Drawings-589A4-22-100- 2023-02-15 BID Set-Part2- Pages 6.pdf
PDF 5 MB Posted
- Solicitation number
- 36C25523R0072
About this file
This solicitation package includes construction documents for a relocation project at a Department of Veterans Affairs medical center. The project involves moving Physical Medicine and Rehabilitation services to the fourth floor. Demolition plans identify walls, doors, casework and other elements to be removed. Floor plans show new room layouts and locations for prosthetics, occupational therapy, physical therapy and other clinical areas on the fourth floor. Key details include the solicitation number, project number, location of the work at a VA medical center in Columbia, Missouri, and involvement of the VA and its Veterans Integrated Service Network 15. Products and services encompass demolition and construction work to implement the relocation as depicted in the construction documents.
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FE
F E
FEC
F E
C
FEC
FEC
T
T
GENERAL DEMOLITION NOTES
A. CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS PRIOR TO WORK BEGINNING. THE
CONTRACTOR IS RESPONSIBLE FOR INFORMING THE ARCHITECT OF ANY CONDITIONS THAT
DIFFER FROM THE INFORMATION INDICATED IN THE DRAWINGS.
B. PROTECT ALL EXISTING BUILDING COMPONENTS WHICH ARE TO REMAIN. REPAIR ANY
DAMAGED AREAS AS REQUIRED TO RETURN THEM TO THEIR ORIGINAL CONDITION.
C. VERIFY EXTENT OF DEMOLITION WORK WITH INFORMATION SHOWN IN THE DRAWINGS AND
WORK THAT IS NOT SHOWN AND MAY BE REQUIRED TO COMPLETE THE INTENDED WORK.
D. ALL WORK SHALL COMPLY WITH REQUIRED LOCAL CODES. CONTRACTOR IS RESPONSIBLE
FOR OBTAINING REQUIRED PERMITS AND INSPECTIONS FOR ALL WORK ASSOCIATED WITH
THIS CONTRACT.
E. CONTRACTOR SHALL REPAIR ALL DISTURBED AREAS AS REQUIRED TO MATCH
SURROUNDING EXISTING FINISHES NOT DISTURBED.
F. TYPES OF FLOOR, WALL, AND CEILING FINISHES INDICATED FOR REMOVAL BY DEMOLITION
NOTES ARE FOR GENERAL INFORMATION ONLY FROM INFORMATION OBTAINED FROM
EXISTING PLANS AND OBSERVATIONS. CONTRACTOR SHALL FIELD VERIFY MATERIAL TYPES
ONSITE PRIOR TO BID AND INCLUDE NECESSARY WORK IN HIS BID.
G. ALL APPLIANCES, FURNITURE, AND EQUIPMENT TO REMAIN THE PROPERTY OF THE
OWNER - CONTRACTOR TO COORDINATE REMOVAL, RELOCATION AND STORAGE OF
EQUIPMENT FROM DEMO AREAS WITH OWNER.
H. MISCELLANEOUS FLOOR PENETRATIONS AND DEMO FOR NEW MECHANICAL AND
ELECTRICAL WORK SHALL BE COORDINATED FROM ARCHITECTURAL, MECHANICAL, AND
ELECTRICAL PLANS.
I. REFER TO MECHANICAL, PLUMBING AND ELECTRICAL DEMO PLANS FOR DEMOLITION,
SALVAGE AND RE-USE OF EXISTING ITEMS.
J. PATCH FLOOR AT REMOVED WALLS AND CASEWORK, PREPARE FLOOR TO RECEIVE NEW
FLOORING AS REQUIRED.
K. ALL HOLES IN EXISTING SLAB LEFT FROM REMOVAL OF FIXTURES TO RECEIVE INFILL PER
STRUCTURAL DETAILS ON AD102.
L. REMOVE ALL STAINLESS STEEL CORNER GUARDS CAREFULLY AND RETURN TO OWNER.
M. ELEMENTS INDICATED WITH A DASHED LINE ARE TO BE DEMOLISHED AND DISPOSED OF AS
A PART OF THIS PROJECT, UNLESS NOTED OTHERWISE.
N. IN EXISTING AREAS, RENOVATION AND DEMOLITION WORK SHALL BE ACCOMPLISHED WITH
MINIMAL DISRUPTION TO OPERATIONS. IF REQUIRED, THE OWNER RESERVES THE RIGHT TO
TEMPORARILY STOP WORK OF SPECIFIC CONSTRUCTION OPERATIONS SHOULD THE
OWNER IDENTIFY AN EMERGENCY OR DANGER EXISTS TO THE WELFARE OF THE
OCCUPANTS ON ACCOUNT OF SUCH WORK OR OPERATIONS.
O. CONTRACTOR SHALL REMOVE AND DISPOSE OF IN A LEGAL MANNER ALL MATERIAL NOT
SCHEDULED FOR REUSE UNDER THIS PROJECT .
P. IN ALL WALLS AND CEILINGS THAT ARE TO BE REMOVED THE CONTRACTOR SHALL BE
RESPONSIBLE FOR DISCONNECTING AT SOURCE AND REMOVING OR CAPPING ELECTRICAL,
PLUMBING, GAS LINES AND MECHANICAL DUCTWORK THAT ARE NOT SCHEDULED FOR
REUSE. CONTRACTOR SHALL REROUTE AND CONTINUE ANY SYSTEM THAT MUST BE
RETAINED FOR NEW CONSTRUCTION. CONTRACTOR SHALL REROUTE AND KEEP
OPERATIONAL ALL SYSTEMS SERVING SPACES IN THE SURROUNDING AREAS TO THE
PROJECT.
Q. ALL ELECTRICAL CIRCUITS FOR EQUIPMENT THAT ARE TO BE REMOVED SHALL BE
DISCONNECTED AT SOURCE AND REMOVED BACK TO PANEL.
R. ALL PIPING GAS, WATER SUPPLY, VENT, DRAIN LINES, ETC. SUPPLYING EQUIPMENT THAT
ARE TO BE REMOVED SHALL BE DISCONNECTED, REMOVED AND CAPPED ABOVE CEILING
OR BELOW FLOOR. CONTRACTOR SHALL REROUTE AS NECESSARY, TO BE BEHIND NEW
CONSTRUCTION. (PATCH FLOOR BACK PRIOR TO TOPPING.)
S. ALL MED GASES AND PLUMBING TO BE REMOVED AT WALLS SCHEDULED FOR DEMOLITION.
T. REMOVE ALL PLUMBING FIXTURES AND EQUIPMENT WITHIN ROOMS SCHEDULED TO BE
DEMOLISHED. SEE MEP PIPING DRAWINGS.
U. RETURN ALL SIGNAGE AFFECTED BY CONSTRUCTION TO OWNER.
V. SECURITY CAMERAS TO BE FUNCTIONAL AT ALL TIME DURING CONSTRUCTION.
W. ALL UTILITY PENETRATIONS TO MATCH THE HOST WALL FIRE RATING AT ALL TIME.
4.5
5.4
6.2
F.1GHJKLMMa La Jb Hb Ga
6.7
2.03
2.302.302.30
2.032.03
2.06
2.03
2.302.30
2.30
2.03
2.032.03
2.05
2.05
2.30
2.30
2.03
2.05
2.06 2.06
2.05
2.03
2.03
2.032.03
2.032.03
2.032.03
2.06
2.05
2.30
2.30
2.31A
2.31
2.302.30
2.30
2.30
2.30
2.30
2.03
2.032.03
2.032.03
2.05
2.03
2.03
2.03
2.80
2.80
2.30
2.03
2.03
2.05
2.31
2.31
2.03
2.032.03
2.032.03
2.80
2.80
2.80
2.31A
2.31A
2.80
2.30
2.302.30
2.302.05
2.032.03
2.03
2.30
2.30
2.30
2.80
2.80
2.03
2.03
2.03
2.032.03
2.03
2.05
2.30
2.31A
2.302.30
2.30
2.03
2.03
2.03
2.80
2.80
2.80
2.06
2.31
2.31
2.03
2.03
2.03
2.30
2.31
2.31
2.03
2.03
2.31A
2.05
2.06
2.05
2.05
2.06
2.06
2.06
2.80
2.80
2.31A
2.31
2.30
2.05
2.03
2.03
2.03
2.802.802.802.80
2.062.06
2.05
2.302.30
2.312.31
2.302.30
2.30
2.30
2.03
2.03
2.05 2.03
2.05
2.802.802.80
2.302.30
2.03 2.032.03
2.30
2.302.30
2.30 2.30
2.31 2.31
2.03 2.03
2.80
2.80
2.80
2.80
2.30
2.30
2.80 2.80
2.03 2.80
2.03
2.31 2.302.30
2.30
2.30
2.31
2.05
2.802.80
2.30
2.03
2.032.032.032.032.03 2.03
2.03 2.03
2.03
2.032.03
2.03
2.03
2.03
2.03
2.06
2.30
2.03
2.802.80
2.302.30
2.31
2.06
2.03
2.05
2.03
2.80
2.80
2.30
2.30
2.032.03
2.03
2.31
2.06
2.03
2.03
2.032.032.03
2.802.80
2.03
2.30
2.302.30
2.03
2.03
2.03
2.31A
2.30
2.80
2.30
2.31
2.802.80
2.80
2.30
2.30
2.30
2.302.30
2.30
2.30
2.31
2.31
2.30
2.30
2.80
2.03
2.31A
2.03
2.80
2.80
2.802.802.802.80
2.06
2.01
2.032.03
2.03
2.03
2.03
2.05 2.05
2.052.05
2.03
2.30
2.30 2.30
2.30
2.30
2.05
2.03
2.032.032.03 2.03
2.032.03
2.03
2.03
2.03
2.05
2.30
2.05
2.03
2.05
2.06
2.05
2.06
2.05
2.06
2.05
2.06
2.05
2.06
2.05
2.06
2.05
2.06
2.05
2.03
2.03
2.05
2.05
2.30
2.03
2.052.05
2.03
2.302.30
2.80
2.03
2.03
2.03
2.03
2.05
2.03
2.07
2.07
2.35
2.03
2.30
2.80
2.80
2.80
2.80
2.802.80
2.03
2.07
2.07
2.07
2.07
2.07
2.07A
2.07
2.07
2.07
2.07
2.07
2.07
2.07
2.07
2.07
2.07
2.07
2.07A
2.07A
2.07A
2.07A
2.07A
2.07A2.07A2.07A2.07A
2.07A
2.07A
2.07A
2.07A
2.05
2.07
2.802.80
2.07
2.07A
2.07 2.07
2.07
2.07
2.07
2.07 2.07
2.07
2.07
2.07
2.07
2.07
2.07A2.07A
2.07
2.07
2.07
2.07
2.07
2.07
2.07
2.07
2.072.07
2.07
2.07
2.07A
2.07
2.07 2.07
2.802.80
2.07
2.07A
2.07
2.07
2.31A
2.312.31
2.312.31
2.31
2.31A 2.31 2.312.31 2.31
2.312.312.312.31 2.31
2.31
2.312.31
2.31
2.31
2.31
2.31
2.31A
2.31A
2.06
2.02
2.09
2.09
2.03
2.032.03
2.032.03
2.07
2.03
2.07 2.07 2.07
2.07A
2.07
2.03
2.07
2.03
2.03 2.06
2.03
2.03
2.03
2.09
2.30
2.03
2.07
2.31
2.31
2.31
2.03
2.03
2.03
2.03
2.08
2.30B
2.30B2.30B2.30B
2.30B
2.30B
2.11
2.042.04
2.04 2.07A
2.07A
2.03
2.032.03
2.03
2.30
2.03
2.912.91
2.14
2.14
2.032.032.032.03
2.10A2.10A
2.16
2.92
2.03
2.04
2.18
PAIN EXAM
ROOM 4
PAIN EXAM
ROOM 3
PAIN EXAM
ROOM 2
PAIN PHARM
PAIN BH
PAIN & PMR
VVC/TM
NURSE
NAVIGATOR
EMG/SCI
PM&R EXAM
ROOM 4
PM&R EXAM
ROOM 3
PM&R EXAM
ROOM 2
PM&R EXAM
ROOM 1
471 MSA
CHECKIN/OUT
NURSES
PROCEDURE
ROOM
CLEAN SUPPLY
PROCEDURE
ROOM
OI&T RM.
STAIR #1
PAIN SWAMP
SOILED
HOLDING
492TOILET
PM&R SWAMP
PAIN EXAM
482 TOILET
EXISTING ELEC.
492A
WORKSTATION
ELEV. LOBBY
401 SOILED DISP
401A
ELEV. LOBBY /
CORR.
400-C41
STAIR #2
ELEV.
#5
ELEV.
#4
ELEV.
#3
ELEV.
#2
ELEV.
#1
ELEV.
#7
ELEV.
#8
CORRIDOR
C496
CORRIDOR
C499
CORRIDOR
C498
CORRIDOR
C495
CORRIDOR
C495
OIT/CLO.
439B
OIT/CLO.
439C
ELEC. RM.
414B
STAFF TLT.
451A
BREAK RM.
STAFF SLEEP
RM.
454A
OFF. SOCIAL
WRK.
CLEAN WRK.
RM.
W/C STG.
401C
CENTRAL JAN.
STG.
401B
NURSE
STATION
CORR.
C42
PAT. TLT.
NURSE
LOUNGE
PAT. TLT.
405A
PAT. RM.
PAT. RM.
PAT. RM./ ISO.
PAT. RM.
PAT. RM.
JAN.
454D
PAT. TLT.
455A
STAFF TLT.
454C
TEAM #1
454B
TEAM #3
OFF. SOCIAL
WRK.
OFF. SOCIAL
WRK.
TEAM WRK. RM.
NURSE
LOUNGE
N. MGT. OFF.
STAFF SHWR.
MED. RM.
PHARM. OFF.
416A
EQPM. STOR.
P.I. OFF
EQPM. STOR.
WAITING AREA
N. COORD. OFF.
427A
STAFF TLT.
TUB RM.
PAT. TLT.
411A
PAT. TLT.
413A
PAT. RM.
PAT. RM.
PAT. RM.
415PAT. RM.
PAT. RM.
PAT. RM.
JAN.
DIALYSIS
PAT. TLT.
425A
PAT. TLT.
423A
PAT. TLT.
420A
PAT. TLT.
PAT. TLT.
417A
PAT. TLT.
415A
CORR.
C44
PAT. TLT.
426A
PAT. RM.
PAT. RM.
PAT. TLT.
428A
PAT. RM.
PAT. RM.
PAT. TLT.
431A
PAT. RM.
CORRIDOR
C500
CONSULT RM.
WARD ADMIN.
PAT. TLT.
STAFF TLT.
463A
ON-CALL RM.
CORR.
C45
PAT. RM.
PAT. RM.
PAT. TLT.
407A
PAT. RM.
PAT. TLT.
410A
CORR.
C43
PAT. TLT.
457A
FOURTH FLOOR KEY PLAN
N
SCOPE OF WORK LEGEND
SHADED AREA NOT IN SCOPE OF WORK
A
2 3 4 5 6
B
C
D
1 2 3 4 5 6
A
B
C
D
VA FORM 08-6231
o n e e ig h th in c o n e fo o t o n e q u a rt e r i n c e fo o t th re e e ig h th s in c e fo o t o n e h a lf in c e fo o t th re e q u a rt e rs e fo o t o n e in c e fo o t o n e a n d o n e h a lf in c h e s e fo o t th re e in c h e e fo o t
CONSULTANTS: ARCHITECT/ENGINEERS:
Drawing Title
Office of Construction and Facilities ManagementApproved: Project Director
Project Title
Location
Date Checked Drawn
Dwg.
Drawing Number
Building Number
Project Number
Department of Veterans Affairs
600 EAST 7TH STEET
SIOUX FALLS, SOUTH DAKOTA 57103
605.274.2893
6 SOUTH OLD ORCHARD
ST. LOUIS, MISSOURI 63119
800.404.7677
330 N MEAD
WICHITA, KANSAS 67202
316.262.2500
AD101
DEMOLITION PLAN - 4TH FLOOR
RELOCATE PHYSICAL
MEDICINE & REHAB. TO THE
4TH FLOOR
800 HOSPITAL DRIVE COLUMBIA, MO 65201
02-15-2023
589A4-22-100
BID DOCUMENTS
IEPJHK
KEYNOTES
KEY VALUE KEYNOTE TEXT
2.01 REMOVE SEMI-RECESSED FIRE EXTINGUISHER CABINET, CONFIRM REUSE W/ COR.
2.02 REMOVE CASEWORK & SALVAGE FOR RETURN TO COR.
2.03 REMOVE WALL AND ALL OF ITS BUILDING COMPONENTS (FULL HEIGHT).
2.04 REMOVE WALL TILE AND PREPARE THE STUD/CMU WALL TO RECIEVE NEW FINISH,
REF. FINISH SCHEDULE.
2.05 REMOVE COLUMN FURRING WALLS.
2.06 REMOVE FURRING WALLS, COMMUNICATE EXISTANCE OF ANY DUCTWORK OR
PIPING WITH ARCHITECT FOR COORDINATION OF REPLACEMENT WALL.
2.07 REMOVE FLOORING AND BASE. PREPARE AREA FOR NEW FLOOR FINISHES AND
BASE, REF. FINISH SCHEDULE.
2.07A REMOVE FLOORING AND WALL TILES. PREPARE AREA FOR NEW FLOOR FINISHES
AND BASE, REF. FINISH SCHEDULE.
2.08 REMOVE TUBE STATION EQUIPMENT & ROUTING, CONFIRM REUSE W/ COR.
2.09 REMOVE PORTION OF EXISTING WALL FOR A NEW OPENING. COORDINATE SIZE W/
DOOR MANUFACTURER & INSTALLER.
2.10A REMOVE DUMBWAITER #8 AND INFILL FLOOR TO MATCH EXISTING. MODIFY THE
OPENING TO RECIEVE NEW DOOR.
2.11 RELOCATE/REUSE EXISTING FIRE EXTINGUISHER, CONFIRM W/ COR.
2.14 REMOVE PORTION OF WALL FOR NEW FIRE RATED ACCESS DOOR AND PATCH / FIRE
PROOF TO MAINTAIN WALL FIRE RATING AT ALL TIME DURING CONSTRUCTION.
2.16 INFILL EXISTING SHAFT OPENING W/ MATCHING CONCRETE FLOOR ASSEMBLY. REF.
STRUCTURAL DETAILS ON AD102.
2.18 INFILL EXISTING HOLE IN THE CMU WALL, PATCH / FIRE PROOF TO MAINTAIN 2-HR
FIRE RATING.
2.30 REMOVE DOOR, FRAME & HARDWARE.
2.30B REMOVE DOOR, FRAME & HARDWARE. MODIFY THE OPENING TO RECIEVE NEW
DOOR.
2.31 REMOVE PASS-THROUGH DOOR, FRAME & HARDWARE.
2.31A REMOVE BUILT-IN LOCKER
2.35 REMOVE SECURITY ROLLING DOOR.
2.80 REMOVE COUNTER TOP, CASEWORK, AND PLUMBING FIXTURE THEN CAP LINES AS
REQUIRED, REF. MEP DEMO PLANS FOR MORE INFORMATION.
2.91 REMOVE ELEC. ELEMENT, REF. ELEC. DEMO PLANS FOR MORE INFORMATION.
2.92 PATCH AND FIRE PROOF ANY PENETRATIONS ON THE SHAFT WALL AFTER REMOVAL
OF EXISTING ELECTRICAL PANELS.
1/8" = 1'-0" D3
DEMOLITION PLAN - 4TH FLOOR
0' 4'-0" 8'-0" 16'-0"
N
# Revision Date
FEC
E
C
FEC
FEC
FOURTH FLOOR KEY PLAN
N
4.5
5.4
6.2
F.1GHJKLMMa La Jb Hb Ga
6.7
D2
AD102
D2
AD102
E Q
E Q
NEW PIPE PENETRATION
DETAIL C1/AD102
DEMO LEGEND - FLOOR PENETRATIONS
COLUMN STRIPEXISTING PIPE PENETRATION
TO BE INFILLED
DETAIL B1/AD102
INTERSECTING COLUMN
STRIPS
MIDDLE STRIP
- REF. MECHANICAL, ELECTRICAL AND PLUMBING DRAWINGS FOR ADDITIONAL INFORMATION AND
POTENTIAL CONFLICTS W/ EXISTING DUCTWORK/PIPING ON THE FLOOR BELOW.
NEW OPENING FOR
FLOOR DRAIN
DETAIL B1/AD102
CHASE/ MECH. DUCT INFILL
~ 65 S.F.
DEPRESSED SLAB INFILL
~ 710 S.F.
INTERRUPTED EXIST. TOP
REINF. BAR
EXIST. REINF.
EXIST. CONC. COLUMN
EXTEND CFRP STRIP 2'-0" MIN.
BEYOND OPENING, TYP.
TOP CFRP STRIP TO REPLACE
INTERRUPTED TOP REINF.
INTERRUPTED EXIST. BOT.
REINF. BAR
TOP CFRP STRIP TO REPLACE
INTERRUPTED TOP REINF.
BOT. CFRP STRIP TO REPLACE
INTERRUPTED BOT. REINF.
INTERRUPTED EXIST. TOP
REINF. BAR
NEW PENETRATION, TYP., REF.
MEP DRAWINGS
COLUMN STRIP OUTLINE, TYP.
INTERRUPTED EXIST. BOT.
REINF. BAR
BOT. CFRP STRIP TO REPLACE
INTERRUPTED BOT. REINF.
NOTES:
• REF C2/AD102 FOR TYPICAL OPENING SPACING DETAIL.
• NEW OPENINGS ARE TO BE SCANNED BY GPR AND LOCATED TO MISS EXISTING
REINFORCING WHERE POSSIBLE. A MAXIMUM OF (1) EXISTING BAR IN EACH
DIRECTION AT THE TOP AND BOTTOM REBAR MAT IN A SLAB MAY BE CUT AT ANY
NEW OPENING LOCATION, TYPICAL WHERE CFRP REINFORCING IS PROVIDED
UNLESS NOTED OTHERWISE. IF NO BARS ARE CUT IN EITHER DIRECTION, THEN NO
REINFORCEMENT IS NECESSARY AT THAT LOCATION.
• DETAIL IS INTENDED TO SHOW TYPICAL REINFORCING CONDITIONS OF A TWO-WAY
SLAB. CFRP STRIP TO MATCH LOCATION OF EXISTING INTERRUPTED BAR, TYPICAL
(TOP OR BOTTOM OF EXISTING CONCRETE SLAB).
• ALL CFRP STRIPS TO BE SIMPSON CSS-CUCL1014-RL
(100MM (3.94") WIDE X 1.4MM (0.055") THICK) U.N.O.
• CONTRACTOR TO ASSUME THAT 100% OF THE NEW MECHANICAL PIPE
PENETRATIONS WILL BE REINFORCED WITH CFRP FOR BIDDING PURPOSES AND
PROVIDE A DEDUCT AMOUNT FOR EVERY OPENING THAT DOES NOT REQUIRE
CFRP REINFORCING.
NEW CONC. SLAB
NOTES:
• FOR OPENINGS GREATER THAN 8" IN ANY
DIMENSION, CONTACT E.O.R. FOR REINFORCING
REQUIREMENTS PRIOR TO PLACEMENT.
ROUGHEN HOLE AND CONCRETE
SIDE TO SLOPE SHOWN. APPLY
SIKADUR 32, HI-MOD TO SURFACE
TO RECEIVE CONCRETE.
F
IE
L D
V E
R
IF
Y
EXIST. CONC. SLAB
3/4" .
FIRE RATED PLYWOOD
#4 REBAR DOWEL, 3" MIN EMBED
INTO EXISTING SLAB
NEW PENETRATION,
REF. MEP DRAWINGS
d
6" MINIMUM
2d CLEAR dMAX1 2
TOP OF CONC.
EXIST. CONC. SLAB,
REF. PLAN
BENT PL5-1/4X4-3/4X3/8 CONT.
ALL FOR SIDES
1/2"Ø ADHESIVE ANCHORS @ 24" O.C.
(MIN. 4" EMBED.)
COMPOSITE SLAB,
REF. PLAN
/4
/4
2" 4" 4" 2"
(2) 1/2"Ø ADHESIVE ANCHORS (MIN. 4"
EMBED.)
PL3/8X4X1'-0" END PLATE
CONNECTION
A
A
SECTION A-A
HSS4X4X1/4
3/16
3/16
NEW CONC. SLAB
NOTES:
• FOR OPENINGS GREATER THAN 8" IN ANY
DIMENSION, CONTACT E.O.R. FOR REINFORCING
REQUIREMENTS PRIOR TO PLACEMENT.
ROUGHEN HOLE AND CONCRETE
SIDE TO SLOPE SHOWN. APPLY
SIKADUR 32, HI-MOD TO SURFACE
TO RECEIVE CONCRETE.
F
IE
L D
V E
R
IF
Y
EXIST. CONC. SLAB
EXIST. MECH. DUCT
CAP OFF & SEAL
EXIST. MECH. DUCT
3/4" .
FIRE RATED PLYWOOD
#4 REBAR DOWEL, 3" MIN EMBED
INTO EXISTING SLAB
0' 4'-0" 8'-0" 16'-0"
N
A
2 3 4 5 6
B
C
D
1 2 3 4 5 6
A
B
C
D
VA FORM 08-6231
o n e e ig e fo o t o n e q u a rt e r i n c e fo o t th re e e ig h th s in c e fo o t o n e h a lf in c e fo o t th re e q u a rt e fo o t o n e in c e fo o t o n e a n d o n e h a lf in c h e e fo o t th re e in c h e e fo o t
CONSULTANTS: ARCHITECT/ENGINEERS:
Drawing Title
Office of Construction and Facilities ManagementApproved: Project Director
Project Title
Location
Date Checked Drawn
Dwg.
Drawing Number
Building Number
Project Number
Department of Veterans Affairs
600 EAST 7TH STEET
SIOUX FALLS, SOUTH DAKOTA 57103
605.274.2893
6 SOUTH OLD ORCHARD
ST. LOUIS, MISSOURI 63119
800.404.7677
330 N MEAD
WICHITA, KANSAS 67202
316.262.2500
AD102
DEMOLITION PLAN - 4TH FLOOR -
FLOOR PENETRATIONS
RELOCATE PHYSICAL
MEDICINE & REHAB. TO THE
4TH FLOOR
800 HOSPITAL DRIVE COLUMBIA, MO 65201
02-15-2023
589A4-22-100
BID DOCUMENTS
IEPJHK
1/8" = 1'-0" D3
DEMOLITION PLAN - 4TH FLOOR - PENETRATION
1/2" = 1'-0" B1
PIPING PENETRATION CFRP PLACEMENT DETAIL
NOT TO SCALE
C1
EXISTING OPENING INFILL DETAIL
NOT TO SCALE
C2
OPENING SPACING DETAIL
NOT TO SCALE
D2
CHASE INFILL
NOT TO SCALE
D1
EXISTING OPENING INFILL DETAIL @
ABANDONED DUCT
T
GENERAL DEMOLITION NOTES
A. CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS PRIOR TO WORK BEGINNING. THE
CONTRACTOR IS RESPONSIBLE FOR INFORMING THE ARCHITECT OF ANY CONDITIONS THAT
DIFFER FROM THE INFORMATION INDICATED IN THE DRAWINGS.
B. PROTECT ALL EXISTING BUILDING COMPONENTS WHICH ARE TO REMAIN. REPAIR ANY
DAMAGED AREAS AS REQUIRED TO RETURN THEM TO THEIR ORIGINAL CONDITION.
C. VERIFY EXTENT OF DEMOLITION WORK WITH INFORMATION SHOWN IN THE DRAWINGS AND
WORK THAT IS NOT SHOWN AND MAY BE REQUIRED TO COMPLETE THE INTENDED WORK.
D. ALL WORK SHALL COMPLY WITH REQUIRED LOCAL CODES. CONTRACTOR IS RESPONSIBLE
FOR OBTAINING REQUIRED PERMITS AND INSPECTIONS FOR ALL WORK ASSOCIATED WITH
THIS CONTRACT.
E. CONTRACTOR SHALL REPAIR ALL DISTURBED AREAS AS REQUIRED TO MATCH
SURROUNDING EXISTING FINISHES NOT DISTURBED.
F. TYPES OF FLOOR, WALL, AND CEILING FINISHES INDICATED FOR REMOVAL BY DEMOLITION
NOTES ARE FOR GENERAL INFORMATION ONLY FROM INFORMATION OBTAINED FROM
EXISTING PLANS AND OBSERVATIONS. CONTRACTOR SHALL FIELD VERIFY MATERIAL TYPES
ONSITE PRIOR TO BID AND INCLUDE NECESSARY WORK IN HIS BID.
G. ALL APPLIANCES, FURNITURE, AND EQUIPMENT TO REMAIN THE PROPERTY OF THE
OWNER - CONTRACTOR TO COORDINATE REMOVAL, RELOCATION AND STORAGE OF
EQUIPMENT FROM DEMO AREAS WITH OWNER.
H. MISCELLANEOUS FLOOR PENETRATIONS AND DEMO FOR NEW MECHANICAL AND
ELECTRICAL WORK SHALL BE COORDINATED FROM ARCHITECTURAL, MECHANICAL, AND
ELECTRICAL PLANS.
I. REFER TO MECHANICAL, PLUMBING AND ELECTRICAL DEMO PLANS FOR DEMOLITION,
SALVAGE AND RE-USE OF EXISTING ITEMS.
J. PATCH FLOOR AT REMOVED WALLS AND CASEWORK, PREPARE FLOOR TO RECEIVE NEW
FLOORING AS REQUIRED.
K. ALL HOLES IN EXISTING SLAB LEFT FROM REMOVAL OF FIXTURES TO RECEIVE INFILL PER
STRUCTURAL DETAILS ON AD102.
L. REMOVE ALL STAINLESS STEEL CORNER GUARDS CAREFULLY AND RETURN TO OWNER.
M. ELEMENTS INDICATED WITH A DASHED LINE ARE TO BE DEMOLISHED AND DISPOSED OF AS
A PART OF THIS PROJECT, UNLESS NOTED OTHERWISE.
N. IN EXISTING AREAS, RENOVATION AND DEMOLITION WORK SHALL BE ACCOMPLISHED WITH
MINIMAL DISRUPTION TO OPERATIONS. IF REQUIRED, THE OWNER RESERVES THE RIGHT TO
TEMPORARILY STOP WORK OF SPECIFIC CONSTRUCTION OPERATIONS SHOULD THE
OWNER IDENTIFY AN EMERGENCY OR DANGER EXISTS TO THE WELFARE OF THE
OCCUPANTS ON ACCOUNT OF SUCH WORK OR OPERATIONS.
O. CONTRACTOR SHALL REMOVE AND DISPOSE OF IN A LEGAL MANNER ALL MATERIAL NOT
SCHEDULED FOR REUSE UNDER THIS PROJECT .
P. IN ALL WALLS AND CEILINGS THAT ARE TO BE REMOVED THE CONTRACTOR SHALL BE
RESPONSIBLE FOR DISCONNECTING AT SOURCE AND REMOVING OR CAPPING ELECTRICAL,
PLUMBING, GAS LINES AND MECHANICAL DUCTWORK THAT ARE NOT SCHEDULED FOR
REUSE. CONTRACTOR SHALL REROUTE AND CONTINUE ANY SYSTEM THAT MUST BE
RETAINED FOR NEW CONSTRUCTION. CONTRACTOR SHALL REROUTE AND KEEP
OPERATIONAL ALL SYSTEMS SERVING SPACES IN THE SURROUNDING AREAS TO THE
PROJECT.
Q. ALL ELECTRICAL CIRCUITS FOR EQUIPMENT THAT ARE TO BE REMOVED SHALL BE
DISCONNECTED AT SOURCE AND REMOVED BACK TO PANEL.
R. ALL PIPING GAS, WATER SUPPLY, VENT, DRAIN LINES, ETC. SUPPLYING EQUIPMENT THAT
ARE TO BE REMOVED SHALL BE DISCONNECTED, REMOVED AND CAPPED ABOVE CEILING
OR BELOW FLOOR. CONTRACTOR SHALL REROUTE AS NECESSARY, TO BE BEHIND NEW
CONSTRUCTION. (PATCH FLOOR BACK PRIOR TO TOPPING.)
S. ALL MED GASES AND PLUMBING TO BE REMOVED AT WALLS SCHEDULED FOR DEMOLITION.
T. REMOVE ALL PLUMBING FIXTURES AND EQUIPMENT WITHIN ROOMS SCHEDULED TO BE
DEMOLISHED. SEE MEP PIPING DRAWINGS.
U. RETURN ALL SIGNAGE AFFECTED BY CONSTRUCTION TO OWNER.
V. SECURITY CAMERAS TO BE FUNCTIONAL AT ALL TIME DURING CONSTRUCTION.
W. ALL UTILITY PENETRATIONS TO MATCH THE HOST WALL FIRE RATING AT ALL TIME.
WALL DOOR
CEILING
AND GRID
DEMO LEGEND
FLOOR
PENETRATION
GYP BOARD
CEILING/SOFFIT
CONCRETE
PATCH AREA
(-X" = DEPTH OF
PATCH AREA)
-X"
FOURTH FLOOR KEY PLAN
N
2.50
2.50
2.50
2.50
2.50
2.50
2.50
2.50 2.50
2.50
2.50
2.50
2.50
2.50
2.50 2.50
2.50
2.50
2.50
2.51
2.50
2.502.51
2.50
2.50
2.50
2.51
2.50
2.502.502.502.50
2.512.51
2.512.50
2.50
2.50
2.50
2.502.50
2.50
2.50
2.50
2.50
2.50
2.50
2.50
2.50
2.51
2.50
2.51
2.502.51
2.50
2.50
2.50
2.50
2.50
2.50
2.50
2.50 2.50
2.50
2.50
2.51
2.50
2.51
2.50
2.50
2.51 2.512.512.512.51 2.51
2.51
2.51
2.55
2.55
2.55
2.55
2.55
2.55
2.55
2.55
2.552.552.552.552.552.552.55
2.55
2.55
2.55
2.55
2.55
2.51
2.51
2.51 2.51
2.50
2.902.90
2.90
2.90
2.90
2.90
2.90 2.90 2.90
2.90 2.90 2.90
2.90
2.90
2.90 2.90
2.90
2.90
2.90
2.90
2.90
2.90 2.90
2.90
2.90
2.90 2.90
2.90
2.90 2.90
2.90
2.90
2.90
2.90
2.90
2.90
2.90
2.90
2.90
2.90
2.90
2.90
2.90
2.13
2.132.13
2.132.13
2.13
2.08A
2.08A
2.08A
2.08A
2.08A
2.08A2.08A
2.08B
2.13
PAIN EXAM
ROOM 4
PAIN EXAM
ROOM 3
PAIN EXAM
ROOM 2
PAIN PHARM
PAIN BH
PAIN & PMR
VVC/TM
NURSE
NAVIGATOR
EMG/SCI
PM&R EXAM
ROOM 4
PM&R EXAM
ROOM 3
PM&R EXAM
ROOM 2
PM&R EXAM
ROOM 1
MSA
CHECKIN/OUT
NURSES
PROCEDURE
ROOM
CLEAN SUPPLY
PROCEDURE
ROOM
OI&T RM.
STAIR #1
PAIN SWAMP
SOILED
HOLDING
492TOILET
PM&R SWAMP
PAIN EXAM
482 TOILET
EXISTING ELEC.
492A
WORKSTATION
ELEV. LOBBY
401 SOILED DISP
401A
ELEV. LOBBY /
CORR.
400-C41
STAIR #2
ELEV.
#5
ELEV.
#4
ELEV.
#3
ELEV.
#2
ELEV.
#1
ELEV.
#7
ELEV.
#8
CORRIDOR
C496
CORRIDOR
C499
CORRIDOR
C498
CORRIDOR
C495
CORRIDOR
C495
OIT/CLO.
439B
OIT/CLO.
439C
ELEC. RM.
414B
STAFF TLT.
451A
BREAK RM.
STAFF SLEEP
RM.
454A
OFF. SOCIAL
WRK.
CLEAN WRK.
RM.
W/C STG.
401C
CENTRAL JAN.
STG.
401B
NURSE
STATION
CORR.
C42
PAT. TLT.
NURSE
LOUNGE
PAT. TLT.
405A
PAT. RM.
PAT. RM.
PAT. RM./ ISO.
PAT. RM.
PAT. RM.
JAN.
454D
PAT. TLT.
455A
STAFF TLT.
454C
TEAM #1
454B
TEAM #3
OFF. SOCIAL
WRK.
OFF. SOCIAL
WRK.
TEAM WRK. RM.
NURSE
LOUNGE
N. MGT. OFF.
STAFF SHWR.
MED. RM.
PHARM. OFF.
416A
EQPM. STOR.
P.I. OFF
EQPM. STOR.
WAITING AREA
N. COORD. OFF.
427A
STAFF TLT.
TUB RM.
PAT. TLT.
411A
PAT. TLT.
413A
PAT. RM.
PAT. RM.
PAT. RM.
PAT. RM.
PAT. RM.
PAT. RM.
JAN.
DIALYSIS
PAT. TLT.
425A
PAT. TLT.
423A
PAT. TLT.
420A
PAT. TLT.
PAT. TLT.
417A
PAT. TLT.
415A
CORR.
C44
PAT. TLT.
426A
PAT. RM.
PAT. RM.
PAT. TLT.
428A
PAT. RM.
PAT. RM.
PAT. TLT.
431A
PAT. RM.
CORRIDOR
C500
CONSULT RM.
WARD ADMIN.
PAT. TLT.
STAFF TLT.
463A
ON-CALL RM.
CORR.
C45
PAT. RM.
PAT. RM.
PAT. TLT.
407A
PAT. RM.
PAT. TLT.
410A
CORR.
C43
PAT. TLT.
457A
SCOPE OF WORK LEGEND
SHADED AREA NOT IN SCOPE OF WORK
A
2 3 4 5 6
B
C
D
1 2 3 4 5 6
A
B
C
D
VA FORM 08-6231
o n e e ig e fo o t o n e q u a rt e r i n c e fo o t th re e e ig h th s in c e fo o t o n e h a lf in c e fo o t th re e q u a rt e fo o t o n e in c e fo o t o n e a n d o n e h a lf in c h e e fo o t th re e in c h e e fo o t
CONSULTANTS: ARCHITECT/ENGINEERS:
Drawing Title
Office of Construction and Facilities ManagementApproved: Project Director
Project Title
Location
Date Checked Drawn
Dwg.
Drawing Number
Building Number
Project Number
Department of Veterans Affairs
600 EAST 7TH STEET
SIOUX FALLS, SOUTH DAKOTA 57103
605.274.2893
6 SOUTH OLD ORCHARD
ST. LOUIS, MISSOURI 63119
800.404.7677
330 N MEAD
WICHITA, KANSAS 67202
316.262.2500
AD111
DEMOLITION RCP - 4TH FLOOR
RELOCATE PHYSICAL
MEDICINE & REHAB. TO THE
4TH FLOOR
800 HOSPITAL DRIVE COLUMBIA, MO 65201
02-15-2023
589A4-22-100
BID DOCUMENTS
IEPJHK
KEYNOTES
KEY VALUE KEYNOTE TEXT
2.08A REMOVE PNEUMATIC TUBE SYSTEM ROURING. CAP AT APPROPRIATE LOCATION ON
THE 3RD FLOOR SO THE SERVICE FOR THE REST OF FACILITY REMAINS INTACT.
2.08B REMOVE PNEUMATIC TUBE SYSTEM TRANSFER UNIT.
2.13 REMOVE PORTION OF WALL FOR NEW UTILITIES PENETRATION AND PATCH / FIRE
PROOF AS NECESSARY TO MAINTAIN WALL FIRE RATING AT ALL TIME DURING
CONSTRUCTION.
2.50 REMOVE ACT CEILING & GRID, DEMO TO INCLUDE DRYWALL & PLASTER SOFFITS.
2.51 REMOVE GYP CEILING, DEMO TO INCLUDE DRYWALL & PLASTER SOFFITS.
2.55 REMOVE PATIENT LIFT TRACKS, RAILS AND VETICAL SUPPORTS. REMOVE ALL
THREADED RODS AND SUPPORTS ABOVE CEILING TO STRUCTURE.
2.90 REMOVE LIGHT FIXTURE, REF. ELEC. DEMO PLANS FOR MORE INFORMATION.
0' 4'-0" 8'-0" 16'-0"
N
1/8" = 1'-0" D3
DEMOLITION RCP - 4TH FLOOR
FEC
E
C
FEC
FEC
R E
F
T
T
F E
C
F E
C
F E
C
F E
C
F E
C
FEC
A. ANY DISCREPANCIES OR CONFLICTS FOUND IN THE VARIOUS PARTS OF THE
CONSTRUCTION DOCUMENTS SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT
AND THE OWNER BEFORE PROCEEDING WITH THE WORK.
B. FILL SURFACE OF CONCRETE WALLS WITH AN APPROPRIATE FILLER AND MAKE SMOOTH.
SEAL OR PRIME ABSORBENT SURFACES WITH A SUITABLE DILUTED ACRYLIC PRIMER.
ALLOW PAINT/PRIMER TO DRY IN ACCORDANCE WITH THE MANUFACTURERS APPLICATION
INSTRUCTIONS. UNFILLED GROUT LINES MAY TELEGRAPH THROUGH THE SHEET; GC TO
COORDINATE WITH MANUFACTURER PROPER THICKNESS AND INSTALLATION METHOD.
C. GYPSUM WALLS NEED TO BE PAINTED PRIOR TO INSTALLATION OF PLYWOOD.
D. ITEMS/EQUIPMENT IN LIGHT GRAY ( ) ARE FOR REFERENCE ONLY.
E. ALL DIMENSIONS ARE TO FACE OF STUDS U.N.O.
F. ALL SPOT ELEVATIONS ARE TO FINISH FLOOR U.N.O
GENERAL PLAN NOTES
PSA
REHAB.
COOR.
STAFF TLT.
BREAK RM.
OT SUPER.
AO
CHIEF PM&R
EXAM
WAIT.
PT/OT
SWAMP
PT GYM
PT/OT EXAM
BARIATRIC
PT/OT STOR.
OT TRAIN.
RM.
OT TLT.
440A
PT/OT EXAM
PT/OT EXAM
ACUPUNCTURE
ACUPUNCTURE
CHIRO. EXAM
CHIRO. EXAM
PELVIC
PELVIC
PROST.
STOCK RM.
CLEAN LINEN
450A
WC
STOR./SHOP
CRASH CART
ALCOVE
WOMEN'S
TLT
MEN'S TLT
MSA
CHECKIN/OUT
PROST.
WAIT.
HSKPG.
PER. CLNC.
GROUP RM.
PER. CLNC.
MASSAGE
STOR.
426A
FITTING/EXAM
RM.
FITTING/EXAM
RM.
PROST.
PURCHASING
PROST. REP
PROST.
CHIEF
PROST.
ASST. CHIEF
STAFF TLT.
FUME RM.
PLASTER
CLEAN LAB
DUST RM.
MAINT.
421A
ANTE
FITTING/EXAM
RM.
151' GAIT TRACK
PT TLT.
EQUIP.
LEGEND
CIRCULATION
CLINICAL SUPPORT
OFFICE/SUPPORT
PATIENT CARE
4.5
5.4
6.2
F.1GHJKLMMa La Jb Hb Ga
TELE
HEALTH
6.7
ELEC.
PROST.
CHECKIN
405A
ELEV. LOBBY
/ CORR.
400CORR.
C41
CORR.
C43
CORR.
C45
CORR.
C44
CORR.
C46
CORR.
C47
CORR.
C42
STG.
404A
ELEC.
CLO.
439A
OI&T RM.
PAIN EXAM
ROOM 4
PAIN EXAM
ROOM 3
PAIN EXAM
ROOM 2
PAIN PHARM
PAIN BH
PAIN & PMR
VVC/TM
NURSE
NAVIGATOR
EMG/SCI
PM&R EXAM
ROOM 4
PM&R EXAM
ROOM 3
PM&R EXAM
ROOM 2
PM&R EXAM
ROOM 1
NURSES
PROCEDURE
ROOM
CLEAN SUPPLY
PROCEDURE
ROOM
STAIR #1
PAIN SWAMP
SOILED
HOLDING
492TOILET
PM&R SWAMP
PAIN EXAM
482 TOILET
EXISTING ELEC.
492A
WORKSTATION
ELEV. LOBBY
401 SOILED DISP
401A
STAIR #2
ELEV.
#5
ELEV.
#4
ELEV.
#3
ELEV.
#2
ELEV.
#1
ELEV.
#7
CORRIDOR
C496
CORRIDOR
C499
CORRIDOR
C498
CORRIDOR
C495
CORRIDOR
C495
OIT/CLO.
439B
OIT/CLO.
439C
FOURTH FLOOR KEY PLAN
N
SCOPE OF WORK LEGEND
SHADED AREA NOT IN SCOPE OF WORK
A
2 3 4 5 6
B
C
D
1 2 3 4 5 6
A
B
C
D
VA FORM 08-6231
o n e e ig e fo o t o n e q u a rt e r i n c e fo o t th re e e ig h th s in c e fo o t o n e h a lf in c e fo o t th re e q u a rt e fo o t o n e in c e fo o t o n e a n d o n e h a lf in c h e e fo o t th re e in c h e e fo o t
CONSULTANTS: ARCHITECT/ENGINEERS:
Drawing Title
Office of Construction and Facilities ManagementApproved: Project Director
Project Title
Location
Date Checked Drawn
Dwg.
Drawing Number
Building Number
Project Number
Department of Veterans Affairs
600 EAST 7TH STEET
SIOUX FALLS, SOUTH DAKOTA 57103
605.274.2893
6 SOUTH OLD ORCHARD
ST. LOUIS, MISSOURI 63119
800.404.7677
330 N MEAD
WICHITA, KANSAS 67202
316.262.2500
AE101
FLOOR PLAN - 4TH FLOOR - OVERALL
RELOCATE PHYSICAL
MEDICINE & REHAB. TO THE
4TH FLOOR
800 HOSPITAL DRIVE COLUMBIA, MO 65201
02-15-2023
589A4-22-100
BID DOCUMENTS
IEPJHK
1/8" = 1'-0" D3
4TH FLOOR - PLAN
0' 4'-0" 8'-0" 16'-0"
E
C
F E
C
FEC
A. ANY DISCREPANCIES OR CONFLICTS FOUND IN THE VARIOUS PARTS OF THE
CONSTRUCTION DOCUMENTS SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT
AND THE OWNER BEFORE PROCEEDING WITH THE WORK.
B. FILL SURFACE OF CONCRETE WALLS WITH AN APPROPRIATE FILLER AND MAKE SMOOTH.
SEAL OR PRIME ABSORBENT SURFACES WITH A SUITABLE DILUTED ACRYLIC PRIMER.
ALLOW PAINT/PRIMER TO DRY IN ACCORDANCE WITH THE MANUFACTURERS APPLICATION
INSTRUCTIONS. UNFILLED GROUT LINES MAY TELEGRAPH THROUGH THE SHEET; GC TO
COORDINATE WITH MANUFACTURER PROPER THICKNESS AND INSTALLATION METHOD.
C. GYPSUM WALLS NEED TO BE PAINTED PRIOR TO INSTALLATION OF PLYWOOD.
D. ITEMS/EQUIPMENT IN LIGHT GRAY ( ) ARE FOR REFERENCE ONLY.
E. ALL DIMENSIONS ARE TO FACE OF STUDS U.N.O.
F. ALL SPOT ELEVATIONS ARE TO FINISH FLOOR U.N.O
GENERAL PLAN NOTES
4.5
5.4
6.2
F.1GHJ
KLMa La
Jb
Hb Ga
SHADED AREA NOT
IN SCOPE OF PROJECT
BREAK RM.
WAIT.
MSA
CHECKIN/OUT
MEN'S TLT
WOMEN'S
TLT
WC
STOR./SHOP
ELEV. LOBBY
ELEV. LOBBY
/ CORR.
SOILED DISP
401A
PROST.
STOCK RM.
CHIRO. EXAM
CHIRO. EXAM
PER. CLNC.
GROUP RM.
PER. CLNC.
MASSAGE
CLEAN LAB
DUST RM.
421 FUME RM.
PLASTER
MAINT.
421A
FITTING/EXAM
RM.
PROST.
ASST. CHIEF
PROST. REP
PROST.
CHIEF
STAFF TLT.
PROST.
PURCHASING
FITTING/EXAM
RM.
FITTING/EXAM
RM.
ANTE
STOR.
426A
HSKPG.
PROST.
WAIT.
421A
A
C42
B
B
C
6.7
CORR.
C45
CORR.
C46
CORR.
C47
CORR.
C46
CORR.
C41
CORR.
C43
ELEC.
405D
8.33
AE401
A1
AE401
D1
AE401
A2
AI403 B2
AI402
A1
AI402
A2
AI402
A3
B3
AI401
D6
8.078.07
8.33
22.34
B
10.40
10.40
10.40
B6
AE501
SIM
B6
AE501
SIM
B6
AE501
SIM
OI&T RM.
26.01
22.47
AI401 D5
D4
AI401
A1
FOURTH FLOOR KEY PLAN
AREA A
N
B
A
SCOPE OF WORK LEGEND
SHADED AREA NOT IN SCOPE OF WORK
A
2 3 4 5 6
B
C
D
1 2 3 4 5 6
A
B
C
D
VA FORM 08-6231
o n e e ig e fo o t o n e q u a rt e r i n c e fo o t th re e e ig h th s in c e fo o t o n e h a lf in c e fo o t th re e q u a rt e fo o t o n e in c e fo o t o n e a n d o n e h a lf in c h e e fo o t th re e in c h e e fo o t
CONSULTANTS: ARCHITECT/ENGINEERS:
Drawing Title
Office of Construction and Facilities ManagementApproved: Project Director
Project Title
Location
Date Checked Drawn
Dwg.
Drawing Number
Building Number
Project Number
Department of Veterans Affairs
600 EAST 7TH STEET
SIOUX FALLS, SOUTH DAKOTA 57103
605.274.2893
6 SOUTH OLD ORCHARD
ST. LOUIS, MISSOURI 63119
800.404.7677
330 N MEAD
WICHITA, KANSAS 67202
316.262.2500
AE102
FLOOR PLAN - 4TH FLOOR - AREA A
RELOCATE PHYSICAL
MEDICINE & REHAB. TO THE
4TH FLOOR
800 HOSPITAL DRIVE COLUMBIA, MO 65201
02-15-2023
589A4-22-100
BID DOCUMENTS
IEPJHK
3/16" = 1'-0" D2
4TH FLOOR - AREA A
0' 2'-8" 5'-4" 10'-8"
N
KEYNOTES
KEY VALUE KEYNOTE TEXT
8.07 OPERABLE PARTITIONS W/ BUILT-IN DOOR, REF. SPECS.
8.33 ROLL UP SECURITY GRILLE, REF. SPECS.
10.40 FULLY RECESSED F.E.C.
22.34 FLOOR DRAIN, REF. PLUMBING.
22.47 BI-LEVEL ADA DRINKING FOUNTAIN W/ BOTTLE FILLING STATION, REF. PLUMBING.
26.01 ELECTRICAL DEVICE, REF. ELECTRICAL.
R E
F
T
T
F E
C
F E
C
F E
C
A. ANY DISCREPANCIES OR CONFLICTS FOUND IN THE VARIOUS PARTS OF THE
CONSTRUCTION DOCUMENTS SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT
AND THE OWNER BEFORE PROCEEDING WITH THE WORK.
B. FILL SURFACE OF CONCRETE WALLS WITH AN APPROPRIATE FILLER AND MAKE SMOOTH.
SEAL OR PRIME ABSORBENT SURFACES WITH A SUITABLE DILUTED ACRYLIC PRIMER.
ALLOW PAINT/PRIMER TO DRY IN ACCORDANCE WITH THE MANUFACTURERS APPLICATION
INSTRUCTIONS. UNFILLED GROUT LINES MAY TELEGRAPH THROUGH THE SHEET; GC TO
COORDINATE WITH MANUFACTURER PROPER THICKNESS AND INSTALLATION METHOD.
C. GYPSUM WALLS NEED TO BE PAINTED PRIOR TO INSTALLATION OF PLYWOOD.
D. ITEMS/EQUIPMENT IN LIGHT GRAY ( ) ARE FOR REFERENCE ONLY.
E. ALL DIMENSIONS ARE TO FACE OF STUDS U.N.O.
F. ALL SPOT ELEVATIONS ARE TO FINISH FLOOR U.N.O
GENERAL PLAN NOTES
F.1GHJKLMMa La Jb Hb Ga
CHIEF PM&R
EXAM
WAIT.
WC
STOR./SHOP
BREAK RM.
AO
OT SUPER.
REHAB.
COOR.
STAFF TLT.
PSA
PT/OT
SWAMP
PT/OT
SWAMP
ELEV. LOBBY
PROST.
STOCK RM.
PELVIC
PELVIC
PT/OT EXAM
BARIATRIC
PT/OT STOR.
PT TLT.
EQUIP.
CORR.
C44
PT GYM
OT TRAIN.
RM.
OT TLT.
440A
PT/OT EXAM
PT/OT EXAM
ACUPUNCTURE
ACUPUNCTURE
CHIRO. EXAM
460B
460A
440A
B
C
C
B
CRASH CART
ALCOVE
6.7
TELE
HEALTH
A
CLEAN LINEN
450A
CORR.
C41
ELEV. LOBBY
/ CORR.
CORR.
C45
SOILED DISP
401A
PROST.
CHECKIN
405A
AI402 D2
D1
AI401
AI401
A3
B3
AE401
C6
AE401
A3
A
B
A
AI403 B2
AI403B1
AI401 C3
B3
404A
ELEC.
AE401
B3
B
C
C
8.33
CORR.
C46
STG.
404A
405D
CLO.
439A
10.40
10.40
10.40
B6
AE501
B6
AE501
SIM
B6
AE501
SIM
B6
AE501
SIM
8.04A
22.47
C4
22.34
FOURTH FLOOR KEY PLAN
AREA B
N
B
A
SCOPE OF WORK LEGEND
SHADED AREA NOT IN SCOPE OF WORK
A
2 3 4 5 6
B
C
D
1 2 3 4 5 6
A
B
C
D
VA FORM 08-6231
o n e e ig e fo o t o n e q u a rt e r i n c e fo o t th re e e ig h th s in c e fo o t o n e h a lf in c e fo o t th re e q u a rt e fo o t o n e in c e fo o t o n e a n d o n e h a lf in c h e e fo o t th re e in c h e e fo o t
CONSULTANTS: ARCHITECT/ENGINEERS:
Drawing Title
Office of Construction and Facilities ManagementApproved: Project Director
Project Title
Location
Date Checked Drawn
Dwg.
Drawing Number
Building Number
Project Number
Department of Veterans Affairs
600 EAST 7TH STEET
SIOUX FALLS, SOUTH DAKOTA 57103
605.274.2893
6 SOUTH OLD ORCHARD
ST. LOUIS, MISSOURI 63119
800.404.7677
330 N MEAD
WICHITA, KANSAS 67202
316.262.2500
AE103
FLOOR PLAN - 4TH FLOOR - AREA B
RELOCATE PHYSICAL
MEDICINE & REHAB. TO THE
4TH FLOOR
800 HOSPITAL DRIVE COLUMBIA, MO 65201
02-15-2023
589A4-22-100
BID DOCUMENTS
IEPJHK
KEYNOTES
KEY VALUE KEYNOTE TEXT
8.04A 24"X24" RATED ACCESS DOOR, REF. LIFE SAFETY PLANS FOR REQUIRED RATING,
"BEST CORE" LOCK BY DOOR HARDWARE SUPPLIER.
8.33 ROLL UP SECURITY GRILLE, REF. SPECS.
10.40 FULLY RECESSED F.E.C.
22.34 FLOOR DRAIN, REF. PLUMBING.
22.47 BI-LEVEL ADA DRINKING FOUNTAIN W/ BOTTLE FILLING STATION, REF. PLUMBING.
3/16" = 1'-0" D2
4TH FLOOR - AREA B
0' 2'-8" 5'-4" 10'-8"
| Sheets |
| AD101 - DEMOLITION PLAN - 4TH FLOOR |
| AD102 - DEMOLITION PLAN - 4TH FLOOR - FLOOR PENETRATIONS |
| AD111 - DEMOLITION RCP - 4TH FLOOR |
| AE101 - FLOOR PLAN - 4TH FLOOR - OVERALL |
| AE102 - FLOOR PLAN - 4TH FLOOR - AREA A |
| AE103 - FLOOR PLAN - 4TH FLOOR - AREA B |
| AE104 - FLOOR PLAN - DIMENSIONS - 4TH FLOOR - AREA A |
File details come from the government source that posted it. Updated .