AMENDMENT 3 - Drawings.pdf
PDF 15 MB Posted
- Solicitation number
- 36C25523R0072
About this file
This document provides details for a federal solicitation to relocate a physical medicine and rehabilitation department. The solicitation number is 36C25523R0072 and seeks to move Physical Medicine & Rehabilitation to the fourth floor at a Veterans Affairs medical center with project number 589A4-22-100. The solicitation was issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 15 for an opportunity type of solicitation. Contractors should respond with proposals to relocate the department as described. Key details provided include the federal agency issuing the solicitation, the work location, and a high-level description of services required to fulfill the requirements of the opportunity.
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ABBREVIATIONS
PROJ(D)
PLBG
PLYWD
PREFIN
RAD(R)
RESIL
REINF
REQ'D
SECT
SHWR
SPECS
REFRIG
GALVANIZEDGALVBMRK BENCHMARK
CONCRETE
MASONRY UNIT
CEILINGCLG
CLR
CMU
COL
CLO
CLEAR/CLEARANCE
COLUMN
CLOSET
CAB
CJ
CC
CB
BW
CL
BOC
BRZ
BRK
BO
BRG
BUR
BTM
BS
BUILT-UP ROOF
CENTER TO CENTER
CHALKBOARD
BOTTOM OF WALL
CENTER LINE
CONTROL JOINT/
CONSTRUCTION JOINT
CABINET
BACK OF CURB
BOTH SIDES
BOTTOM OF
BRONZE
BRICK
BEARING
BOTTOM
FOUNDATION
FLOOR DRAIN
FIRE EXTINGUISHER
FIRE
EXTINGUISHER
CABINET
FE
FEC
FDN
FD
EAST
EACH
EQUIPMENT
EXPOSED
EACH WAY
EXISTING
ELECTRICAL
EXTERIOR INSULATION
FINISH SYSTEM
ELEVATION/ELEVATOR
EXPANSION JOINT
EXISTING GRADE
ELECTRICAL CONTRACTOR
EXTERIOR
ETHYLENE PROPYLENE
DIENE TERPOLYMER
ELEV
EQUIP
EW
EPDM
EXP
EXIST
EXT
E
EA
EC
EG
EIFS
EJ
ELEC
INSULATION
INTERIOR
INSIDE DIAMETER
INSUL
IN(")
INT
ID
INCH
GRAB BAR
GENERAL CONTRACTOR
GYPSUM
GLASS/GLAZING
HOLLOW METAL
HIGH PRESSURE
DECORATIVE LAMINATE
HORIZONTAL
HARDWARE
HARDWOOD
HOSE BIB
HOT WATER
HEATING, VENTILATING
& AIR CONDITIONING
HDWR
HM
HORZ
HT
HPDL
HVAC
HW
HEIGHT
GB
GL
GRD
GYP
GC
HDWD
HB
GRADE
PART
PLAS
OVHD
PARTITION
PLASTER
OVERHEAD
SRT
SS
SQ
MISCELANEOUS
MASONRY OPENING
NOT IN CONTRACT
NOT APPLICABLE
OUTSIDE DIAMETER
NUMBERNO(#)
NTS
OC
OA
NOM
OFF
OPNG
OD
ON CENTER
OVERALL
NOMINAL
NOT TO SCALE
OFFICE
OPENING
MISC
N
MO
MULL
MTL
NIC
NA
NORTH
MULLION
METAL
SHT
SF
SB
SND
SIM
S
RM
ROW
RO
SAT
SAN
ARCHITECT/
ARCHITECTURAL
AB ANCHOR BOLT
APPROX
BLDG
BD
ARCH
BM
BLK
ADJ
AFF
AC
ACCU
ALUM
ANOD
ALT
APPROXIMATE
BLOCK/BLOCKING
AT
BOARD
BEAM
BUILDING
AIR COOLED
CONDENSING UNIT
ABOVE FINISHED FLOOR
ADJUSTABLE
ALTERNATE
ANODIZED
ACOUSTICAL
ALUMINUM
A/C AIR CONDITIONING
PLUS OR MINUS
CONSTRUCTIONCONST
COURSE
CERAMIC TILE
CONTINUOUS
CARPET
CORRIDOR
DIAMETER
DOOR
DOWN
DITTO
DIMENSION
DOUBLE
DRINKING FOUNTAIN
DETAIL
DRAWING
DOWNSPOUT
DIA
DR
DS
DN
DO
DIM
DTL
DWG
CRS
CT
CONT
CORR
CPT
DBL
DF
CONFERENCE
CONCRETE
CONF
CONC
FINISHFIN
FLUORESENT
FLOW LINE
FOLDING
FIELD VERIFY
FURNACE
FOOTING
FIRE RETARDANT
FOOT SCRAPER
FIBERGLASS
REINFORCED PLASTIC
FV
FT(')
FURR
FURN
FTG
G
GA
FOOT
FURRING
GAS
GUAGE
FRP
FLR
FLDG
FL
FRT
FS
FLUOR
FLOOR
FINISH GRADE
FINISH FLOOR
FG
FF
JOISTJST
LOW VOLUMN CHANGE
MASONRYMAS
MANUF
MATL
MAX
MECH
MEMB
MH
MIN
MIRR
MANUFACTURER
MATERIAL
MECHANICAL
MEMBRANE
MAXIMUM
MINIMUM
MANHOLE
MIRROR
LDR
LF
LAV
LAM
LVC
LOCN
LINEAL FEET
LADDER
LAVATORY
LAMINATE
LOCATION
REF
R
RAG
RD
PT
PR
QT
PTD
JT
JAN JANITOR
JOINT
PL
UNDER CABINET LIGHTREQUIRED
PHYSICAL THERAPY
RESPIRATORY CARE
SURGICAL INTENSIVE CARE UNIT
STUDDED RUBBER TILE
STAINLESS STEEL
SQUARE
SPECIFICATIONS
YD
SUSPENDED
ACOUSTICAL TILE
SIMILAR
SANITARY NAPKIN
DISPENSER
SECTION
SHOWER
SHEET
SQUARE FEET
SPLASH BLOCK
RESILIENT
SOUTH
SANITARY
RIGHT OF WAY
ROUGH OPENING
ROOM
WD
WNDW
WH
WNSCT
WC
WT
WWF
WP
VCT
VWC
VEST
VERT
W
W/
W/O
YARD
WATERPROOFING
/WATERPROOF
WELDED WIRE FABRIC
WATER HEATER
WATER CLOSET
WINDOW
WOOD
WAINSCOT
WEIGHT
VINYL COMPOSITION TILE
VINYL WALL COVERING
VERTICAL
VESTIBULE
WEST
WITH
WITH OUT
RC
SICU
CENTRAL STERILE
LONG TERM CARE
INTENSIVE CARE UNIT
OCCUPATIONAL THERAPY
MAGNETIC RESONANCE IMAGING
POST ANESTHETIC CARE UNIT
MEDICAL INTENSIVE CARE UNIT
LABOR-DELIVERY-RECOVERY-POST PARTUM
OPERATING ROOM
FOR MEDICAL
FACILITIES ONLY
EMERGENCY ROOM
COMPUTED TOMOGRAPHY
STORPLUMBING
PROJECT/(PROJECTED)
REFER/REFERENCE
ROOF DRAIN
RADIUS
RETURN AIR GRILLE
REINFORCING
REFRIGERATOR
RISER
PRESSURE TREATED
PAINTED
QUARRY TILE
PLYWOOD
PREFINISHED
PAIR
TLT
TV
TW
TOC
TPH
TO
TYP
UCL
T&B
T
SUSP
STRUCT
TEL
TB
T&G
PLATE/PLASTIC/
PROPERTY LINE STL
STD
STORAGE
TOILET PAPER HOLDER
TOP OF CURB
TOILET
TELEVISION
TOP OF
TYPICAL
TOP OF WALL
TONGUE & GROOVE
TOP & BOTTOM
STRUCTURE/STRUCTURAL
TREAD
TELEPHONE
TACKBOARD
SUSPENDED
ICU
OR
LDRP
MRI
MICU
LTC
PT
PACU
OT
CS
CT
ER
STEEL
STANDARD
CUT STONE
STEEL
PLYWOOD
FINISH WOOD
CONT WD FRAMING
WOOD BLOCKING
MATERIAL SYMBOLS
LVC FILL
GRANULAR FILL
CONCRETE MASONRY
FACE BRICK
CONCRETE
EARTH
EXISTING CONSTRUCTION
ASPHALT
GLASS
RIGID OR TAPERED
INSULATION, EIFS
BATT INSULATION
GYPSUM BOARD
DRAWING SYMBOLS
95.00
TOC
98.5
TOC
98.5 E
B
NEW ELEVATION
ELEVATION DESCRIPTION
EXISTING CONTOUR
NEW CONTOUR
TEST BORING (SITE PLANS ONLY)
EXISTING ELEVATION
ELEVATION DESCRIPTION
PROPERTY LINE
/1 A101
/1 A101 MATCHLINE
SHT. REFERENCE
ELEVATION DATUM
(SECTIONS, ELEVATIONS ONLY)
BUILDING SECTION
WALL SECTION
DETAIL DRAWING
BUILDING ELEVATION
AI-201
INTERIOR ELEVATION
A100
WINDOW ID TAG
DOOR NUMBER
ROOM NAME
ROOM NAME & NUMBER
PARTITION SYMBOL
1 REVISION TAG
COLUMN LINE GRID
ME100E EQUIPMENT NUMBER
SITE PLAN NOTES
DEMOLITION PLAN NOTES
VICINITY MAP
NO SCALE
PRECAST CONCRETE
WALL PANEL TAG
XXX
AE-101
A-4 ALTERNATE TAG
PT-XX PAINT COLOR TAG
# PLAN NOTES &
ROOF PLAN NOTES
PROJECT
LOCATION
AE-201
AE-301
AE-310
N
600 EAST 7TH STEET
SIOUX FALLS, SOUTH DAKOTA 57103
605.274.2893
A
B
C
D on e e ig ht h in ch o ne fo ot on e q ua rt er i nc h th re e e ig ht hs o ne f oo t on e h al f ne f oo t th re e q ua rt er s on e in ch on e a nd on e h al f in ch es o ne f oo t th re e in es ne f oo t
1 2 3 4 5 6
A
B
C
D
1 2 3 4 5 6
VA FORM 08-6231
Office of Construction and Facilities Management
Department of Veterans AffairsDwg.
Drawing Number
Building Number
Project NumberProject Title
Location
Date Checked Drawn
Drawing Title
Approved: Project Director
CONSULTANTS: ARCHITECT/ENGINEERS:
330 N MEAD
WICHITA, KANSAS 67202
316.262.2500
6 SOUTH OLD ORCHARD
ST. LOUIS, MISSOURI 63119
800.404.7677
GI001
TITLE SHEET
RELOCATE PHYSICAL
MEDICINE & REHAB. TO THE
4TH FLOOR
800 HOSPITAL DRIVE COLUMBIA, MO 65201
02-15-2023
589A4-22-100
RELOCATE PHYSICAL MEDICINE & REHAB. TO THE 4TH FLOOR
HARRY S. TRUMAN MEMORIAL VETERANS' HOSPITAL
DEPT OF VETERANS AFFAIRS
800 HOSPITAL DRIVE COLUMBIA, MO 65201
BID DOCUMENTS
BID DOCUMENTS
589A4-22-100
IEPJHK
SHEET INDEX
SHEET # SHEET NAME R.1
MECHANICAL
M-000 MECHANICAL SYMBOLS AND ABBREVIATIONS
M-001 MECHANICAL PHASING PLANS
MD101 MECHANICAL DEMOLITION PLAN - PIPING - 3RD FLOOR - AREA A X
MD102 MECHANICAL DEMOLITION PLAN - 4TH FLOOR - OVERALL X
MD103 MECHANICAL DEMOLITION PLAN - PIPING - 4TH FLOOR - AREA A X
MD104 MECHANICAL DEMOLITION PLAN - PIPING - 4TH FLOOR - AREA B X
MD105 MECHANICAL DEMOLITION PLAN - DUCTWORK - 4TH FLOOR - AREA A X
MD106 MECHANICAL DEMOLITION PLAN - DUCTWORK - 4TH FLOOR - AREA B X
MD107 MECHANICAL DEMOLITION PLAN - DUCTWORK - LOWER PENTHOUSE X
MP101 MECHANICAL NEW WORK PLAN - PIPING - 3RD FLOOR - AREA A X
MH102 MECHANICAL NEW WORK PLAN - 4TH FLOOR - OVERALL X
MP103 MECHANICAL NEW WORK PLAN - PIPING - 4TH FLOOR - AREA A X
MP104 MECHANICAL NEW WORK PLAN - PIPING - 4TH FLOOR - AREA B X
MH105 MECHANICAL NEW WORK PLAN - DUCTWORK - 4TH FLOOR - AREA A X
MH106 MECHANICAL NEW WORK PLAN - DUCTWORK - 4TH FLOOR - AREA B X
MH107 MECHANICAL NEW WORK PLAN - DUCTWORK - LOWER PENTHOUSE X
M-501 MECHANICAL DETAILS
M-601 MECHANICAL SCHEDULES X
M-701 MECHANICAL CONTROLS SYMBOLS AND ABBREVIATIONS
M-702 MECHANICAL CONTROLS
MECHANICAL: 20
ELECTRICAL
E-000 ELECTRICAL SYMBOLS AND ABBREVIATIONS
ED100 ELECTRICAL DEMOLITION PLAN - LIGHTING - 4TH FLOOR - OVERALL
ED101 ELECTRICAL DEMOLITION PLAN - LIGHTING - 4TH FLOOR - AREA A
ED102 ELECTRICAL DEMOLITION PLAN - LIGHTING - 4TH FLOOR - AREA B
ED103 ELECTRICAL DEMOLITION PLAN - POWER - 4TH FLOOR - OVERALL
ED104 ELECTRICAL DEMOLITION PLAN - POWER - 4TH FLOOR - AREA A
ED105 ELECTRICAL DEMOLITION PLAN - POWER - 4TH FLOOR - AREA B
ED106 ELECTRICAL DEMOLITION PLAN - DATA - 4TH FLOOR - OVERALL
ED107 ELECTRICAL DEMOLITION PLAN - DATA - 4TH FLOOR - AREA A
ED108 ELECTRICAL DEMOLITION PLAN - DATA - 4TH FLOOR - AREA B
EL100 ELECTRICAL REFLECTED CEILING PLAN - LIGHTING - 4TH FLOOR - OVERALL
EL101 ELECTRICAL REFLECTED CEILING PLAN - LIGHTING - 4TH FLOOR - AREA A
EL102 ELECTRICAL REFLECTED CEILING PLAN - LIGHTING - 4TH FLOOR - AREA B
EL601 LIGHTING CONTROL SCHEDULE
EN100 ELECTRICAL FLOOR PLAN - NURSE CALL - 4TH FLOOR - OVERALL
EP100 ELECTRICAL FLOOR PLAN - POWER - 4TH FLOOR - OVERALL
EP101 ELECTRICAL FLOOR PLAN - POWER - 4TH FLOOR - AREA A
EP102 ELECTRICAL FLOOR PLAN - POWER - 4TH FLOOR - AREA B X
EP103 ELECTRICAL FLOOR PLAN - POWER - 3RD FLOOR - PARTIAL ROOF
EP400 ELECTRICAL ENLARGED PLAN - 4TH FLOOR - ROOM 414B
EP600 ELECTRICAL PANEL SCHEDULE
EP601 ELECTRICAL PANEL SCHEDULE
EP602 ELECTRICAL PANEL SCHEDULE
EP701 ELECTRICAL ONE-LINE
ET100 ELECTRICAL FLOOR PLAN - DATA - 4TH FLOOR - OVERALL
ET101 ELECTRICAL FLOOR PLAN - DATA - 4TH FLOOR - AREA A
ET102 ELECTRICAL FLOOR PLAN - DATA - 4TH FLOOR - AREA B
ET500 DATA DETAILS
ELECTRICAL: 28
TOTAL SHEETS: 111
SHEET INDEX
SHEET # SHEET NAME R.1
GENERAL
GI001 TITLE SHEET X
GI002 ABA SHEET
GI103 ABA SHEET
GI104 LIFE SAFETY PLAN - 4TH FLOOR
GI110 PHASING PLAN - 4TH FLOOR
HA100 HAZARDOUS MATERIAL PLANS
GENERAL: 6
ARCHITECTURAL
AD100 DEMOLITION RCP - 3RD FLOOR - ABOVE CEILING
AD101 DEMOLITION PLAN - 4TH FLOOR
AD102 DEMOLITION PLAN - 4TH FLOOR - FLOOR PENETRATIONS X
AD111 DEMOLITION RCP - 4TH FLOOR
AE101 FLOOR PLAN - 4TH FLOOR - OVERALL
AE102 FLOOR PLAN - 4TH FLOOR - AREA A
AE103 FLOOR PLAN - 4TH FLOOR - AREA B
AE104 FLOOR PLAN - DIMENSIONS - 4TH FLOOR - AREA A
AE105 FLOOR PLAN - DIMENSIONS - 4TH FLOOR AREA B
AE120 REFLECTED CEILING PLAN - 4TH FLOOR - AREA A
AE121 REFLECTED CEILING PLAN - 4TH FLOOR - AREA B
AE401 ENLARGED PLANS - SLOPED FLOORS
AE501 DETAILS
AE601 SCHEDULES
ARCHITECTURAL: 14
ARCHITECTURAL INTERIORS
AI101 FINISH SCHEDULE
AI102 FINISH PLAN - 4TH FLOOR-AREA A
AI103 FINISH PLAN - 4TH FLOOR-AREA B
AI201 EQUIPMENT SCHEDULE
AI202 EQUIPMENT PLAN - 4TH FLOOR - AREA A
AI203 EQUIPMENT PLAN - 4TH FLOOR - AREA B
AI204 ENLARGED PLANS - EQUIPMENT
AI301 WALL PROTECTION PLAN - 4TH FLOOR - AREA A
AI302 WALL PROTECTION PLAN - 4TH FLOOR - AREA B
AI401 INTERIOR ELEVATIONS
AI402 INTERIOR ELEVATIONS
AI403 INTERIOR ELEVATIONS
AI501 MILLWORK SECTION DETAILS
AI601 SIGNAGE SCHEDULE AND DETAILS
AI602 SIGNAGE PLAN - 4TH FLOOR - AREA A
AI603 SIGNAGE PLAN - 4TH FLOOR - AREA B
ARCHITECTURAL INTERIORS: 16
FIRE SUPPRESSION AND ALARM
F-000 FIRE PROTECTION SYMBOLS AND ABBREVIATIONS
FD101 FIRE PROTECTION DEMOLITION PLAN - 4TH FLOOR - OVERALL
FD201 FIRE ALARM DEMOLITION PLAN - 4TH FLOOR - OVERALL
FD202 FIRE ALARM DEMOLITION PLAN - 4TH FLOOR - AREA A
FD203 FIRE ALARM DEMOLITION PLAN - 4TH FLOOR - AREA B
FX101 FIRE PROTECTION NEW WORK PLAN - 4TH FLOOR - OVERALL
FX501 FIRE PROTECTION - DETAILS
FA000 FIRE ALARM SYMBOLS AND ABBREVIATIONS
FA100 FIRE ALARM FLOOR PLAN - 4TH FLOOR - OVERALL
FA101 FIRE ALARM FLOOR PLAN - 4TH FLOOR - AREA A
FA102 FIRE ALARM FLOOR PLAN - 4TH FLOOR - AREA B
FIRE SUPPRESSION AND ALARM: 11
PLUMBING
P-000 PLUMBING SYMBOLS AND ABBREVIATIONS
PD100 PLUMBING PHASING PLAN - 4TH FLOOR
PD101 PLUMBING DEMOLITION PLAN - 3RD FLOOR - OVERALL
PD102 PLUMBING DEMOLITION PLAN - 3RD FLOOR - AREA A
PD103 PLUMBING DEMOLITION PLAN - 3RD FLOOR - AREA B
PD104 PLUMBING DEMOLITION PLAN - 4TH FLOOR - OVERALL
PD105 PLUMBING DEMOLITION PLAN - 4TH FLOOR - AREA A
PD106 PLUMBING DEMOLITION PLAN - 4TH FLOOR - AREA B
PP101 PLUMBING NEW WORK PLAN - 3RD FLOOR - OVERALL
PP102 PLUMBING NEW WORK PLAN - 3RD FLOOR - AREA A
PP103 PLUMBING NEW WORK PLAN - 3RD FLOOR - AREA B
PP104 PLUMBING NEW WORK PLAN - 4TH FLOOR - OVERALL
PP105 PLUMBING NEW WORK PLAN - 4TH FLOOR - AREA A
PP106 PLUMBING NEW WORK PLAN - 4TH FLOOR - AREA B
P-501 PLUMBING DETAILS
P-601 PLUMBING SCHEDULES
PLUMBING: 16
# Revision Date
1 AMENDMENT 3 05/03/2023
FEC
F E
C
FEC
FEC
FOURTH FLOOR KEY PLAN
N
4.5
5.4
6.2
F.1GHJKLMMa La Jb Hb Ga
6.7
D2
AD102
D2
AD102
E Q
E Q
4"
1"
1"
1"
4"
NEW PIPE PENETRATION
DETAIL C1/AD102
DEMO LEGEND - FLOOR PENETRATIONS
COLUMN STRIPEXISTING PIPE PENETRATION
TO BE INFILLED
DETAIL B1/AD102
INTERSECTING COLUMN
STRIPS
MIDDLE STRIP
- REF. MECHANICAL, ELECTRICAL AND PLUMBING DRAWINGS FOR ADDITIONAL INFORMATION AND
POTENTIAL CONFLICTS W/ EXISTING DUCTWORK/PIPING ON THE FLOOR BELOW.
NEW OPENING FOR
FLOOR DRAIN
DETAIL B1/AD102
CHASE/ MECH. DUCT INFILL
~ 65 S.F.
DEPRESSED SLAB INFILL
~ 710 S.F.
INTERRUPTED EXIST. TOP
REINF. BAR
EXIST. REINF.
EXIST. CONC. COLUMN
EXTEND CFRP STRIP 2'-0" MIN.
BEYOND OPENING, TYP.
TOP CFRP STRIP TO REPLACE
INTERRUPTED TOP REINF.
INTERRUPTED EXIST. BOT.
REINF. BAR
TOP CFRP STRIP TO REPLACE
INTERRUPTED TOP REINF.
BOT. CFRP STRIP TO REPLACE
INTERRUPTED BOT. REINF.
INTERRUPTED EXIST. TOP
REINF. BAR
NEW PENETRATION, TYP., REF.
MEP DRAWINGS
COLUMN STRIP OUTLINE, TYP.
INTERRUPTED EXIST. BOT.
REINF. BAR
BOT. CFRP STRIP TO REPLACE
INTERRUPTED BOT. REINF.
NOTES:
• REF C2/AD102 FOR TYPICAL OPENING SPACING DETAIL.
• NEW OPENINGS ARE TO BE SCANNED BY GPR AND LOCATED TO MISS EXISTING
REINFORCING WHERE POSSIBLE. A MAXIMUM OF (1) EXISTING BAR IN EACH
DIRECTION AT THE TOP AND BOTTOM REBAR MAT IN A SLAB MAY BE CUT AT ANY
NEW OPENING LOCATION, TYPICAL WHERE CFRP REINFORCING IS PROVIDED
UNLESS NOTED OTHERWISE. IF NO BARS ARE CUT IN EITHER DIRECTION, THEN NO
REINFORCEMENT IS NECESSARY AT THAT LOCATION.
• DETAIL IS INTENDED TO SHOW TYPICAL REINFORCING CONDITIONS OF A TWO-WAY
SLAB. CFRP STRIP TO MATCH LOCATION OF EXISTING INTERRUPTED BAR, TYPICAL
(TOP OR BOTTOM OF EXISTING CONCRETE SLAB).
• ALL CFRP STRIPS TO BE SIMPSON CSS-CUCL1014-RL
(100MM (3.94") WIDE X 1.4MM (0.055") THICK) U.N.O.
• CONTRACTOR TO ASSUME THAT 100% OF THE NEW MECHANICAL PIPE
PENETRATIONS WILL BE REINFORCED WITH CFRP FOR BIDDING PURPOSES AND
PROVIDE A DEDUCT AMOUNT FOR EVERY OPENING THAT DOES NOT REQUIRE
CFRP REINFORCING.
EXTERNAL FIBER REINFORCING FOR CONCRETE MEMBERS:
• MATERIALS USED FOR REINFORCING EXISTING CONCRETE MEMBERS SHALL BE CARBON FIBER AND COMPATIBLE RESINS. FIBER SHALL BE SIMPSON STRONG-TIE CSS-CUCL OR APPROVED EQUAL, AND RESIN SHALL BE SIMPSON STRONG-TIE CSS-EP OR APPROVED EQUAL (CURED COMPOSITE PROPERTIES: TENSILE STRENGTH = 181,000 PSI, TENSILE MODULUS = 23,600 KSI, PER ICC-ES AC125). TO BE APPROVED, PRODUCT SUBSTITUTIONS SHALL HAVE
APPROPRIATE ICC-ESR DOCUMENTS.
• PREPARE THE CONCRETE SURFACE ACCORDING TO MANUFACTURER’S RECOMMENDATIONS, INCLUDING REPAIRING
ANY UNEVEN SURFACES.
NEW CONC. SLAB
NOTES:
• FOR OPENINGS GREATER THAN 8" IN ANY
DIMENSION, CONTACT E.O.R. FOR REINFORCING
REQUIREMENTS PRIOR TO PLACEMENT.
ROUGHEN HOLE AND CONCRETE
SIDE TO SLOPE SHOWN. APPLY
SIKADUR 32, HI-MOD TO SURFACE
TO RECEIVE CONCRETE.
F
IE
L D
V E
R
IF
Y
EXIST. CONC. SLAB
3/4" .
FIRE RATED PLYWOOD
#4 REBAR DOWEL, 3" MIN EMBED
INTO EXISTING SLAB
NEW PENETRATION,
REF. MEP DRAWINGS
d
6" MINIMUM
2d CLEAR dMAX1 2
TOP OF CONC.
EXIST. CONC. SLAB,
REF. PLAN
BENT PL5-1/4X4-3/4X3/8 CONT.
ALL FOR SIDES
1/2"Ø ADHESIVE ANCHORS @ 24" O.C.
(MIN. 4" EMBED.)
COMPOSITE SLAB,
REF. PLAN
/4
/4
2" 4" 4" 2"
(2) 1/2"Ø ADHESIVE ANCHORS (MIN. 4"
EMBED.)
PL3/8X4X1'-0" END PLATE
CONNECTION
A
A
SECTION A-A
HSS4X4X1/4
3/16
3/16
NEW CONC. SLAB
NOTES:
• FOR OPENINGS GREATER THAN 8" IN ANY
DIMENSION, CONTACT E.O.R. FOR REINFORCING
REQUIREMENTS PRIOR TO PLACEMENT.
ROUGHEN HOLE AND CONCRETE
SIDE TO SLOPE SHOWN. APPLY
SIKADUR 32, HI-MOD TO SURFACE
TO RECEIVE CONCRETE.
F
IE
L D
V E
R
IF
Y
EXIST. CONC. SLAB
EXIST. MECH. DUCT
CAP OFF & SEAL
EXIST. MECH. DUCT
3/4" .
FIRE RATED PLYWOOD
#4 REBAR DOWEL, 3" MIN EMBED
INTO EXISTING SLAB
0' 4'-0" 8'-0" 16'-0"
N
A
2 3 4 5 6
B
C
D
1 2 3 4 5 6
A
B
C
D
VA FORM 08-6231
o n e e ig h th c n e fo o t o n e q u a rt e r i n c e fo o t th re e e ig h th s in c e fo o t o n e h a lf in c e fo o t th re e q u a rt rs e fo o t o n e in c e fo o t o n e a n d o n e h a lf in c h e s e fo o t th re e in c h e e fo o t
CONSULTANTS: ARCHITECT/ENGINEERS:
Drawing Title
Office of Construction and Facilities ManagementApproved: Project Director
Project Title
Location
Date Checked Drawn
Dwg.
Drawing Number
Building Number
Project Number
Department of Veterans Affairs
600 EAST 7TH STEET
SIOUX FALLS, SOUTH DAKOTA 57103
605.274.2893
6 SOUTH OLD ORCHARD
ST. LOUIS, MISSOURI 63119
800.404.7677
330 N MEAD
WICHITA, KANSAS 67202
316.262.2500
AD102
DEMOLITION PLAN - 4TH FLOOR -
FLOOR PENETRATIONS
RELOCATE PHYSICAL
MEDICINE & REHAB. TO THE
4TH FLOOR
800 HOSPITAL DRIVE COLUMBIA, MO 65201
02-15-2023
589A4-22-100
BID DOCUMENTS
IEPJHK
1/8" = 1'-0" D3
DEMOLITION PLAN - 4TH FLOOR - PENETRATION
1/2" = 1'-0" B1
PIPING PENETRATION CFRP PLACEMENT DETAIL
NOT TO SCALE
C1
EXISTING OPENING INFILL DETAIL
NOT TO SCALE
C2
OPENING SPACING DETAIL
NOT TO SCALE
D2
CHASE INFILL
NOT TO SCALE
D1
EXISTING OPENING INFILL DETAIL @
ABANDONED DUCT
# Revision Date
1 AMENDMENT 3 05/03/2023
F E
C
ABCDEEaFGGaHJJbK BaBbH.5Ja F.1 Eb Aa
2.8
3.7
6.2
5.4
5.7
5.3
4.6
3.6
4.1
4.7
5.1
6.1
6.3
1.9
5.5
1.1
3.1
4.4
NOT IN SCOPE
3" UP
3"
EX 3" HCR
EX 2" V
EX 1" MPS
1. REFER TO M000 FOR MECHANICAL SYMBOLS AND
ABBREVIATIONS.
2. COORDINATE PHASING AND SHUTDOWN FOR SUPPLY
AIR, RETURN AIR, HEATING HOT WATER SUPPLY, AND
HEATING HOT WATER RETURN WITH OWNER. PROVIDE
ISOLATION VALVES AS REQUIRED FOR PHASING TO
LIMIT SHUTDOWNS. SHUTDOWN AND REPLACEMENT TO
OCCUR AFTER HOURS OR OVER WEEKEND.
3. COORDINATE EXISTING CONDITIONS AND ASBESTOS
REMOVAL WITH EXISTING CONDITIONS. FOR EXISTING
ASBESTOS, REFER TO MOST RECENT REPORT
PROVIDED BY OWNER. COORDINATE ALL REMOVAL IN
COMPLIANCE WITH CURRENT VA ASBESTOS
ABATEMENT DESIGN MANUAL. REFER TO
SPECIFICATION 02 82 11 FOR ADDITIONAL
INFORMATION.
4. PAIN CLINIC - NORTHWEST QUADRANT OF THE FLOOR -
SHALL BE OPERATIONAL AT ALL WORKING DAYS &
HOURS (MON-FRI 7M - 5PM) DURING THE ENTIRE
CONSTRUCTION PERIOD. ANY REQUIRED WORK IN THIS
CLINIC SHALL BE COORDINATED CLOSELY W/ COR.
5. NEW HEATING HOT WATER PIPING FOR THE PAIN
CLINIC NEEDS TO BE ROUGHED IN PRIOR TO
DEMOLISHING THE EXISTING HEATING HOT WATER
PIPING FOR THE PAIN CLINIC. COORDINATE MAXIMUM
ALLOWABLE DOWNTIME WITH THE COR.
GENERAL NOTES#
1. VERIFY EXISTING CONDITIONS PRIOR TO
CONSTRUCTION.
2. DEMOLISH EXISTING PIPING FROM FLOOR ABOVE TO
DEMARCATION POINT SHOWN.
SHEET KEYNOTES#
A
2 3 4 5 6
B
C
D
1 2 3 4 5 6
A
B
C
D
VA FORM 08-6231
o n e e ig e fo o t o n e q u a rt e r i n c e fo o t th re e e ig h th s in c e fo o t o n e h a lf in c e fo o t th re e q u a rt e fo o t o n e in c e fo o t o n e a n d o n e h a lf in c h e e fo o t th re e in c h e e fo o t
CONSULTANTS: ARCHITECT/ENGINEERS:
Drawing Title
Office of Construction and Facilities ManagementApproved: Project Director
Project Title
Location
Date Checked Drawn
Dwg.
Drawing Number
Building Number
Project Number
600 EAST 7TH STEET
SIOUX FALLS, SOUTH DAKOTA 57103
605.274.2893
6 SOUTH OLD ORCHARD
ST. LOUIS, MISSOURI 63119
800.404.7677
330 N MEAD
WICHITA, KANSAS 67202
316.262.2500
NOT FOR
CONSTRUCTION
JOHN SOMMERS, PE MO #2015028399
MD101
MECHANICAL DEMOLITION PLAN -
PIPING - 3RD FLOOR - AREA A
RELOCATE PHYSICAL
MEDICINE & REHAB. TO THE
4TH FLOOR
800 HOSPITAL DRIVE COLUMBIA, MO 65201
02-15-2023
589A4-22-100
BID DOCUMENTS
RLCJES
1/8" = 1'-0"
MECHANICAL DEMOLITION PLAN - PIPING - 3RD FLOOR - AREA A
# Revision Date
1 Amendment 3 05/03/2023
05/03/2023
FE
E
T
T
T
T
ABCDEEaFGGaHHbJJbKLLaMNNa BaBbH.5Ja F.1 Eb AaMaNb
2.8
3.7
7.3
8.2
9.1
10.4
4.5
6.2
5.4
6.7
5.7
5.3
4.6
10.2
9.8
8.9
8.3
7.2
7.1
3.6
4.1
4.7
5.1
6.1
6.3
8.0
1.9
5.5
7.5
1.1
3.1
4.4
ROOF TOP EQUIPMENT
EXISTING TO REMAIN
HE
HE
HE
HE
HE
HE
E
MD103
1 1
MD106
MD104
1 1
MD107
NOT IN SCOPE
1. REFER TO M000 FOR MECHANICAL SYMBOLS AND
ABBREVIATIONS.
2. COORDINATE PHASING AND SHUTDOWN FOR SUPPLY
AIR, RETURN AIR, HEATING HOT WATER SUPPLY, AND
HEATING HOT WATER RETURN WITH OWNER. PROVIDE
ISOLATION VALVES AS REQUIRED FOR PHASING TO
LIMIT SHUTDOWNS. SHUTDOWN AND REPLACEMENT TO
OCCUR AFTER HOURS OR OVER WEEKEND.
3. COORDINATE EXISTING CONDITIONS AND ASBESTOS
REMOVAL WITH EXISTING CONDITIONS. FOR EXISTING
ASBESTOS, REFER TO MOST RECENT REPORT
PROVIDED BY OWNER. COORDINATE ALL REMOVAL IN
COMPLIANCE WITH CURRENT VA ASBESTOS
ABATEMENT DESIGN MANUAL. REFER TO
SPECIFICATION 02 82 11 FOR ADDITIONAL
INFORMATION.
4. PAIN CLINIC - NORTHWEST QUADRANT OF THE FLOOR -
SHALL BE OPERATIONAL AT ALL WORKING DAYS &
HOURS (MON-FRI 7M - 5PM) DURING THE ENTIRE
CONSTRUCTION PERIOD. ANY REQUIRED WORK IN THIS
CLINIC SHALL BE COORDINATED CLOSELY W/ COR.
5. NEW HEATING HOT WATER PIPING FOR THE PAIN
CLINIC NEEDS TO BE ROUGHED IN PRIOR TO
DEMOLISHING THE EXISTING HEATING HOT WATER
PIPING FOR THE PAIN CLINIC. COORDINATE MAXIMUM
ALLOWABLE DOWNTIME WITH THE COR.
GENERAL NOTES#
FOURTH FLOOR KEY PLAN
N
A
2 3 4 5 6
B
C
D
1 2 3 4 5 6
A
B
C
D
VA FORM 08-6231
o n e e ig e fo o t o n e q u a rt e r i n c e fo o t th re e e ig h th s in c e fo o t o n e h a lf in c e fo o t th re e q u a rt e fo o t o n e in c e fo o t o n e a n d o n e h a lf in c h e e fo o t th re e in c h e e fo o t
CONSULTANTS: ARCHITECT/ENGINEERS:
Drawing Title
Office of Construction and Facilities ManagementApproved: Project Director
Project Title
Location
Date Checked Drawn
Dwg.
Drawing Number
Building Number
Project Number
600 EAST 7TH STEET
SIOUX FALLS, SOUTH DAKOTA 57103
605.274.2893
6 SOUTH OLD ORCHARD
ST. LOUIS, MISSOURI 63119
800.404.7677
330 N MEAD
WICHITA, KANSAS 67202
316.262.2500
NOT FOR
CONSTRUCTION
JOHN SOMMERS, PE MO #2015028399
MD102
MECHANICAL DEMOLITION PLAN - 4TH
FLOOR - OVERALL
RELOCATE PHYSICAL
MEDICINE & REHAB. TO THE
4TH FLOOR
800 HOSPITAL DRIVE COLUMBIA, MO 65201
02-15-2023
589A4-22-100
BID DOCUMENTS
RLCJES
3/32" = 1'-0"
MECHANICAL DEMOLITION PLAN - 4TH FLOOR - OVERALL
# Revision Date
1 Amendment 3 05/03/2023
1. REFER TO M000 FOR MECHANICAL SYMBOLS AND
ABBREVIATIONS.
2. COORDINATE PHASING AND SHUTDOWN FOR SUPPLY
AIR, RETURN AIR, HEATING HOT WATER SUPPLY, AND
HEATING HOT WATER RETURN WITH OWNER. PROVIDE
ISOLATION VALVES AS REQUIRED FOR PHASING TO
LIMIT SHUTDOWNS. SHUTDOWN AND REPLACEMENT TO
OCCUR AFTER HOURS OR OVER WEEKEND.
3. COORDINATE EXISTING CONDITIONS AND ASBESTOS
REMOVAL WITH EXISTING CONDITIONS. FOR EXISTING
ASBESTOS, REFER TO MOST RECENT REPORT
PROVIDED BY OWNER. COORDINATE ALL REMOVAL IN
COMPLIANCE WITH CURRENT VA ASBESTOS
ABATEMENT DESIGN MANUAL. REFER TO
SPECIFICATION 02 82 11 FOR ADDITIONAL
INFORMATION.
4. PAIN CLINIC - NORTHWEST QUADRANT OF THE FLOOR -
SHALL BE OPERATIONAL AT ALL WORKING DAYS &
HOURS (MON-FRI 7M - 5PM) DURING THE ENTIRE
CONSTRUCTION PERIOD. ANY REQUIRED WORK IN THIS
CLINIC SHALL BE COORDINATED CLOSELY W/ COR.
5. NEW HEATING HOT WATER PIPING FOR THE PAIN
CLINIC NEEDS TO BE ROUGHED IN PRIOR TO
DEMOLISHING THE EXISTING HEATING HOT WATER
PIPING FOR THE PAIN CLINIC. COORDINATE MAXIMUM
ALLOWABLE DOWNTIME WITH THE COR.
GENERAL NOTES#EaFGGaHHbJJbKLLaMNNa H.5Ja F.1 EbMaNb
2.8
3.7
4.5
6.2
5.4
6.7
5.7
5.3
4.6
7.1
3.6
4.1
4.7
5.1
6.1
6.3
5.5
3.1
4.4
3/4"
3/4"
2"
1 1/4"
1"
1" 3/4"
3/4" typical size VAV connection
1 1/4"
2"
1"
1"
1 1/2"
1 1/4"
1 1/4"
1 1/2"
3"
6" HCS UP &
DN
1"1"
3/4"
3/4"
HCR DN
2" AT.MOS.VENT
TO 6TH FL.
1" MPS(30#)
UP & DN
UP
UP
5"
3" 3"
5" HCR UP
HCR
HCR HCR
T
T
T
T
T
T
TT
T
T
T
T
T
T T
T
T
NOT IN SCOPE
3 3
1 1/4"
1 1/2"
22 2 2 2 2
EX 1/2" D
EX 1" HCS 5
EX 1" HCS
EX 1/2" D
EX 1" HCS
EX 1/2" D
EX 1" HCS
EX 1/2" D
EX 1" HCS
EX 1/2" D
EX 1" HCS
EX 1/2" D
EX 1" HCS
EX 1/2" D
EX 1/2" D
EX 1" HCS
EX 1" HCS
EX 1/2" D
EX 1" HCS
EX 1/2" D
1. DEMOLISH ALL EXISTING TERMINAL UNITS AND
ASSOCIATED PIPING, CONTROLS, AND ACCESSORIES
BACK TO DEMARCATION POINT SHOWN.
2. EXISTING INDUCTION UNIT TO BE REMOVED. REMOVE
CONTROLS AND ACCESSORIES. REMOVE PIPING BACK
ABOVE CEILING AND PREPARE FOR CONNECTION TO
NEW INDUCTION UNIT PIPING LOOP. REMOVE ALL
CONTROL WIRING BACK TO CENTRAL PANEL IN 401C.
REMOVE ALL PNEUMATIC CONTROL TUBING.
3. DEMOLISH EXISTING PIPING FROM FLOOR BELOW TO
DEMARCATION POINT SHOWN.
4. DEMOLISH EXISTING PIPING BACK TO DEMARCATION
POINT SHOWN.
5. DEMOLISH INDUCTION UNIT SUPPLY AND CONDENSATE
PIPING BACK TO 4TH FLOOR SLAB AND CEILING.
PREPARE FOR CONNECTION OF NEW PIPING. INSTALL
NEW INDUCTION UNIT SUPPLY AND CONDENSATE
PIPING PRIOR TO DEMOLITION OF EXISTING PIPING. SEE
NEW WORK FOR RELATED INFORMATION.
SHEET KEYNOTES#
FOURTH FLOOR KEY PLAN
AREA A
N
B
A
A
2 3 4 5 6
B
C
D
1 2 3 4 5 6
A
B
C
D
VA FORM 08-6231
o n e e ig e fo o t o n e q u a rt e r i n c e fo o t th re e e ig h th s in c e fo o t o n e h a lf in c e fo o t th re e q u a rt e fo o t o n e in c e fo o t o n e a n d o n e h a lf in c h e e fo o t th re e in c h e e fo o t
CONSULTANTS: ARCHITECT/ENGINEERS:
Drawing Title
Office of Construction and Facilities ManagementApproved: Project Director
Project Title
Location
Date Checked Drawn
Dwg.
Drawing Number
Building Number
Project Number
600 EAST 7TH STEET
SIOUX FALLS, SOUTH DAKOTA 57103
605.274.2893
6 SOUTH OLD ORCHARD
ST. LOUIS, MISSOURI 63119
800.404.7677
330 N MEAD
WICHITA, KANSAS 67202
316.262.2500
NOT FOR
CONSTRUCTION
JOHN SOMMERS, PE MO #2015028399
MD103
MECHANICAL DEMOLITION PLAN -
PIPING - 4TH FLOOR - AREA A
RELOCATE PHYSICAL
MEDICINE & REHAB. TO THE
4TH FLOOR
800 HOSPITAL DRIVE COLUMBIA, MO 65201
02-15-2023
589A4-22-100
BID DOCUMENTS
RLCJES
3/16" = 1'-0"
MECHANICAL DEMOLITION PLAN - PIPING - 4TH FLOOR - AREA A
# Revision Date
1 Amendment 3 05/03/2023
E
T
TT
T
TT
1. REFER TO M000 FOR MECHANICAL SYMBOLS AND
ABBREVIATIONS.
2. COORDINATE PHASING AND SHUTDOWN FOR SUPPLY
AIR, RETURN AIR, HEATING HOT WATER SUPPLY, AND
HEATING HOT WATER RETURN WITH OWNER. PROVIDE
ISOLATION VALVES AS REQUIRED FOR PHASING TO
LIMIT SHUTDOWNS. SHUTDOWN AND REPLACEMENT TO
OCCUR AFTER HOURS OR OVER WEEKEND.
3. COORDINATE EXISTING CONDITIONS AND ASBESTOS
REMOVAL WITH EXISTING CONDITIONS. FOR EXISTING
ASBESTOS, REFER TO MOST RECENT REPORT
PROVIDED BY OWNER. COORDINATE ALL REMOVAL IN
COMPLIANCE WITH CURRENT VA ASBESTOS
ABATEMENT DESIGN MANUAL. REFER TO
SPECIFICATION 02 82 11 FOR ADDITIONAL
INFORMATION.
4. PAIN CLINIC - NORTHWEST QUADRANT OF THE FLOOR -
SHALL BE OPERATIONAL AT ALL WORKING DAYS &
HOURS (MON-FRI 7M - 5PM) DURING THE ENTIRE
CONSTRUCTION PERIOD. ANY REQUIRED WORK IN THIS
CLINIC SHALL BE COORDINATED CLOSELY W/ COR.
5. NEW HEATING HOT WATER PIPING FOR THE PAIN
CLINIC NEEDS TO BE ROUGHED IN PRIOR TO
DEMOLISHING THE EXISTING HEATING HOT WATER
PIPING FOR THE PAIN CLINIC. COORDINATE MAXIMUM
ALLOWABLE DOWNTIME WITH THE COR.
GENERAL NOTES#EaFGGaHHbJJbKLLaMNNa H.5Ja F.1 EbMaNb
7.3
8.2
9.1
6.7
9.8
8.9
8.3
7.2
7.1
8.0
7.5
2"
2"
3/4"
2"
2" 1 1/4"
1"
1" 3/4"
3/4"
2"
1" typical size VAV connection
2"
3/4"
2"
1"
2"
1"
1 1/4"
2"
1"
1"
1 1/2" 1 1/4"
3/4"
3/4"
EX 6" MPS UP &
DN
EX 8" CWR UP
& DN
EX 3" HWS UP
& DN
EX 3" HWR UP
& DN
EX 8" CWS UP
& DN
EX 1 1/4" EXP
UP & DN
4"
3/4"
3/4"
- 5' 0" LG x 1'-6" VERT.
EXP.LOOP AT CLG
1' - 0" RAD. BEND -
UP & DN
UP
UP
EX 4" MPC UP
& DN
T
22222222222222
EX 1" HCS
EX 1/2" D
EX 1" HCS
EX 1/2" D
EX 1" HCS
EX 1/2" D
EX 1" HCS
EX 1/2" D
EX 1" HCS
EX 1/2" D
EX 1" HCS
EX 1/2" D
EX 1" HCS
EX 1/2" D
EX 1" HCS
EX 1/2" D
EX 1" HCS
EX 1/2" D
EX 1" HCS
EX 1/2" D
EX 1/2" D
EX 1" HCS 4
FOURTH FLOOR KEY PLAN
AREA B
N
B
A
1. DEMOLISH ALL EXISTING TERMINAL UNITS AND
ASSOCIATED PIPING, CONTROLS, AND ACCESSORIES
BACK TO DEMARCATION POINT SHOWN.
2. EXISTING INDUCTION UNIT TO BE REMOVED. REMOVE
CONTROLS AND ACCESSORIES. REMOVE PIPING BACK
ABOVE CEILING AND PREPARE FOR CONNECTION TO
NEW INDUCTION UNIT PIPING LOOP. REMOVE ALL
CONTROL WIRING BACK TO CENTRAL PANEL IN 401C.
REMOVE ALL PNEUMATIC CONTROL TUBING.
3. VERIFY SHUTOFF VALVES EXIST AND ADD NEW AS
REQUIRED FOR NEW WORK.
4. DEMOLISH INDUCTION UNIT SUPPLY AND CONDENSATE
PIPING BACK TO 4TH FLOOR SLAB AND CEILING.
PREPARE FOR CONNECTION OF NEW PIPING. INSTALL
NEW INDUCTION UNIT SUPPLY AND CONDENSATE
PIPING PRIOR TO DEMOLITION OF EXISTING PIPING. SEE
NEW WORK FOR RELATED INFORMATION.
SHEET KEYNOTES#
A
2 3 4 5 6
B
C
D
1 2 3 4 5 6
A
B
C
D
VA FORM 08-6231
o n e e ig e fo o t o n e q u a rt e r i n c e fo o t th re e e ig h th s in c e fo o t o n e h a lf in c e fo o t th re e q u a rt e fo o t o n e in c e fo o t o n e a n d o n e h a lf in c h e e fo o t th re e in c h e e fo o t
CONSULTANTS: ARCHITECT/ENGINEERS:
Drawing Title
Office of Construction and Facilities ManagementApproved: Project Director
Project Title
Location
Date Checked Drawn
Dwg.
Drawing Number
Building Number
Project Number
600 EAST 7TH STEET
SIOUX FALLS, SOUTH DAKOTA 57103
605.274.2893
6 SOUTH OLD ORCHARD
ST. LOUIS, MISSOURI 63119
800.404.7677
330 N MEAD
WICHITA, KANSAS 67202
316.262.2500
NOT FOR
CONSTRUCTION
JOHN SOMMERS, PE MO #2015028399
MD104
MECHANICAL DEMOLITION PLAN -
PIPING - 4TH FLOOR - AREA B
RELOCATE PHYSICAL
MEDICINE & REHAB. TO THE
4TH FLOOR
800 HOSPITAL DRIVE COLUMBIA, MO 65201
02-15-2023
589A4-22-100
BID DOCUMENTS
RLCJES
3/16" = 1'-0"
MECHANICAL DEMOLITION PLAN - PIPING - 4TH FLOOR - AREA B
# Revision Date
1 Amendment 3 05/03/2023
1. REFER TO M000 FOR MECHANICAL SYMBOLS AND
ABBREVIATIONS.
2. COORDINATE PHASING AND SHUTDOWN FOR SUPPLY
AIR, RETURN AIR, HEATING HOT WATER SUPPLY, AND
HEATING HOT WATER RETURN WITH OWNER. PROVIDE
ISOLATION VALVES AS REQUIRED FOR PHASING TO
LIMIT SHUTDOWNS. SHUTDOWN AND REPLACEMENT TO
OCCUR AFTER HOURS OR OVER WEEKEND.
3. COORDINATE EXISTING CONDITIONS AND ASBESTOS
REMOVAL WITH EXISTING CONDITIONS. FOR EXISTING
ASBESTOS, REFER TO MOST RECENT REPORT
PROVIDED BY OWNER. COORDINATE ALL REMOVAL IN
COMPLIANCE WITH CURRENT VA ASBESTOS
ABATEMENT DESIGN MANUAL. REFER TO
SPECIFICATION 02 82 11 FOR ADDITIONAL
INFORMATION.
4. PAIN CLINIC - NORTHWEST QUADRANT OF THE FLOOR -
SHALL BE OPERATIONAL AT ALL WORKING DAYS &
HOURS (MON-FRI 7M - 5PM) DURING THE ENTIRE
CONSTRUCTION PERIOD. ANY REQUIRED WORK IN THIS
CLINIC SHALL BE COORDINATED CLOSELY W/ COR.
5. NEW HEATING HOT WATER PIPING FOR THE PAIN
CLINIC NEEDS TO BE ROUGHED IN PRIOR TO
DEMOLISHING THE EXISTING HEATING HOT WATER
PIPING FOR THE PAIN CLINIC. COORDINATE MAXIMUM
ALLOWABLE DOWNTIME WITH THE COR.
GENERAL NOTES#
EaFGGaHHbJJbKLLaMNNa H.5Ja F.1 EbMaNb
2.8
3.7
4.5
6.2
5.4
6.7
5.7
5.3
4.6
7.1
3.6
4.1
4.7
5.1
6.1
6.3
5.5
3.1
4.4
8x4
16x6 x
12x4
6x6
8x4
6x6
6x4
6x6
11x6
6x6
9x6
6x6
6x4
6x6
10x8
8x7
8x6
14x8
6x4
8ø 8ø
8x4 x x x x x
10x9
10x6
15ø
10x4
EX 15x25
7x6
6x7 6x7 6x7 6x7
9ø 10x4
16x6
10x4 9x4
11x4 ø
12x5
6x4
9x4
6x6
6x4
9x4
6x4
10x4
10x4 12x5
10x4
10x4
6x4
12x8 x
6x6
30x11
17x11 x
6x4
6x4 6x4
6x4
6x4
6x4
9x6
11x6
6x4 13x6
7x6
6x5
6x4
16x6
6x5
10x6
9x5
14ø
13ø
10ø
12x6
9x4 9x6
6x4
9x4
14x8
15x6
7x6
12x4
6x6
8x4
6x4
6x6
11ø
29x6 1 x
6x5
10x6
13x6
13ø
16ø
22x10
8x4
11x5
12x4
6x4
6x4 6x4
6x4
6x6 x
14x10
14x8
6x6
6x6
18x7
8x5
6x4
6x4 9x5
12x7 12x7
6x8
6x6
8x6 6x6
6x4
6x4
EX 45x12 RA UP
EX 24ø SA
UP & DN
EX 12x12
EA UP & DN
EX 9x12 EA
UP & DN
EX 14x12
EA UP & DN
EX 16ø
VENT UP &
DN
EX 26x24 SA
EX 12x10
EA UP & DN
EX 10x12 EA
EX 10x12 EA
EX 10x12 EA
EX 10x12 EA
EX 10x12 EA
EX 10x12 EA
EX 16ø SA UP
EX 22ø SA
UP & DN
EX 13ø OA UP
EX 15ø OA DN
(AC-S3)
(AC-S1)
(AC-ER-2)
(AC-ER-5)
(AC-S5)
(AC-S2)
(AC-ER-4)
EXCEPT AS
NOTED
(AC-S4)
(AC-ER-3)
(AC-S2)
(E-3)
17x14
17x13
NOT IN SCOPE
EX 30x31 RA
EX 36x30
RA UP & DN
EX 40x22
RA UP & DN
EX 34ø SA
UP & DN
EX 16ø SA UP
EX 24ø SA
UP & DN
EX 12ø
VENT UP &
DN
22 2 2 2 2
EX 20x20 SA
EX 20x20 RA
1. DEMOLISH ALL EXISTING TERMINAL UNITS AND
ASSOCIATED DUCTWORK, CONTROLS, AND
ACCESSORIES BACK TO DEMARCATION POINT SHOWN.
2. EXISTING INDUCTION UNIT TO BE REMOVED. REMOVE
CONTROLS AND ACCESSORIES. REMOVE DUCT BACK
TO TOP OF 5TH FLOOR SLAB AND PROVIDE CAP.
REMOVE ALL CONTROL WIRING BACK TO CENTRAL
PANEL IN 401C. REMOVE ALL PNEUMATIC CONTROL
TUBING.
3. RELOCATE EXISTING DIFFUSER AND FLEX DUCT TO
ALIGN WITH NEW CEILING GRID. SEE MH105 FOR
RELATED INFORMATION.
4. FIELD VERIFY EXISTING DUCT ROUTING PRIOR TO
CONSTRUCTION. RECORD DRAWINGS MAY NOT
REPRESENT CURRENT DUCT ROUTING.
5. DEMOLISH EXISTING DUCTWORK IN CHASE FROM 4TH
FLOOR UP TO THE FLOOR ABOVE. VERIFY DUCTWORK
IS INACTIVE WITH OWNER PRIOR TO DEMOLITION.
SHEET KEYNOTES#
FOURTH FLOOR KEY PLAN
AREA A
N
B
A
A
2 3 4 5 6
B
C
D
1 2 3 4 5 6
A
B
C
D
VA FORM 08-6231
o n e e ig e fo o t o n e q u a rt e r i n c e fo o t th re e e ig h th s in c e fo o t o n e h a lf in c e fo o t th re e q u a rt e fo o t o n e in c e fo o t o n e a n d o n e h a lf in c h e e fo o t th re e in c h e e fo o t
CONSULTANTS: ARCHITECT/ENGINEERS:
Drawing Title
Office of Construction and Facilities ManagementApproved: Project Director
Project Title
Location
Date Checked Drawn
Dwg.
Drawing Number
Building Number
Project Number
600 EAST 7TH STEET
SIOUX FALLS, SOUTH DAKOTA 57103
605.274.2893
6 SOUTH OLD ORCHARD
ST. LOUIS, MISSOURI 63119
800.404.7677
330 N MEAD
WICHITA, KANSAS 67202
316.262.2500
NOT FOR
CONSTRUCTION
JOHN SOMMERS, PE MO #2015028399
MD105
MECHANICAL DEMOLITION PLAN -
DUCTWORK - 4TH FLOOR - AREA A
RELOCATE PHYSICAL
MEDICINE & REHAB. TO THE
4TH FLOOR
800 HOSPITAL DRIVE COLUMBIA, MO 65201
02-15-2023
589A4-22-100
BID DOCUMENTS
RLCJES
3/16" = 1'-0"
MECHANICAL DEMOLITION PLAN - DUCTWORK - 4TH FLOOR - AREA A
# Revision Date
1 Amendment 3 05/03/2023
E
T
TT
T
TT
1. REFER TO M000 FOR MECHANICAL SYMBOLS AND
ABBREVIATIONS.
2. COORDINATE PHASING AND SHUTDOWN FOR SUPPLY
AIR, RETURN AIR, HEATING HOT WATER SUPPLY, AND
HEATING HOT WATER RETURN WITH OWNER. PROVIDE
ISOLATION VALVES AS REQUIRED FOR PHASING TO
LIMIT SHUTDOWNS. SHUTDOWN AND REPLACEMENT TO
OCCUR AFTER HOURS OR OVER WEEKEND.
3. COORDINATE EXISTING CONDITIONS AND ASBESTOS
REMOVAL WITH EXISTING CONDITIONS. FOR EXISTING
ASBESTOS, REFER TO MOST RECENT REPORT
PROVIDED BY OWNER. COORDINATE ALL REMOVAL IN
COMPLIANCE WITH CURRENT VA ASBESTOS
ABATEMENT DESIGN MANUAL. REFER TO
SPECIFICATION 02 82 11 FOR ADDITIONAL
INFORMATION.
4. PAIN CLINIC - NORTHWEST QUADRANT OF THE FLOOR -
SHALL BE OPERATIONAL AT ALL WORKING DAYS &
HOURS (MON-FRI 7M - 5PM) DURING THE ENTIRE
CONSTRUCTION PERIOD. ANY REQUIRED WORK IN THIS
CLINIC SHALL BE COORDINATED CLOSELY W/ COR.
5. NEW HEATING HOT WATER PIPING FOR THE PAIN
CLINIC NEEDS TO BE ROUGHED IN PRIOR TO
DEMOLISHING THE EXISTING HEATING HOT WATER
PIPING FOR THE PAIN CLINIC. COORDINATE MAXIMUM
ALLOWABLE DOWNTIME WITH THE COR.
GENERAL NOTES#EaFGGaHHbJJbKLLaMNNa H.5Ja F.1 EbMaNb
7.3
8.2
9.1
6.7
9.8
8.9
8.3
7.2
7.1
8.0
7.5
12x4
8x4
6x4
6x6
6x6
8x4
6x4
6x4
16x5
12x5 24x14 x
12x4
6x6
8x4 x x 4 17x11 x
13ø 12x6
9x4 9x6
6x4
9x4
14x8
29x6
15x6
27x6
8ø
10x6
9x5 7ø
6x5
9ø
6x4 6x6
6x4
6x6 6x4
9x5
24x15
19x7
13x5
13x7
6x5
12x4
6x4
6x4
6x4 6x6
9x5
9x6
8x5 6x4
12x4
12x8
5x4
7x6
7x6
6x6 6x4
6x4
9x5
6x4 6x4
8x4
12x6
12x8
6x4 6x4 6x4
6x4 6x6
8x4
14x8
11x4
6x4 6x4
6ø
6x4
6x4 6x6
9x5 9x5
19x8
10x4
6x5
6x5
9x6 7ø
22x14 x
16x5
6x6
27x6
8ø
9ø
8x4
6x4 6x6 6x4
12x5
6x4
12x4
6x6
8x4
6x4
6x6
12x4
6x6
8x4
11ø
29x6
15x6 x
6x4
6x5
10x6
13x6
13ø
16ø
11x5
6x6
10x4 10x4
10x6 6x5
12x8
14x10
14x8
6x6
6x6
6x4 6x4
11x4
6x6
40x24 UP &
DN
34x24 UP &
DN
40x24 EA UP
34x20 EA DN
(AC-ER 7)
(AC-ER 8)
(E-2) 2735 CFM
8605 CFM
(E-1)
18x14
17x14
1 1
22222222222222
FOURTH FLOOR KEY PLAN
AREA B
N
B
A
1. DEMOLISH ALL EXISTING TERMINAL UNITS AND
ASSOCIATED DUCTWORK, CONTROLS, AND
ACCESSORIES BACK TO DEMARCATION POINT SHOWN.
2. EXISTING INDUCTION UNIT TO BE REMOVED. REMOVE
CONTROLS AND ACCESSORIES. REMOVE DUCT BACK
TO TOP OF 5TH FLOOR SLAB AND PROVIDE CAP.
REMOVE ALL CONTROL WIRING BACK TO CENTRAL
PANEL IN 401C. REMOVE ALL PNEUMATIC CONTROL
TUBING.
3. DEMOLISH EXISTING DUCTWORK IN CHASE FROM 4TH
FLOOR UP TO THE FLOOR ABOVE. VERIFY DUCTWORK
IS INACTIVE WITH OWNER PRIOR TO DEMOLITION.
SHEET KEYNOTES#
A
2 3 4 5 6
B
C
D
1 2 3 4 5 6
A
B
C
D
VA FORM 08-6231
o n e e ig e fo o t o n e q u a rt e r i n c e fo o t th re e e ig h th s in c e fo o t o n e h a lf in c e fo o t th re e q u a rt e fo o t o n e in c e fo o t o n e a n d o n e h a lf in c h e e fo o t th re e in c h e e fo o t
CONSULTANTS: ARCHITECT/ENGINEERS:
Drawing Title
Office of Construction and Facilities ManagementApproved: Project Director
Project Title
Location
Date Checked Drawn
Dwg.
Drawing Number
Building Number
Project Number
600 EAST 7TH STEET
SIOUX FALLS, SOUTH DAKOTA 57103
605.274.2893
6 SOUTH OLD ORCHARD
ST. LOUIS, MISSOURI 63119
800.404.7677
330 N MEAD
WICHITA, KANSAS 67202
316.262.2500
NOT FOR
CONSTRUCTION
JOHN SOMMERS, PE MO #2015028399
MD106
MECHANICAL DEMOLITION PLAN -
DUCTWORK - 4TH FLOOR - AREA B
RELOCATE PHYSICAL
MEDICINE & REHAB. TO THE
4TH FLOOR
800 HOSPITAL DRIVE COLUMBIA, MO 65201
02-15-2023
589A4-22-100
BID DOCUMENTS
RLCJES
3/16" = 1'-0"
MECHANICAL DEMOLITION PLAN - DUCTWORK - 4TH FLOOR - AREA B
# Revision Date
1 Amendment 3 05/03/2023
EaFGGaHHbJJbKLLaMNNa H.5Ja F.1 EbMaNb
4.5
6.2
5.4
6.7
9.8
8.9
8.3
7.2
7.1
3.6
4.1
4.7
5.1
6.1
6.3
5.5
3.1
AC-S
AC-S
AHU
XAC
TEMP
E
AC-ER
E
E
E
E
E
HRU
E
EX 108x24 SA
E X ø
S A
E X x R
A
E X ø
S A
EX 24ø SA
E X ø
S A
E X ø
S A
E X ø
S A
E X x R
A
EX 30x48 RA
EX 60x40 RA
EX 48x28 RA
EX 56x24 RA
EX 44x24 SA EX 20x20 RA
EX 20x20 RA
EX 48x28 RA
EX 44x24 SA
EX 44x24 SA
EX 36x30 RA EX 108x22 RA
EX 30x48 RA
EX 30ø SA
16ø
EX 20x20 SA
EX 20x20 SA
TOP
BOTTOM
TOP
BOTTOM
EX 20x20 SA DN EX 20x20 RA DN
EX 42x32
SA UP & DN
EX 36x36
RA UP & DN
DN
EX 24x56 RA EX 28ø SA
EX 36x30 RA
16ø
EX 12x10
EA UP & DN
EX 14x24
EA UP & DN
EX 12x12
EA UP & DN
EX 12x18
EA UP & DN
EX 22ø SA
UP & DN
EX 14x12
EA UP & DN
TYP.
UNLESS
NOTED EX 40x22
RA UP & DN
EX 34ø SA
UP & DN
EX 24ø SA DN EX 12ø
VENT UP &
DN
EX 30x31
RA UP & DN
EX 24ø SA DN
EX 36x30 RA DN
EX 24ø SA DN
EX 24ø SA DN
EX 16ø
VENT UP &
DN
EX 56x24 RA DN
EX 17ø SA DN
EX 17ø SA DN
E
EX 96x16 SA
BOTTOM
TOP
EX 36x30 RA
16ø
EX 60x60 SA
EX 34x34 SA
UP
EX 30ø SA
DN
EX 34x34 SA
36x36 RA x R
A
36x36 RA
30x24 RA 54x24 RA DN
1. REFER TO M000 FOR MECHANICAL SYMBOLS AND
ABBREVIATIONS.
2. COORDINATE PHASING AND SHUTDOWN FOR SUPPLY
AIR, RETURN AIR, HEATING HOT WATER SUPPLY, AND
HEATING HOT WATER RETURN WITH OWNER. PROVIDE
ISOLATION VALVES AS REQUIRED FOR PHASING TO
LIMIT SHUTDOWNS. SHUTDOWN AND REPLACEMENT TO
OCCUR AFTER HOURS OR OVER WEEKEND.
3. COORDINATE EXISTING CONDITIONS AND ASBESTOS
REMOVAL WITH EXISTING CONDITIONS. FOR EXISTING
ASBESTOS, REFER TO MOST RECENT REPORT
PROVIDED BY OWNER. COORDINATE ALL REMOVAL IN
COMPLIANCE WITH CURRENT VA ASBESTOS
ABATEMENT DESIGN MANUAL. REFER TO
SPECIFICATION 02 82 11 FOR ADDITIONAL
INFORMATION.
4. PAIN CLINIC - NORTHWEST QUADRANT OF THE FLOOR -
SHALL BE OPERATIONAL AT ALL WORKING DAYS &
HOURS (MON-FRI 7M - 5PM) DURING THE ENTIRE
CONSTRUCTION PERIOD. ANY REQUIRED WORK IN THIS
CLINIC SHALL BE COORDINATED CLOSELY W/ COR.
5. NEW HEATING HOT WATER PIPING FOR THE PAIN
CLINIC NEEDS TO BE ROUGHED IN PRIOR TO
DEMOLISHING THE EXISTING HEATING HOT WATER
PIPING FOR THE PAIN CLINIC. COORDINATE MAXIMUM
ALLOWABLE DOWNTIME WITH THE COR.
GENERAL NOTES#
1. DEMOLISH EXISTING DUCTWORK TO DEMARCATION
POINT SHOWN.
2. REMOVE INSULATION FROM DUCTWORK ON ROOF.
PREPARE FOR INSTALLATION OF NEW INSULATION. SEE
NEW WORK FOR RELATED INFORMATION.
SHEET KEYNOTES#
A
2 3 4 5 6
B
C
D
1 2 3 4 5 6
A
B
C
D
VA FORM 08-6231
o n e e ig e fo o t o n e q u a rt e r i n c e fo o t th re e e ig h th s in c e fo o t o n e h a lf in c e fo o t th re e q u a rt e fo o t o n e in c e fo o t o n e a n d o n e h a lf in c h e e fo o t th re e in c h e e fo o t
CONSULTANTS: ARCHITECT/ENGINEERS:
Drawing Title
Office of Construction and Facilities ManagementApproved: Project Director
Project Title
Location
Date Checked Drawn
Dwg.
Drawing Number
Building Number
Project Number
600 EAST 7TH STEET
SIOUX FALLS, SOUTH DAKOTA 57103
605.274.2893
6 SOUTH OLD ORCHARD
ST. LOUIS, MISSOURI 63119
800.404.7677
330 N MEAD
WICHITA, KANSAS 67202
316.262.2500
NOT FOR
CONSTRUCTION
JOHN SOMMERS, PE MO #2015028399
MD107
MECHANICAL DEMOLITION PLAN -
DUCTWORK - LOWER PENTHOUSE
RELOCATE PHYSICAL
MEDICINE & REHAB. TO THE
4TH FLOOR
800 HOSPITAL DRIVE COLUMBIA, MO 65201
02-15-2023
589A4-22-100
BID DOCUMENTS
RLCJES
1/8" = 1'-0"
MECHANICAL DEMOLITION PLAN - DUCTWORK - LOWER PENTHOUSE
# Revision Date
1 Amendment 3 05/03/2023
F E
C
ABCDEEaFGGaHJJbK BaBbH.5Ja F.1 Eb Aa
2.8
3.7
6.2
5.4
5.7
5.3
4.6
3.6
4.1
4.7
5.1
6.1
6.3
1.9
5.5
1.1
3.1
4.4
NOT IN SCOPE
3" HCR UP
EX 1" MPS
EX 2" V
3" HCR
1. VERIFY EXISTING CONDITIONS PRIOR TO
CONSTRUCTION.
2. INSTALL NEW PIPING FROM FLOOR ABOVE TO
DEMARCATION POINT SHOWN.
SHEET KEYNOTES#
1. REFER TO M000 FOR MECHANICAL SYMBOLS AND
ABBREVIATIONS.
2. COORDINATE PHASING AND SHUTDOWN FOR SUPPLY
AIR, RETURN AIR, HEATING HOT WATER SUPPLY, AND
HEATING HOT WATER RETURN WITH OWNER. PROVIDE
ISOLATION VALVES AS REQUIRED FOR PHASING TO
LIMIT SHUTDOWNS. SHUTDOWN AND REPLACEMENT TO
OCCUR AFTER HOURS OR OVER WEEKEND.
3. PAIN CLINIC - NORTHWEST QUADRANT OF THE FLOOR -
SHALL BE OPERATIONAL AT ALL WORKING DAYS &
HOURS (MON-FRI 7M - 5PM) DURING THE ENTIRE
CONSTRUCTION PERIOD. ANY REQUIRED WORK IN THIS
CLINIC SHALL BE COORDINATED CLOSELY W/ COR.
4. NEW HEATING HOT WATER PIPING FOR THE PAIN
CLINIC NEEDS TO BE ROUGHED IN PRIOR TO
DEMOLISHING THE EXISTING HEATING HOT WATER
PIPING FOR THE PAIN CLINIC. COORDINATE MAXIMUM
ALLOWABLE DOWNTIME WITH THE COR.
GENERAL NOTES#
A
2 3 4 5 6
B
C
D
1 2 3 4 5 6
A
B
C
D
VA FORM 08-6231
o n e e ig e fo o t o n e q u a rt e r i n c e fo o t th re e e ig h th s in c e fo o t o n e h a lf in c e fo o t th re e q u a rt e fo o t o n e in c e fo o t o n e a n d o n e h a lf in c h e e fo o t th re e in c h e e fo o t
CONSULTANTS: ARCHITECT/ENGINEERS:
Drawing Title
Office of Construction and Facilities ManagementApproved: Project Director
Project Title
Location
Date Checked Drawn
Dwg.
Drawing Number
Building Number
Project Number
600 EAST 7TH STEET
SIOUX FALLS, SOUTH DAKOTA 57103
605.274.2893
6 SOUTH OLD ORCHARD
ST. LOUIS, MISSOURI 63119
800.404.7677
330 N MEAD
WICHITA, KANSAS 67202
316.262.2500
NOT FOR
CONSTRUCTION
JOHN SOMMERS, PE MO #2015028399
MP101
MECHANICAL NEW WORK PLAN -
PIPING - 3RD FLOOR - AREA A
RELOCATE PHYSICAL
MEDICINE & REHAB. TO THE
4TH FLOOR
800 HOSPITAL DRIVE COLUMBIA, MO 65201
02-15-2023
589A4-22-100
BID DOCUMENTS
RLCJES
1/8" = 1'-0"
MECHANICAL NEW WORK PLAN - PIPING - 3RD FLOOR - AREA A
# Revision Date
1 Amendment 3 05/03/2023
R E
F
F E
C
F E
C
F E
C
F E
C
F E
C
FEC
T
T
T
T
ABCDEEaFGGaHHbJJbKLLaMNNa BaBbH.5Ja F.1 Eb AaMaNb
2.8
3.7
7.3
8.2
9.1
10.4
4.5
6.2
5.4
6.7
5.7
5.3
4.6
10.2
9.8
8.9
8.3
7.2
7.1
3.6
4.1
4.7
5.1
6.1
6.3
8.0
1.9
5.5
7.5
1.1
3.1
4.4
EF
CU
4-2
ROOF TOP EQUIPMENT
EXISTING TO REMAIN
HE
HE
HE
HE
HE
HE
E
MP103
MP104
1 1 M-107
NOT IN SCOPE
x E
A
20x14 EA
1. ROUTE DUCTWORK FROM 453 – LAB CLEAN RM. TO
EXHAUST FAN. SEE SHEET MH-104 FOR ADDITIONAL
INFORMATION.
2. ROUTE REFRIGERANT LINES FROM MINI-SPLIT (ACU-4-2)
TO CONDENSING UNITS (CU-4-2). SEE SHEET MP104
FOR ADDITIONAL INFORMATION.
3. PROVIDE ROOF SUPPORT FOR DUCT MOUNTED
ACROSS ROOF. REFER TO DETAILS AND
SPECIFICATIONS FOR BRACING AND ADDITIONAL
INFORMATION.
4. ROOF MOUNTED FAN TO BE MOUNTED ON VIBRATION
ISOLATION EQUIPMENT SUPPORT. REFER TO DETAILS
AND SPECIFICATIONS FOR BRACING AND ADDITIONAL
INFORMATION.
SHEET KEYNOTES#
FOURTH FLOOR KEY PLAN
N
1. REFER TO M000 FOR MECHANICAL SYMBOLS AND
ABBREVIATIONS.
2. COORDINATE PHASING AND SHUTDOWN FOR SUPPLY
AIR, RETURN AIR, HEATING HOT WATER SUPPLY, AND
HEATING HOT WATER RETURN WITH OWNER. PROVIDE
ISOLATION VALVES AS REQUIRED FOR PHASING TO
LIMIT SHUTDOWNS. SHUTDOWN AND REPLACEMENT TO
OCCUR AFTER HOURS OR OVER WEEKEND.
3. PAIN CLINIC - NORTHWEST QUADRANT OF THE FLOOR -
SHALL BE OPERATIONAL AT ALL WORKING DAYS &
HOURS (MON-FRI 7M - 5PM) DURING THE ENTIRE
CONSTRUCTION PERIOD. ANY REQUIRED WORK IN THIS
CLINIC SHALL BE COORDINATED CLOSELY W/ COR.
4. NEW HEATING HOT WATER PIPING FOR THE PAIN
CLINIC NEEDS TO BE ROUGHED IN PRIOR TO
DEMOLISHING THE EXISTING HEATING HOT WATER
PIPING FOR THE PAIN CLINIC. COORDINATE MAXIMUM
ALLOWABLE DOWNTIME WITH THE COR.
GENERAL NOTES#
A
2 3 4 5 6
B
C
D
1 2 3 4 5 6
A
B
C
D
VA FORM 08-6231
o n e e ig e fo o t o n e q u a rt e r i n c e fo o t th re e e ig h th s in c e fo o t o n e h a lf in c e fo o t th re e q u a rt e fo o t o n e in c e fo o t o n e a n d o n e h a lf in c h e e fo o t th re e in c h e e fo o t
CONSULTANTS: ARCHITECT/ENGINEERS:
Drawing Title
Office of Construction and Facilities ManagementApproved: Project Director
Project Title
Location
Date Checked Drawn
Dwg.
Drawing Number
Building Number
Project Number
600 EAST 7TH STEET
SIOUX FALLS, SOUTH DAKOTA 57103
605.274.2893
6 SOUTH OLD ORCHARD
ST. LOUIS, MISSOURI 63119
800.404.7677
330 N MEAD
WICHITA, KANSAS 67202
316.262.2500
NOT FOR
CONSTRUCTION
JOHN SOMMERS, PE MO #2015028399
MH102
MECHANICAL NEW WORK PLAN - 4TH
FLOOR - OVERALL
RELOCATE PHYSICAL
MEDICINE & REHAB. TO THE
4TH FLOOR
800 HOSPITAL DRIVE COLUMBIA, MO 65201
02-15-2023
589A4-22-100
BID DOCUMENTS
RLCJES
3/32" = 1'-0"
MECHANICAL NEW WORK PLAN - 4TH FLOOR - OVERALL
# Revision Date
1 Amendment 3 05/03/2023
C
F E
C
FEC
EaFGGaHHbJJbKLLaMNNa H.5Ja F.1 EbMaNb
2.8
3.7
4.5
6.2
5.4
6.7
5.7
5.3
4.6
7.1
3.6
4.1
4.7
5.1
6.1
6.3
5.5
3.1
4.4
PROST. CHIEF
PROST. ASST. CHIEF
PROST. REP
STAFF TLT.
FUME RM.
PLASTER
MAINT.
421A
DUST RM.
STOR.
426A
CLEAN LAB
PER. CLNC. MASSAGE
PER. CLNC. GROUP RM.
HSKPG.
PROST. PURCHASING
FITTING/EXAM RM.
FITTING/EXAM RM.
PROST. WAIT.
CHIRO. EXAM
CHIRO. EXAM
PELVIC
PROST. STOCK RM.
BREAK RM.
WAIT.
455 WC STOR./SHOP
WOMEN'S TLT
MEN'S TLT
MSA CHECKIN/OUT
ANTE
FITTING/EXAM RM.
CORR.
C43
ELEV. LOBBY / CORR.
ELEV. LOBBY
SOILED DISP
401A
NOT IN SCOPE
6" HCS UP &
DN
2" AT.MOS.VENT
TO 6TH FL.
1" MPS(30#)
UP & DN
5"
3"
5" HCR UP
HCR
HCR
TU
4-2-1
TU
4-4-6
TU
4-4-20
TU
4-4-7
TU
4-4-16
TU
4-4-15
TU
4-4-14
TU
4-4-8
TU
4-4-9
TU
4-4-11
TU
4-4-10
TU
4-4-12
TU
4-4-13
TU
4-2-16
TU
4-2-17
TU
4-2-15
TU
4-4-17
TU
4-4-21
TU
4-4-22
TU
4-2-20
TU
4-4-25
TU
4-4-26
TU
4-4-24
TU
4-4-27
TU
4-4-23
EACV
3" HCR DN
3" HCR
1 1/2" HWR
1 1/2" HWS
1 1/4" HWR
1 1/4" HWS
1" HWR
1" HWS
3/4" HWR
3/4" HWS
2 1/2" HWS
2 1/2" HWS
2 1/2" HWR
2" HWS
2" HWR
1 1/4" HWS
1 1/4" HWR
3/4" HWS
3/4" HWR
3/4" HWS
3/4" HWR
3/4" HWS
3/4" HWR
3/4" HWS
3/4" HWR
3/4" HWR
3/4" HWS
3/4" HWS
3/4" HWR
3/4" HWR
3/4" HWS
3/4" HWR
3/4" HWS
3/4" HWS
3/4" HWR
3/4" HWS
3/4" HWR
3/4" HWR
3/4" HWS
3/4" HWR
3/4" HWS 3/4" HWR
3/4" HWS
3/4" HWS
3/4" HWR
3/4" HWS
3/4" HWR
3/4" HWR
3/4" HWS
3/4" HWS
3/4" HWR
3/4" HWS
3/4" HWR
3/4" HWS
3/4" HWR
3/4" HWR
3/4" HWS
3/4" HWS
3/4" HWR
3/4" HWS
3/4" HWR
3/4" HWR
3/4" HWS
3/4" HWS
3/4" HWR
1" HWS
1" HWR
3/4" HWS
3/4" HWR
3/4" HWR
3/4" HWS
1 1/4" HWS
1 1/4" HWR
1 1/4" HWS
1 1/4" HWR
3/4" HWS
3/4" HWR
2 1/2" HCS 2 1/2" HCS 2 1/2" HCS
2 1/2" HCS
2 1/2" HCS
2 1/2" HCS
2 1/2" HCS 2" HCS
2" HCS
2 1/2" HCS
2 1/2" HCS
2 1/2" HCS
2 1/2" HCS
2 1/2" HCS
2 1/2" HCS 2 1/2" HCS
4" HCS
4" HCS
2 32 32 32 3
2 3
2 3
2 3 2 3
2 3
2 3
4 5
EX 1/2" D
EX 1" HCS
EX 1" HCS
EX 1/2" D
EX 1" HCS
EX 1/2" D
EX 1" HCS
EX 1/2" D
EX 1" HCS
EX 1/2" D
EX 1" HCS
EX 1/2" D
EX 1" HCS
EX 1/2" D
EX 1/2" D
EX 1" HCS
EX 1" HCS
EX 1/2" D
EX 1" HCS
EX 1/2" D
1" D 1" D
1" D
1" D
1" D
1" D
1" D
1" D
1" D
1" D
1" D
1" D
1" D
1. INSTALL NEW PIPING FROM FLOOR BELOW TO
DEMARCATION POINT SHOWN. SEE SHEET M-101 FOR
RELATED INFORMATION.
2. CONNECT NEW INDUCTION UNIT SUPPLY PIPING TO
EXISTING RISER AT DEMARCATION POINT SHOWN.
INSTALL NEW INDUCTION UNIT SUPPLY AND
CONDENSATE PIPING PRIOR TO DEMOLITION OF
EXISTING PIPING. SEE DEMOLITION DRAWINGS FOR
RELATED INFORMATION.
3. CONNECT NEW CONDENSATE PIPING TO EXISTING
RISER AT DEMARCATION POINT SHOWN.
4. DISCHARGE CONDENSATE DRAIN INTO MOP SINK.
COORDINATE.
5. CONNECT CONDENSATE DRAIN TO LAVATORY TRAP.
COORDINATE WITH PLUMBING.
SHEET KEYNOTES#
FOURTH FLOOR KEY PLAN
AREA A
N
B
A
1. REFER TO M000 FOR MECHANICAL SYMBOLS AND
ABBREVIATIONS.
2. COORDINATE PHASING AND SHUTDOWN FOR SUPPLY
AIR, RETURN AIR, HEATING HOT WATER SUPPLY, AND
HEATING HOT WATER RETURN WITH OWNER. PROVIDE
ISOLATION VALVES AS REQUIRED FOR PHASING TO
LIMIT SHUTDOWNS. SHUTDOWN AND REPLACEMENT TO
OCCUR AFTER HOURS OR OVER WEEKEND.
3. PAIN CLINIC - NORTHWEST QUADRANT OF THE FLOOR -
SHALL BE OPERATIONAL AT ALL WORKING DAYS &
HOURS (MON-FRI 7M - 5PM) DURING THE ENTIRE
CONSTRUCTION PERIOD. ANY REQUIRED WORK IN THIS
CLINIC SHALL BE COORDINATED CLOSELY W/ COR.
4. NEW HEATING HOT WATER PIPING FOR THE PAIN
CLINIC NEEDS TO BE ROUGHED IN PRIOR TO
DEMOLISHING THE EXISTING HEATING HOT WATER
PIPING FOR THE PAIN CLINIC. COORDINATE MAXIMUM
ALLOWABLE DOWNTIME WITH THE COR.
GENERAL NOTES#
A
2 3 4 5 6
B
C
D
1 2 3 4 5 6
A
B
C
D
VA FORM 08-6231
o n e e ig e fo o t o n e q u a rt e r i n c e fo o t th re e e ig h th s in c e fo o t o n e h a lf in c e fo o t th re e q u a rt e fo o t o n e in c e fo o t o n e a n d o n e h a lf in c h e e fo o t th re e in c h e e fo o t
CONSULTANTS: ARCHITECT/ENGINEERS:
Drawing Title
Office of Construction and Facilities ManagementApproved: Project Director
Project Title
Location
Date Checked Drawn
Dwg.
Drawing Number
Building Number
Project Number
600 EAST 7TH STEET
SIOUX FALLS, SOUTH DAKOTA 57103
605.274.2893
6 SOUTH OLD ORCHARD
ST. LOUIS, MISSOURI 63119
800.404.7677
330 N MEAD
WICHITA, KANSAS 67202
316.262.2500
NOT FOR
CONSTRUCTION
JOHN SOMMERS, PE MO #2015028399
MP103
MECHANICAL NEW WORK PLAN -
PIPING - 4TH FLOOR - AREA A
RELOCATE PHYSICAL
MEDICINE & REHAB. TO THE
4TH FLOOR
800 HOSPITAL DRIVE COLUMBIA, MO 65201
02-15-2023
589A4-22-100
BID DOCUMENTS
RLCJES
3/16" = 1'-0"
MECHANICAL NEW WORK PLAN - PIPING - 4TH FLOOR - AREA A
# Revision Date
1 Amendment 3 05/03/2023
F
F E
C
F E
C
F E
C
T
TT
T
TT
FOURTH FLOOR KEY PLAN
AREA B
N
B
A
EaFGGaHHbJJbKLLaMNNa H.5Ja F.1 EbMaNb
7.3
8.2
9.1
6.7
9.8
8.9
8.3
7.2
7.1
8.0
7.5
CHIRO. EXAM
ACUPUNCTURE
ACUPUNCTURE
PT/OT EXAM
PT/OT EXAM
PELVIC
PELVIC
PT/OT EXAM BARIATRIC
PT/OT STOR.
PT TLT.
PROST. STOCK RM.
PT GYM
AO
OT SUPER.
BREAK RM.
STAFF TLT.
REHAB. COOR.
PSA
464 PT/OT SWAMP
CHIEF PM&R EXAM
WAIT.
OT TRAIN. RM.
OT TLT.
440A
CRASH CART ALCOVE
ELEC.
WC STOR./SHOP
CLEAN LINEN
450A
EQUIP.
CORR.
C43
CORR.
C44
ELEV. LOBBY / CORR.
ELEV. LOBBY
SOILED DISP
401A
TELE HEALTH
EX 6" MPS UP &
DN
EX 8" CWR UP
& DN
EX 3" HWS UP
& DN
EX 3" HWR UP
& DN
EX 8" CWS UP
& DN
4" - 5' 0" LG x 1'-6" VERT.
EXP.LOOP AT CLG
1' - 0" RAD. BEND -
UP & DN
TU
4-2-1
TU
4-2-2
TU
4-2-3
TU
4-2-4
TU
4-2-5
TU
4-2-6
TU
4-2-7
TU
4-2-9
TU
4-2-11
TU
4-2-12
TU
4-2-10
TU
4-2-18 TU
4-2-13
TU
4-4-1
TU
4-4-2
TU
4-4-3
TU
4-4-19
TU
4-4-18
TU
4-4-5
TU
4-4-4
TU
4-4-6
TU
4-2-14
TU
4-2-17
TU
4-2-15
TU
4-2-8
TU
4-4-17
TU
4-2-19
TU
4-4-21
ACU
4-2
EX 1 1/4" EXP
UP & DN
EX 4" MPC UP
& DN
3/4" HWS
3/4" HWR
3/4" HWS
3/4" HWR
1 1/4" HWS
1 1/4" HWR
2 1/2" HWS
2 1/2" HWR
2 1/2" HWR
2 1/2" HWR
2 1/2" HWS
3/4" HWR
3/4" HWS
3/4" HWS
3/4" HWR 3/4" HWS
3/4" HWR
3/4" HWS
3/4" HWR
3/4" HWR
3/4" HWS
3/4" HWS
3/4" HWR
3/4" HWR
3/4" HWS
3/4" HWR
3/4" HWS
3/4" HWS
3/4" HWR
3/4" HWS
3/4" HWR
3/4" HWS
3/4" HWR
3/4" HWR
3/4" HWS
3/4" HWS
3/4" HWR
3/4" HWR
3/4" HWS
3/4" HWS
3/4" HWR
3/4" HWR
3/4" HWS
3/4" HWS
3/4" HWR
3/4" HWR
3/4" HWS
3/4" HWR
3/4" HWS
3/4" HWS
3/4" HWR
3/4" HWS
3/4" HWR
3/4" HWR
3/4" HWS
3/4" HWS
3/4" HWR
3/4" HWR
3/4" HWS
3/4" HWR
3/4" HWS
3/4" HWR
3/4" HWS
3/4" HWR
3/4" HWS
3/4" HWS
3/4" HWR
3/4" HWS
3/4" HWR
3/4" HWR
3/4" HWS
3/4" HWR
3/4" HWS
3/4" HWS
3/4" HWR
3/4" HWR
3/4" HWS
2 1/2" HWS
2 1/2" HWR
1 1/4" HWR
3/4" HWR
1" HWS
1" HWR
2 1/2" HCS
2" HCS
2 1/2" HCS
2" HCS
1 1/2" HCS 2" HCS 1 1/2" HCS 1 1/4" HCS 1 1/4" HCS 1 1/4" HCS 1 1/4" HCS 1 1/2" HCS
1 1/2" HCS
2" HCS
2" HCS
2" HCS
2 3
2 3
2 3
2 3
2 3 2 3 2 3 2 3 2 3 2 3 2 3
EX 1" HCS
EX 1/2" D
EX 1" HCS
EX 1/2" D
EX 1" HCS
EX 1/2" D
EX 1" HCS
EX 1/2" D
EX 1" HCS
EX 1/2" D
EX 1" HCS
EX 1/2" D
EX 1" HCS
EX 1/2" D
EX 1" HCS
EX 1/2" D
EX 1" HCS
EX 1/2" D
EX 1" HCS
EX 1/2" D
EX 1/2" D
EX 1" HCS
1" D
1" D
1" D
1" D 1" D 1" D 1" D 1" D
1" D
1" D
1" D
CP
1" D
1" D 1" D
CO
1. ROUTE REFRIGERANT LINES FROM MINI-SPLIT (ACU-4-2)
TO CONDENSING UNIT (CU-4-2) ON ROOF. SEE SHEET
MH102 FOR ADDITIONAL INFORMATION.
2. CONNECT NEW INDUCTION UNIT SUPPLY PIPING TO
EXISTING RISER AT DEMARCATION POINT SHOWN.
INSTALL NEW INDUCTION UNIT SUPPLY AND
CONDENSATE PIPING PRIOR TO DEMOLITION OF
EXISTING PIPING. SEE DEMOLITION DRAWINGS FOR
RELATED INFORMATION.
3. CONNECT NEW CONDENSATE PIPING TO EXISTING
RISER AT DEMARCATION POINT SHOWN.
SHEET KEYNOTES#
1. REFER TO M000 FOR MECHANICAL SYMBOLS AND
ABBREVIATIONS.
2. COORDINATE PHASING AND SHUTDOWN FOR SUPPLY
AIR, RETURN AIR, HEATING HOT WATER SUPPLY, AND
HEATING HOT WATER RETURN WITH OWNER. PROVIDE
ISOLATION VALVES AS REQUIRED FOR PHASING TO
LIMIT SHUTDOWNS. SHUTDOWN AND REPLACEMENT TO
OCCUR AFTER HOURS OR OVER WEEKEND.
3. PAIN CLINIC - NORTHWEST QUADRANT OF THE FLOOR -
SHALL BE OPERATIONAL AT ALL WORKING DAYS &
HOURS (MON-FRI 7M - 5PM) DURING THE ENTIRE
CONSTRUCTION PERIOD. ANY REQUIRED WORK IN THIS
CLINIC SHALL BE COORDINATED CLOSELY W/ COR.
4. NEW HEATING HOT WATER PIPING FOR THE PAIN
CLINIC NEEDS TO BE ROUGHED IN PRIOR TO
DEMOLISHING THE EXISTING HEATING HOT WATER
PIPING FOR THE PAIN CLINIC. COORDINATE MAXIMUM
ALLOWABLE DOWNTIME WITH THE COR.
GENERAL NOTES#
A
2 3 4 5 6
B
C
D
1 2 3 4 5 6
A
B
C
D
VA FORM 08-6231
o n e e ig e fo o t o n e q u a rt e r i n c e fo o t th re e e ig h th s in c e fo o t o n e h a lf in c e fo o t th re e q u a rt e fo o t o n e in c e fo o t o n e a n d o n e h a lf in c h e e fo o t th re e in c h e e fo o t
CONSULTANTS: ARCHITECT/ENGINEERS:
Drawing Title
Office of Construction and Facilities ManagementApproved: Project Director
Project Title
Location
Date Checked Drawn
Dwg.
Drawing Number
Building Number
Project Number
600 EAST 7TH STEET
SIOUX FALLS, SOUTH DAKOTA 57103
605.274.2893
6 SOUTH OLD ORCHARD
ST. LOUIS, MISSOURI 63119
800.404.7677
330 N MEAD
WICHITA, KANSAS 67202
316.262.2500
NOT FOR
CONSTRUCTION
JOHN SOMMERS, PE MO #2015028399
MP104
MECHANICAL NEW WORK PLAN -
PIPING - 4TH FLOOR - AREA B
RELOCATE PHYSICAL
MEDICINE & REHAB. TO THE
4TH FLOOR
800 HOSPITAL DRIVE COLUMBIA, MO 65201
02-15-2023
589A4-22-100
BID DOCUMENTS
RLCJES
3/16" = 1'-0"
MECHANICAL NEW WORK PLAN - PIPING - 4TH FLOOR - AREA B
# Revision Date
1 Amendment 3 05/03/2023
C
F E
C
FEC
EaFGGaHHbJJbKLLaMNNa H.5Ja F.1 EbMaNb
2.8
3.7
4.5
6.2
5.4
6.7
5.7
5.3
4.6
7.1
3.6
4.1
4.7
5.1
6.1
6.3
5.5
3.1
4.4
PROST. CHIEF
PROST. ASST. CHIEF
PROST. REP
STAFF TLT.
FUME RM.
PLASTER
MAINT.
421ADUST RM.
STOR.
426A
CLEAN LAB
PER. CLNC. MASSAGE
PER. CLNC. GROUP RM.
HSKPG.
PROST. PURCHASING
FITTING/EXAM RM.
FITTING/EXAM RM.
PROST. WAIT.
410 CHIRO. EXAM
CHIRO.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .