About this file

This document provides details for a federal solicitation to relocate a physical medicine and rehabilitation department. The solicitation number is 36C25523R0072 and seeks to move Physical Medicine & Rehabilitation to the fourth floor at a Veterans Affairs medical center with project number 589A4-22-100. The solicitation was issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 15 for an opportunity type of solicitation. Contractors should respond with proposals to relocate the department as described. Key details provided include the federal agency issuing the solicitation, the work location, and a high-level description of services required to fulfill the requirements of the opportunity.

View the file

Other files

File Type Posted
36C25523R0072 0004.docx DOCX document
AMENDMENT 3 - Specifications.pdf PDF
36C25523R0072 0003.docx DOCX document
Prebid-site visit attendee list.pdf PDF
36C25523R0072 0002.docx DOCX document
589A4-22-100 Volume 2 Specifications- 494 pages.pdf PDF
36C25523R0072 0001.docx DOCX document
Drawings-589A4-22-100-2023-02-15 BID Set- Part5-pages 10.pdf PDF
Drawings-589A4-22-100-BID Set -2-15-2023- Part1-7 pages.pdf PDF
Drawings-589A4-22-100-2023-02-15 BID Set -Part4-pages 10.pdf PDF
36C25523R0072.docx DOCX document
Drawings-589A4-22-100-2023-02-15 BID Set - Part12-pages 11.pdf PDF
Drawings-589A4-22-100- 2023-02-15 BID Set-Part2- Pages 6.pdf PDF
Drawings-589A4-22-100-2023-02-15 BID Set- Part13-pages 1.pdf PDF
Drawings-589A4-22-100-2023-02-15 BID Set-Part6-pages 6.pdf PDF
Drawings-589A4-22-100-2023-02-15 BID Set- Part9-pages 8.pdf PDF
Drawings-589A4-22-100-2023-02-15 BID Set - Part3-pages-12.pdf PDF
Specifications-589A4-22-100-2023-02-15 BID Set - VOL 1- Pages 785.pdf PDF
Drawings-589A4-22-100-2023-02-15 BID Set-Part8-pages 9.pdf PDF
Drawings-589A4-22-100-2023-02-15 BID Set-Part11-pages 9.pdf PDF
Drawings-589A4-22-100-2023-02-15 BID Set-Part10-pages 13.pdf PDF
Drawings-589A4-22-100-2023-02-15 BID set - Part7-pages 9.pdf PDF
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ABBREVIATIONS

PROJ(D)

PLBG

PLYWD

PREFIN

RAD(R)

RESIL

REINF

REQ'D

SECT

SHWR

SPECS

REFRIG

GALVANIZEDGALVBMRK BENCHMARK

CONCRETE

MASONRY UNIT

CEILINGCLG

CLR

CMU

COL

CLO

CLEAR/CLEARANCE

COLUMN

CLOSET

CAB

CJ

CC

CB

BW

CL

BOC

BRZ

BRK

BO

BRG

BUR

BTM

BS

BUILT-UP ROOF

CENTER TO CENTER

CHALKBOARD

BOTTOM OF WALL

CENTER LINE

CONTROL JOINT/

CONSTRUCTION JOINT

CABINET

BACK OF CURB

BOTH SIDES

BOTTOM OF

BRONZE

BRICK

BEARING

BOTTOM

FOUNDATION

FLOOR DRAIN

FIRE EXTINGUISHER

FIRE

EXTINGUISHER

CABINET

FE

FEC

FDN

FD

EAST

EACH

EQUIPMENT

EXPOSED

EACH WAY

EXISTING

ELECTRICAL

EXTERIOR INSULATION

FINISH SYSTEM

ELEVATION/ELEVATOR

EXPANSION JOINT

EXISTING GRADE

ELECTRICAL CONTRACTOR

EXTERIOR

ETHYLENE PROPYLENE

DIENE TERPOLYMER

ELEV

EQUIP

EW

EPDM

EXP

EXIST

EXT

E

EA

EC

EG

EIFS

EJ

ELEC

INSULATION

INTERIOR

INSIDE DIAMETER

INSUL

IN(")

INT

ID

INCH

GRAB BAR

GENERAL CONTRACTOR

GYPSUM

GLASS/GLAZING

HOLLOW METAL

HIGH PRESSURE

DECORATIVE LAMINATE

HORIZONTAL

HARDWARE

HARDWOOD

HOSE BIB

HOT WATER

HEATING, VENTILATING

& AIR CONDITIONING

HDWR

HM

HORZ

HT

HPDL

HVAC

HW

HEIGHT

GB

GL

GRD

GYP

GC

HDWD

HB

GRADE

PART

PLAS

OVHD

PARTITION

PLASTER

OVERHEAD

SRT

SS

SQ

MISCELANEOUS

MASONRY OPENING

NOT IN CONTRACT

NOT APPLICABLE

OUTSIDE DIAMETER

NUMBERNO(#)

NTS

OC

OA

NOM

OFF

OPNG

OD

ON CENTER

OVERALL

NOMINAL

NOT TO SCALE

OFFICE

OPENING

MISC

N

MO

MULL

MTL

NIC

NA

NORTH

MULLION

METAL

SHT

SF

SB

SND

SIM

S

RM

ROW

RO

SAT

SAN

ARCHITECT/

ARCHITECTURAL

AB ANCHOR BOLT

APPROX

BLDG

BD

ARCH

BM

BLK

ADJ

AFF

AC

ACCU

ALUM

ANOD

ALT

APPROXIMATE

BLOCK/BLOCKING

AT

BOARD

BEAM

BUILDING

AIR COOLED

CONDENSING UNIT

ABOVE FINISHED FLOOR

ADJUSTABLE

ALTERNATE

ANODIZED

ACOUSTICAL

ALUMINUM

A/C AIR CONDITIONING

PLUS OR MINUS

CONSTRUCTIONCONST

COURSE

CERAMIC TILE

CONTINUOUS

CARPET

CORRIDOR

DIAMETER

DOOR

DOWN

DITTO

DIMENSION

DOUBLE

DRINKING FOUNTAIN

DETAIL

DRAWING

DOWNSPOUT

DIA

DR

DS

DN

DO

DIM

DTL

DWG

CRS

CT

CONT

CORR

CPT

DBL

DF

CONFERENCE

CONCRETE

CONF

CONC

FINISHFIN

FLUORESENT

FLOW LINE

FOLDING

FIELD VERIFY

FURNACE

FOOTING

FIRE RETARDANT

FOOT SCRAPER

FIBERGLASS

REINFORCED PLASTIC

FV

FT(')

FURR

FURN

FTG

G

GA

FOOT

FURRING

GAS

GUAGE

FRP

FLR

FLDG

FL

FRT

FS

FLUOR

FLOOR

FINISH GRADE

FINISH FLOOR

FG

FF

JOISTJST

LOW VOLUMN CHANGE

MASONRYMAS

MANUF

MATL

MAX

MECH

MEMB

MH

MIN

MIRR

MANUFACTURER

MATERIAL

MECHANICAL

MEMBRANE

MAXIMUM

MINIMUM

MANHOLE

MIRROR

LDR

LF

LAV

LAM

LVC

LOCN

LINEAL FEET

LADDER

LAVATORY

LAMINATE

LOCATION

REF

R

RAG

RD

PT

PR

QT

PTD

JT

JAN JANITOR

JOINT

PL

UNDER CABINET LIGHTREQUIRED

PHYSICAL THERAPY

RESPIRATORY CARE

SURGICAL INTENSIVE CARE UNIT

STUDDED RUBBER TILE

STAINLESS STEEL

SQUARE

SPECIFICATIONS

YD

SUSPENDED

ACOUSTICAL TILE

SIMILAR

SANITARY NAPKIN

DISPENSER

SECTION

SHOWER

SHEET

SQUARE FEET

SPLASH BLOCK

RESILIENT

SOUTH

SANITARY

RIGHT OF WAY

ROUGH OPENING

ROOM

WD

WNDW

WH

WNSCT

WC

WT

WWF

WP

VCT

VWC

VEST

VERT

W

W/

W/O

YARD

WATERPROOFING

/WATERPROOF

WELDED WIRE FABRIC

WATER HEATER

WATER CLOSET

WINDOW

WOOD

WAINSCOT

WEIGHT

VINYL COMPOSITION TILE

VINYL WALL COVERING

VERTICAL

VESTIBULE

WEST

WITH

WITH OUT

RC

SICU

CENTRAL STERILE

LONG TERM CARE

INTENSIVE CARE UNIT

OCCUPATIONAL THERAPY

MAGNETIC RESONANCE IMAGING

POST ANESTHETIC CARE UNIT

MEDICAL INTENSIVE CARE UNIT

LABOR-DELIVERY-RECOVERY-POST PARTUM

OPERATING ROOM

FOR MEDICAL

FACILITIES ONLY

EMERGENCY ROOM

COMPUTED TOMOGRAPHY

STORPLUMBING

PROJECT/(PROJECTED)

REFER/REFERENCE

ROOF DRAIN

RADIUS

RETURN AIR GRILLE

REINFORCING

REFRIGERATOR

RISER

PRESSURE TREATED

PAINTED

QUARRY TILE

PLYWOOD

PREFINISHED

PAIR

TLT

TV

TW

TOC

TPH

TO

TYP

UCL

T&B

T

SUSP

STRUCT

TEL

TB

T&G

PLATE/PLASTIC/

PROPERTY LINE STL

STD

STORAGE

TOILET PAPER HOLDER

TOP OF CURB

TOILET

TELEVISION

TOP OF

TYPICAL

TOP OF WALL

TONGUE & GROOVE

TOP & BOTTOM

STRUCTURE/STRUCTURAL

TREAD

TELEPHONE

TACKBOARD

SUSPENDED

ICU

OR

LDRP

MRI

MICU

LTC

PT

PACU

OT

CS

CT

ER

STEEL

STANDARD

CUT STONE

STEEL

PLYWOOD

FINISH WOOD

CONT WD FRAMING

WOOD BLOCKING

MATERIAL SYMBOLS

LVC FILL

GRANULAR FILL

CONCRETE MASONRY

FACE BRICK

CONCRETE

EARTH

EXISTING CONSTRUCTION

ASPHALT

GLASS

RIGID OR TAPERED

INSULATION, EIFS

BATT INSULATION

GYPSUM BOARD

DRAWING SYMBOLS

95.00

TOC

98.5

TOC

98.5 E

B

NEW ELEVATION

ELEVATION DESCRIPTION

EXISTING CONTOUR

NEW CONTOUR

TEST BORING (SITE PLANS ONLY)

EXISTING ELEVATION

ELEVATION DESCRIPTION

PROPERTY LINE

/1 A101

/1 A101 MATCHLINE

SHT. REFERENCE

ELEVATION DATUM

(SECTIONS, ELEVATIONS ONLY)

BUILDING SECTION

WALL SECTION

DETAIL DRAWING

BUILDING ELEVATION

AI-201

INTERIOR ELEVATION

A100

WINDOW ID TAG

DOOR NUMBER

ROOM NAME

ROOM NAME & NUMBER

PARTITION SYMBOL

1 REVISION TAG

COLUMN LINE GRID

ME100E EQUIPMENT NUMBER

SITE PLAN NOTES

DEMOLITION PLAN NOTES

VICINITY MAP

NO SCALE

PRECAST CONCRETE

WALL PANEL TAG

XXX

AE-101

A-4 ALTERNATE TAG

PT-XX PAINT COLOR TAG

# PLAN NOTES &

ROOF PLAN NOTES

PROJECT

LOCATION

AE-201

AE-301

AE-310

N

600 EAST 7TH STEET

SIOUX FALLS, SOUTH DAKOTA 57103

605.274.2893

A

B

C

D on e e ig ht h in ch o ne fo ot on e q ua rt er i nc h th re e e ig ht hs o ne f oo t on e h al f ne f oo t th re e q ua rt er s on e in ch on e a nd on e h al f in ch es o ne f oo t th re e in es ne f oo t

1 2 3 4 5 6

A

B

C

D

1 2 3 4 5 6

VA FORM 08-6231

Office of Construction and Facilities Management

Department of Veterans AffairsDwg.

Drawing Number

Building Number

Project NumberProject Title

Location

Date Checked Drawn

Drawing Title

Approved: Project Director

CONSULTANTS: ARCHITECT/ENGINEERS:

330 N MEAD

WICHITA, KANSAS 67202

316.262.2500

6 SOUTH OLD ORCHARD

ST. LOUIS, MISSOURI 63119

800.404.7677

GI001

TITLE SHEET

RELOCATE PHYSICAL

MEDICINE & REHAB. TO THE

4TH FLOOR

800 HOSPITAL DRIVE COLUMBIA, MO 65201

02-15-2023

589A4-22-100

RELOCATE PHYSICAL MEDICINE & REHAB. TO THE 4TH FLOOR

HARRY S. TRUMAN MEMORIAL VETERANS' HOSPITAL

DEPT OF VETERANS AFFAIRS

800 HOSPITAL DRIVE COLUMBIA, MO 65201

BID DOCUMENTS

BID DOCUMENTS

589A4-22-100

IEPJHK

SHEET INDEX

SHEET # SHEET NAME R.1

MECHANICAL

M-000 MECHANICAL SYMBOLS AND ABBREVIATIONS

M-001 MECHANICAL PHASING PLANS

MD101 MECHANICAL DEMOLITION PLAN - PIPING - 3RD FLOOR - AREA A X

MD102 MECHANICAL DEMOLITION PLAN - 4TH FLOOR - OVERALL X

MD103 MECHANICAL DEMOLITION PLAN - PIPING - 4TH FLOOR - AREA A X

MD104 MECHANICAL DEMOLITION PLAN - PIPING - 4TH FLOOR - AREA B X

MD105 MECHANICAL DEMOLITION PLAN - DUCTWORK - 4TH FLOOR - AREA A X

MD106 MECHANICAL DEMOLITION PLAN - DUCTWORK - 4TH FLOOR - AREA B X

MD107 MECHANICAL DEMOLITION PLAN - DUCTWORK - LOWER PENTHOUSE X

MP101 MECHANICAL NEW WORK PLAN - PIPING - 3RD FLOOR - AREA A X

MH102 MECHANICAL NEW WORK PLAN - 4TH FLOOR - OVERALL X

MP103 MECHANICAL NEW WORK PLAN - PIPING - 4TH FLOOR - AREA A X

MP104 MECHANICAL NEW WORK PLAN - PIPING - 4TH FLOOR - AREA B X

MH105 MECHANICAL NEW WORK PLAN - DUCTWORK - 4TH FLOOR - AREA A X

MH106 MECHANICAL NEW WORK PLAN - DUCTWORK - 4TH FLOOR - AREA B X

MH107 MECHANICAL NEW WORK PLAN - DUCTWORK - LOWER PENTHOUSE X

M-501 MECHANICAL DETAILS

M-601 MECHANICAL SCHEDULES X

M-701 MECHANICAL CONTROLS SYMBOLS AND ABBREVIATIONS

M-702 MECHANICAL CONTROLS

MECHANICAL: 20

ELECTRICAL

E-000 ELECTRICAL SYMBOLS AND ABBREVIATIONS

ED100 ELECTRICAL DEMOLITION PLAN - LIGHTING - 4TH FLOOR - OVERALL

ED101 ELECTRICAL DEMOLITION PLAN - LIGHTING - 4TH FLOOR - AREA A

ED102 ELECTRICAL DEMOLITION PLAN - LIGHTING - 4TH FLOOR - AREA B

ED103 ELECTRICAL DEMOLITION PLAN - POWER - 4TH FLOOR - OVERALL

ED104 ELECTRICAL DEMOLITION PLAN - POWER - 4TH FLOOR - AREA A

ED105 ELECTRICAL DEMOLITION PLAN - POWER - 4TH FLOOR - AREA B

ED106 ELECTRICAL DEMOLITION PLAN - DATA - 4TH FLOOR - OVERALL

ED107 ELECTRICAL DEMOLITION PLAN - DATA - 4TH FLOOR - AREA A

ED108 ELECTRICAL DEMOLITION PLAN - DATA - 4TH FLOOR - AREA B

EL100 ELECTRICAL REFLECTED CEILING PLAN - LIGHTING - 4TH FLOOR - OVERALL

EL101 ELECTRICAL REFLECTED CEILING PLAN - LIGHTING - 4TH FLOOR - AREA A

EL102 ELECTRICAL REFLECTED CEILING PLAN - LIGHTING - 4TH FLOOR - AREA B

EL601 LIGHTING CONTROL SCHEDULE

EN100 ELECTRICAL FLOOR PLAN - NURSE CALL - 4TH FLOOR - OVERALL

EP100 ELECTRICAL FLOOR PLAN - POWER - 4TH FLOOR - OVERALL

EP101 ELECTRICAL FLOOR PLAN - POWER - 4TH FLOOR - AREA A

EP102 ELECTRICAL FLOOR PLAN - POWER - 4TH FLOOR - AREA B X

EP103 ELECTRICAL FLOOR PLAN - POWER - 3RD FLOOR - PARTIAL ROOF

EP400 ELECTRICAL ENLARGED PLAN - 4TH FLOOR - ROOM 414B

EP600 ELECTRICAL PANEL SCHEDULE

EP601 ELECTRICAL PANEL SCHEDULE

EP602 ELECTRICAL PANEL SCHEDULE

EP701 ELECTRICAL ONE-LINE

ET100 ELECTRICAL FLOOR PLAN - DATA - 4TH FLOOR - OVERALL

ET101 ELECTRICAL FLOOR PLAN - DATA - 4TH FLOOR - AREA A

ET102 ELECTRICAL FLOOR PLAN - DATA - 4TH FLOOR - AREA B

ET500 DATA DETAILS

ELECTRICAL: 28

TOTAL SHEETS: 111

SHEET INDEX

SHEET # SHEET NAME R.1

GENERAL

GI001 TITLE SHEET X

GI002 ABA SHEET

GI103 ABA SHEET

GI104 LIFE SAFETY PLAN - 4TH FLOOR

GI110 PHASING PLAN - 4TH FLOOR

HA100 HAZARDOUS MATERIAL PLANS

GENERAL: 6

ARCHITECTURAL

AD100 DEMOLITION RCP - 3RD FLOOR - ABOVE CEILING

AD101 DEMOLITION PLAN - 4TH FLOOR

AD102 DEMOLITION PLAN - 4TH FLOOR - FLOOR PENETRATIONS X

AD111 DEMOLITION RCP - 4TH FLOOR

AE101 FLOOR PLAN - 4TH FLOOR - OVERALL

AE102 FLOOR PLAN - 4TH FLOOR - AREA A

AE103 FLOOR PLAN - 4TH FLOOR - AREA B

AE104 FLOOR PLAN - DIMENSIONS - 4TH FLOOR - AREA A

AE105 FLOOR PLAN - DIMENSIONS - 4TH FLOOR AREA B

AE120 REFLECTED CEILING PLAN - 4TH FLOOR - AREA A

AE121 REFLECTED CEILING PLAN - 4TH FLOOR - AREA B

AE401 ENLARGED PLANS - SLOPED FLOORS

AE501 DETAILS

AE601 SCHEDULES

ARCHITECTURAL: 14

ARCHITECTURAL INTERIORS

AI101 FINISH SCHEDULE

AI102 FINISH PLAN - 4TH FLOOR-AREA A

AI103 FINISH PLAN - 4TH FLOOR-AREA B

AI201 EQUIPMENT SCHEDULE

AI202 EQUIPMENT PLAN - 4TH FLOOR - AREA A

AI203 EQUIPMENT PLAN - 4TH FLOOR - AREA B

AI204 ENLARGED PLANS - EQUIPMENT

AI301 WALL PROTECTION PLAN - 4TH FLOOR - AREA A

AI302 WALL PROTECTION PLAN - 4TH FLOOR - AREA B

AI401 INTERIOR ELEVATIONS

AI402 INTERIOR ELEVATIONS

AI403 INTERIOR ELEVATIONS

AI501 MILLWORK SECTION DETAILS

AI601 SIGNAGE SCHEDULE AND DETAILS

AI602 SIGNAGE PLAN - 4TH FLOOR - AREA A

AI603 SIGNAGE PLAN - 4TH FLOOR - AREA B

ARCHITECTURAL INTERIORS: 16

FIRE SUPPRESSION AND ALARM

F-000 FIRE PROTECTION SYMBOLS AND ABBREVIATIONS

FD101 FIRE PROTECTION DEMOLITION PLAN - 4TH FLOOR - OVERALL

FD201 FIRE ALARM DEMOLITION PLAN - 4TH FLOOR - OVERALL

FD202 FIRE ALARM DEMOLITION PLAN - 4TH FLOOR - AREA A

FD203 FIRE ALARM DEMOLITION PLAN - 4TH FLOOR - AREA B

FX101 FIRE PROTECTION NEW WORK PLAN - 4TH FLOOR - OVERALL

FX501 FIRE PROTECTION - DETAILS

FA000 FIRE ALARM SYMBOLS AND ABBREVIATIONS

FA100 FIRE ALARM FLOOR PLAN - 4TH FLOOR - OVERALL

FA101 FIRE ALARM FLOOR PLAN - 4TH FLOOR - AREA A

FA102 FIRE ALARM FLOOR PLAN - 4TH FLOOR - AREA B

FIRE SUPPRESSION AND ALARM: 11

PLUMBING

P-000 PLUMBING SYMBOLS AND ABBREVIATIONS

PD100 PLUMBING PHASING PLAN - 4TH FLOOR

PD101 PLUMBING DEMOLITION PLAN - 3RD FLOOR - OVERALL

PD102 PLUMBING DEMOLITION PLAN - 3RD FLOOR - AREA A

PD103 PLUMBING DEMOLITION PLAN - 3RD FLOOR - AREA B

PD104 PLUMBING DEMOLITION PLAN - 4TH FLOOR - OVERALL

PD105 PLUMBING DEMOLITION PLAN - 4TH FLOOR - AREA A

PD106 PLUMBING DEMOLITION PLAN - 4TH FLOOR - AREA B

PP101 PLUMBING NEW WORK PLAN - 3RD FLOOR - OVERALL

PP102 PLUMBING NEW WORK PLAN - 3RD FLOOR - AREA A

PP103 PLUMBING NEW WORK PLAN - 3RD FLOOR - AREA B

PP104 PLUMBING NEW WORK PLAN - 4TH FLOOR - OVERALL

PP105 PLUMBING NEW WORK PLAN - 4TH FLOOR - AREA A

PP106 PLUMBING NEW WORK PLAN - 4TH FLOOR - AREA B

P-501 PLUMBING DETAILS

P-601 PLUMBING SCHEDULES

PLUMBING: 16

# Revision Date

1 AMENDMENT 3 05/03/2023

FEC

F E

C

FEC

FEC

FOURTH FLOOR KEY PLAN

N

4.5

5.4

6.2

F.1GHJKLMMa La Jb Hb Ga

6.7

D2

AD102

D2

AD102

E Q

E Q

4"

1"

1"

1"

4"

NEW PIPE PENETRATION

DETAIL C1/AD102

DEMO LEGEND - FLOOR PENETRATIONS

COLUMN STRIPEXISTING PIPE PENETRATION

TO BE INFILLED

DETAIL B1/AD102

INTERSECTING COLUMN

STRIPS

MIDDLE STRIP

- REF. MECHANICAL, ELECTRICAL AND PLUMBING DRAWINGS FOR ADDITIONAL INFORMATION AND

POTENTIAL CONFLICTS W/ EXISTING DUCTWORK/PIPING ON THE FLOOR BELOW.

NEW OPENING FOR

FLOOR DRAIN

DETAIL B1/AD102

CHASE/ MECH. DUCT INFILL

~ 65 S.F.

DEPRESSED SLAB INFILL

~ 710 S.F.

INTERRUPTED EXIST. TOP

REINF. BAR

EXIST. REINF.

EXIST. CONC. COLUMN

EXTEND CFRP STRIP 2'-0" MIN.

BEYOND OPENING, TYP.

TOP CFRP STRIP TO REPLACE

INTERRUPTED TOP REINF.

INTERRUPTED EXIST. BOT.

REINF. BAR

TOP CFRP STRIP TO REPLACE

INTERRUPTED TOP REINF.

BOT. CFRP STRIP TO REPLACE

INTERRUPTED BOT. REINF.

INTERRUPTED EXIST. TOP

REINF. BAR

NEW PENETRATION, TYP., REF.

MEP DRAWINGS

COLUMN STRIP OUTLINE, TYP.

INTERRUPTED EXIST. BOT.

REINF. BAR

BOT. CFRP STRIP TO REPLACE

INTERRUPTED BOT. REINF.

NOTES:

• REF C2/AD102 FOR TYPICAL OPENING SPACING DETAIL.

• NEW OPENINGS ARE TO BE SCANNED BY GPR AND LOCATED TO MISS EXISTING

REINFORCING WHERE POSSIBLE. A MAXIMUM OF (1) EXISTING BAR IN EACH

DIRECTION AT THE TOP AND BOTTOM REBAR MAT IN A SLAB MAY BE CUT AT ANY

NEW OPENING LOCATION, TYPICAL WHERE CFRP REINFORCING IS PROVIDED

UNLESS NOTED OTHERWISE. IF NO BARS ARE CUT IN EITHER DIRECTION, THEN NO

REINFORCEMENT IS NECESSARY AT THAT LOCATION.

• DETAIL IS INTENDED TO SHOW TYPICAL REINFORCING CONDITIONS OF A TWO-WAY

SLAB. CFRP STRIP TO MATCH LOCATION OF EXISTING INTERRUPTED BAR, TYPICAL

(TOP OR BOTTOM OF EXISTING CONCRETE SLAB).

• ALL CFRP STRIPS TO BE SIMPSON CSS-CUCL1014-RL

(100MM (3.94") WIDE X 1.4MM (0.055") THICK) U.N.O.

• CONTRACTOR TO ASSUME THAT 100% OF THE NEW MECHANICAL PIPE

PENETRATIONS WILL BE REINFORCED WITH CFRP FOR BIDDING PURPOSES AND

PROVIDE A DEDUCT AMOUNT FOR EVERY OPENING THAT DOES NOT REQUIRE

CFRP REINFORCING.

EXTERNAL FIBER REINFORCING FOR CONCRETE MEMBERS:

• MATERIALS USED FOR REINFORCING EXISTING CONCRETE MEMBERS SHALL BE CARBON FIBER AND COMPATIBLE RESINS. FIBER SHALL BE SIMPSON STRONG-TIE CSS-CUCL OR APPROVED EQUAL, AND RESIN SHALL BE SIMPSON STRONG-TIE CSS-EP OR APPROVED EQUAL (CURED COMPOSITE PROPERTIES: TENSILE STRENGTH = 181,000 PSI, TENSILE MODULUS = 23,600 KSI, PER ICC-ES AC125). TO BE APPROVED, PRODUCT SUBSTITUTIONS SHALL HAVE

APPROPRIATE ICC-ESR DOCUMENTS.

• PREPARE THE CONCRETE SURFACE ACCORDING TO MANUFACTURER’S RECOMMENDATIONS, INCLUDING REPAIRING

ANY UNEVEN SURFACES.

NEW CONC. SLAB

NOTES:

• FOR OPENINGS GREATER THAN 8" IN ANY

DIMENSION, CONTACT E.O.R. FOR REINFORCING

REQUIREMENTS PRIOR TO PLACEMENT.

ROUGHEN HOLE AND CONCRETE

SIDE TO SLOPE SHOWN. APPLY

SIKADUR 32, HI-MOD TO SURFACE

TO RECEIVE CONCRETE.

F

IE

L D

V E

R

IF

Y

EXIST. CONC. SLAB

3/4" .

FIRE RATED PLYWOOD

#4 REBAR DOWEL, 3" MIN EMBED

INTO EXISTING SLAB

NEW PENETRATION,

REF. MEP DRAWINGS

d

6" MINIMUM

2d CLEAR dMAX1 2

TOP OF CONC.

EXIST. CONC. SLAB,

REF. PLAN

BENT PL5-1/4X4-3/4X3/8 CONT.

ALL FOR SIDES

1/2"Ø ADHESIVE ANCHORS @ 24" O.C.

(MIN. 4" EMBED.)

COMPOSITE SLAB,

REF. PLAN

/4

/4

2" 4" 4" 2"

(2) 1/2"Ø ADHESIVE ANCHORS (MIN. 4"

EMBED.)

PL3/8X4X1'-0" END PLATE

CONNECTION

A

A

SECTION A-A

HSS4X4X1/4

3/16

3/16

NEW CONC. SLAB

NOTES:

• FOR OPENINGS GREATER THAN 8" IN ANY

DIMENSION, CONTACT E.O.R. FOR REINFORCING

REQUIREMENTS PRIOR TO PLACEMENT.

ROUGHEN HOLE AND CONCRETE

SIDE TO SLOPE SHOWN. APPLY

SIKADUR 32, HI-MOD TO SURFACE

TO RECEIVE CONCRETE.

F

IE

L D

V E

R

IF

Y

EXIST. CONC. SLAB

EXIST. MECH. DUCT

CAP OFF & SEAL

EXIST. MECH. DUCT

3/4" .

FIRE RATED PLYWOOD

#4 REBAR DOWEL, 3" MIN EMBED

INTO EXISTING SLAB

0' 4'-0" 8'-0" 16'-0"

N

A

2 3 4 5 6

B

C

D

1 2 3 4 5 6

A

B

C

D

VA FORM 08-6231

o n e e ig h th c n e fo o t o n e q u a rt e r i n c e fo o t th re e e ig h th s in c e fo o t o n e h a lf in c e fo o t th re e q u a rt rs e fo o t o n e in c e fo o t o n e a n d o n e h a lf in c h e s e fo o t th re e in c h e e fo o t

CONSULTANTS: ARCHITECT/ENGINEERS:

Drawing Title

Office of Construction and Facilities ManagementApproved: Project Director

Project Title

Location

Date Checked Drawn

Dwg.

Drawing Number

Building Number

Project Number

Department of Veterans Affairs

600 EAST 7TH STEET

SIOUX FALLS, SOUTH DAKOTA 57103

605.274.2893

6 SOUTH OLD ORCHARD

ST. LOUIS, MISSOURI 63119

800.404.7677

330 N MEAD

WICHITA, KANSAS 67202

316.262.2500

AD102

DEMOLITION PLAN - 4TH FLOOR -

FLOOR PENETRATIONS

RELOCATE PHYSICAL

MEDICINE & REHAB. TO THE

4TH FLOOR

800 HOSPITAL DRIVE COLUMBIA, MO 65201

02-15-2023

589A4-22-100

BID DOCUMENTS

IEPJHK

1/8" = 1'-0" D3

DEMOLITION PLAN - 4TH FLOOR - PENETRATION

1/2" = 1'-0" B1

PIPING PENETRATION CFRP PLACEMENT DETAIL

NOT TO SCALE

C1

EXISTING OPENING INFILL DETAIL

NOT TO SCALE

C2

OPENING SPACING DETAIL

NOT TO SCALE

D2

CHASE INFILL

NOT TO SCALE

D1

EXISTING OPENING INFILL DETAIL @

ABANDONED DUCT

# Revision Date

1 AMENDMENT 3 05/03/2023

F E

C

ABCDEEaFGGaHJJbK BaBbH.5Ja F.1 Eb Aa

2.8

3.7

6.2

5.4

5.7

5.3

4.6

3.6

4.1

4.7

5.1

6.1

6.3

1.9

5.5

1.1

3.1

4.4

NOT IN SCOPE

3" UP

3"

EX 3" HCR

EX 2" V

EX 1" MPS

1. REFER TO M000 FOR MECHANICAL SYMBOLS AND

ABBREVIATIONS.

2. COORDINATE PHASING AND SHUTDOWN FOR SUPPLY

AIR, RETURN AIR, HEATING HOT WATER SUPPLY, AND

HEATING HOT WATER RETURN WITH OWNER. PROVIDE

ISOLATION VALVES AS REQUIRED FOR PHASING TO

LIMIT SHUTDOWNS. SHUTDOWN AND REPLACEMENT TO

OCCUR AFTER HOURS OR OVER WEEKEND.

3. COORDINATE EXISTING CONDITIONS AND ASBESTOS

REMOVAL WITH EXISTING CONDITIONS. FOR EXISTING

ASBESTOS, REFER TO MOST RECENT REPORT

PROVIDED BY OWNER. COORDINATE ALL REMOVAL IN

COMPLIANCE WITH CURRENT VA ASBESTOS

ABATEMENT DESIGN MANUAL. REFER TO

SPECIFICATION 02 82 11 FOR ADDITIONAL

INFORMATION.

4. PAIN CLINIC - NORTHWEST QUADRANT OF THE FLOOR -

SHALL BE OPERATIONAL AT ALL WORKING DAYS &

HOURS (MON-FRI 7M - 5PM) DURING THE ENTIRE

CONSTRUCTION PERIOD. ANY REQUIRED WORK IN THIS

CLINIC SHALL BE COORDINATED CLOSELY W/ COR.

5. NEW HEATING HOT WATER PIPING FOR THE PAIN

CLINIC NEEDS TO BE ROUGHED IN PRIOR TO

DEMOLISHING THE EXISTING HEATING HOT WATER

PIPING FOR THE PAIN CLINIC. COORDINATE MAXIMUM

ALLOWABLE DOWNTIME WITH THE COR.

GENERAL NOTES#

1. VERIFY EXISTING CONDITIONS PRIOR TO

CONSTRUCTION.

2. DEMOLISH EXISTING PIPING FROM FLOOR ABOVE TO

DEMARCATION POINT SHOWN.

SHEET KEYNOTES#

A

2 3 4 5 6

B

C

D

1 2 3 4 5 6

A

B

C

D

VA FORM 08-6231

o n e e ig e fo o t o n e q u a rt e r i n c e fo o t th re e e ig h th s in c e fo o t o n e h a lf in c e fo o t th re e q u a rt e fo o t o n e in c e fo o t o n e a n d o n e h a lf in c h e e fo o t th re e in c h e e fo o t

CONSULTANTS: ARCHITECT/ENGINEERS:

Drawing Title

Office of Construction and Facilities ManagementApproved: Project Director

Project Title

Location

Date Checked Drawn

Dwg.

Drawing Number

Building Number

Project Number

600 EAST 7TH STEET

SIOUX FALLS, SOUTH DAKOTA 57103

605.274.2893

6 SOUTH OLD ORCHARD

ST. LOUIS, MISSOURI 63119

800.404.7677

330 N MEAD

WICHITA, KANSAS 67202

316.262.2500

NOT FOR

CONSTRUCTION

JOHN SOMMERS, PE MO #2015028399

MD101

MECHANICAL DEMOLITION PLAN -

PIPING - 3RD FLOOR - AREA A

RELOCATE PHYSICAL

MEDICINE & REHAB. TO THE

4TH FLOOR

800 HOSPITAL DRIVE COLUMBIA, MO 65201

02-15-2023

589A4-22-100

BID DOCUMENTS

RLCJES

1/8" = 1'-0"

MECHANICAL DEMOLITION PLAN - PIPING - 3RD FLOOR - AREA A

# Revision Date

1 Amendment 3 05/03/2023

05/03/2023

FE

E

T

T

T

T

ABCDEEaFGGaHHbJJbKLLaMNNa BaBbH.5Ja F.1 Eb AaMaNb

2.8

3.7

7.3

8.2

9.1

10.4

4.5

6.2

5.4

6.7

5.7

5.3

4.6

10.2

9.8

8.9

8.3

7.2

7.1

3.6

4.1

4.7

5.1

6.1

6.3

8.0

1.9

5.5

7.5

1.1

3.1

4.4

ROOF TOP EQUIPMENT

EXISTING TO REMAIN

HE

HE

HE

HE

HE

HE

E

MD103

1 1

MD106

MD104

1 1

MD107

NOT IN SCOPE

1. REFER TO M000 FOR MECHANICAL SYMBOLS AND

ABBREVIATIONS.

2. COORDINATE PHASING AND SHUTDOWN FOR SUPPLY

AIR, RETURN AIR, HEATING HOT WATER SUPPLY, AND

HEATING HOT WATER RETURN WITH OWNER. PROVIDE

ISOLATION VALVES AS REQUIRED FOR PHASING TO

LIMIT SHUTDOWNS. SHUTDOWN AND REPLACEMENT TO

OCCUR AFTER HOURS OR OVER WEEKEND.

3. COORDINATE EXISTING CONDITIONS AND ASBESTOS

REMOVAL WITH EXISTING CONDITIONS. FOR EXISTING

ASBESTOS, REFER TO MOST RECENT REPORT

PROVIDED BY OWNER. COORDINATE ALL REMOVAL IN

COMPLIANCE WITH CURRENT VA ASBESTOS

ABATEMENT DESIGN MANUAL. REFER TO

SPECIFICATION 02 82 11 FOR ADDITIONAL

INFORMATION.

4. PAIN CLINIC - NORTHWEST QUADRANT OF THE FLOOR -

SHALL BE OPERATIONAL AT ALL WORKING DAYS &

HOURS (MON-FRI 7M - 5PM) DURING THE ENTIRE

CONSTRUCTION PERIOD. ANY REQUIRED WORK IN THIS

CLINIC SHALL BE COORDINATED CLOSELY W/ COR.

5. NEW HEATING HOT WATER PIPING FOR THE PAIN

CLINIC NEEDS TO BE ROUGHED IN PRIOR TO

DEMOLISHING THE EXISTING HEATING HOT WATER

PIPING FOR THE PAIN CLINIC. COORDINATE MAXIMUM

ALLOWABLE DOWNTIME WITH THE COR.

GENERAL NOTES#

FOURTH FLOOR KEY PLAN

N

A

2 3 4 5 6

B

C

D

1 2 3 4 5 6

A

B

C

D

VA FORM 08-6231

o n e e ig e fo o t o n e q u a rt e r i n c e fo o t th re e e ig h th s in c e fo o t o n e h a lf in c e fo o t th re e q u a rt e fo o t o n e in c e fo o t o n e a n d o n e h a lf in c h e e fo o t th re e in c h e e fo o t

CONSULTANTS: ARCHITECT/ENGINEERS:

Drawing Title

Office of Construction and Facilities ManagementApproved: Project Director

Project Title

Location

Date Checked Drawn

Dwg.

Drawing Number

Building Number

Project Number

600 EAST 7TH STEET

SIOUX FALLS, SOUTH DAKOTA 57103

605.274.2893

6 SOUTH OLD ORCHARD

ST. LOUIS, MISSOURI 63119

800.404.7677

330 N MEAD

WICHITA, KANSAS 67202

316.262.2500

NOT FOR

CONSTRUCTION

JOHN SOMMERS, PE MO #2015028399

MD102

MECHANICAL DEMOLITION PLAN - 4TH

FLOOR - OVERALL

RELOCATE PHYSICAL

MEDICINE & REHAB. TO THE

4TH FLOOR

800 HOSPITAL DRIVE COLUMBIA, MO 65201

02-15-2023

589A4-22-100

BID DOCUMENTS

RLCJES

3/32" = 1'-0"

MECHANICAL DEMOLITION PLAN - 4TH FLOOR - OVERALL

# Revision Date

1 Amendment 3 05/03/2023

1. REFER TO M000 FOR MECHANICAL SYMBOLS AND

ABBREVIATIONS.

2. COORDINATE PHASING AND SHUTDOWN FOR SUPPLY

AIR, RETURN AIR, HEATING HOT WATER SUPPLY, AND

HEATING HOT WATER RETURN WITH OWNER. PROVIDE

ISOLATION VALVES AS REQUIRED FOR PHASING TO

LIMIT SHUTDOWNS. SHUTDOWN AND REPLACEMENT TO

OCCUR AFTER HOURS OR OVER WEEKEND.

3. COORDINATE EXISTING CONDITIONS AND ASBESTOS

REMOVAL WITH EXISTING CONDITIONS. FOR EXISTING

ASBESTOS, REFER TO MOST RECENT REPORT

PROVIDED BY OWNER. COORDINATE ALL REMOVAL IN

COMPLIANCE WITH CURRENT VA ASBESTOS

ABATEMENT DESIGN MANUAL. REFER TO

SPECIFICATION 02 82 11 FOR ADDITIONAL

INFORMATION.

4. PAIN CLINIC - NORTHWEST QUADRANT OF THE FLOOR -

SHALL BE OPERATIONAL AT ALL WORKING DAYS &

HOURS (MON-FRI 7M - 5PM) DURING THE ENTIRE

CONSTRUCTION PERIOD. ANY REQUIRED WORK IN THIS

CLINIC SHALL BE COORDINATED CLOSELY W/ COR.

5. NEW HEATING HOT WATER PIPING FOR THE PAIN

CLINIC NEEDS TO BE ROUGHED IN PRIOR TO

DEMOLISHING THE EXISTING HEATING HOT WATER

PIPING FOR THE PAIN CLINIC. COORDINATE MAXIMUM

ALLOWABLE DOWNTIME WITH THE COR.

GENERAL NOTES#EaFGGaHHbJJbKLLaMNNa H.5Ja F.1 EbMaNb

2.8

3.7

4.5

6.2

5.4

6.7

5.7

5.3

4.6

7.1

3.6

4.1

4.7

5.1

6.1

6.3

5.5

3.1

4.4

3/4"

3/4"

2"

1 1/4"

1"

1" 3/4"

3/4" typical size VAV connection

1 1/4"

2"

1"

1"

1 1/2"

1 1/4"

1 1/4"

1 1/2"

3"

6" HCS UP &

DN

1"1"

3/4"

3/4"

HCR DN

2" AT.MOS.VENT

TO 6TH FL.

1" MPS(30#)

UP & DN

UP

UP

5"

3" 3"

5" HCR UP

HCR

HCR HCR

T

T

T

T

T

T

TT

T

T

T

T

T

T T

T

T

NOT IN SCOPE

3 3

1 1/4"

1 1/2"

22 2 2 2 2

EX 1/2" D

EX 1" HCS 5

EX 1" HCS

EX 1/2" D

EX 1" HCS

EX 1/2" D

EX 1" HCS

EX 1/2" D

EX 1" HCS

EX 1/2" D

EX 1" HCS

EX 1/2" D

EX 1" HCS

EX 1/2" D

EX 1/2" D

EX 1" HCS

EX 1" HCS

EX 1/2" D

EX 1" HCS

EX 1/2" D

1. DEMOLISH ALL EXISTING TERMINAL UNITS AND

ASSOCIATED PIPING, CONTROLS, AND ACCESSORIES

BACK TO DEMARCATION POINT SHOWN.

2. EXISTING INDUCTION UNIT TO BE REMOVED. REMOVE

CONTROLS AND ACCESSORIES. REMOVE PIPING BACK

ABOVE CEILING AND PREPARE FOR CONNECTION TO

NEW INDUCTION UNIT PIPING LOOP. REMOVE ALL

CONTROL WIRING BACK TO CENTRAL PANEL IN 401C.

REMOVE ALL PNEUMATIC CONTROL TUBING.

3. DEMOLISH EXISTING PIPING FROM FLOOR BELOW TO

DEMARCATION POINT SHOWN.

4. DEMOLISH EXISTING PIPING BACK TO DEMARCATION

POINT SHOWN.

5. DEMOLISH INDUCTION UNIT SUPPLY AND CONDENSATE

PIPING BACK TO 4TH FLOOR SLAB AND CEILING.

PREPARE FOR CONNECTION OF NEW PIPING. INSTALL

NEW INDUCTION UNIT SUPPLY AND CONDENSATE

PIPING PRIOR TO DEMOLITION OF EXISTING PIPING. SEE

NEW WORK FOR RELATED INFORMATION.

SHEET KEYNOTES#

FOURTH FLOOR KEY PLAN

AREA A

N

B

A

A

2 3 4 5 6

B

C

D

1 2 3 4 5 6

A

B

C

D

VA FORM 08-6231

o n e e ig e fo o t o n e q u a rt e r i n c e fo o t th re e e ig h th s in c e fo o t o n e h a lf in c e fo o t th re e q u a rt e fo o t o n e in c e fo o t o n e a n d o n e h a lf in c h e e fo o t th re e in c h e e fo o t

CONSULTANTS: ARCHITECT/ENGINEERS:

Drawing Title

Office of Construction and Facilities ManagementApproved: Project Director

Project Title

Location

Date Checked Drawn

Dwg.

Drawing Number

Building Number

Project Number

600 EAST 7TH STEET

SIOUX FALLS, SOUTH DAKOTA 57103

605.274.2893

6 SOUTH OLD ORCHARD

ST. LOUIS, MISSOURI 63119

800.404.7677

330 N MEAD

WICHITA, KANSAS 67202

316.262.2500

NOT FOR

CONSTRUCTION

JOHN SOMMERS, PE MO #2015028399

MD103

MECHANICAL DEMOLITION PLAN -

PIPING - 4TH FLOOR - AREA A

RELOCATE PHYSICAL

MEDICINE & REHAB. TO THE

4TH FLOOR

800 HOSPITAL DRIVE COLUMBIA, MO 65201

02-15-2023

589A4-22-100

BID DOCUMENTS

RLCJES

3/16" = 1'-0"

MECHANICAL DEMOLITION PLAN - PIPING - 4TH FLOOR - AREA A

# Revision Date

1 Amendment 3 05/03/2023

E

T

TT

T

TT

1. REFER TO M000 FOR MECHANICAL SYMBOLS AND

ABBREVIATIONS.

2. COORDINATE PHASING AND SHUTDOWN FOR SUPPLY

AIR, RETURN AIR, HEATING HOT WATER SUPPLY, AND

HEATING HOT WATER RETURN WITH OWNER. PROVIDE

ISOLATION VALVES AS REQUIRED FOR PHASING TO

LIMIT SHUTDOWNS. SHUTDOWN AND REPLACEMENT TO

OCCUR AFTER HOURS OR OVER WEEKEND.

3. COORDINATE EXISTING CONDITIONS AND ASBESTOS

REMOVAL WITH EXISTING CONDITIONS. FOR EXISTING

ASBESTOS, REFER TO MOST RECENT REPORT

PROVIDED BY OWNER. COORDINATE ALL REMOVAL IN

COMPLIANCE WITH CURRENT VA ASBESTOS

ABATEMENT DESIGN MANUAL. REFER TO

SPECIFICATION 02 82 11 FOR ADDITIONAL

INFORMATION.

4. PAIN CLINIC - NORTHWEST QUADRANT OF THE FLOOR -

SHALL BE OPERATIONAL AT ALL WORKING DAYS &

HOURS (MON-FRI 7M - 5PM) DURING THE ENTIRE

CONSTRUCTION PERIOD. ANY REQUIRED WORK IN THIS

CLINIC SHALL BE COORDINATED CLOSELY W/ COR.

5. NEW HEATING HOT WATER PIPING FOR THE PAIN

CLINIC NEEDS TO BE ROUGHED IN PRIOR TO

DEMOLISHING THE EXISTING HEATING HOT WATER

PIPING FOR THE PAIN CLINIC. COORDINATE MAXIMUM

ALLOWABLE DOWNTIME WITH THE COR.

GENERAL NOTES#EaFGGaHHbJJbKLLaMNNa H.5Ja F.1 EbMaNb

7.3

8.2

9.1

6.7

9.8

8.9

8.3

7.2

7.1

8.0

7.5

2"

2"

3/4"

2"

2" 1 1/4"

1"

1" 3/4"

3/4"

2"

1" typical size VAV connection

2"

3/4"

2"

1"

2"

1"

1 1/4"

2"

1"

1"

1 1/2" 1 1/4"

3/4"

3/4"

EX 6" MPS UP &

DN

EX 8" CWR UP

& DN

EX 3" HWS UP

& DN

EX 3" HWR UP

& DN

EX 8" CWS UP

& DN

EX 1 1/4" EXP

UP & DN

4"

3/4"

3/4"

- 5' 0" LG x 1'-6" VERT.

EXP.LOOP AT CLG

1' - 0" RAD. BEND -

UP & DN

UP

UP

EX 4" MPC UP

& DN

T

22222222222222

EX 1" HCS

EX 1/2" D

EX 1" HCS

EX 1/2" D

EX 1" HCS

EX 1/2" D

EX 1" HCS

EX 1/2" D

EX 1" HCS

EX 1/2" D

EX 1" HCS

EX 1/2" D

EX 1" HCS

EX 1/2" D

EX 1" HCS

EX 1/2" D

EX 1" HCS

EX 1/2" D

EX 1" HCS

EX 1/2" D

EX 1/2" D

EX 1" HCS 4

FOURTH FLOOR KEY PLAN

AREA B

N

B

A

1. DEMOLISH ALL EXISTING TERMINAL UNITS AND

ASSOCIATED PIPING, CONTROLS, AND ACCESSORIES

BACK TO DEMARCATION POINT SHOWN.

2. EXISTING INDUCTION UNIT TO BE REMOVED. REMOVE

CONTROLS AND ACCESSORIES. REMOVE PIPING BACK

ABOVE CEILING AND PREPARE FOR CONNECTION TO

NEW INDUCTION UNIT PIPING LOOP. REMOVE ALL

CONTROL WIRING BACK TO CENTRAL PANEL IN 401C.

REMOVE ALL PNEUMATIC CONTROL TUBING.

3. VERIFY SHUTOFF VALVES EXIST AND ADD NEW AS

REQUIRED FOR NEW WORK.

4. DEMOLISH INDUCTION UNIT SUPPLY AND CONDENSATE

PIPING BACK TO 4TH FLOOR SLAB AND CEILING.

PREPARE FOR CONNECTION OF NEW PIPING. INSTALL

NEW INDUCTION UNIT SUPPLY AND CONDENSATE

PIPING PRIOR TO DEMOLITION OF EXISTING PIPING. SEE

NEW WORK FOR RELATED INFORMATION.

SHEET KEYNOTES#

A

2 3 4 5 6

B

C

D

1 2 3 4 5 6

A

B

C

D

VA FORM 08-6231

o n e e ig e fo o t o n e q u a rt e r i n c e fo o t th re e e ig h th s in c e fo o t o n e h a lf in c e fo o t th re e q u a rt e fo o t o n e in c e fo o t o n e a n d o n e h a lf in c h e e fo o t th re e in c h e e fo o t

CONSULTANTS: ARCHITECT/ENGINEERS:

Drawing Title

Office of Construction and Facilities ManagementApproved: Project Director

Project Title

Location

Date Checked Drawn

Dwg.

Drawing Number

Building Number

Project Number

600 EAST 7TH STEET

SIOUX FALLS, SOUTH DAKOTA 57103

605.274.2893

6 SOUTH OLD ORCHARD

ST. LOUIS, MISSOURI 63119

800.404.7677

330 N MEAD

WICHITA, KANSAS 67202

316.262.2500

NOT FOR

CONSTRUCTION

JOHN SOMMERS, PE MO #2015028399

MD104

MECHANICAL DEMOLITION PLAN -

PIPING - 4TH FLOOR - AREA B

RELOCATE PHYSICAL

MEDICINE & REHAB. TO THE

4TH FLOOR

800 HOSPITAL DRIVE COLUMBIA, MO 65201

02-15-2023

589A4-22-100

BID DOCUMENTS

RLCJES

3/16" = 1'-0"

MECHANICAL DEMOLITION PLAN - PIPING - 4TH FLOOR - AREA B

# Revision Date

1 Amendment 3 05/03/2023

1. REFER TO M000 FOR MECHANICAL SYMBOLS AND

ABBREVIATIONS.

2. COORDINATE PHASING AND SHUTDOWN FOR SUPPLY

AIR, RETURN AIR, HEATING HOT WATER SUPPLY, AND

HEATING HOT WATER RETURN WITH OWNER. PROVIDE

ISOLATION VALVES AS REQUIRED FOR PHASING TO

LIMIT SHUTDOWNS. SHUTDOWN AND REPLACEMENT TO

OCCUR AFTER HOURS OR OVER WEEKEND.

3. COORDINATE EXISTING CONDITIONS AND ASBESTOS

REMOVAL WITH EXISTING CONDITIONS. FOR EXISTING

ASBESTOS, REFER TO MOST RECENT REPORT

PROVIDED BY OWNER. COORDINATE ALL REMOVAL IN

COMPLIANCE WITH CURRENT VA ASBESTOS

ABATEMENT DESIGN MANUAL. REFER TO

SPECIFICATION 02 82 11 FOR ADDITIONAL

INFORMATION.

4. PAIN CLINIC - NORTHWEST QUADRANT OF THE FLOOR -

SHALL BE OPERATIONAL AT ALL WORKING DAYS &

HOURS (MON-FRI 7M - 5PM) DURING THE ENTIRE

CONSTRUCTION PERIOD. ANY REQUIRED WORK IN THIS

CLINIC SHALL BE COORDINATED CLOSELY W/ COR.

5. NEW HEATING HOT WATER PIPING FOR THE PAIN

CLINIC NEEDS TO BE ROUGHED IN PRIOR TO

DEMOLISHING THE EXISTING HEATING HOT WATER

PIPING FOR THE PAIN CLINIC. COORDINATE MAXIMUM

ALLOWABLE DOWNTIME WITH THE COR.

GENERAL NOTES#

EaFGGaHHbJJbKLLaMNNa H.5Ja F.1 EbMaNb

2.8

3.7

4.5

6.2

5.4

6.7

5.7

5.3

4.6

7.1

3.6

4.1

4.7

5.1

6.1

6.3

5.5

3.1

4.4

8x4

16x6 x

12x4

6x6

8x4

6x6

6x4

6x6

11x6

6x6

9x6

6x6

6x4

6x6

10x8

8x7

8x6

14x8

6x4

8ø 8ø

8x4 x x x x x

10x9

10x6

15ø

10x4

EX 15x25

7x6

6x7 6x7 6x7 6x7

9ø 10x4

16x6

10x4 9x4

11x4 ø

12x5

6x4

9x4

6x6

6x4

9x4

6x4

10x4

10x4 12x5

10x4

10x4

6x4

12x8 x

6x6

30x11

17x11 x

6x4

6x4 6x4

6x4

6x4

6x4

9x6

11x6

6x4 13x6

7x6

6x5

6x4

16x6

6x5

10x6

9x5

14ø

13ø

10ø

12x6

9x4 9x6

6x4

9x4

14x8

15x6

7x6

12x4

6x6

8x4

6x4

6x6

11ø

29x6 1 x

6x5

10x6

13x6

13ø

16ø

22x10

8x4

11x5

12x4

6x4

6x4 6x4

6x4

6x6 x

14x10

14x8

6x6

6x6

18x7

8x5

6x4

6x4 9x5

12x7 12x7

6x8

6x6

8x6 6x6

6x4

6x4

EX 45x12 RA UP

EX 24ø SA

UP & DN

EX 12x12

EA UP & DN

EX 9x12 EA

UP & DN

EX 14x12

EA UP & DN

EX 16ø

VENT UP &

DN

EX 26x24 SA

EX 12x10

EA UP & DN

EX 10x12 EA

EX 10x12 EA

EX 10x12 EA

EX 10x12 EA

EX 10x12 EA

EX 10x12 EA

EX 16ø SA UP

EX 22ø SA

UP & DN

EX 13ø OA UP

EX 15ø OA DN

(AC-S3)

(AC-S1)

(AC-ER-2)

(AC-ER-5)

(AC-S5)

(AC-S2)

(AC-ER-4)

EXCEPT AS

NOTED

(AC-S4)

(AC-ER-3)

(AC-S2)

(E-3)

17x14

17x13

NOT IN SCOPE

EX 30x31 RA

EX 36x30

RA UP & DN

EX 40x22

RA UP & DN

EX 34ø SA

UP & DN

EX 16ø SA UP

EX 24ø SA

UP & DN

EX 12ø

VENT UP &

DN

22 2 2 2 2

EX 20x20 SA

EX 20x20 RA

1. DEMOLISH ALL EXISTING TERMINAL UNITS AND

ASSOCIATED DUCTWORK, CONTROLS, AND

ACCESSORIES BACK TO DEMARCATION POINT SHOWN.

2. EXISTING INDUCTION UNIT TO BE REMOVED. REMOVE

CONTROLS AND ACCESSORIES. REMOVE DUCT BACK

TO TOP OF 5TH FLOOR SLAB AND PROVIDE CAP.

REMOVE ALL CONTROL WIRING BACK TO CENTRAL

PANEL IN 401C. REMOVE ALL PNEUMATIC CONTROL

TUBING.

3. RELOCATE EXISTING DIFFUSER AND FLEX DUCT TO

ALIGN WITH NEW CEILING GRID. SEE MH105 FOR

RELATED INFORMATION.

4. FIELD VERIFY EXISTING DUCT ROUTING PRIOR TO

CONSTRUCTION. RECORD DRAWINGS MAY NOT

REPRESENT CURRENT DUCT ROUTING.

5. DEMOLISH EXISTING DUCTWORK IN CHASE FROM 4TH

FLOOR UP TO THE FLOOR ABOVE. VERIFY DUCTWORK

IS INACTIVE WITH OWNER PRIOR TO DEMOLITION.

SHEET KEYNOTES#

FOURTH FLOOR KEY PLAN

AREA A

N

B

A

A

2 3 4 5 6

B

C

D

1 2 3 4 5 6

A

B

C

D

VA FORM 08-6231

o n e e ig e fo o t o n e q u a rt e r i n c e fo o t th re e e ig h th s in c e fo o t o n e h a lf in c e fo o t th re e q u a rt e fo o t o n e in c e fo o t o n e a n d o n e h a lf in c h e e fo o t th re e in c h e e fo o t

CONSULTANTS: ARCHITECT/ENGINEERS:

Drawing Title

Office of Construction and Facilities ManagementApproved: Project Director

Project Title

Location

Date Checked Drawn

Dwg.

Drawing Number

Building Number

Project Number

600 EAST 7TH STEET

SIOUX FALLS, SOUTH DAKOTA 57103

605.274.2893

6 SOUTH OLD ORCHARD

ST. LOUIS, MISSOURI 63119

800.404.7677

330 N MEAD

WICHITA, KANSAS 67202

316.262.2500

NOT FOR

CONSTRUCTION

JOHN SOMMERS, PE MO #2015028399

MD105

MECHANICAL DEMOLITION PLAN -

DUCTWORK - 4TH FLOOR - AREA A

RELOCATE PHYSICAL

MEDICINE & REHAB. TO THE

4TH FLOOR

800 HOSPITAL DRIVE COLUMBIA, MO 65201

02-15-2023

589A4-22-100

BID DOCUMENTS

RLCJES

3/16" = 1'-0"

MECHANICAL DEMOLITION PLAN - DUCTWORK - 4TH FLOOR - AREA A

# Revision Date

1 Amendment 3 05/03/2023

E

T

TT

T

TT

1. REFER TO M000 FOR MECHANICAL SYMBOLS AND

ABBREVIATIONS.

2. COORDINATE PHASING AND SHUTDOWN FOR SUPPLY

AIR, RETURN AIR, HEATING HOT WATER SUPPLY, AND

HEATING HOT WATER RETURN WITH OWNER. PROVIDE

ISOLATION VALVES AS REQUIRED FOR PHASING TO

LIMIT SHUTDOWNS. SHUTDOWN AND REPLACEMENT TO

OCCUR AFTER HOURS OR OVER WEEKEND.

3. COORDINATE EXISTING CONDITIONS AND ASBESTOS

REMOVAL WITH EXISTING CONDITIONS. FOR EXISTING

ASBESTOS, REFER TO MOST RECENT REPORT

PROVIDED BY OWNER. COORDINATE ALL REMOVAL IN

COMPLIANCE WITH CURRENT VA ASBESTOS

ABATEMENT DESIGN MANUAL. REFER TO

SPECIFICATION 02 82 11 FOR ADDITIONAL

INFORMATION.

4. PAIN CLINIC - NORTHWEST QUADRANT OF THE FLOOR -

SHALL BE OPERATIONAL AT ALL WORKING DAYS &

HOURS (MON-FRI 7M - 5PM) DURING THE ENTIRE

CONSTRUCTION PERIOD. ANY REQUIRED WORK IN THIS

CLINIC SHALL BE COORDINATED CLOSELY W/ COR.

5. NEW HEATING HOT WATER PIPING FOR THE PAIN

CLINIC NEEDS TO BE ROUGHED IN PRIOR TO

DEMOLISHING THE EXISTING HEATING HOT WATER

PIPING FOR THE PAIN CLINIC. COORDINATE MAXIMUM

ALLOWABLE DOWNTIME WITH THE COR.

GENERAL NOTES#EaFGGaHHbJJbKLLaMNNa H.5Ja F.1 EbMaNb

7.3

8.2

9.1

6.7

9.8

8.9

8.3

7.2

7.1

8.0

7.5

12x4

8x4

6x4

6x6

6x6

8x4

6x4

6x4

16x5

12x5 24x14 x

12x4

6x6

8x4 x x 4 17x11 x

13ø 12x6

9x4 9x6

6x4

9x4

14x8

29x6

15x6

27x6

8ø

10x6

9x5 7ø

6x5

9ø

6x4 6x6

6x4

6x6 6x4

9x5

24x15

19x7

13x5

13x7

6x5

12x4

6x4

6x4

6x4 6x6

9x5

9x6

8x5 6x4

12x4

12x8

5x4

7x6

7x6

6x6 6x4

6x4

9x5

6x4 6x4

8x4

12x6

12x8

6x4 6x4 6x4

6x4 6x6

8x4

14x8

11x4

6x4 6x4

6ø

6x4

6x4 6x6

9x5 9x5

19x8

10x4

6x5

6x5

9x6 7ø

22x14 x

16x5

6x6

27x6

8ø

9ø

8x4

6x4 6x6 6x4

12x5

6x4

12x4

6x6

8x4

6x4

6x6

12x4

6x6

8x4

11ø

29x6

15x6 x

6x4

6x5

10x6

13x6

13ø

16ø

11x5

6x6

10x4 10x4

10x6 6x5

12x8

14x10

14x8

6x6

6x6

6x4 6x4

11x4

6x6

40x24 UP &

DN

34x24 UP &

DN

40x24 EA UP

34x20 EA DN

(AC-ER 7)

(AC-ER 8)

(E-2) 2735 CFM

8605 CFM

(E-1)

18x14

17x14

1 1

22222222222222

FOURTH FLOOR KEY PLAN

AREA B

N

B

A

1. DEMOLISH ALL EXISTING TERMINAL UNITS AND

ASSOCIATED DUCTWORK, CONTROLS, AND

ACCESSORIES BACK TO DEMARCATION POINT SHOWN.

2. EXISTING INDUCTION UNIT TO BE REMOVED. REMOVE

CONTROLS AND ACCESSORIES. REMOVE DUCT BACK

TO TOP OF 5TH FLOOR SLAB AND PROVIDE CAP.

REMOVE ALL CONTROL WIRING BACK TO CENTRAL

PANEL IN 401C. REMOVE ALL PNEUMATIC CONTROL

TUBING.

3. DEMOLISH EXISTING DUCTWORK IN CHASE FROM 4TH

FLOOR UP TO THE FLOOR ABOVE. VERIFY DUCTWORK

IS INACTIVE WITH OWNER PRIOR TO DEMOLITION.

SHEET KEYNOTES#

A

2 3 4 5 6

B

C

D

1 2 3 4 5 6

A

B

C

D

VA FORM 08-6231

o n e e ig e fo o t o n e q u a rt e r i n c e fo o t th re e e ig h th s in c e fo o t o n e h a lf in c e fo o t th re e q u a rt e fo o t o n e in c e fo o t o n e a n d o n e h a lf in c h e e fo o t th re e in c h e e fo o t

CONSULTANTS: ARCHITECT/ENGINEERS:

Drawing Title

Office of Construction and Facilities ManagementApproved: Project Director

Project Title

Location

Date Checked Drawn

Dwg.

Drawing Number

Building Number

Project Number

600 EAST 7TH STEET

SIOUX FALLS, SOUTH DAKOTA 57103

605.274.2893

6 SOUTH OLD ORCHARD

ST. LOUIS, MISSOURI 63119

800.404.7677

330 N MEAD

WICHITA, KANSAS 67202

316.262.2500

NOT FOR

CONSTRUCTION

JOHN SOMMERS, PE MO #2015028399

MD106

MECHANICAL DEMOLITION PLAN -

DUCTWORK - 4TH FLOOR - AREA B

RELOCATE PHYSICAL

MEDICINE & REHAB. TO THE

4TH FLOOR

800 HOSPITAL DRIVE COLUMBIA, MO 65201

02-15-2023

589A4-22-100

BID DOCUMENTS

RLCJES

3/16" = 1'-0"

MECHANICAL DEMOLITION PLAN - DUCTWORK - 4TH FLOOR - AREA B

# Revision Date

1 Amendment 3 05/03/2023

EaFGGaHHbJJbKLLaMNNa H.5Ja F.1 EbMaNb

4.5

6.2

5.4

6.7

9.8

8.9

8.3

7.2

7.1

3.6

4.1

4.7

5.1

6.1

6.3

5.5

3.1

AC-S

AC-S

AHU

XAC

TEMP

E

AC-ER

E

E

E

E

E

HRU

E

EX 108x24 SA

E X ø

S A

E X x R

A

E X ø

S A

EX 24ø SA

E X ø

S A

E X ø

S A

E X ø

S A

E X x R

A

EX 30x48 RA

EX 60x40 RA

EX 48x28 RA

EX 56x24 RA

EX 44x24 SA EX 20x20 RA

EX 20x20 RA

EX 48x28 RA

EX 44x24 SA

EX 44x24 SA

EX 36x30 RA EX 108x22 RA

EX 30x48 RA

EX 30ø SA

16ø

EX 20x20 SA

EX 20x20 SA

TOP

BOTTOM

TOP

BOTTOM

EX 20x20 SA DN EX 20x20 RA DN

EX 42x32

SA UP & DN

EX 36x36

RA UP & DN

DN

EX 24x56 RA EX 28ø SA

EX 36x30 RA

16ø

EX 12x10

EA UP & DN

EX 14x24

EA UP & DN

EX 12x12

EA UP & DN

EX 12x18

EA UP & DN

EX 22ø SA

UP & DN

EX 14x12

EA UP & DN

TYP.

UNLESS

NOTED EX 40x22

RA UP & DN

EX 34ø SA

UP & DN

EX 24ø SA DN EX 12ø

VENT UP &

DN

EX 30x31

RA UP & DN

EX 24ø SA DN

EX 36x30 RA DN

EX 24ø SA DN

EX 24ø SA DN

EX 16ø

VENT UP &

DN

EX 56x24 RA DN

EX 17ø SA DN

EX 17ø SA DN

E

EX 96x16 SA

BOTTOM

TOP

EX 36x30 RA

16ø

EX 60x60 SA

EX 34x34 SA

UP

EX 30ø SA

DN

EX 34x34 SA

36x36 RA x R

A

36x36 RA

30x24 RA 54x24 RA DN

1. REFER TO M000 FOR MECHANICAL SYMBOLS AND

ABBREVIATIONS.

2. COORDINATE PHASING AND SHUTDOWN FOR SUPPLY

AIR, RETURN AIR, HEATING HOT WATER SUPPLY, AND

HEATING HOT WATER RETURN WITH OWNER. PROVIDE

ISOLATION VALVES AS REQUIRED FOR PHASING TO

LIMIT SHUTDOWNS. SHUTDOWN AND REPLACEMENT TO

OCCUR AFTER HOURS OR OVER WEEKEND.

3. COORDINATE EXISTING CONDITIONS AND ASBESTOS

REMOVAL WITH EXISTING CONDITIONS. FOR EXISTING

ASBESTOS, REFER TO MOST RECENT REPORT

PROVIDED BY OWNER. COORDINATE ALL REMOVAL IN

COMPLIANCE WITH CURRENT VA ASBESTOS

ABATEMENT DESIGN MANUAL. REFER TO

SPECIFICATION 02 82 11 FOR ADDITIONAL

INFORMATION.

4. PAIN CLINIC - NORTHWEST QUADRANT OF THE FLOOR -

SHALL BE OPERATIONAL AT ALL WORKING DAYS &

HOURS (MON-FRI 7M - 5PM) DURING THE ENTIRE

CONSTRUCTION PERIOD. ANY REQUIRED WORK IN THIS

CLINIC SHALL BE COORDINATED CLOSELY W/ COR.

5. NEW HEATING HOT WATER PIPING FOR THE PAIN

CLINIC NEEDS TO BE ROUGHED IN PRIOR TO

DEMOLISHING THE EXISTING HEATING HOT WATER

PIPING FOR THE PAIN CLINIC. COORDINATE MAXIMUM

ALLOWABLE DOWNTIME WITH THE COR.

GENERAL NOTES#

1. DEMOLISH EXISTING DUCTWORK TO DEMARCATION

POINT SHOWN.

2. REMOVE INSULATION FROM DUCTWORK ON ROOF.

PREPARE FOR INSTALLATION OF NEW INSULATION. SEE

NEW WORK FOR RELATED INFORMATION.

SHEET KEYNOTES#

A

2 3 4 5 6

B

C

D

1 2 3 4 5 6

A

B

C

D

VA FORM 08-6231

o n e e ig e fo o t o n e q u a rt e r i n c e fo o t th re e e ig h th s in c e fo o t o n e h a lf in c e fo o t th re e q u a rt e fo o t o n e in c e fo o t o n e a n d o n e h a lf in c h e e fo o t th re e in c h e e fo o t

CONSULTANTS: ARCHITECT/ENGINEERS:

Drawing Title

Office of Construction and Facilities ManagementApproved: Project Director

Project Title

Location

Date Checked Drawn

Dwg.

Drawing Number

Building Number

Project Number

600 EAST 7TH STEET

SIOUX FALLS, SOUTH DAKOTA 57103

605.274.2893

6 SOUTH OLD ORCHARD

ST. LOUIS, MISSOURI 63119

800.404.7677

330 N MEAD

WICHITA, KANSAS 67202

316.262.2500

NOT FOR

CONSTRUCTION

JOHN SOMMERS, PE MO #2015028399

MD107

MECHANICAL DEMOLITION PLAN -

DUCTWORK - LOWER PENTHOUSE

RELOCATE PHYSICAL

MEDICINE & REHAB. TO THE

4TH FLOOR

800 HOSPITAL DRIVE COLUMBIA, MO 65201

02-15-2023

589A4-22-100

BID DOCUMENTS

RLCJES

1/8" = 1'-0"

MECHANICAL DEMOLITION PLAN - DUCTWORK - LOWER PENTHOUSE

# Revision Date

1 Amendment 3 05/03/2023

F E

C

ABCDEEaFGGaHJJbK BaBbH.5Ja F.1 Eb Aa

2.8

3.7

6.2

5.4

5.7

5.3

4.6

3.6

4.1

4.7

5.1

6.1

6.3

1.9

5.5

1.1

3.1

4.4

NOT IN SCOPE

3" HCR UP

EX 1" MPS

EX 2" V

3" HCR

1. VERIFY EXISTING CONDITIONS PRIOR TO

CONSTRUCTION.

2. INSTALL NEW PIPING FROM FLOOR ABOVE TO

DEMARCATION POINT SHOWN.

SHEET KEYNOTES#

1. REFER TO M000 FOR MECHANICAL SYMBOLS AND

ABBREVIATIONS.

2. COORDINATE PHASING AND SHUTDOWN FOR SUPPLY

AIR, RETURN AIR, HEATING HOT WATER SUPPLY, AND

HEATING HOT WATER RETURN WITH OWNER. PROVIDE

ISOLATION VALVES AS REQUIRED FOR PHASING TO

LIMIT SHUTDOWNS. SHUTDOWN AND REPLACEMENT TO

OCCUR AFTER HOURS OR OVER WEEKEND.

3. PAIN CLINIC - NORTHWEST QUADRANT OF THE FLOOR -

SHALL BE OPERATIONAL AT ALL WORKING DAYS &

HOURS (MON-FRI 7M - 5PM) DURING THE ENTIRE

CONSTRUCTION PERIOD. ANY REQUIRED WORK IN THIS

CLINIC SHALL BE COORDINATED CLOSELY W/ COR.

4. NEW HEATING HOT WATER PIPING FOR THE PAIN

CLINIC NEEDS TO BE ROUGHED IN PRIOR TO

DEMOLISHING THE EXISTING HEATING HOT WATER

PIPING FOR THE PAIN CLINIC. COORDINATE MAXIMUM

ALLOWABLE DOWNTIME WITH THE COR.

GENERAL NOTES#

A

2 3 4 5 6

B

C

D

1 2 3 4 5 6

A

B

C

D

VA FORM 08-6231

o n e e ig e fo o t o n e q u a rt e r i n c e fo o t th re e e ig h th s in c e fo o t o n e h a lf in c e fo o t th re e q u a rt e fo o t o n e in c e fo o t o n e a n d o n e h a lf in c h e e fo o t th re e in c h e e fo o t

CONSULTANTS: ARCHITECT/ENGINEERS:

Drawing Title

Office of Construction and Facilities ManagementApproved: Project Director

Project Title

Location

Date Checked Drawn

Dwg.

Drawing Number

Building Number

Project Number

600 EAST 7TH STEET

SIOUX FALLS, SOUTH DAKOTA 57103

605.274.2893

6 SOUTH OLD ORCHARD

ST. LOUIS, MISSOURI 63119

800.404.7677

330 N MEAD

WICHITA, KANSAS 67202

316.262.2500

NOT FOR

CONSTRUCTION

JOHN SOMMERS, PE MO #2015028399

MP101

MECHANICAL NEW WORK PLAN -

PIPING - 3RD FLOOR - AREA A

RELOCATE PHYSICAL

MEDICINE & REHAB. TO THE

4TH FLOOR

800 HOSPITAL DRIVE COLUMBIA, MO 65201

02-15-2023

589A4-22-100

BID DOCUMENTS

RLCJES

1/8" = 1'-0"

MECHANICAL NEW WORK PLAN - PIPING - 3RD FLOOR - AREA A

# Revision Date

1 Amendment 3 05/03/2023

R E

F

F E

C

F E

C

F E

C

F E

C

F E

C

FEC

T

T

T

T

ABCDEEaFGGaHHbJJbKLLaMNNa BaBbH.5Ja F.1 Eb AaMaNb

2.8

3.7

7.3

8.2

9.1

10.4

4.5

6.2

5.4

6.7

5.7

5.3

4.6

10.2

9.8

8.9

8.3

7.2

7.1

3.6

4.1

4.7

5.1

6.1

6.3

8.0

1.9

5.5

7.5

1.1

3.1

4.4

EF

CU

4-2

ROOF TOP EQUIPMENT

EXISTING TO REMAIN

HE

HE

HE

HE

HE

HE

E

MP103

MP104

1 1 M-107

NOT IN SCOPE

x E

A

20x14 EA

1. ROUTE DUCTWORK FROM 453 – LAB CLEAN RM. TO

EXHAUST FAN. SEE SHEET MH-104 FOR ADDITIONAL

INFORMATION.

2. ROUTE REFRIGERANT LINES FROM MINI-SPLIT (ACU-4-2)

TO CONDENSING UNITS (CU-4-2). SEE SHEET MP104

FOR ADDITIONAL INFORMATION.

3. PROVIDE ROOF SUPPORT FOR DUCT MOUNTED

ACROSS ROOF. REFER TO DETAILS AND

SPECIFICATIONS FOR BRACING AND ADDITIONAL

INFORMATION.

4. ROOF MOUNTED FAN TO BE MOUNTED ON VIBRATION

ISOLATION EQUIPMENT SUPPORT. REFER TO DETAILS

AND SPECIFICATIONS FOR BRACING AND ADDITIONAL

INFORMATION.

SHEET KEYNOTES#

FOURTH FLOOR KEY PLAN

N

1. REFER TO M000 FOR MECHANICAL SYMBOLS AND

ABBREVIATIONS.

2. COORDINATE PHASING AND SHUTDOWN FOR SUPPLY

AIR, RETURN AIR, HEATING HOT WATER SUPPLY, AND

HEATING HOT WATER RETURN WITH OWNER. PROVIDE

ISOLATION VALVES AS REQUIRED FOR PHASING TO

LIMIT SHUTDOWNS. SHUTDOWN AND REPLACEMENT TO

OCCUR AFTER HOURS OR OVER WEEKEND.

3. PAIN CLINIC - NORTHWEST QUADRANT OF THE FLOOR -

SHALL BE OPERATIONAL AT ALL WORKING DAYS &

HOURS (MON-FRI 7M - 5PM) DURING THE ENTIRE

CONSTRUCTION PERIOD. ANY REQUIRED WORK IN THIS

CLINIC SHALL BE COORDINATED CLOSELY W/ COR.

4. NEW HEATING HOT WATER PIPING FOR THE PAIN

CLINIC NEEDS TO BE ROUGHED IN PRIOR TO

DEMOLISHING THE EXISTING HEATING HOT WATER

PIPING FOR THE PAIN CLINIC. COORDINATE MAXIMUM

ALLOWABLE DOWNTIME WITH THE COR.

GENERAL NOTES#

A

2 3 4 5 6

B

C

D

1 2 3 4 5 6

A

B

C

D

VA FORM 08-6231

o n e e ig e fo o t o n e q u a rt e r i n c e fo o t th re e e ig h th s in c e fo o t o n e h a lf in c e fo o t th re e q u a rt e fo o t o n e in c e fo o t o n e a n d o n e h a lf in c h e e fo o t th re e in c h e e fo o t

CONSULTANTS: ARCHITECT/ENGINEERS:

Drawing Title

Office of Construction and Facilities ManagementApproved: Project Director

Project Title

Location

Date Checked Drawn

Dwg.

Drawing Number

Building Number

Project Number

600 EAST 7TH STEET

SIOUX FALLS, SOUTH DAKOTA 57103

605.274.2893

6 SOUTH OLD ORCHARD

ST. LOUIS, MISSOURI 63119

800.404.7677

330 N MEAD

WICHITA, KANSAS 67202

316.262.2500

NOT FOR

CONSTRUCTION

JOHN SOMMERS, PE MO #2015028399

MH102

MECHANICAL NEW WORK PLAN - 4TH

FLOOR - OVERALL

RELOCATE PHYSICAL

MEDICINE & REHAB. TO THE

4TH FLOOR

800 HOSPITAL DRIVE COLUMBIA, MO 65201

02-15-2023

589A4-22-100

BID DOCUMENTS

RLCJES

3/32" = 1'-0"

MECHANICAL NEW WORK PLAN - 4TH FLOOR - OVERALL

# Revision Date

1 Amendment 3 05/03/2023

C

F E

C

FEC

EaFGGaHHbJJbKLLaMNNa H.5Ja F.1 EbMaNb

2.8

3.7

4.5

6.2

5.4

6.7

5.7

5.3

4.6

7.1

3.6

4.1

4.7

5.1

6.1

6.3

5.5

3.1

4.4

PROST. CHIEF

PROST. ASST. CHIEF

PROST. REP

STAFF TLT.

FUME RM.

PLASTER

MAINT.

421A

DUST RM.

STOR.

426A

CLEAN LAB

PER. CLNC. MASSAGE

PER. CLNC. GROUP RM.

HSKPG.

PROST. PURCHASING

FITTING/EXAM RM.

FITTING/EXAM RM.

PROST. WAIT.

CHIRO. EXAM

CHIRO. EXAM

PELVIC

PROST. STOCK RM.

BREAK RM.

WAIT.

455 WC STOR./SHOP

WOMEN'S TLT

MEN'S TLT

MSA CHECKIN/OUT

ANTE

FITTING/EXAM RM.

CORR.

C43

ELEV. LOBBY / CORR.

ELEV. LOBBY

SOILED DISP

401A

NOT IN SCOPE

6" HCS UP &

DN

2" AT.MOS.VENT

TO 6TH FL.

1" MPS(30#)

UP & DN

5"

3"

5" HCR UP

HCR

HCR

TU

4-2-1

TU

4-4-6

TU

4-4-20

TU

4-4-7

TU

4-4-16

TU

4-4-15

TU

4-4-14

TU

4-4-8

TU

4-4-9

TU

4-4-11

TU

4-4-10

TU

4-4-12

TU

4-4-13

TU

4-2-16

TU

4-2-17

TU

4-2-15

TU

4-4-17

TU

4-4-21

TU

4-4-22

TU

4-2-20

TU

4-4-25

TU

4-4-26

TU

4-4-24

TU

4-4-27

TU

4-4-23

EACV

3" HCR DN

3" HCR

1 1/2" HWR

1 1/2" HWS

1 1/4" HWR

1 1/4" HWS

1" HWR

1" HWS

3/4" HWR

3/4" HWS

2 1/2" HWS

2 1/2" HWS

2 1/2" HWR

2" HWS

2" HWR

1 1/4" HWS

1 1/4" HWR

3/4" HWS

3/4" HWR

3/4" HWS

3/4" HWR

3/4" HWS

3/4" HWR

3/4" HWS

3/4" HWR

3/4" HWR

3/4" HWS

3/4" HWS

3/4" HWR

3/4" HWR

3/4" HWS

3/4" HWR

3/4" HWS

3/4" HWS

3/4" HWR

3/4" HWS

3/4" HWR

3/4" HWR

3/4" HWS

3/4" HWR

3/4" HWS 3/4" HWR

3/4" HWS

3/4" HWS

3/4" HWR

3/4" HWS

3/4" HWR

3/4" HWR

3/4" HWS

3/4" HWS

3/4" HWR

3/4" HWS

3/4" HWR

3/4" HWS

3/4" HWR

3/4" HWR

3/4" HWS

3/4" HWS

3/4" HWR

3/4" HWS

3/4" HWR

3/4" HWR

3/4" HWS

3/4" HWS

3/4" HWR

1" HWS

1" HWR

3/4" HWS

3/4" HWR

3/4" HWR

3/4" HWS

1 1/4" HWS

1 1/4" HWR

1 1/4" HWS

1 1/4" HWR

3/4" HWS

3/4" HWR

2 1/2" HCS 2 1/2" HCS 2 1/2" HCS

2 1/2" HCS

2 1/2" HCS

2 1/2" HCS

2 1/2" HCS 2" HCS

2" HCS

2 1/2" HCS

2 1/2" HCS

2 1/2" HCS

2 1/2" HCS

2 1/2" HCS

2 1/2" HCS 2 1/2" HCS

4" HCS

4" HCS

2 32 32 32 3

2 3

2 3

2 3 2 3

2 3

2 3

4 5

EX 1/2" D

EX 1" HCS

EX 1" HCS

EX 1/2" D

EX 1" HCS

EX 1/2" D

EX 1" HCS

EX 1/2" D

EX 1" HCS

EX 1/2" D

EX 1" HCS

EX 1/2" D

EX 1" HCS

EX 1/2" D

EX 1/2" D

EX 1" HCS

EX 1" HCS

EX 1/2" D

EX 1" HCS

EX 1/2" D

1" D 1" D

1" D

1" D

1" D

1" D

1" D

1" D

1" D

1" D

1" D

1" D

1" D

1. INSTALL NEW PIPING FROM FLOOR BELOW TO

DEMARCATION POINT SHOWN. SEE SHEET M-101 FOR

RELATED INFORMATION.

2. CONNECT NEW INDUCTION UNIT SUPPLY PIPING TO

EXISTING RISER AT DEMARCATION POINT SHOWN.

INSTALL NEW INDUCTION UNIT SUPPLY AND

CONDENSATE PIPING PRIOR TO DEMOLITION OF

EXISTING PIPING. SEE DEMOLITION DRAWINGS FOR

RELATED INFORMATION.

3. CONNECT NEW CONDENSATE PIPING TO EXISTING

RISER AT DEMARCATION POINT SHOWN.

4. DISCHARGE CONDENSATE DRAIN INTO MOP SINK.

COORDINATE.

5. CONNECT CONDENSATE DRAIN TO LAVATORY TRAP.

COORDINATE WITH PLUMBING.

SHEET KEYNOTES#

FOURTH FLOOR KEY PLAN

AREA A

N

B

A

1. REFER TO M000 FOR MECHANICAL SYMBOLS AND

ABBREVIATIONS.

2. COORDINATE PHASING AND SHUTDOWN FOR SUPPLY

AIR, RETURN AIR, HEATING HOT WATER SUPPLY, AND

HEATING HOT WATER RETURN WITH OWNER. PROVIDE

ISOLATION VALVES AS REQUIRED FOR PHASING TO

LIMIT SHUTDOWNS. SHUTDOWN AND REPLACEMENT TO

OCCUR AFTER HOURS OR OVER WEEKEND.

3. PAIN CLINIC - NORTHWEST QUADRANT OF THE FLOOR -

SHALL BE OPERATIONAL AT ALL WORKING DAYS &

HOURS (MON-FRI 7M - 5PM) DURING THE ENTIRE

CONSTRUCTION PERIOD. ANY REQUIRED WORK IN THIS

CLINIC SHALL BE COORDINATED CLOSELY W/ COR.

4. NEW HEATING HOT WATER PIPING FOR THE PAIN

CLINIC NEEDS TO BE ROUGHED IN PRIOR TO

DEMOLISHING THE EXISTING HEATING HOT WATER

PIPING FOR THE PAIN CLINIC. COORDINATE MAXIMUM

ALLOWABLE DOWNTIME WITH THE COR.

GENERAL NOTES#

A

2 3 4 5 6

B

C

D

1 2 3 4 5 6

A

B

C

D

VA FORM 08-6231

o n e e ig e fo o t o n e q u a rt e r i n c e fo o t th re e e ig h th s in c e fo o t o n e h a lf in c e fo o t th re e q u a rt e fo o t o n e in c e fo o t o n e a n d o n e h a lf in c h e e fo o t th re e in c h e e fo o t

CONSULTANTS: ARCHITECT/ENGINEERS:

Drawing Title

Office of Construction and Facilities ManagementApproved: Project Director

Project Title

Location

Date Checked Drawn

Dwg.

Drawing Number

Building Number

Project Number

600 EAST 7TH STEET

SIOUX FALLS, SOUTH DAKOTA 57103

605.274.2893

6 SOUTH OLD ORCHARD

ST. LOUIS, MISSOURI 63119

800.404.7677

330 N MEAD

WICHITA, KANSAS 67202

316.262.2500

NOT FOR

CONSTRUCTION

JOHN SOMMERS, PE MO #2015028399

MP103

MECHANICAL NEW WORK PLAN -

PIPING - 4TH FLOOR - AREA A

RELOCATE PHYSICAL

MEDICINE & REHAB. TO THE

4TH FLOOR

800 HOSPITAL DRIVE COLUMBIA, MO 65201

02-15-2023

589A4-22-100

BID DOCUMENTS

RLCJES

3/16" = 1'-0"

MECHANICAL NEW WORK PLAN - PIPING - 4TH FLOOR - AREA A

# Revision Date

1 Amendment 3 05/03/2023

F

F E

C

F E

C

F E

C

T

TT

T

TT

FOURTH FLOOR KEY PLAN

AREA B

N

B

A

EaFGGaHHbJJbKLLaMNNa H.5Ja F.1 EbMaNb

7.3

8.2

9.1

6.7

9.8

8.9

8.3

7.2

7.1

8.0

7.5

CHIRO. EXAM

ACUPUNCTURE

ACUPUNCTURE

PT/OT EXAM

PT/OT EXAM

PELVIC

PELVIC

PT/OT EXAM BARIATRIC

PT/OT STOR.

PT TLT.

PROST. STOCK RM.

PT GYM

AO

OT SUPER.

BREAK RM.

STAFF TLT.

REHAB. COOR.

PSA

464 PT/OT SWAMP

CHIEF PM&R EXAM

WAIT.

OT TRAIN. RM.

OT TLT.

440A

CRASH CART ALCOVE

ELEC.

WC STOR./SHOP

CLEAN LINEN

450A

EQUIP.

CORR.

C43

CORR.

C44

ELEV. LOBBY / CORR.

ELEV. LOBBY

SOILED DISP

401A

TELE HEALTH

EX 6" MPS UP &

DN

EX 8" CWR UP

& DN

EX 3" HWS UP

& DN

EX 3" HWR UP

& DN

EX 8" CWS UP

& DN

4" - 5' 0" LG x 1'-6" VERT.

EXP.LOOP AT CLG

1' - 0" RAD. BEND -

UP & DN

TU

4-2-1

TU

4-2-2

TU

4-2-3

TU

4-2-4

TU

4-2-5

TU

4-2-6

TU

4-2-7

TU

4-2-9

TU

4-2-11

TU

4-2-12

TU

4-2-10

TU

4-2-18 TU

4-2-13

TU

4-4-1

TU

4-4-2

TU

4-4-3

TU

4-4-19

TU

4-4-18

TU

4-4-5

TU

4-4-4

TU

4-4-6

TU

4-2-14

TU

4-2-17

TU

4-2-15

TU

4-2-8

TU

4-4-17

TU

4-2-19

TU

4-4-21

ACU

4-2

EX 1 1/4" EXP

UP & DN

EX 4" MPC UP

& DN

3/4" HWS

3/4" HWR

3/4" HWS

3/4" HWR

1 1/4" HWS

1 1/4" HWR

2 1/2" HWS

2 1/2" HWR

2 1/2" HWR

2 1/2" HWR

2 1/2" HWS

3/4" HWR

3/4" HWS

3/4" HWS

3/4" HWR 3/4" HWS

3/4" HWR

3/4" HWS

3/4" HWR

3/4" HWR

3/4" HWS

3/4" HWS

3/4" HWR

3/4" HWR

3/4" HWS

3/4" HWR

3/4" HWS

3/4" HWS

3/4" HWR

3/4" HWS

3/4" HWR

3/4" HWS

3/4" HWR

3/4" HWR

3/4" HWS

3/4" HWS

3/4" HWR

3/4" HWR

3/4" HWS

3/4" HWS

3/4" HWR

3/4" HWR

3/4" HWS

3/4" HWS

3/4" HWR

3/4" HWR

3/4" HWS

3/4" HWR

3/4" HWS

3/4" HWS

3/4" HWR

3/4" HWS

3/4" HWR

3/4" HWR

3/4" HWS

3/4" HWS

3/4" HWR

3/4" HWR

3/4" HWS

3/4" HWR

3/4" HWS

3/4" HWR

3/4" HWS

3/4" HWR

3/4" HWS

3/4" HWS

3/4" HWR

3/4" HWS

3/4" HWR

3/4" HWR

3/4" HWS

3/4" HWR

3/4" HWS

3/4" HWS

3/4" HWR

3/4" HWR

3/4" HWS

2 1/2" HWS

2 1/2" HWR

1 1/4" HWR

3/4" HWR

1" HWS

1" HWR

2 1/2" HCS

2" HCS

2 1/2" HCS

2" HCS

1 1/2" HCS 2" HCS 1 1/2" HCS 1 1/4" HCS 1 1/4" HCS 1 1/4" HCS 1 1/4" HCS 1 1/2" HCS

1 1/2" HCS

2" HCS

2" HCS

2" HCS

2 3

2 3

2 3

2 3

2 3 2 3 2 3 2 3 2 3 2 3 2 3

EX 1" HCS

EX 1/2" D

EX 1" HCS

EX 1/2" D

EX 1" HCS

EX 1/2" D

EX 1" HCS

EX 1/2" D

EX 1" HCS

EX 1/2" D

EX 1" HCS

EX 1/2" D

EX 1" HCS

EX 1/2" D

EX 1" HCS

EX 1/2" D

EX 1" HCS

EX 1/2" D

EX 1" HCS

EX 1/2" D

EX 1/2" D

EX 1" HCS

1" D

1" D

1" D

1" D 1" D 1" D 1" D 1" D

1" D

1" D

1" D

CP

1" D

1" D 1" D

CO

1. ROUTE REFRIGERANT LINES FROM MINI-SPLIT (ACU-4-2)

TO CONDENSING UNIT (CU-4-2) ON ROOF. SEE SHEET

MH102 FOR ADDITIONAL INFORMATION.

2. CONNECT NEW INDUCTION UNIT SUPPLY PIPING TO

EXISTING RISER AT DEMARCATION POINT SHOWN.

INSTALL NEW INDUCTION UNIT SUPPLY AND

CONDENSATE PIPING PRIOR TO DEMOLITION OF

EXISTING PIPING. SEE DEMOLITION DRAWINGS FOR

RELATED INFORMATION.

3. CONNECT NEW CONDENSATE PIPING TO EXISTING

RISER AT DEMARCATION POINT SHOWN.

SHEET KEYNOTES#

1. REFER TO M000 FOR MECHANICAL SYMBOLS AND

ABBREVIATIONS.

2. COORDINATE PHASING AND SHUTDOWN FOR SUPPLY

AIR, RETURN AIR, HEATING HOT WATER SUPPLY, AND

HEATING HOT WATER RETURN WITH OWNER. PROVIDE

ISOLATION VALVES AS REQUIRED FOR PHASING TO

LIMIT SHUTDOWNS. SHUTDOWN AND REPLACEMENT TO

OCCUR AFTER HOURS OR OVER WEEKEND.

3. PAIN CLINIC - NORTHWEST QUADRANT OF THE FLOOR -

SHALL BE OPERATIONAL AT ALL WORKING DAYS &

HOURS (MON-FRI 7M - 5PM) DURING THE ENTIRE

CONSTRUCTION PERIOD. ANY REQUIRED WORK IN THIS

CLINIC SHALL BE COORDINATED CLOSELY W/ COR.

4. NEW HEATING HOT WATER PIPING FOR THE PAIN

CLINIC NEEDS TO BE ROUGHED IN PRIOR TO

DEMOLISHING THE EXISTING HEATING HOT WATER

PIPING FOR THE PAIN CLINIC. COORDINATE MAXIMUM

ALLOWABLE DOWNTIME WITH THE COR.

GENERAL NOTES#

A

2 3 4 5 6

B

C

D

1 2 3 4 5 6

A

B

C

D

VA FORM 08-6231

o n e e ig e fo o t o n e q u a rt e r i n c e fo o t th re e e ig h th s in c e fo o t o n e h a lf in c e fo o t th re e q u a rt e fo o t o n e in c e fo o t o n e a n d o n e h a lf in c h e e fo o t th re e in c h e e fo o t

CONSULTANTS: ARCHITECT/ENGINEERS:

Drawing Title

Office of Construction and Facilities ManagementApproved: Project Director

Project Title

Location

Date Checked Drawn

Dwg.

Drawing Number

Building Number

Project Number

600 EAST 7TH STEET

SIOUX FALLS, SOUTH DAKOTA 57103

605.274.2893

6 SOUTH OLD ORCHARD

ST. LOUIS, MISSOURI 63119

800.404.7677

330 N MEAD

WICHITA, KANSAS 67202

316.262.2500

NOT FOR

CONSTRUCTION

JOHN SOMMERS, PE MO #2015028399

MP104

MECHANICAL NEW WORK PLAN -

PIPING - 4TH FLOOR - AREA B

RELOCATE PHYSICAL

MEDICINE & REHAB. TO THE

4TH FLOOR

800 HOSPITAL DRIVE COLUMBIA, MO 65201

02-15-2023

589A4-22-100

BID DOCUMENTS

RLCJES

3/16" = 1'-0"

MECHANICAL NEW WORK PLAN - PIPING - 4TH FLOOR - AREA B

# Revision Date

1 Amendment 3 05/03/2023

C

F E

C

FEC

EaFGGaHHbJJbKLLaMNNa H.5Ja F.1 EbMaNb

2.8

3.7

4.5

6.2

5.4

6.7

5.7

5.3

4.6

7.1

3.6

4.1

4.7

5.1

6.1

6.3

5.5

3.1

4.4

PROST. CHIEF

PROST. ASST. CHIEF

PROST. REP

STAFF TLT.

FUME RM.

PLASTER

MAINT.

421ADUST RM.

STOR.

426A

CLEAN LAB

PER. CLNC. MASSAGE

PER. CLNC. GROUP RM.

HSKPG.

PROST. PURCHASING

FITTING/EXAM RM.

FITTING/EXAM RM.

PROST. WAIT.

410 CHIRO. EXAM

CHIRO.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .