Drawings-589A4-22-100-2023-02-15 BID Set- Part13-pages 1.pdf

PDF 500 KB Posted

Attached to
Z2DA-- Relocate Physical Medicine and Rehabilitation to the 4th Floor PN: 589A4-22-100
Solicitation number
36C25523R0072
Issued by

About this file

This document package includes construction drawings and specifications for a federal contract opportunity to relocate Physical Medicine and Rehabilitation to the fourth floor at a Veterans Affairs medical center. The solicitation is to provide electrical, telecommunications, and security infrastructure to support the relocation, including installing new data and phone cabling, access control systems at doors, security cameras, and power upgrades. Key project details in the drawings include specifications for installing new server racks, patch panels, UPS systems, cable management, and related IT equipment. The opportunity is identified as solicitation number 36C25523R0072 from the Department of Veterans Affairs VHA VISN 15 to renovate space at 800 Hospital Drive in Columbia, Missouri. The response due date is not stated.

View the file

Other files

File Type Posted
36C25523R0072 0004.docx DOCX document
AMENDMENT 3 - Drawings.pdf PDF
AMENDMENT 3 - Specifications.pdf PDF
36C25523R0072 0003.docx DOCX document
Prebid-site visit attendee list.pdf PDF
36C25523R0072 0002.docx DOCX document
589A4-22-100 Volume 2 Specifications- 494 pages.pdf PDF
36C25523R0072 0001.docx DOCX document
Drawings-589A4-22-100-2023-02-15 BID Set- Part5-pages 10.pdf PDF
Drawings-589A4-22-100-BID Set -2-15-2023- Part1-7 pages.pdf PDF
Drawings-589A4-22-100-2023-02-15 BID Set -Part4-pages 10.pdf PDF
36C25523R0072.docx DOCX document
Drawings-589A4-22-100-2023-02-15 BID Set - Part12-pages 11.pdf PDF
Drawings-589A4-22-100- 2023-02-15 BID Set-Part2- Pages 6.pdf PDF
Drawings-589A4-22-100-2023-02-15 BID Set-Part6-pages 6.pdf PDF
Drawings-589A4-22-100-2023-02-15 BID Set- Part9-pages 8.pdf PDF
Drawings-589A4-22-100-2023-02-15 BID Set - Part3-pages-12.pdf PDF
Specifications-589A4-22-100-2023-02-15 BID Set - VOL 1- Pages 785.pdf PDF
Drawings-589A4-22-100-2023-02-15 BID Set-Part8-pages 9.pdf PDF
Drawings-589A4-22-100-2023-02-15 BID Set-Part11-pages 9.pdf PDF
Drawings-589A4-22-100-2023-02-15 BID Set-Part10-pages 13.pdf PDF
Drawings-589A4-22-100-2023-02-15 BID set - Part7-pages 9.pdf PDF
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GENERAL NOTES:

14 15

RACK 3

RACK 1 RACK 2 RACK 3

B

LEG 1 LEG 2 LEG 1 LEG 2 LEG 1 LEG 2

RACK ELEVATIONS

N.T.S. 3

POWER ELEVATION AND SCHEMATIC

N.T.S.

A GROUP A

OX OY

GROUP B

OZ OX

GROUP A

OY OZ

GROUP B

OX OY

GROUP A

OY OZ

GROUP B

OX OY

OZ OY OX OZ OX OZ

# KEYED NOTES:

3 3

RACK 2 RACK 1

C B

C

B

C B

C B

C

B

C B

C B

C

B

C B

C B

C

B

C B

C B

C

B

C B

C B

C

B

C B

1. HORIZONTAL CABLE MANAGER, SINGLE SIDED, 1 RU.

2. HORIZONTAL CABLE MANAGER, SINGLE SIDED, 2 RU.

3. PATCH PANEL, 48 PORT, 1 RU

4. ETHERNET SWITCH (END USER FURNISH AND INSTALL)

5. FIBER OPTIC ENCLOSURE WITH DUPLEX-LC, MPO CASSETS, 1 RU

6. SPACE RESERVED FOR RACK MOUNTED POWER EQUIPMENT.

7. 60 A, 208 V, 3-PHASE ZONE PDU BASE UNIT - REAR CIRCUITS WITH SIX NEMA L21-20R

OUTPUT RECEPTACLES AND TWO 10' POWER CORDS TERMINATING IN HARD-WIRED

JUNCTION BOX. ZONIT ZPDS-208V60A-HW-6L21-2 OR APPROVED EQUAL

8. PROVIDE A LOADED 48-PORT PATCH PANEL. PROVIDE 50-PAIR CAT3 CABLE FROM

THE CLOSEST SIGNALS CLOSET AND TERMINATE TO THIS PATCH PANEL.

COORDINATE TERMINATION OF THESE CABLES TO EXTEND THE EXISTING RISER

CABLE INTO THE NEW TR ROOMS. COORDINATE WITH FACILITIES ENGINEERING FOR

TIMING, LOCATION AND RE-LABELING THE RISER AT THE MDF ACCORDING TO THE

CURRENT FACILITY SCHEME.

9. PRIMARY PROTECTOR

10. VERTICAL CABLE MANAGEMENT. 6.45" WIDE X 10.26" DEEP, DOUBLE SIDED.

11. RACK-MOUNTED, 5KW, 208V, UPS WITH NEMA 20A, L21-20P INPUT AND L21-20R

OUTPUT.

12. VERTICAL RACK PDU, L21-20 PLUG, 3-PHASE WYE, 20A, 208V INPUT, (24) C13 (6) C19 (6)

5-20R OUTLETS, 208V OUTPUT.

13. 60 A, 208 V, 3-PHASE ZONE PDU BASE UNIT -REAR CIRCUITS WITH SIX NEMA L21-20R

OUTPUT RECEPTACLES AND TWO 10' POWER CORDS TERMINATING IN HARD-WIRED

JUNCTION BOX.

14. SIDE A POWER, REQUIRES A 208V, 60A, THREE-PHASE CIRCUIT TERMINATING IN A

HARD-WIRED JUNCTION BOX.

15. SIDE B POWER, REQUIRES A 208V, 60A, THREE-PHASE CIRCUIT TERMINATING IN A

HARD-WIRED JUNCTION BOX.

16. RACK BONDING BUSBAR (R.B.B.)

17. MIGHTY 20Mo CHANNEL RACK, 23.75" X 30" DEEP, 7' HIGH

17 17 17

1. CONTRACTOR SHALL COORDINATE THE EQUIPMENT'S INSTALLATION AND FINAL

LOCATION WITH THE ELECTRICAL AND MECHANICAL DIVISION. REFER TO

ELECTRICAL, MECHANICAL AND PLUMBING DRAWINGS.

2. CONTRACTOR SHALL INSTALL PATHWAY DIVIDERS, RADIUS DROP, AND ANY OTHER

FITTING FOR A PROPER CABLE RUNWAY INSTALLATION.

3. CONTRACTOR SHALL COORDINATE THE EZ-PATH LOCATIONS WITH THE PATHWAY

SYSTEM LAYOUT OUTSIDE EACH TELECOM ROOM. REFER TO FLOOR PLAN

DRAWINGS.

4. CONTRACTOR SHALL X-RAY CONCRETE FLOOR BEFORE CORE DRILLING.

CONTRACTOR SHALL COORDINATE WITH THE COR BEFORE BEGINNING DRILLING.

5. CONTRACTOR SHALL LABEL EACH CABLE AT 42 INCHES A.F.F. ON EACH FLOOR.

7. GOVERNMENT EQUIPMENT WILL BE RELOCATED BY VA IT PERSONNEL.

CONTRACTOR WILL HAVE TECHNICIANS AVAILABLE TO PROVIDE SUPPORT DURING

OUTAGES AND CUT-OVERS. COORDINATE WORK WITH THE COR.

8. CONTRACTOR SHALL PROVIDE CABLE MANAGEMENT FINGERS, AIR DAMS, BAYING

SEAL KITS, CABLE BRUSHES, AND GROMMETS MANUFACTURED AND COMPATIBLE

WITH CABINETS.

2 GANG BACK BOX WITH SINGLE GANG MUD RING.

2V TERMINATIONS.

(2) CAT6 TO IT ROOM

(1) CAT3 IN 1" C

2 GANG BACK BOX WITH SINGLE GANG MUD RING.

(2) CAT3 TERMINATIONS (TYPICAL).

(1) CAT3

IN 1" C

(1) CAT3

IN 1" C

CABLE TO EQUIPMENT BY OTHERS

CABLE TO EQUIPMENT BY OTHERS

CEILING

CONDUIT TO BE ROUTE 6"

ABOVE CEILING(TYPICAL)

1" CONDUIT. STUB INTO EXISTING

ACCESSIBLE CEILING SPACE.

6" SQUARE JUNCTION BOX MOUNTED

ABOVE ACCESSIBLE CEILING. IN AREAS

WITHOUT ACCESSIBLE CEILING PROVIDE

A PLASTER RING AND STAINLESS STEEL

COVERPLATE. JUNCTION BOX SHALL

BE INSTALLED ON UNSECURED SIDE OF

DOOR.

1" CONDUIT CONCEALED IN WALL

1 CONDUIT STUBBED INTO DOOR FRAME

FOR DOOR POSITION SWITCH.

4" SQUARE JUNCTION BOX WITH SINGLE

GANG PLASTER RING FOR CARD READER.

4" SQUARE JUNCTION BOX WITH SINGLE

GANG PLASTER RING FOR HAND FREE

OPENER.

CENTERLINE SHALL BE AT 42" ABOVE

FINISHED FLOOR ON SECURED SIDE OF

DOOR.

3/4" CONDUIT STUBBED INTO DOOR

FRAME FOR ELECTRONIC STRIKE.

3/4" CONDUIT STUBBED INTO DOOR

FRAME FOR POWER TRANSFER HINGE.

(EACH SIDE).

1 CONDUIT STUBBED INTO DOOR FRAME

FOR DOOR POSITION SWITCH.

DOOR HARDWARE - SINGLE DOOR ROUGH-IN

NO SCALE

DOOR HARDWARE - DOUBLE DOOR ROUGH-IN

NO SCALE

CR

ES

DPS

PS REX

3/4" CONDUIT STUBBED INTO DOOR

FRAME FOR ELECTRONIC STRIKE.

3/4" CONDUIT TO CEILING MOUNT REX UNIT.

3/4" CONDUIT TO DOOR OPENER POWER

SUPPLY. 4" SQUARE JUNCTION BOX WITH

SINGLE GANG PLASTER RING FOR DOOR

OPENER POWER SUPPLY.

CRES

DPS

ES

PSREXPS

DPS

3/4" CONDUIT TO CEILING MOUNT REX UNIT.

3/4" CONDUIT TO REX. 4" SQUARE JUNCTION

BOX WITH SINGLE GANG PLASTER RING FOR

DOOR OPENER POWER SUPPLY.

4" SQUARE JUNCTION BOX WITH SINGLE

GANG PLASTER RING FOR CARD READER.

4" SQUARE JUNCTION BOX WITH SINGLE

GANG PLASTER RING FOR HAND FREE

OPENER.

CENTERLINE SHALL BE AT 42" ABOVE

FINISHED FLOOR ON SECURED SIDE OF

DOOR.

1" CONDUIT. STUB INTO EXISTING

ACCESSIBLE CEILING SPACE.

6" SQUARE JUNCTION BOX MOUNTED

ABOVE ACCESSIBLE CEILING. IN AREAS

WITHOUT ACCESSIBLE CEILING PROVIDE

A PLASTER RING AND STAINLESS STEEL

COVERPLATE. JUNCTION BOX SHALL

BE INSTALLED ON UNSECURED SIDE OF

DOOR.

NOTES:

1. TECH ELECTRONICS IS THE REP FOR DOOR SECURITY.

2. REFER TO MANUFACTURE FOR WIRE REQUIREMENTS.

3. CONNECT TO EXISTING LENNEL ACCESS CONTROL SYSTEM. PROVIDE EXPANSION CARDS AS

REQUIRED.

A

2 3 4 5 6

B

C

D

1 2 3 4 5 6

A

B

C

D

VA FORM 08-6231

o n e e ig h th in c o n e fo o t o n e q u a rt e r i n c e fo o t th re e e ig h th s in c e fo o t o n e h a lf in c e fo o t th re e q u a rt e rs in c e fo o t o n e in c e fo o t o n e a n d o n e h a lf in c h e s e fo o t th re e in c h e s e fo o t

CONSULTANTS: ARCHITECT/ENGINEERS:

Drawing Title

Office of Construction and Facilities ManagementApproved: Project Director

Project Title

Location

Date Checked Drawn

Dwg.

Drawing Number

Building Number

Project Number

600 EAST 7TH STEET

SIOUX FALLS, SOUTH DAKOTA 57103

605.274.2893

6 SOUTH OLD ORCHARD

ST. LOUIS, MISSOURI 63119

800.404.7677

330 N MEAD

WICHITA, KANSAS 67202

316.262.2500

ET500

DATA DETAILS

RELOCATE PHYSICAL

MEDICINE & REHAB. TO THE

4TH FLOOR

800 HOSPITAL DRIVE COLUMBIA, MO 65201

02-15-2023

589A4-22-100

BID DOCUMENTS

TLKGF

NOT TO SCALE

ET SUPPLY PXYSIS DATA

NOT TO SCALE

ACCESS CONTROL DOOR DETIAL

# Revision Date

Date: 02-09-2023 Exp. Date: 12-31-2023

File details come from the government source that posted it. Updated .