
Drawings-589A4-22-100-2023-02-15 BID Set-Part11-pages 9.pdf PDF
Drawings-589A4-22-100-2023-02-15 BID set - Part7-pages 9.pdf PDF
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

R E

F

F E

C

F E

C

F E

C

T

TT

T

TT

EaFGGaHHbJJbKLLaMNNa H.5Ja F.1 EbMaNb

7.3

8.2

9.1

6.7

9.8

8.9

8.3

7.2

7.1

8.0

7.5

CHIRO. EXAM

ACUPUNCTURE

ACUPUNCTURE

PT/OT EXAM

PT/OT EXAM

PELVIC

PELVIC

PT/OT EXAM BARIATRIC

PT/OT STOR.

PT TLT.

PROST. STOCK RM.

PT GYM

AO

OT SUPER.

BREAK RM.

STAFF TLT.

REHAB. COOR.

PSA

PT/OT SWAMP

CHIEF PM&R EXAM

WAIT.

OT TRAIN. RM.

OT TLT.

440A

CRASH CART ALCOVE

ELEC.

WC STOR./SHOP

CLEAN LINEN

450A

EQUIP.

CORR.

C43

CORR.

C44

ELEV. LOBBY / CORR.

ELEV. LOBBY

SOILED DISP

401A

TELE HEALTH

TU

4-2-1

TU

4-2-2

TU

4-2-3

TU

4-2-4

TU

4-2-5

TU

4-2-6

TU

4-2-7

TU

4-2-9

TU

4-2-11

TU

4-2-12

TU

4-2-10

TU

4-2-18

TU

4-2-13

TU

4-4-1

TU

4-4-2

TU

4-4-3

TU

4-4-19

TU

4-4-18

TU

4-4-5

TU

4-4-4

TU

4-4-6

TU

4-2-14

TU

4-2-17

TU

4-2-15

TU

4-2-8

TU

4-4-17

TU

4-2-19

TU

4-4-21

ACU

4-2

40x24 EA UP

34x20 EA DN

8605 CFM

(E-1)

PROST. CHECKIN

405A x R

A x R

A x R

A x ø

S A x ø

S A x E

A x E

A

14x8 EA

8x6 EA

6x6 EA

6x6 EA x E

A

8x6 EA

22x12ø SA 30x12ø SA x ø

S A

28x15 EA ø

S A

8ø SA x ø

S A x ø

S A x ø

S A 8ø SA ø

S A

6x6 EA

12ø SA

12ø SA

26ø HA

26ø HA x R

A

24x10 RA x R

A

30x18 RA

8x6 RA

8ø SA

8ø SA 30x12ø SA x ø

S A

12x7 RA

18x7 RA x ø

S A x S

A

16x14 RA x R

A x S

A x E

A x E

A x E

A x E

A

30x9 EA

8x6 RA 8x6 RA

D N

U P x S

A x S

A

UP

x S

A x ø

S A

14x10ø SA x R

A

10x8 RA x R

A

6x6 EA

DN UP

x S

A

12x8 SA

12x8 SA

UP

6x6 EA

DNUP

10x4 SA 10x8 SA

10x8 SA

R-12

S-3

S-3

S-3

S-3

S-3

R-12

S-3

S-3

R-12

S-4

S-4

S-3

S-3

R-12

S-5

S-5

R-12

R-12

S-3

R-12

S-5

S-5

R-12

U P

U P

S-5

S-5

S-4

R-12 x S

A x S

A x R

A x R

A x R

AR-12

S-5

S-5

R-12

S-5

R-12

R-12

S-3

R-12

S-3

S-5

R-12

S-4

R-12

S-4

S-4

S-4

S-4

R-12

S-4

S-4

S-4

S-4

R-12

12x10 SA x S

A

12x10 SA x S

A x S

A x R

A x R

A x R

A x R

A x R

A x R

A

R-12

DN 24x18 RA

24x10 RA

S-4

S-3

S-4

R-13

TYP. 5

x R

A

14x14 SA x S

A

14x14 SA

14x14 SA 14x14 SA x S

A

18x12 RA

18x12 RA 18x12 RA

18x12 RA

10x10 SA

S-3

TYP. 3

R-12

R-12

R-12

S-3

R-12

30S-3

R-12

S-3

R-12

S-3

R-12

R-12

S-3

R-12

R-12

D N

SL-6

SL-6

DN

U P

UP

CORR.

C42

CORR.

C45

UP

UP D

N

D N

12x5ø SA

12x5ø SA

6ø SA

D N

SL-6

SL-6

SL-6

SL-6

SL-6

D N

D N

SD

4-2-3

SD

4-2-4

SD

4-2-5

12x12 RA

12x12 RA

S-4

S-4

S-4

S-4

R-13

R-13

S-4

S-4

S-4

S-4

S-4

S-4

S-4

S-4

S-4

R-13

R-13

R-13

S-3

SD

4-2-12

FSD

4-2-1

FOURTH FLOOR KEY PLAN

AREA B

N

B

A

1. REFER TO M000 FOR MECHANICAL SYMBOLS AND

ABBREVIATIONS.

2. COORDINATE PHASING AND SHUTDOWN FOR SUPPLY

AIR, RETURN AIR, HEATING HOT WATER SUPPLY, AND

HEATING HOT WATER RETURN WITH OWNER.

SHUTDOWN AND REPLACEMENT TO OCCUR AFTER

HOURS OR OVER WEEKEND.

3. PAIN CLINIC - NORTHWEST QUADRANT OF THE FLOOR -

SHALL BE OPERATIONAL AT ALL WORKING DAYS &

HOURS (MON-FRI 7M - 5PM) DURING THE ENTIRE

CONSTRUCTION PERIOD. ANY REQUIRED WORK IN THIS

CLINIC SHALL BE COORDINATED CLOSELY W/ COR.

GENERAL NOTES#

1. PROVIDE SP SENSOR FOR AC-S-2 IN THIS LOCATION.

2. PROVIDE SP SENSOR FOR AC-S-4 IN THIS LOCATION.

SHEET KEYNOTES#

A

2 3 4 5 6

B

C

D

1 2 3 4 5 6

A

B

C

D

VA FORM 08-6231

o n e e ig h th in c o n e fo o t o n e q u a rt e r i n c e fo o t th re e e ig h th s in c e fo o t o n e h a lf in c e fo o t th re e q u a rt e rs e fo o t o n e in c e fo o t o n e a n d o n e h a lf in c h e s e fo o t th re e in c h e e fo o t

CONSULTANTS: ARCHITECT/ENGINEERS:

Drawing Title

Office of Construction and Facilities ManagementApproved: Project Director

Project Title

Location

Date Checked Drawn

Dwg.

Drawing Number

Building Number

Project Number

600 EAST 7TH STEET

SIOUX FALLS, SOUTH DAKOTA 57103

605.274.2893

6 SOUTH OLD ORCHARD

ST. LOUIS, MISSOURI 63119

800.404.7677

330 N MEAD

WICHITA, KANSAS 67202

316.262.2500

NOT FOR

CONSTRUCTION

JOHN SOMMERS, PE MO #2015028399

MH106

MECHANICAL NEW WORK PLAN -

DUCTWORK - 4TH FLOOR - AREA B

RELOCATE PHYSICAL

MEDICINE & REHAB. TO THE

4TH FLOOR

800 HOSPITAL DRIVE COLUMBIA, MO 65201

02-15-2023

589A4-22-100

BID DOCUMENTS

RLCJES

3/16" = 1'-0"

MECHANICAL NEW WORK PLAN - DUCTWORK - 4TH FLOOR - AREA B

# Revision Date

John Ernest Sommers, PE

PE-2015028399

02/13/2023

EaFGGaHHbJJbKLLaMNNa H.5Ja F.1 EbMaNb

4.5

6.2

5.4

6.7

9.8

8.9

8.3

7.2

7.1

3.6

4.1

4.7

5.1

6.1

6.3

5.5

3.1

AC-S

AC-S

AHU

XAC

TEMP

EX 108x24 SA

E X ø

S A

EX 24x56 RA

E X x R

A

E X ø

S A

EX 24ø SA

E X ø

S A

E X ø

S A

E X ø

S A

E X x R

A

EX 36x30 RA

EX 30x48 RA

EX 60x40 RA

EX 48x28 RA

EX 56x24 RA

EX 44x24 SA EX 20x20 RA

EX 20x20 RA

E

AC-ER

E

E

E

E

HRU

E

E

EX 48x28 RA

EX 44x24 SA

EX 44x24 SA

EX 28ø SA

EX 36x30 RA

EX 36x30 RA EX 108x22 RA

EX 30x48 RA

EX 30ø SA

EX 96x16 SA

EX 20x20 SA

EX 20x20 SA

TOP

BOTTOM

TOP

BOTTOM

EX 20x20 SA DN EX 20x20 RA DN

EX 42x32

SA UP & DN

EX 36x36

RA UP & DN

DN

EX 12x10

EA UP & DN

EX 14x24

EA UP & DN

EX 12x12

EA UP & DN

EX 12x18

EA UP & DN

EX 22ø SA

UP & DN

EX 14x12

EA UP & DN

TYP.

UNLESS

NOTED

EX 40x22

RA UP & DN

EX 34ø SA

UP & DN

EX 24ø SA DN

EX 12ø

VENT UP &

DN

EX 30x31

RA UP & DN

EX 24ø SA DN

EX 36x30 RA DN

EX 24ø SA DN

EX 24ø SA DN

EX 16ø

VENT UP &

DN

EX 56x24 RA DN

EX 17ø SA DN

EX 17ø SA DN

BOTTOM

TOP

24ø SA

24ø SA

24ø SA

EX 60x60 SA

EX 34x34 SA

UP

EX 30ø SA

DN

EX 34x34 SA

30x24 RA 54x24 RA

UP & DN

36x36 RA

36x36 RA x R

A

1. INSTALL NEW DUCTWORK TO DEMARCATION POINT

SHOWN.

2. INSTALL NEW INSULATION FOR DUCTWORK ON ROOF.

SEE DEMOLITION DRAWINGS FOR RELATED

INFORMATION.

3. PROVIDE NEW AIRFLOW MONITORING STATION.

SHEET KEYNOTES#

1. REFER TO M000 FOR MECHANICAL SYMBOLS AND

ABBREVIATIONS.

2. COORDINATE PHASING AND SHUTDOWN FOR SUPPLY

AIR, RETURN AIR, HEATING HOT WATER SUPPLY, AND

HEATING HOT WATER RETURN WITH OWNER.

SHUTDOWN AND REPLACEMENT TO OCCUR AFTER

HOURS OR OVER WEEKEND.

3. PAIN CLINIC - NORTHWEST QUADRANT OF THE FLOOR -

SHALL BE OPERATIONAL AT ALL WORKING DAYS &

HOURS (MON-FRI 7M - 5PM) DURING THE ENTIRE

CONSTRUCTION PERIOD. ANY REQUIRED WORK IN THIS

CLINIC SHALL BE COORDINATED CLOSELY W/ COR.

GENERAL NOTES#

A

2 3 4 5 6

B

C

D

1 2 3 4 5 6

A

B

C

D

VA FORM 08-6231

o n e e ig e fo o t o n e q u a rt e r i n c e fo o t th re e e ig h th s in c e fo o t o n e h a lf in c e fo o t th re e q u a rt e fo o t o n e in c e fo o t o n e a n d o n e h a lf in c h e e fo o t th re e in c h e e fo o t

CONSULTANTS: ARCHITECT/ENGINEERS:

Drawing Title

Office of Construction and Facilities ManagementApproved: Project Director

Project Title

Location

Date Checked Drawn

Dwg.

Drawing Number

Building Number

Project Number

600 EAST 7TH STEET

SIOUX FALLS, SOUTH DAKOTA 57103

605.274.2893

6 SOUTH OLD ORCHARD

ST. LOUIS, MISSOURI 63119

800.404.7677

330 N MEAD

WICHITA, KANSAS 67202

316.262.2500

NOT FOR

CONSTRUCTION

JOHN SOMMERS, PE MO #2015028399

MH107

MECHANICAL NEW WORK PLAN -

DUCTWORK - LOWER PENTHOUSE

RELOCATE PHYSICAL

MEDICINE & REHAB. TO THE

4TH FLOOR

800 HOSPITAL DRIVE COLUMBIA, MO 65201

02-15-2023

589A4-22-100

BID DOCUMENTS

RLCJES

1/8" = 1'-0"

MECHANICAL NEW WORK PLAN - DUCTWORK - LOWER PENTHOUSE

# Revision Date

John Ernest Sommers, PE

W

L

CLOSE OPENING AT

CORNERS WITH

SEALANTS, FILLER

PIECES OR GASKET

45°

L = 1/4W. IF DUCT IS LESS THAN 16", USE 4".

NOTES:

1. FLOW ARROWS SHOULD BE OPPOSITE FOR RETURN OR EXHAUST.

AIRFLOW

AIR

FLO

W

STRUCTURE

FLEX FLOW ELBOW BY

THERMAFLEX OR

APPROVED EQUAL.

SUPPORT FLEX

DUCT PER SMACNA

FIG 3-9, 3-10 & 3-11

INSULATED ACOUSTICAL

FLEXIBLE DUCT

LOW VELOCITY RIGID ROUND

DUCTWORK BEYOND THE 6'-0"

MAXIMUM FLEX DUCT LENGTH.

ATTACH FLEX TO SHEET METAL

WITH SCREWS & TAPE OR USE

DRAWBAND, PER SMACNA

HVAC DUCT CONSTRUCTION

STANDARDS.

NEW CONNECTIONS

SHALL BE 45°

RECTANGULAR TO ROUND

TRANSITION FITTING.

MAIN DUCT DRAW BANDS SNUG,

WITHOUT CRUSHING

FLEXIBLE DUCT

TRIM STRAPS AFTER

TIGHTENING

SHEET METAL

SCREWS (TYP)

INSTALL FLEXIBLE DUCTWORK SUPPORTS AT

ALL ROUND NECK OUTLETS/INLETS UNLESS

OTHERWISE NOTED ON DRAWINGS.

FLEXIBLE DUCT LENGTH SHALL BE A MINIMUM

3'-0" AND A MAXIMUM OF 6'-0".

CONNECT FLEXIBLE DUCTWORK TO DIFFUSER

WITH MINIMUM FOUR(4) SHEET METAL SCREWS.

1.

2.

3.

NOTES: CEILING DIFFUSER

(SEE DIFFUSER

SCHEDULE FOR SIZE)

INSULATE BACKS OF

DIFFUSERS

GRILLE OR DIFFUSER

RECTANGULAR BRANCH DUCT

RECTANGULAR BRANCH SUPPLY, RETURN OR

EXHAUST DUCTWORK WITH ROUND OR SQUARE

DIFFUSER COLLAR.

AS INDICATED ON FLOOR PLAN

DETAIL OF BRANCH

TAKE-OFF TO

DIFFUSER OR GRILLE

WITH ROUND COLLAR

DETAIL OF BRANCH

TAKE-OFF TO

DIFFUSER OR GRILLE

WITH SQUARE COLLAR

DETAIL OF BRANCH

TAKE-OFF TO

DIFFUSER OR GRILLE

WITH SQUARE COLLAR

PLAN VIEWS

ROUND OR

SQUARE

DIFFUSER

COLLAR

RECTANGULAR

BRANCH DUCT

CEILING CEILING

SQUARE

DIFFUSER

COLLAR

RECTANGULAR

BRANCH DUCT

ELEVATION VIEWS

NOTES:

1.

2.

3.

MAINTAIN MINIMUM CLEARANCE

OF 18" ABOVE ROOF TO

BOTTOM OF DUCT.

SUPPORTS SHALL BE

HOT-DIPPED GALVANIZED

STEEL.

STRAP SHALL RESTRAIN DUCT

BUT SHALL ALLOW FOR 1/4" GAP

BETWEEN STRAP AND DUCT

FOR EXPANSION/CONTRACTION.

4"x4"x1/4" PLATE

BOLTED TO CURB (TYP).

COUNTER FLASHING.

FASTEN SHEET METAL STRAPS

TO UPRIGHT SUPPORTS BELOW

CROSS ANGLE SUPPORTS WITH

TWO (2) 1/2" DIA BOLTS WITH

DOUBLE NUTS AND WASHER

BOTH SIDES

1" WIDE, 14 GA. SHEET METAL STRAP

ADHERE NEOPRENE PAD (3/16" THICK)

ON CROSS ANGLE WHERE IN CONTACT

WITH DUCT

OUTER DIAMETER OF ROUND DUCT OR

WIDTH OF RECTANGULAR DUCT, PLUS 1/2"

(SPACING INCLUDES DUCT INSULATION)

ANGLE SUPPORTS

SUPPORTS IN LOCATIONS

AS SHOWN ON THE

DRAWINGS

1/2 OUTER DIAMETER OF

ROUND DUCT HEIGHT OR

RECTANGULAR DUCT

A

A

SECTION A

ROOFING SYSTEM.

ALL DUCTWORK TO BE

SEALED W/HIGH

PRESSURE DUCT SEALER

1/2" MESH

BIRDSCREEN

DRAIN

COORDINATE FLASHING

REQUIREMENTS WITH

ARCHITECTURAL DETAILS

AND REQUIREMENTS OF

ROOFING MANUFACTURER.

ROOF

PRE-FABRICATED CURB

SPRING ISOLATORS, REFER

TO SPECIFICATIONS.

UTILITY SET FAN WITH

WEATHER PROOF MOTOR

COVER

FLEXIBLE CONNECTION. DO NOT

PUT DIRECTLY ON FAN INLET

PRE-FABRICATED CURBS.

T E

R M

IN

A

T E

M

IN

A B

O V

E R

O O

F

TRANSITION TO ROUND

DISCHARGE DUCT TO

INCREASE DISCHARGE

VELOCITY TO 2500 - 3000 FPM

GUY WIRE

(4) REQUIRED

SECURE TO ROOF

COORDINATE WITH

ROOFING SYSTEM

PROVIDE MINIMUM 2.5 INLET

DIAMETERS OF STRAIGHT DUCT

ON FAN INLET

LIMIT SLOPE IN TRANSITION TO

15 DEGREES CONVERGING

NOTE:

INSTALL AIR VALVE PLUMB AND LEVEL WITH SERVICE SPACE FOR CONTROLS, ETC.

MAINTAIN MANUFACTURER'S RECOMMENDED CLEARANCE IN FRONT OF LABORATORY

AIR VALVE CONTROL PANEL.

1.

2.

LABORATORY AIR VALVE

CONTROLLER

SEE NOTE 2

TRANSITION AS

REQUIRED (TYP)

SUPPLY/EXHAUST

AIR DUCT AS

INDICATED ON

THE PLANS.

HOT WATER

REHEAT COIL

BOTTOM OR SIDE ACCESS

PANEL ON UPSTREAM SIDE OF

REHEAT COIL. MINIMUM SIZE =

8"x8"

FACTORY SOUND

ATTENUATOR BY AIR

VALVE MANUFACTURER.

TRANSITION AS

REQUIRED (TYP)

RETURN MAIN (HWR/CWR)

STRAINER WITH

BLOWDOWN VALVE,

NIPPLE, AND CAP.

COIL

SEE NOTE 1

NOTES:

1. BRANCH PIPES SHALL TAP THE BOTTOM OF THE MAINS.

2. HOSE-END DRAIN VALVE CAN BE ELIMINATED IF STRAINER CAN BE INSTALLED AT THE LOW

POINT OF THE COIL BRANCH PIPING.

SUPPLY MAIN (HWS/CWS)

PRESSURE AND

TEMPERATURE TEST

PLUG (TYP). INSTALL

AT SAME ELEVATION.

SHUTOFF VALVE,

BALL TYPE (TYP)

2-WAY MODULATING CONTROL VALVE

UNION (TYP)

MANUAL AIR

VENT

REDUCER AT COIL

(WHERE REQUIRED)

AIRFLOW

REDUCER

CALIBRATED BALANCE VALVE

(MULTI-TURN GLOBE-STYLE)

M

HOSE-END DRAIN VALVE

(SEE NOTE 2) WITH THD.

CAP.

RETURN MAIN (HWS/CWS)

AIR FLOW

STRAINER WITH BLOWDOWN

VAVLE, NIPPLE, AND CAP. SEE

NOTE 2.

COIL

SEE NOTE 1

NOTES:

1. BRANCH PIPES SHALL TAP THE BOTTOM OF THE MAINS.

2. HOSE-END DRAIN VALVE CAN BE ELIMINATED IF STRAINER CAN BE INSTALLED AT THE LOW POINT

OF THE COIL BRANCH PIPING.

SUPPLY MAIN (HWS/CWS)

CALIBRATED PRESSURE AND

TEMPERATURE TEST PLUG (TYP)

SHUTOFF VALVE, BALL TYPE (TYP)

3-WAY MODULATING CONTROL VALVE

UNION (TYP)

REDUCER AT COIL

(WHERE REQUIRED)

M

MANUAL AIR

VENT

CALIBRATED BALANCE VALVE

(MULTI-TURN GLOBE-STYLE)

PRESSURE AND TEMPERATURE

TEST PLUG (TYP). INSTALL AT

SAME ELEVATION.

HOSE-END DRAIN VALVE

(SEE NOTE 2) WITH THD.

CAP.

6"

INSTALLATION APPLIES TO HORIZONTAL (WALL) OR VERITCAL

(FLOOR) POSITION. REFER TO APPROVED DAMPER

MANUFACTURERS INSTALLATION INSTRUCTIONS FOR

MANUFACTURERS APPROVED UL INSTALLATION ASSEMBLY.

ACCESS PANEL SHALL BE 18"x18" WHENEVER POSSIBLE.

IF 18"x18" ACCESS PANEL IS NOT POSSIBLE, PROVIDE 18" LONG

FLANGED, REMOVABLE SEGMENT OF DUCT AT CONNECTION TO

DAMPER WITH A 6"x6" ACCESS PANEL FOR VISUAL INSPECTION

OF DAMPER.

NEGATOR SPRING

SECURE RETAINING ANGLES

TO SLEEVE ONLY ON 8"

CENTERS WITH 1/2" LONG

WELDS OR NUMBER 10 STEEL

SCREWS.

MOUNTING ANGLE

6"

DAMPER FRAME

CAULKING MATERIAL

OPERATOR/ACTUATOR

FUSIBLE ROD

SECURE DAMPER TO SLEEVE

ONLY ON 8" CENTERS WITH 1/2"

LONG WELDS OR NO 10 STEEL

SCREWS.

AUXILARY OPERATING

JACK SHAFT

FUSIBLE LINK

WITH LOCK

ACCESS PANEL

LOCATIONS BOTTOM

OR SIDE. (ONLY ONE

REQUIRED)

1.

2.

3.

NOTE:

PARTITION OR WALL

(FLOOR SIMILAR)

MOUNTING FLANGE

3"

SMOKE DAMPER BLADES

ARE AIR FOIL SHAPED FOR

LOW PRESSURE DROP

DAMPER

OPERATOR

EXTERNALLY

MOUNTED

THICKNESS VARIES

16 GAUGE GALVANIZED SLEEVE-

(WALL THICKNESS +6")

3"

DUCT CONNECTION

NOTES:

1.

2.

3.

REFER TO APPROVED DAMPER MANUFACTURERS INSTALLATION

INSTRUCTION FOR MANUFACTURERS APPROVED UL

INSTALLATION ASSEMBLY.

ACCESS PANEL SHALL BE 18"x18" WHEREVER POSSIBLE.

IF 18"x18" ACCESS PANEL IS NOT POSSIBLE, PROVIDE 18" LONG

FLANGED, REMOVABLE SEGMENT OF DUCT AT CONNECTION TO

DAMPER WITH A 6"x6" ACCESS PANEL FOR VISUAL INSPECTION

OF DAMPER.

ACCESS PANEL LOCATIONS

BOTTOM OR SIDE. (ONLY

ONE REQUIRED)

NOTE:

1.

WALL CONSTRUCTION SYSTEM.

REFER TO ARCHITECTURAL

DRAWINGS.

WELDED EXHAUST DUCT.

SEE PLAN FOR SIZE.

REFER TO ARCHITECTURAL DRAWINGS FOR WALL PENETRATION DETAILS.

COORDINATE ALL PENETRATIONS WITH GENERAL CONTRACTOR.

3" CLEAR TO

COMBUSTIBLES

A

2 3 4 5 6

B

C

D

1 2 3 4 5 6

A

B

C

D

VA FORM 08-6231

o n e e ig e fo o t o n e q u a rt e r i n c e fo o t th re e e ig h th s in c e fo o t o n e h a lf in c e fo o t th re e q u a rt e fo o t o n e in c e fo o t o n e a n d o n e h a lf in c h e e fo o t th re e in c h e e fo o t

CONSULTANTS: ARCHITECT/ENGINEERS:

Drawing Title

Office of Construction and Facilities ManagementApproved: Project Director

Project Title

Location

Date Checked Drawn

Dwg.

Drawing Number

Building Number

Project Number

600 EAST 7TH STEET

SIOUX FALLS, SOUTH DAKOTA 57103

605.274.2893

6 SOUTH OLD ORCHARD

ST. LOUIS, MISSOURI 63119

800.404.7677

330 N MEAD

WICHITA, KANSAS 67202

316.262.2500

NOT FOR

CONSTRUCTION

JOHN SOMMERS, PE MO #2015028399

M-501

MECHANICAL DETAILS

RELOCATE PHYSICAL

MEDICINE & REHAB. TO THE

4TH FLOOR

800 HOSPITAL DRIVE COLUMBIA, MO 65201

02-15-2023

589A4-22-100

BID DOCUMENTS

RLCJES

NTS

45 DEGREE BRANCH TAKE-OFF DETAIL

NTS

FLEXIBLE DUCT CONNECTION TO AIR OUTLET/INLET

NTS

RIGID DUCTWORK CONNECTION TO AIR OUTLET/INLET

NTS

ROOF DUCT SUPPORT DETAIL (SECURED)

NTS

ROOF MOUNTED EXHAUST FAN DETAIL

NTS

LABORATORY AIR VALVE DETAIL

NTS

2-WAY TERMINAL UNIT COIL DETAIL

NTS

3-WAY TERMINAL UNIT COIL DETAIL

# Revision Date

NTS

COMBINATION FIRE/SMOKE DAMPER DETAIL

NTS

SMOKE DAMPER INSTALLATION DETAIL

NTS

EXTERIOR WALL PENETRATION

John Ernest Sommers, PE

KH 1 ACCUREX XRRS 30 23.5 12.5 STAINLESS STEEL 250 8 86

KITCHEN HOOD SCHEDULE

GENERAL EXHAUST

GENERAL SIZE (IN)

HOOD CONSTRUCTION

AIRFLOW

(CFM)

TOTAL WEIGHT

(LBS)

NOTES

MARK # MFG. MODEL # LENGTH WIDTH HEIGHT DIAMETER

A

2 3 4 5 6

B

C

D

1 2 3 4 5 6

A

B

C

D

VA FORM 08-6231

o n e e ig e fo o t o n e q u a rt e r i n c e fo o t th re e e ig h th s in c e fo o t o n e h a lf in c e fo o t th re e q u a rt e fo o t o n e in c e fo o t o n e a n d o n e h a lf in c h e e fo o t th re e in c h e e fo o t

CONSULTANTS: ARCHITECT/ENGINEERS:

Drawing Title

Office of Construction and Facilities ManagementApproved: Project Director

Project Title

Location

Date Checked Drawn

Dwg.

Drawing Number

Building Number

Project Number

600 EAST 7TH STEET

SIOUX FALLS, SOUTH DAKOTA 57103

605.274.2893

6 SOUTH OLD ORCHARD

ST. LOUIS, MISSOURI 63119

800.404.7677

330 N MEAD

WICHITA, KANSAS 67202

316.262.2500

NOT FOR

CONSTRUCTION

JOHN SOMMERS, PE MO #2015028399

M-601

MECHANICAL SCHEDULES

RELOCATE PHYSICAL

MEDICINE & REHAB. TO THE

4TH FLOOR

800 HOSPITAL DRIVE COLUMBIA, MO 65201

02-15-2023

589A4-22-100

BID DOCUMENTS

RLCJES

AIR CONTROL VALVE SCHEDULE

MARK

MFR. MODEL TYPE LOCATION SIZE

AIRFLOW (CFM)

APD NOTES

ID # MAX

OCCUPIED

MIN

UNOCCUPIED

MIN

EACV 1 CRITICAL ROOM CONTROL CLV-ST 2-WAY 422 - FUME RM 8" 600 260 260 0.3

1. PROVIDE THE NUMBER OF COILS AS REQUIRED TO MEET SCHEDULED PERFORMANCE AND STILL FALL WITHIN REHEAT COIL PRESSURE DROP LIMITATION.

NOTES:

AIR TERMINAL UNIT SCHEDULE

MARK

MFR. MODEL LOCATION

ROUND DUCT

INLET SIZE

(IN)

PRIMARY AIRFLOW (CFM)

DESIGN INLET STATIC

PRESSURE (IN WC)

MAX

PRESSURE

DROP (IN WC)

OUTLET DUCT

SIZE WxD (IN)

AUXILIARY HOT WATER HEATING COIL

NOTES

ID # COOLING MAX MIN HEATING MAX

CAPACITY

(MBH)

EAT (°F) LAT (°F) EWT (°F)

FLOW

(GPM)

ROWS

MAX WPD

(FT HD)

MAX APD

(IN WC)

TU 4-2-1 TITUS DESV 468 - BREAK RM 8 800 240 240 1 0.5 12x10 30.2 55 90 160 3.0 NOTE 1 5 0.25 1

TU 4-2-2 TITUS DESV 467 - CHIEF PM&R EXAM 6 285 95 95 1 0.5 12x8 10.8 55 90 160 1.1 NOTE 1 5 0.25 1

TU 4-2-3 TITUS DESV 466 - AO 6 275 85 85 1 0.5 12x8 10.4 55 90 160 1.0 NOTE 1 5 0.25 1

TU 4-2-4 TITUS DESV 465 - OT SUPER 6 270 85 85 1 0.5 12x8 10.2 55 90 160 1.0 NOTE 1 5 0.25 1

TU 4-2-5 TITUS DESV 464 - PSA 6 65 65 65 1 0.5 12x8 2.5 55 90 160 0.2 NOTE 1 5 0.25 1

TU 4-2-6 TITUS DESV 463 - TELE HEALTH 6 65 65 65 1 0.5 12x8 2.5 55 90 160 0.2 NOTE 1 5 0.25 1

TU 4-2-7 TITUS DESV 461 - REHAB COOR 6 275 85 85 1 0.5 12x8 10.4 55 90 160 1.0 NOTE 1 5 0.25 1

TU 4-2-8 TITUS DESV 460 - PT/OT SWAMP 8 700 475 475 1 0.5 12x10 26.5 55 90 160 2.6 NOTE 1 5 0.25 1

TU 4-2-9 TITUS DESV 450 - PT GYM 10 905 660 660 1 0.5 14x12 1/2 53.1 55 90 160 5.3 NOTE 1 5 0.25 1

TU 4-2-10 TITUS DESV 450 - PT GYM 10 900 690 690 1 0.5 14x12 1/2 44.6 55 90 160 4.5 NOTE 1 5 0.25 1

TU 4-2-11 TITUS DESV 450 - PT GYM 10 1005 765 765 1 0.5 14x12 1/2 28.9 55 90 160 2.9 NOTE 1 5 0.25 1

TU 4-2-12 TITUS DESV 450 - PT GYM 10 1340 800 800 1 0.5 14x12 1/2 30.2 55 90 160 3.0 NOTE 1 5 0.25 1

TU 4-2-13 TITUS DESV 452 - PT/OT STOR 6 30 10 10 1 0.5 12x8 1.1 55 90 160 0.1 NOTE 1 5 0.25 1

TU 4-2-14 TITUS DESV 401 - ELEV LOBBY 6 140 140 140 1 0.5 12x8 5.3 55 90 160 0.5 NOTE 1 5 0.25 1

TU 4-2-15 TITUS DESV 404 - WC STOR/SHOP 6 315 315 315 1 0.5 12x8 11.9 55 90 160 1.2 NOTE 1 5 0.25 1

TU 4-2-16 TITUS DESV 470 - MSA CHECKIN/OUT 6 245 245 245 1 0.5 12x8 9.3 55 90 160 0.9 NOTE 1 5 0.25 1

TU 4-2-17 TITUS DESV 455 - WAIT 7 495 365 365 1 0.5 12x10 18.7 55 90 160 1.9 NOTE 1 5 0.25 1

TU 4-2-18 TITUS DESV 451 - PT/OT EXAM BARIATRIC 6 110 110 110 1 0.5 12x8 4.2 55 90 160 0.4 NOTE 1 5 0.25 1

TU 4-2-19 TITUS DESV C43 - CORR 7 455 385 385 1 0.5 12x10 17.2 55 90 160 1.7 NOTE 1 5 0.25 1

TU 4-2-20 TITUS DESV 400 - ELEV LOBBY/CORR 6 365 365 365 1 0.5 12x8 13.8 55 90 160 1.4 NOTE 1 5 0.25 1

TU 4-4-1 TITUS DESV 440 - OT TRAIN RM 10 950 495 495 1 0.5 14x12 1/2 35.9 55 90 160 3.6 NOTE 1 5 0.25 1

TU 4-4-2 TITUS DESV 438 - PT/OT EXAM 6 75 75 75 1 0.5 12x8 2.8 55 90 160 0.3 NOTE 1 5 0.25 1

TU 4-4-3 TITUS DESV 436 - PT/OT EXAM 6 265 80 80 1 0.5 12x8 10.0 55 90 160 1.0 NOTE 1 5 0.25 1

TU 4-4-4 TITUS DESV 433 - ACUPUNCTURE 6 265 80 80 1 0.5 12x8 10.0 55 90 160 1.0 NOTE 1 5 0.25 1

TU 4-4-5 TITUS DESV 432 - ACUPUNCTURE 6 265 80 80 1 0.5 12x8 10.0 55 90 160 1.0 NOTE 1 5 0.25 1

TU 4-4-6 TITUS DESV 431 - CHIRO EXAM 6 265 80 80 1 0.5 12x8 10.0 55 90 160 1.0 NOTE 1 5 0.25 1

TU 4-4-7 TITUS DESV 426 - PER CLNC MASSAGE 8 770 560 560 1 0.5 12x10 29.1 55 90 160 2.9 NOTE 1 5 0.25 1

TU 4-4-8 TITUS DESV 425 - PER CLNC GROUP RM 6 310 285 285 1 0.5 12x8 11.7 55 90 160 1.2 NOTE 1 5 0.25 1

TU 4-4-9 TITUS DESV 419 - FITTING/EXAM RM 6 120 120 120 1 0.5 12x8 4.5 55 90 160 0.5 NOTE 1 5 0.25 1

TU 4-4-10 TITUS DESV 415 - PROST REP 6 215 150 150 1 0.5 12x8 8.1 55 90 160 0.8 NOTE 1 5 0.25 1

TU 4-4-11 TITUS DESV 417 - PROST ASST CHIEF 6 210 65 65 1 0.5 12x8 7.9 55 90 160 0.8 NOTE 1 5 0.25 1

TU 4-4-12 TITUS DESV 416 - PROST CHIEF 6 205 70 70 1 0.5 12x8 7.7 55 90 160 0.8 NOTE 1 5 0.25 1

TU 4-4-13 TITUS DESV 413 - PROST PURCHASING 6 210 210 210 1 0.5 12x8 7.9 55 90 160 0.8 NOTE 1 5 0.25 1

TU 4-4-14 TITUS DESV 412 - FITTING/EXAM RM 6 115 115 115 1 0.5 12x8 4.4 55 90 160 0.4 NOTE 1 5 0.25 1

TU 4-4-15 TITUS DESV 411 - FITTING/EXAM RM 6 115 115 115 1 0.5 12x8 4.4 55 90 160 0.4 NOTE 1 5 0.25 1

TU 4-4-16 TITUS DESV 410 - PROST WAIT 6 165 125 125 1 0.5 12x8 6.2 55 90 160 0.6 NOTE 1 5 0.25 1

TU 4-4-17 TITUS DESV 405 - PROST STOCK RM 8 605 450 450 1 0.5 12x10 22.9 55 90 160 2.3 NOTE 1 5 0.25 1

TU 4-4-18 TITUS DESV 434 - PELVIC 6 80 80 80 1 0.5 12x8 3.0 55 90 160 0.3 NOTE 1 5 0.25 1

TU 4-4-19 TITUS DESV 435 - PELVIC 6 80 80 80 1 0.5 12x8 3.0 55 90 160 0.3 NOTE 1 5 0.25 1

TU 4-4-20 TITUS DESV 430 - CHIRO EXAM 6 270 85 85 1 0.5 12x8 10.2 55 90 160 1.0 NOTE 1 5 0.25 1

TU 4-4-21 TITUS DESV C45 - CORR 6 355 355 355 1 0.5 12x8 13.4 55 90 160 1.3 NOTE 1 5 0.25 1

TU 4-4-22 TITUS DESV C46 - CORR 8 635 635 635 1 0.5 12x10 24.0 55 90 160 2.4 NOTE 1 5 0.25 1

TU 4-4-23 TITUS DESV 424 - LAB CLEAN RM 8 705 705 705 1 0.5 12x10 26.6 55 90 160 2.7 NOTE 1 5 0.25 1

TU 4-4-24 TITUS DESV 422 - FUME RM 7 500 500 500 1 0.5 12x10 18.9 55 90 160 1.9 NOTE 1 5 0.25 1

TU 4-4-25 TITUS DESV 421 - DUST RM 6 315 315 315 1 0.5 12x8 11.9 55 90 160 1.2 NOTE 1 5 0.25 1

TU 4-4-26 TITUS DESV 423 - PLASTER 6 70 70 70 1 0.5 12x8 2.6 55 90 160 0.3 NOTE 1 5 0.25 1

TU 4-4-27 TITUS DESV 424 - LAB CLEAN RM 6 35 35 35 1 0.5 12x8 1.3 55 90 160 0.1 NOTE 1 5 0.25 1

FAN SCHEDULE

MARK

MFR. MODEL TYPE LOCATION SERVICE DRIVE

AIRFLOW

(CFM)

ESP (IN WC)

MAX FAN

SPEED (RPM)

MOTOR

SPEED (RPM)

MAX WEIGHT

(LBS)

ELECTRICAL DATA

NOTES

ID # HP VOLTS PHASE

EF 68 GREENHECK VEKTOR-H-14 HIGH PLUME LABORATORY EXHAUST 3RD FLOOR ROOF LABORATORY EXHAUST DIRECT / VFD 1725 1.5 2950 1770 478 1 460 3

SPLIT SYSTEM CONDENSING UNIT SCHEDULE

MARK

MFR. MODEL LOCATION

OUTDOOR UNIT DATA ELECTRICAL DATA

NOTES

ID #

DESIGN SUMMMER

AMBIENT (°F)

DESIGN WINTER

AMBIENT (°F)

REFRIGERANT MCA MOCP VOLTS PHASE

CU 4-2 LG ARUN024GSS4 3RD FLOOR ROOF 105 0 R410A 19.6 30 208 1

SPLIT SYSTEM FAN UNIT SCHEDULE

MARK

MFR. MODEL TYPE LOCATION

INDOOR UNIT DATA ELECTRICAL DATA

NOTES

ID #

DX COOLING DATA HEATING DATA

AMPS VOLTS PHASECAPACITY

CAP (MBH)

TOTAL

ACU 4-2 LG ARNU243SKA4 WALL MOUNT 414B - ELEC CLOSET 24.2 25.6 208 1

NOTES:

AIR DEVICE SCHEDULE

MARK

MFR. MODEL TYPE LOCATION SERVICE

NECK

SIZE (IN)

FACE SIZE

(IN x IN)

MATERIAL FINISH

MAX TPD

(IN WC)

MAX

NOISE

(NC)

MAX CFM @

LISTED

CONDITIONS

MIN THROW

(FT) 50 FPM

NOTES

ID #

S 1 TITUS OMNI SQUARE PLAQUE CEILING SUPPLY AIR 6 12x12 STEEL WHITE 0.1 30 170 8

S 3 TITUS OMNI SQUARE PLAQUE CEILING SUPPLY AIR 6 24x24 STEEL WHITE 0.1 30 170 8

S 4 TITUS OMNI SQUARE PLAQUE CEILING SUPPLY AIR 8 24x24 STEEL WHITE 0.1 30 305 12

S 5 TITUS OMNI SQUARE PLAQUE CEILING SUPPLY AIR 10 24x24 STEEL WHITE 0.1 30 420 13

R 12 TITUS 50F SQUARE PLAQUE CEILING RETURN AIR 12x12 24x24 STEEL WHITE 0.1 30 704 -

R 13 TITUS 50F SQUARE PLAQUE CEILING RETURN AIR 18x12 24x24 STEEL WHITE 0.1 30 1712 -

# Revision Date

2. ALL COMBINATION FIRE/SMOKE SAMPERS OR SMOKE DAMPERS SHALL BE 115 VOLT ACTUATOR, POWER, AND CONTROL TO THIS DAMPER SHALL BE THE WORK ...

1. 165° F HEAT ACTUATED CONTROLLED CLOSURE DEVICE.

NOTES:

FIRE SMOKE DAMPER SCHEDULE

MARK

MFR. MODEL TYPE FRAME ORIENTATION

DUCT SIZE

WxH (IN)

DAMPER

RATINGS (HR)

FUSIBLE LINK

TEMP (°F)

ELECTRICAL

DATA NOTES

ID # AMPS PHASE

FSD 4-2-1 RUSKIN FSD36 DYNAMIC HAT CHANNEL HORIZONTAL SEE PLAN 1.5 165 115 1 1-2

FSD 4-4-1 RUSKIN FSD36 DYNAMIC HAT CHANNEL VERTICAL SEE PLAN 1.5 165 115 1 1-2

FSD 4-4-2 RUSKIN FSD36 DYNAMIC HAT CHANNEL VERTICAL SEE PLAN 1.5 165 115 1 1-2

FSD 4-4-3 RUSKIN FSD36 DYNAMIC HAT CHANNEL VERTICAL SEE PLAN 1.5 165 115 1 1-2

NOTES:

SMOKE DAMPER SCHEDULE

MARK

MFR. MODEL TYPE FRAME ORIENTATION

DUCT SIZE

WxH (IN)

ELECTRICAL

DATA NOTES

ID # AMPS PHASE

SD 4-2-1 RUSKIN SD36 DYNAMIC HAT CHANNEL VERTICAL SEE PLAN 115 1

SD 4-2-2 RUSKIN SD36 DYNAMIC HAT CHANNEL VERTICAL SEE PLAN 115 1

SD 4-2-3 RUSKIN SD36 DYNAMIC HAT CHANNEL VERTICAL SEE PLAN 115 1

SD 4-2-4 RUSKIN SD36 DYNAMIC HAT CHANNEL VERTICAL SEE PLAN 115 1

SD 4-2-5 RUSKIN SD36 DYNAMIC HAT CHANNEL VERTICAL SEE PLAN 115 1

SD 4-2-6 RUSKIN SD36 DYNAMIC HAT CHANNEL VERTICAL SEE PLAN 115 1

SD 4-2-7 RUSKIN SD36 DYNAMIC HAT CHANNEL VERTICAL SEE PLAN 115 1

SD 4-2-8 RUSKIN SD36 DYNAMIC HAT CHANNEL VERTICAL SEE PLAN 115 1

SD 4-2-9 RUSKIN SDRS25 DYNAMIC HAT CHANNEL VERTICAL SEE PLAN 115 1

SD 4-2-10 RUSKIN SD36 DYNAMIC HAT CHANNEL VERTICAL SEE PLAN 115 1

SD 4-2-11 RUSKIN SDRS25 DYNAMIC HAT CHANNEL VERTICAL SEE PLAN 115 1

SD 4-2-12 RUSKIN SD36 DYNAMIC HAT CHANNEL VERTICAL SEE PLAN 115 1

SD 4-4-1 RUSKIN SD36 DYNAMIC HAT CHANNEL VERTICAL SEE PLAN 115 1

SD 4-4-2 RUSKIN SD36 DYNAMIC HAT CHANNEL VERTICAL SEE PLAN 115 1

NOTES:

AIR DEVICE LINEAR SCHEDULE

MARK

MFR. MODEL TYPE LOCATION SERVICE

MAX

CFM

LENGTH

(IN)

INLET

SIZE

BORDER

TYPE

WIDTH

(IN)

SLOTS

MAX

APD

MAX

NC

NOTES

ID #

SL 6 TITUS FT-10 LINEAR SLOT CEILING SUPPLY AIR 220 48 08 11 1 1 0.1 30

John Ernest Sommers, PE

ABBREVIATIONS SENSORS - DUCT

T

H

FRZ

CO2

E

SD

DP

DP

HSL

LSL

CONTROL DEVICE

EQUIPMENT

TEMPERATURE SENSOR

HUMIDITY SENSOR

FREEZESTAT

CO2 SENSOR

ENTHALPY SENSOR

SMOKE DETECTOR

DIFFERENTIAL PRESSURE - COMPONENT

DIFFERENTIAL PRESSURE - DUCT

HIGH STATIC PRESSURE LIMIT SWITCH

LOW STATIC PRESSURE LIMIT SWITCH

STATUS INDICATOR (SEE POINTS

LIST SCHEDULE FOR TYPE)

M

M

OPPOSED BLADE

PARALLEL BLADE

MODULATING

2-POSITION

DESIGNATIONS:

M: MOTORIZED

SD: SMOKE DAMPER

BD: BACKDRAFT DAMPER

VD: VOLUME DAMPER

M

N.O.

H W

R

H W

S

M

N.O.

H W

R

H W

S

M

N.O.

H W

R

H W

S

M IFB

HYDRONIC/STEAM COIL

(HHW, STEAM, OR CHW)

HYDRONIC COIL WITH

RECIRC PUMP

(HHW OR CHW)

COIL WITH IFB DAMPERS

(HHW OR STEAM)

M

N.C.

N G

SCR

NATURAL GAS BURNER

ELECTRIC HEATING COIL

WITH SCR CONTROL

M

N.O.

C W

S

C W

R

COIL WITH 3-WAY CONTROL VALVE

(HHW OR CHW)

DIRECT EXPANSION (DX) COIL

AIRFLOW MEASUREMENT STATION

TEMPERATURE SENSOR

PRESSURE SENSOR

FLOW METER

AQUASTAT

WATER LEVEL SENSOR

SENSORS - ZONE

T ZONE TEMPERATURE SENSOR

ZONE OCCUPANCY SENSOR

ZONE CARBON MONOXIDE SENSOR

ZONE CARBON DIOXIDE SENSOR

ZONE NITROGEN DIOXIDE SENSOR

H

OCC

CO

ZONE HUMIDITY SENSOR

CO2

NO2

BUILDING DIFFERENTIAL PRESSURE

DP

L

H

IN

S

ID

E

O U

T S

ID

E

STEAM DISPERSION GRID

(HUMIDIFIER)

M

L P

S

N.C.

FAN, BLOWER

FAN, PLENUM

HYDRONIC PUMP

FILTER

M

M

2-WAY MODULATING CONTROL VALVE

3-WAY MODULATING CONTROL VALVE

MOTOR CONTROL ASSEMBLY

MOTOR

CURRENT TRANSMITTER

STARTER -OR- VARIABLE

FREQUENCY DRIVE (VFD)

AI ANALOG INPUT

AO ANOLOG OUTPUT

AV ANOLOG VIRTUAL

AFS AIRFLOW STATION

AF AFTER FILTER

ACV AIRFLOW CONTROL VALVE

AHU AIR HANDLING UNIT

ATU AIR TERMINAL UNIT

BAC BUILDING AUTOMATION CONTROL

BAS BUILDING AUTOMATION SYSTEM

BI BINARY INPUT

BO BINARY OUTPUT

BV BINARY VIRTUAL

BP BUILDING PRESSURE

BPC BUILDING PRESSURE CONTROL

CA COMPRESSED AIR

CAV CONSTANT AIR VOLUME

CC COOLING COIL

CHW CHILLED WATER

CO CARBON MONOXIDE

CO2 CARBON DIOXIDE

CP CIRCULATING PUMP

CT CURRENT TRANSMITTER

CWR CHILLED WATER RETURN

CWS CHILLED WATER SUPPLY

DD DIRECT DRIVE

DX DIRECT EXPANSION

DP DIFFERENTIAL PRESSURE

EA EXHAUST AIR

EAT ENTERING AIR TEMPERATURE

ECM ELECTRONICALLY COMMUTATED MOTOR

EF EXHAUST FAN

ER ENERGY RECOVERY

ERU ENERGY RECOVERY UNIT

ERV ENERGY RECOVERY VENTILATOR

EWT ENTERING WATER TEMPERATURE

FF FINAL FILTER

FFU FAN FILTER UNIT

FSD FIRE-SMOKE DAMPER

GF GAS FURNACE

HC HEATING COIL

HGB HOT GAS BYPASS

HHW HEATING HOT WATER

HPR HIGH PRESSURE STEAM RETURN

HPS HIGH PRESSURE STEAM SUPPLY

HRC HEAT RECOVERY COIL

HRU HEAT RECOVERY UNIT

HRV HEAT RECOVERY VENTILATOR

HWR HOT WATER RETURN

HWS HOT WATER SUPPLY

IFB INTEGRAL FACE AND BYPASS

LAT LEAVING AIR TEMPERATURE

LPR LOW PRESSURE STEAM RETURN

LPS LOW PRESSURE STEAM SUPPLY

LWT LEAVING WATER TEMPERATURE

MAT MIXED AIR TEMPERATURE

MOA MINIMUM OUTSIDE AIR

MPR MEDIUM PRESSURE STEAM RETURN

MPS MEDIUM PRESSURE STEAM SUPPLY

N.C. NORMALLY CLOSED

N.O. NORMALLY OPEN

NG NATURAL GAS

NGF NATURAN GAS FURNACE

NO2 NITROGEN DIOXIDE

OA OUTSIDE AIR

OAT OUTSIDE AIR TEMPERATURE

OCC OCCUPANCY

O2 OXYGEN

PCC PRECONDITIONING COIL

PF PREFILTER

PHC PREHEAT COIL

RA RETURN AIR

RF RETURN FAN

RHC REHEAT COIL

RP ROOM PRESSURE

RPC ROOM PRESSURE CONTROL

R/E RELIEF/EXHAUST

R/R RETURN/RELIEF

SA SUPPLY AIR

SAT SUPPLY AIR TEMPERATURE

SF SUPPLY FAN

SD SMOKE DAMPER

TA TRANSFER AIR

TCP TEMPERATURE CONTROL PANEL

TCV TEMPERATURE CONTROL VALVE

TMV THERMOSTATIC MIXING VALVE

UH UNIT HEATER

UV ULTRAVIOLET

VAV VARIABLE AIR VOLUME

VFD VARIABLE FREQUENCY DRIVE

VOC VOLITILE ORGANIC COMPOUND

WS WINDOW SWITCH

SENSORS - PIPE

CONTROL POINT TAG

CTRL

PNL

S

2-WAY SOLENOID VALVE

S

3-WAY SOLENOID VALVE

M

VFD

CT

T

P

FM

AS

WL

XX-XX-X

GENERAL NOTES

T ZONE THERMOSTAT

H ZONE HUMIDISTAT

ZONE OXYGEN SENSORO2

AFS

IDENTIFICATION TAGS

EQUIPMENT TAG

XX

XX

# KEYED NOTE

ZONE DIFFERENTIAL PRESSUREDP

WINDOW SWITCHWS

M

AFS

MODULATING DAMPER WITH INTEGRAL

AIRFLOW SENSOR

CT CURRENT TRANSMITTER

FAN, PROPELLER

NOTES:

PRGY1: Rehabilitation Therapy Gym 75 75 70 70 60 20 (-)

Engineering Shops (Maintenance) 80 80 68 68 NA NA (-)

SPSU1: Soiled Utility Room NA NA NA NA NA NA (- -)

STCL1: Multipurpose Storage NA NA 50 50 NA NA (o)

Waiting Rooms 75 75 70 70 60 20 (o)

OPMH1: Group Therapy Room 75 75 70 70 60 20 (o)

IPK01: OT Training Kitchen 75 75 70 70 60 0 (o)

Toilets - Public (Perimeter) NA NA 68 68 NA NA (- -)

Toilets - Public (Interior) NA NA NA NA NA NA (- -)

DNSC3: Sterile Instrument Storage 70 70 70 70 55 30 (+)

Housekeeping Aid Closet (HAC) NA NA NA NA NA NA (- -)

PREV1: PT/OT Evaluation Room 75 75 70 70 60 20 (o)

DNPC1: Laboratory Porcelain / Ceramics 75 75 70 70 60 20 (-)

CLHS1: Clean Linen Storage NA NA NA NA NA NA (+)

XXXX: Break Room / Staff Lounge 75 75 70 70 60 20 (-)

Offices 75 75 70 70 60 20 (o)

Corridors 75 75 70 70 60 20 (+)

CLCEX3: Exam Room 75 75 70 70 60 20 (o)

Satellite and Main Electrical Rooms with Internal Heat Gain 86 86 40 40 NA NA (o)

°F DB °F DB °F DB °F DB % RH % RH

OCC. UNOCC. OCC. UNOCC. OCC. UNOCC.

COOLING HEATING HUMIDITY ROOM AIR

BALANCE

M-F SAT SUN

TEMPERATURE CONTROL ZONE DESCRIPTION SETPOINTS BUILDING OCCUPANCY SCHEDULE NOTES

MINIMUM AMBIENT TEMP - 50 YRS (°F DB / °F WB) -15.2 / -15.8

MAXIMUM AMBIENT TEMP - 50 YRS (°F DB / °F WB) 109.1 / 85.8

COOLING 0.4% (DB / MCWB) 94.7 / 75.7

HUMIDIFICATION 99.6% (DP / HR / MCDB) -5.2 / 4.3 / 5.1

HEATING 99.6% (°F DB) 3.2

ASHRAE CLIMATE ZONE: 4 A

WEATHER STATION: STATION 724450 COLUMBIA, MO, USA]

CLIMATE CONDITIONS: 2021 ASHRAE CLIMATE DATA

PROJECT DESIGN CONDITIONS

6. REFER TO THE PROJECT DESIGN CONDITIONS SCHEDULE ON

SHEET M-701 FOR SITE LOCATION INFORMATION; BUILDING

OCCUPANCY SCHEDULE; AND TYPICAL ROOM TEMPERATURE,

HUMIDITY, AND AIR BALANCE INFORMATION AND SETPOINTS.

5. ALL ZONE AND BUILDING SENSORS AND DEVICES SHALL BE

LOCATED AS SHOWN ON PLANS. SEE SPECIFICATION SECTION

230900 FOR SENSOR TYPE AND RELATED INFORMATION.

4. THE CONTRACTOR SHALL COORDINATE THE LOCATIONS OF

BUILDING CONTROL PANELS AND WORKSTATION(S) WITH THE

OWNER'S REPRESENTATIVE.

3. THE WRITTEN SEQUENCE(S) OF OPERATION SHALL BE THE

CRITERION USED TO JUDGE THE FINAL PERFORMANCE OF THE

CONTROL SYSTEM. ALL FUNCTIONS IN THE SEQUENCE(S) WILL

BE REQUIRED EVEN IF THE REQUIRED EQUIPMENT AND

CONNECTIONS ARE NOT DEPICTED ON THE PROVIDED

CONTROL DIAGRAM(S) AND POINTS LIST(S).

2. THE CONTRACTOR WILL BE EXPECTED TO WORK OUT THE

DETAILS OF CONTROLLER ACTION, CONTROL LOOP TUNING,

NORMALLY OPEN / NORMALLY CLOSED CONNECTIONS, AND

EXACT EQUIPMENT REQUIREMENTS TO PROVIDE A WORKING

CONTROL SYSTEM TO ACHIEVE THE SEQUENCES OF

OPERATION OUTLINED HEREIN.

1. THE CONTRACTOR SHALL SUBMIT ENGINEERED CONTROL

DRAWINGS, WIRING DIAGRAMS, EQUIPMENT SCHEDULES, ETC.

AS REQUIRED FOR A COMPLETE REPRESENTATION OF THE

CONTROLS SYSTEM.

A

2 3 4 5 6

B

C

D

1 2 3 4 5 6

A

B

C

D

VA FORM 08-6231

o n e e ig e fo o t o n e q u a rt e r i n c e fo o t th re e e ig h th s in c e fo o t o n e h a lf in c e fo o t th re e q u a rt e fo o t o n e in c e fo o t o n e a n d o n e h a lf in c h e e fo o t th re e in c h e e fo o t

CONSULTANTS: ARCHITECT/ENGINEERS:

Drawing Title

Office of Construction and Facilities ManagementApproved: Project Director

Project Title

Location

Date Checked Drawn

Dwg.

Drawing Number

Building Number

Project Number

600 EAST 7TH STEET

SIOUX FALLS, SOUTH DAKOTA 57103

605.274.2893

6 SOUTH OLD ORCHARD

ST. LOUIS, MISSOURI 63119

800.404.7677

330 N MEAD

WICHITA, KANSAS 67202

316.262.2500

NOT FOR

CONSTRUCTION

JOHN SOMMERS, PE MO #2015028399

M-701

MECHANICAL CONTROLS SYMBOLS

AND ABBREVIATIONS

RELOCATE PHYSICAL

MEDICINE & REHAB. TO THE

4TH FLOOR

800 HOSPITAL DRIVE COLUMBIA, MO 65201

02-15-2023

589A4-22-100

BID DOCUMENTS

RLCJES

# Revision Date

John Ernest Sommers, PE

SPC-T

TU-AF-S

TU-LAT

TU-S-DMPR

SPC-WC

SPC-OCOR

SPC-OCCOCC

TAFS

ACT

N.C.

T

R H

C H

W R

H W

S

N.O.

SA IN SA OUT

RHC-VLV

ACT

N.C. AFS

EA INEA OUT

ACV-R/E-RF

ACV-R/E-ACTR

EF-X-S

EF-X-SS

EF-DMPR-MOD

L

H

DP

L

H M

CT

VFD

N.O.

EA OUTEA IN

EF-DMPR-S

SEQUENCE OF OPERATIONS

LABORATORY EXHAUST FAN (EF-X)

GENERAL DESCRIPTION

THE LABORATORY EXHAUST FAN SYSTEM CONSISTS OF A VARIABLE VOLUME

EXHAUST FAN AND A 2-POSITION, MOTORIZED ISOLATION DAMPER TO PROVIDE

LABORATORY EXHAUST FROM THE CONDITIONED SPACE(S) AS SHOWN ON THE

DRAWINGS.

MODES OF OPERATION

OCCUPIED

OCCUPIED MODE SHALL BE ENABLED AT ALL TIMES WITHIN THE BUILDING

OCCUPIED SCHEDULE PER THE PROJECT DESIGN CONDITIONS FOR THIS

PROJECT.

UNOCCUPIED

UNOCCUPIED MODE SHALL BE ENABLED AT ALL TIMES OUTSIDE THE BUILDING

OCCUPIED SCHEDULE PER THE PROJECT DESIGN CONDITIONS FOR THIS

PROJECT.

SAFETIES, OVERRIDES, & INTERLOCKS

LOW STATIC SHUTDOWN

THE EXHAUST FAN SHALL BE SHUTDOWN UPON RECEIPT OF SIGNAL FROM THE

LOW STATIC SHUTDOWN SWITCH VIA HARDWIRED INTERLOCK TO THE FAN'S

START CIRCUIT.

HIGH STATIC SHUTDOWN

THE EXHAUST FAN SHALL BE SHUTDOWN UPON RECEIPT OF SIGNAL FROM THE

HIGH STATIC SHUTDOWN SWITCH VIA HARDWIRED INTERLOCK TO THE FAN'S

START CIRCUIT.

COMPONENT CONTROL LOOPS

EXHAUST FAN

OCCUPIED MODE

UPON RECIEPT OF AN OPEN STATUS FROM THE ISOLATION DAMPER PROVING

SWITCH, THE CONTROLLER SHALL ACTIVATE THE EXHAUST FAN 15 SEC (ADJ.)

AFTER THE ISOLATION DAMPER HAS OPENED.

THE EXHAUST FAN VFD SHALL RAMP UP TO IT'S MINIMUM AIRFLOW AS

DETERMINED DURING PROJECT TEST AND BALANCE AND SHALL MODULATE AS

REQUIRED TO MAINTAIN THE SPACE STATIC PRESSURE SETPOINT.

UNOCCUPIED MODE

THE FAN SHALL OPERATE AS IF IN OCCUPIED MODE.

ISOLATION DAMPER

OCCUPIED MODE

THE ISOLATION DAMPER SHALL OPEN.

UNOCCUPIED MODE

THE ISOLATION DAMPERSHALL OPERATE AS IF IN OCCUPIED MODE.

EF-D-LSSEF-D-DP

DX HEATING/COOLING

COIL

SPC-T

R S

R L

CONDENSING

UNIT

RETURN

AIR

SF

FILTER

SUPPLY

AIR

INSTALL IN

RETURN AIR

INLET PLENUM

SF-SS

CU-SS

NOT TO SCALE

TERMINAL UNIT CONTROL DIAGRAM

SEQUENCE OF OPERATIONS

VARIABLE AIR VOLUME

AIR TERMINAL UNIT (TU-X)

GENERAL DESCRIPTION

THE VARIABLE AIR VOLUME AIR TERMINAL UNIT AND ASSOCIATED ZONE DAMPER

AND REHEAT COIL OPERATE TO PROVIDE COOLING AND HEATING TO THE

CONDITIONED ZONE AS SHOWN ON THE DRAWINGS.

MODES OF OPERATION

OCCUPIED

OCCUPIED MODE SHALL BE ENABLED AT ALL TIMES WITHIN THE BUILDING

OCCUPIED SCHEDULE PER THE PROJECT DESIGN CONDITIONS FOR THIS PROJECT.

UNOCCUPIED

UNOCCUPIED MODE SHALL BE ENABLED AT ALL TIMES OUTSIDE THE BUILDING

OCCUPIED SCHEDULE PER THE PROJECT DESIGN CONDITIONS FOR THIS PROJECT.

DEHUMIDIFICATION

THE DEHUMIDIFICATION SEQUENCE SHALL ACTIVATE WHEN THE ASSOCIATED AHU

DEHUMIDIFICATION SEQUENCE IS ACTIVATED -OR- IF THE ZONE RELATIVE

HUMIDITY IS ABOVE THE RELATIVE HUMIDITY HIGH LIMIT SETPOINT.

COMPONENT CONTROLS

VAV DAMPER

OCCUPIED MODE

ON A CALL FOR COOLING, THE VAV DAMPER SHALL MODULATE TO MAINTAIN THE

OCCUPIED SPACE TEMPERATURE COOLING SETPOINT.

ON A CALL FOR HEATING, THE VAV DAMPER SHALL CLOSE TO PROVIDE IT'S

SCHEDULED MINIMUM HEATING AIRFLOW SETPOINT AND SHALL MODULATE TO

MAINTAIN THE OCCUPIED SPACE TEMPERATURE HEATING SETPOINT.

UNOCCUPIED MODE

THE VAV DAMPER SHALL CLOSE TO IT'S MINIMUM POSITION. ON A CALL FOR

COOLING, HEATING, OR DEHUMIDIFICATION, THE VAV DAMPER SHALL OPERATE AS

IF IN OCCUPIED MODE TO MAINTAIN IT'S UNOCCUPIED SPACE TEMPERATURE

SETPOINT.

DEHUMIDIFICATION MODE

ON A CALL FOR COOLING, THE VAV DAMPER SHALL OPERATE AS IF IN OCCUPIED

MODE

ON A CALL FOR HEATING, THE VAV DAMPER SHALL MODULATE TO MAINTAIN THE

SPACE COOLING TEMPERATURE SETPOINT.

REHEAT COIL

OCCUPIED MODE

ON A CALL FOR HEATING, THE REHEAT COIL VALVE SHALL BE ENABLED AND SHALL

MODULATE TO MAINTAIN THE SCHEDULED LEAVING SUPPLY AIR TEMPERATURE

SETPOINT.

UNOCCUPIED MODE

THE REHEAT COIL VALVE SHALL BE CLOSED. ON A CALL FOR HEATING, THE

REHEAT COIL VALVE SHALL MODULATE TO MAINTAIN THE SCHEDULED LEAVING

SUPPLY AIR TEMPERATURE SETPOINT.

DEHUMIDIFICATION MODE

THE REHEAT COIL VALVE SHALL OPERATE AS IF IN OCCUPIED MODE.

NOTES:

HYDRONIC VARIABLE AIR VOLUME TERMINAL UNIT POINTS LIST (TU-X)

CONTROL

POINT TAG SYSTEM POINT DESCRIPTION

INPUTS OUTPUTS ALARM REPORTS

NOTESDI AI DO AO H

IG

H \L

O W

L

IM

IT

S A

F E

T Y

M A

IN

T

A N

E N

C E

A B

N O

R M

A L

O N

/O F

F O

P E

N /C

L O

S E

A L A

R M

R U

N T

IM

E

T O

T A

L

IZ

A T

IO

N

T R

E N

D

RHC-VLV SUPPLY AIR TEMPERATURE ● ● ●

SPC-OCC SPACE OCCUPANCY SENSOR ●

SPC-OCOR SPACE OCCUPANCY OVERRIDE ● ●

SPC-T SPACE TEMPERATURE ● ● ● ●

SPC-WC SPACE SETPOINT ADJUSTMENT ● ●

TU-AF-S SUPPLY AIR FLOW ● ●

TU-LAT SUPPLY AIR TEMPERATURE ● ● ●

TU-S-DMPR ATU ZONE DAMPER ● ●

A

2 3 4 5 6

B

C

D

1 2 3 4 5 6

A

B

C

D

VA FORM 08-6231

o n e e ig e fo o t o n e q u a rt e r i n c e fo o t th re e e ig h th s in c e fo o t o n e h a lf in c e fo o t th re e q u a rt e fo o t o n e in c e fo o t o n e a n d o n e h a lf in c h e e fo o t th re e in c h e e fo o t

CONSULTANTS: ARCHITECT/ENGINEERS:

Drawing Title

Office of Construction and Facilities ManagementApproved: Project Director

Project Title

Location

Date Checked Drawn

Dwg.

Drawing Number

Building Number

Project Number

600 EAST 7TH STEET

SIOUX FALLS, SOUTH DAKOTA 57103

605.274.2893

6 SOUTH OLD ORCHARD

ST. LOUIS, MISSOURI 63119

800.404.7677

330 N MEAD

WICHITA, KANSAS 67202

316.262.2500

NOT FOR

CONSTRUCTION

JOHN SOMMERS, PE MO #2015028399

M-702

MECHANICAL CONTROLS

RELOCATE PHYSICAL

MEDICINE & REHAB. TO THE

4TH FLOOR

800 HOSPITAL DRIVE COLUMBIA, MO 65201

02-15-2023

589A4-22-100

BID DOCUMENTS

RLCJES

NOT TO SCALE

AIRFLOW CONTROL VALVE CONTROL DIAGRAM

SEQUENCE OF OPERATIONS

AIRFLOW CONTROL VALVE (ACV-X)

GENERAL DESCRIPTION

THE AIRFLOW CONTROL VALVE OPERATES TO MAINTAIN SPACE STATIC PRESSURE

IN THE CONDITIONED ZONE AS SHOWN ON THE DRAWINGS.

MODES OF OPERATION

OCCUPIED

OCCUPIED MODE SHALL BE ENABLED AT ALL TIMES WITHIN THE BUILDING

OCCUPIED SCHEDULE PER THE PROJECT DESIGN CONDITIONS FOR THIS PROJECT.

UNOCCUPIED

UNOCCUPIED MODE SHALL BE ENABLED AT ALL TIMES OUTSIDE THE BUILDING

OCCUPIED SCHEDULE PER THE PROJECT DESIGN CONDITIONS FOR THIS PROJECT.

COMPONENT CONTROLS

EXHAUST ACV DAMPER

OCCUPIED MODE

THE ACV DAMPER SHALL MODULATE TO MAINTAIN THE OCCUPIED SPACE STATIC

PRESSURE SETPOINT.

UNOCCUPIED MODE

THE ACV DAMPER SHALL OPERATE AS IF IN OCCUPIED MODE.

DEHUMIDIFICATION MODE

THE ACV DAMPER SHALL OPERATE AS IF IN OCCUPIED MODE.

NOTES:

AIRFLOW CONTROL VALVE POINTS LIST (ACV-X)

CONTROL

POINT TAG SYSTEM POINT DESCRIPTION

INPUTS OUTPUTS ALARM REPORTS

NOTESDI AI DO AO H

IG

H \L

O W

L

IM

IT

S A

F E

T Y

M A

IN

T

A N

E N

C E

A B

N O

R M

A L

O N

/O F

F O

P E

N /C

L O

S E

A L A

R M

R U

N T

IM

E

T O

T A

L

IZ

A T

IO

N

T R

E N

D

ACV-R/E-ACTR EXHAUST / RETURN ATU ACTUATOR ●

ACV-R/E-RF EXHAUST / RETURN AIR FLOW ● ● ● ●

EXHAUST FAN (EF-X) POINTS LIST

CONTROL

POINT TAG SYSTEM POINT DESCRIPTION

INPUTS OUTPUTS ALARM REPORTS

P

IC

T O

R A

L G

R A

P H

IC

NOTESDI AI DO AO H

IG

H \L

O W

L

IM

IT

S A

F E

T Y

M A

IN

T

A N

E N

C E

A B

N O

R M

A L

O N

/O F

F O

P E

N /C

L O

S E

A L A

R M

R U

N T

IM

E

T O

T A

L

IZ

A T

IO

N

T R

E N

D

EF-D-DP EXHAUST AIR DIFFERENTIAL PRESSURE ●

EF-D-LSS EXHAUST AIR LOW STATIC SHUTDOWN ●

EF-DMPR-MOD EXHAUST AIR DAMPER OPEN/CLOSE ●

EF-DMPR-S EXHAUST AIR DAMPER POSITION ● ● ● ● ●

EF-X-S EXHAUST FAN STATUS ● ● ● ● ●

EF-X-SS EXHAUST FAN START/STOP ●

NOT TO SCALE

LABORATORY EXHAUST FAN CONTROL DIAGRAM

FAN COIL UNIT (FCU-X) AND AIR COOLED CONDENSING UNIT (CU-X) POINTS

CONTROL

POINT TAG SYSTEM POINT DESCRIPTION

INPUTS OUTPUTS ALARM REPORTS

NOTESDI AI DO AO H

IG

H \L

O W

L

IM

IT

S A

F E

T Y

M A

IN

T

A N

E N

C E

A B

N O

R M

A L

O N

/O F

F O

P E

N /C

L O

S E

A L A

R M

R U

N T

IM

E

T O

T A

L

IZ

A T

IO

N

T R

E N

D

CU-SS CONDENSING UNIT START / STOP ●

SF-SS SUPPLY FAN START / STOP ●

SPC-T SPACE TEMPERATURE ● ● ●

SEQUENCE OF OPERATIONS

SPLIT SYSTEM HEAT PUMP (ACU-X / CU-X)

GENERAL DESCRIPTION

THE SPLIT SYSTEM HEAT PUMP OPERATES TO PROVIDE COOLING AND HEATING TO

THE CONDITIONED ZONE AS SHOWN ON THE DRAWINGS.

MODES OF OPERATION

OCCUPIED

OCCUPIED MODE SHALL BE ENABLED AT ALL TIMES WITHIN THE BUILDING

OCCUPIED SCHEDULE PER THE PROJECT DESIGN CONDITIONS FOR THIS PROJECT.

UNOCCUPIED

UNOCCUPIED MODE SHALL BE ENABLED AT ALL TIMES OUTSIDE THE BUILDING

OCCUPIED SCHEDULE PER THE PROJECT DESIGN CONDITIONS FOR THIS PROJECT.

COMPONENT CONTROLS

INDOOR UNIT (ACU-X)

OCCUPIED MODE

ON A CALL FOR COOLING, THE FAN SHALL MODULATE TO MAINTAIN THE OCCUPIED

SPACE TEMPERATURE COOLING SETPOINT.

ON A CALL FOR HEATING, THE FAN SHALL MODULATE TO MAINTAIN THE OCCUPIED

SPACE TEMPERATURE HEATING SETPOINT.

UNOCCUPIED MODE

THE FAN SHALL OPERATE AS IF IN OCCUPIED MODE.

OUTDOOR UNIT (CU-X)

OCCUPIED MODE

ON A CALL FOR COOLING, THE OUTDOOR UNIT SHALL OPERATE SUBJECT TO THE

INTEGRATED FACTORY DIGITAL CONTROLS (DDC) SYSEM.

ON A CALL FOR HEATING, THE OUTDOOR UNIT SHALL OPERATE SUBJECT TO THE

INTEGRATED FACTORY DIGITAL CONTROLS (DDC) SYSEM.

UNOCCUPIED MODE

THE OUTDOOR UNIT SHALL OPERATE AS IF IN OCCUPIED MODE.

NOT TO SCALE

SPLIT SYSTEM HEAT PUMP CONTROLS DIAGRAM

# Revision Date

John Ernest Sommers, PE

TELECOMMUNICATIONS

1. ALL TELECOMMUNICATION CONDUIT SHALL BE A MINIMUM OF 1" IN

DIAMETER STUBBED TO OR TOWARDS NEAREST CABLE TRAY, UNLESS

OTHERWISE NOTED. END POINT OF CONDUIT, SHALL BE HAND

ACCESSABLE AND REACHABLE. PROVIDE INSULATED BUSHINGS ON ALL

RACEWAYS.

2. ALL CABLES RUN EXPOSED IN STRUCTURE ABOVE OR ABOVE CEILINGS

SHALL BE SUPPORTED BY OPEN STYLE BRIDLE RINGS OR J-HOOKS AT

EVERY 5'-0" TO CABLE TRAYS.

3. ALL TELECOMMUNICATION CABLING SHALL BE PLENUM-RATED.

4. PROVIDE WIRING COIL FOR SECURITY CAMERAS AND WIRELESS

ACCESS POINTS IN ACCORDANCE WITH THE DETAILS.

5. REFER TO THE TELECOMMUNICATIONS FACEPLATE DETAILS FOR

ADDITIONAL INFORMATION AND REQUIREMENTS FOR THE FOLLOWING:

CPP

FPP

COPPER PATCH PANEL

FIBER PATCH PANEL

TELECOMMUNICATIONS

ENCLOSURE

PA SPEAKER

SECURITY CAMERA

CONNECTION

(CAT6 - PURPLE)

SEE DRAWINGS

FOR LOCATIONS

PM - PATIENT MONITORING DEVICE W/ DOUBLE ANTENNAE (ORANGE CABLE)

GW - GET WELL DATA OUTLET (BROWN CABLE)

PW - PUBLIC WIRELESS ACCESS POINT (PINK CABLE)

NC - CENTRAX NURSE CALL WIRELESS ACCESS POINT W/ DOUBLE ANTENNAE (LIME

GREEN CABLE)

CW - CLINICAL WIRELESS ACCESS POINT (HUNTER GREEN CABLE)

SA - SINGLE ANTENNAE W/ GREEN DOT (BLACK CABLE)

VZ - VERIZON ACCESS POINT

MULTI-SERVICE FLOORBOX

FOUR-COMPARTMENT

SHALLOW INSTALLATIONS

DATA OUTLET (CAT6A)

WALL-MOUNTED

V - VOICE (CAT6A - WHITE)

D - DATA (CAT6A - BLUE)

P - PRINTER (CAT6A - BLUE)

T - GET WELL TV (CAT6A -

BROWN)

# - INDICATES QUANTITY OF

CABLE HOMERUNS TO ROOM.

- NO NUMBER INDICATES ONE

CABLE

WIRELESS ACCESS POINT

CEILING-MOUNTED

PU - PUBLIC WAP (CAT6A - PINK)

WIRELESS ACCESS POINT

POLE-MOUNTED

HARDENED ELECTRONICS

FOR EXTERIOR

INSTALLATIONS

PA - PA SYSTEM (WHITE CABLE)

S

COMBINATION AUDIO/VISUAL ALARM

AUDIBLE ALARM ONLY

CARD READER WITH PIN PAD WALL MOUNT AT +42" A.F.F.

ELECTRIC DOOR STRIKE (FURNISHED BY G.C., INSTALLED BY E.C.)

SECURITY ALARM SYSTEMS

ACCESS CONTROL SYSTEMS

SECURITY CAMERA (CAT6A TO TR ROOM)

IME119-1S (MATCH EXISTING)

NUMBER INDICATES CAMERA DEG

WAVE OPEN SWITCH : +42" A.F.F. OR AS NOTED

CEILING MOUNT - REQUEST TO EXIT INFERRED MONITION DETECTOR

DOOR POSITION SWITCH

POWER SUPPLY - DOOR OPENER

RESPONSIBILITIES:

RESPONSIBILITIES:

RACEWAY AND BOXES: CONTRACTOR FURNISHED,

INSTALLED

WIRING: CONTRACTOR FURNISHED, INSTALLED

DEVICES: CONTRACTOR FURNISHED, INSTALLED

RACEWAY AND BOXES: CONTRACTOR FURNISHED, INSTALLED

WIRING: CONTRACTOR FURNISHED, INSTALLED

DEVICES: CONTRACTOR FURNISHED, INSTALLED

EXISTING ACCESS CONTROL SYSTEM IS LENEL.

PS

ES

CR

A

V

SECURITY ELECTRONICS

1. REFER TO THE SECURITY ELECTRONICS LEGEND FOR ELECTRICAL

CONTRACTOR RESPONSIBILITIES AND SCOPE AS IT PERTAINS TO

SCOPE IDENTIFIED WITHIN THE SECURITY ELECTRONICS DRAWINGS.

2. PROVIDE ALL RACEWAYS, ENCLOSURES AND BACK BOXES FOR

SECURITY ELECTRONICS DEVICES. REFER TO THE SECURITY

ELECTRONICS (SE-SERIES) DRAWINGS FOR COMPONENTS REQUIRING

A DEDICATED HOMERUN.

3. PROVIDE A COMPLETE RACEWAY SYSTEM FOR DEVICES AND

COMPONENTS SHOWN ON THE SECURITY ELECTRONICS DRAWINGS.

RACEWAY SYSTEM INCLUDES ALL WIRE WAY, WIRE DUCT, CONDUIT,

UNDERGROUND DUCT BANKS, DIRECT-BURIED CONDUIT, SLEEVES AND

PULL STRINGS.

4. INSTALL ALL SECURITY SYSTEM SPECIALTY ENCLOSURES AND

BACKBOXES FURNISHED AS PART OF THE SECURITY ELECTRONICS

PACKAGE.

5. PROVIDE HORIZONTAL CABLING TO SECURITY ELECTRONICS CAMERAS

AND DEVICES AS REQUIRED FOR CONNECTIVITY.

6. PROVIDE RECESSED, DOUBLE-GANG NEMA 3R BACKBOX WITH

GASKETED FACEPLACE FOR ALL EXTERIOR CAMERAS.

REX

DPS

MATRIX OF RESPONSIBILITIES

ACTIVE EQUIPMENT (SERVERS, SWITCHES,

RACK-MOUNTED UPS's, ETC.)

VOICE/DATA

PASSIVE EQUIPMENT AND APPURTENANCES

(RACKS, CABINETS, CABLE MANAGEMENT,

PATCH PANELS, PETS, HIGH-DENSITY

ADAPTERS, WALL PLATES, JACKS,

CONNECTORS, RACEWAYS, BOXES, ETC.)

BACKBONE AND HORIZONTAL CABLING

CROSS-CONNECTS AND PATCH CABLING

AUDIO/VIDEO

PASSIVE EQUIPMENT & APPURTENANCES

(RACKS, CABINETS, CABLE MANAGEMENTS,

RACEWAYS, BOXES, WALL PLATES, ETC.)

ACTIVE EQUIPMENT (SWITCHES, DISPLAYS,

PROJECTORS, SPEAKERS, ETC.)

CABLING AND CONNECTORS

O F

O I

O F

C I

C F

C I

(N

O T

E

(N

O T

E

UG RACEWAYS FOR SP CABLING

TELECOMMUNICATIONS DEVICES

(WIFI, VoIP PHONES, ETC.)

PASSIVE EQUIPMENT & APPURTENANCES

(RACKS, CABINETS, CABLE MANAGEMENTS,

RACEWAYS, BOXES, WALL PLATES, ETC.)

SECURITY CAMERAS

REUSE - OFCI

NEW - CFCI

CABLING AND CONNECTORS

1.

2.

NOTES:

FURNISHED AND INSTALLED BY SERVICE PROVIDER UNDER CONTRACT WITH

GENERAL CONTRACTOR.

NOT ALL SYSTEM COMPONENTS ARE LISTED ABOVE; FURNISH AND INSTALL ALL

OTHER COMPONENTS AS INDICATED WITHIN THESE DOCUMENTS AND IN THE

SPECIFICATIONS. ONLY SYSTEM COMPONENTS WHICH COMMONLY REQUIRE

CLARIFICATION ARE LISTED ABOVE.

SECURITY ELECTRONICS

A AMPERES

AC ALTERNATING CURRENT

ACS ACCESS CONTROL SYSTEM

AFF ABOVE FINISHED FLOOR

AIC AMPERES INTERRUPTING CAPACITY

AV AUDIO/VIDEO

AWG AMERICAN WIRE GAUGE

BAS BUILDING AUTOMATION SYSTEM

C CONDUIT

CAT CATEGORY

CATV CABLE TELEVISION

CBP COPPER BACKBONE PATCH PANEL

CCTV CLOSED CIRCUIT TELEVISION

CFCI CONTRACTOR FURNISHED,

CONTRACTOR INSTALLED

COMM COMMUNICATIONS

CPP COPPER HORIZONTAL PATCH PANEL

CT CABLE TRAY

CU COPPER

CUH CABINET UNIT HEATER

CO COPIER

DC DIRECT CURRENT

DPST DUAL POLE, SINGLE THROW

DW DISHWASHER

EC EMPTY CONDUIT

EF EXHAUST FAN

EGC EQUIPMENT GROUNDING CONDUCTOR

EIA ELECTRONICS INDUSTRIES ASSOCIATIONS

EMT ELECTRICAL METALLIC TUBING

EOC EMERGENCY OPERATIONS CENTER

EPO EMERGENCY POWER OFF

ETR EXISTING TO REMAIN

EWC ELECTRIC WATER COOLER

FAAP FIRE ALARM ANNUNCIATOR PANEL

FACP FIRE ALARM CONTROL PANEL

FBO FURNISHED BY OTHERS

FO FIBER OPTIC

FPD FLAT PANEL DISPLAY

FPP FIBER OPTIC PATCH PANEL

FT FEET OR FOOT

GFI OR GFCI GROUND FAULT CIRCUIT INTERRUPTER

GC GENERAL CONTRACTOR

G OR GND GROUND

GFR GROUND FAULT RELAY

GFP GROUND FAULT PROTECTION

HZ HERTZ

IG ISOLATED GROUND

INV INVERTER

JBOX JUNCTION BOX

K KILO

KCMIL THOUSAND CIRCULAR MILS

KV KILOVOLT AMPERES

KWH KILOWATT HOURS

LC LIGHTING CONTACTOR

LPI LIGHTNING PROTECTION INSTITUTE

MAX MAXIMUM

MCB MAIN CIRCUIT BREAKER

MDP MAIN DISTRIBUTION PANEL

MH MANHOLE

MLO MAIN LUGS ONLY

MM MULTIMODE

MTD MOUNTED

MW MICROWAVE

N NEUTRAL CONDUCTOR

N.C. NORMALLY CLOSED

NEC NATIONAL ELECTRICAL CODE

NEMA NATIONAL ELECTRICAL

MA MANUFACTURER'S ASSOCIATION

NIC NOT IN CONTRACT

NL NIGHT LIGHT

N.O. NORMALLY OPEN

NTS NOT TO SCALE

OC ON CENTER

OFCI OWNER FURNISHED,

CONTRACTOR INSTALLED

OFOI OWNER FURNISHED,

OWNER INSTALLED

ONT OPTICAL NETWORK TERMINAL

P POLE

PR PAIR

PVC POLYVINYL CHLORIDE

R RELAY

REF REFRIGERATOR

RGS RIGID GALVANIZED STEEL CONDUIT

RN REPLACE WITH NEW

RMC RIGID METAL CONDUIT

SCCR SHORT CIRCUIT CURRENT RATING

SCH SCHEDULE

ScTP SHIELDED TWISTED PAIR

SE SECURITY ELECTRONICS

SM SINGLE MODE

SPD SURGE PROTECTION DEVICE

SPECS CONTRACT SPECIFICATIONS

SPST SINGLE POLE SINGLE THROW

STR STRAND

SWBD SWITCHBOARD

T TRANSFORMER

TR TELECOMMUNICATIONS ROOM

TYP TYPICAL

UHF ULTRA-HIGH FREQUENCY

UL UNDERWRITERS' LABORATORIES

UON UNLESS OTHERWISE NOTED

UPS UNINTERRUPTABLE POWER SUPPLY

UTP UNSHIELDED TWISTED PAIR

V VOLTS

VA VOLT AMPERES

VFD VARIABLE FREQUENCY DRIVE

VHF VERY HIGH FREQUENCY

VM VENDING MACHINE

W WIRE OR WATT

WP WEATHERPROOF

WR WEATHER-RESISTANT

WPIU WEATHERPROOF WHILE IN USE

XFMR TRANSFORMER

XRL EXISTING TO BE RELOCATED

Z IMPEDANCE

ABBREVIATIONS

ELECTRICAL DEMOLITION NOTES

1. REMOVE, CAP AND RELOCATE EQUIPMENT, OUTLETS, CONDUIT, WIRE,

ETC., AS SHOWN AND SPECIFIED ON DRAWINGS, AND AS MAY BECOME

NECESSARY BECAUSE OF EXISTING FIELD CONDITIONS. VISIBLY EXAMINE

ALL EXISTING WALLS DESIGNATED FOR REMOVAL TO DETERMINE THE

CONDUIT AND THE WIRING THAT WILL REQUIRE CAPPING AND REMOVAL,

WHETHER OR NOT SUCH CONDITIONS ARE INDICATED ON THE DRAWINGS.

FAILURE TO VISIT THE SITE AND TO TAKE ALL EXISTING CONDITIONS INTO

ACCOUNT WILL NOT ALLOW FOR CHANGES TO THE SCOPE OF WORK.

2. MAINTAIN CIRCUIT CONTINUITY TO ALL EXISTING FIXTURES, EQUIPMENT,

OUTLETS, ETC., TO REMAIN IN USE WHETHER NOTED ON THE PLANS OR

NOT. FIELD VERIFY EXISTING ITEMS TO REMAIN IN USE. RECONNECT

RACEWAYS AND WIRING FOR EXISTING CIRCUITS WHICH MUST BE RE-

ROUTED OR WHICH ARE PARTIALLY ABANDONED TO POWER THE

REMAINING OUTLETS ON THE CIRCUIT.

3. REMOVE ALL UNUSED WIRING AND CABLES BACK TO THEIR SOURCE.

REMOVE ALL UNUSED CONDUIT THAT IS EXPOSED OR ABOVE ACCESSIBLE

CEILINGS WHICH IS AFFECTED BY OR IS IN THE AREA OF THE DEMOLITION

WORK.

4. THE INTENTION OF THE ELECTRICAL DEMOLITION DRAWINGS IS TO

DISCONNECT AND REMOVE ALL ELECTRICAL WORK MADE VOID BY THE

SCOPE OF THE CONSTRUCTION AND ALTERATION. FIELD VERIFY EXACT

MATERIAL QUANTITIES REQUIRED TO BE REMOVED.

5. DISCONNECT AND REMOVE ALL EXISTING ELECTRICAL EQUIPMENT,

DEVICES, ASSOCIATED RACEWAYS, SUPPORTING HARDWARE, AND

WIRING, WHICH HAVE BEEN MADE OBSOLETE BY THE WORK OR IS SHOWN

DASHED ON THE ELECTRICAL DEMOLITION DRAWINGS, UNLESS

OTHERWISE NOTED. ALTHOUGH AN ATTEMPT HAS BEEN MADE TO

INDICATE ALL OF THIS WORK, TOTAL ACCURACY IS NOT GUARANTEED.

VISIBLY EXAMINE ALL AREAS AND WALLS AND CEILINGS SCHEDULED FOR

REMOVAL TO DETERMINE EXISTING ELECTRICAL ITEMS TO REMAIN.

6. WHERE ELECTRICAL EQUIPMENT, CONDUIT, BOXES, AND SUPPORTING

HARDWARE ARE REMOVED, PATCH AND FINISH THE SURFACE AS

REQUIRED TO MATCH THE EXISTING, USING WORKERS QUALIFIED IN THE

APPROPRIATE TRADE.

7. WHERE BURIED CONDUITS EXTENDING OUT OF A CONCRETE SLAB

BECOME ABANDONED, CUT AND GRIND THE CONDUITS OFF FLUSH WITH

TOP OF SLAB AND PLUG WITH NON-SHRINK WATERPROOF GROUT FILL.

8. TAKE ALL REMOVED MATERIALS FROM THE PROJECT SITE, EXCEPT FOR

THOSE TO BE RELOCATED, STORED, OR TURNED OVER TO THE OWNER.

9. ACCEPTANCE OF CONTRACT MEANS INSTALLER ACCEPTS EXISTING

CONDITIONS.

10. COORDINATE ALL DEMOLITION WORK WITH ALL OTHER TRADES.

11. PROVIDE A BLANK COVER OVER THE OUTLET WHERE A FLUSH DEVICE IS

BEING REMOVED FROM FLOORS AND WALLS THAT ARE TO REMAIN.

MATCH THE COLOR AND MATERIAL TO THE EXISTING REMAINING COVERS

IN THE ROOM OR SPACE.

12. LEGALLY DISPOSE OF HAZARDOUS MATERIALS AND BALLASTS OR OTHER

EQUIPMENT CONTAINING PCBS AND LAMPS CONTAINING MERCURY.

COMPLY WITH ALL FEDERAL, EPA, STATE, AND LOCAL LAWS.

13. REPLACE EXISTING PANEL DIRECTORIES FOR PANELBOARDS WHICH HAVE

HAD ALTERATIONS TO THE CIRCUITS ORIGINATING THEREIN. DESCRIBE

THE LOAD AND LOCATION. TYPE, DO NOT HAND LETTER NEW

PANELBOARD DIRECTORIES.

ELECTRICAL GENERAL NOTES

1. MAKE ALL INSTALLATIONS IN ACCORDANCE WITH THE AMERICANS WITH

DISABILITIES ACT ACCESSIBILITY GUIDELINES (ADAAG).

2. MOUNTING HEIGHTS INDICATED WITHIN PLANS AND SCHEDULES ARE

DIMENSIONED TO THE CENTER LINE OF THE DEVICE, EQUIPMENT,

LUMINAIRE, ETC. UNLESS OTHERWISE NOTED.

3. COORDINATE EXACT EQUIPMENT LOCATIONS WITH OTHER TRADES.

EQUIPMENT LOCATIONS SHOWN ON ELECTRICAL PLANS ARE

DIAGRAMMATICAL ONLY AND MIGHT NOT BE EXACT.

4. CIRCUIT IDENTIFICATION NUMBERS BESIDE ELECTRICAL DEVICES AND

CONNECTION POINTS ON PLANS CORRESPOND TO AN OVERCURRENT

DEVICE IN THE DESIGNATED PANELBOARD. NOTE ALL CIRCUIT NUMBER

CHANGES MADE IN THE FIELD AT EACH ELECTRICAL DEVICE AND

CONNECTION POINT. ALSO CORRECT THE DIRECTORIES AND DEVICE

MARKINGS AT PANELBOARDS, SWITCHBOARDS AND SWITCHGEAR TO

ACCURATELY REFLECT THE AS-BUILT CONDITIONS.

5. INSTALL EMERGENCY AND EXIT LUMINAIRE WIRING IN A SEPARATE

RACEWAY FROM THAT OF ANY NORMAL POWER DEVICE.

6. CONCEAL ALL CONDUIT IN WALLS, PARTITIONS, ABOVE CEILINGS, AND IN

FLOOR SLABS, ETC. UNLESS OTHERWISE INDICATED ON THE PLANS OR IN

THE SPECIFICATIONS. CONDUIT ROUTED IN MECHANICAL ROOMS,

ELECTRICAL ROOMS, AND STORAGE ROOMS WITHOUT CEILINGS MAY BE

ROUTED EXPOSED.

7. COORDINATE VERTICAL CONDUIT ROUTING TO WALL MOUNTED DEVICES

TO ENSURE DEVICES LOCATED WITHIN AN 18-INCH HORIZONTAL

DIMENSION WILL BE CENTER-ALIGNED VERTICALLY.

8. CONCEAL ELECTRICAL CONNECTIONS FOR ELECTRIC WATER COOLERS

(EWC)…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .