Drawings-589A4-22-100-2023-02-15 BID Set-Part6-pages 6.pdf

PDF 5 MB Posted

Attached to
Z2DA-- Relocate Physical Medicine and Rehabilitation to the 4th Floor PN: 589A4-22-100
Solicitation number
36C25523R0072
Issued by

About this file

This set of documents includes construction drawings and specifications for a federal contract to relocate a physical medicine and rehabilitation department to the fourth floor of a hospital. The drawings show demolition, phasing, and new construction plans for plumbing, fire alarm, and other systems on the third and fourth floors. Key details include relocating physical medicine and rehabilitation from the third to fourth floor; demolishing existing plumbing, fire alarm, and other systems on the third floor as shown in plan drawings; installing new systems on the fourth floor as laid out in construction documents; and phasing the work over multiple stages as indicated in phasing plans. The solicitation is issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 15 for contract number 36C25523R0072 with a project number of 589A4-22-100 to relocate the department as specified in the construction drawings and specifications provided.

View the file

Other files

File Type Posted
36C25523R0072 0004.docx DOCX document
AMENDMENT 3 - Drawings.pdf PDF
AMENDMENT 3 - Specifications.pdf PDF
36C25523R0072 0003.docx DOCX document
Prebid-site visit attendee list.pdf PDF
36C25523R0072 0002.docx DOCX document
589A4-22-100 Volume 2 Specifications- 494 pages.pdf PDF
36C25523R0072 0001.docx DOCX document
Drawings-589A4-22-100-2023-02-15 BID Set- Part5-pages 10.pdf PDF
Drawings-589A4-22-100-BID Set -2-15-2023- Part1-7 pages.pdf PDF
Drawings-589A4-22-100-2023-02-15 BID Set -Part4-pages 10.pdf PDF
36C25523R0072.docx DOCX document
Drawings-589A4-22-100-2023-02-15 BID Set - Part12-pages 11.pdf PDF
Drawings-589A4-22-100- 2023-02-15 BID Set-Part2- Pages 6.pdf PDF
Drawings-589A4-22-100-2023-02-15 BID Set- Part13-pages 1.pdf PDF
Drawings-589A4-22-100-2023-02-15 BID Set- Part9-pages 8.pdf PDF
Drawings-589A4-22-100-2023-02-15 BID Set - Part3-pages-12.pdf PDF
Specifications-589A4-22-100-2023-02-15 BID Set - VOL 1- Pages 785.pdf PDF
Drawings-589A4-22-100-2023-02-15 BID Set-Part8-pages 9.pdf PDF
Drawings-589A4-22-100-2023-02-15 BID Set-Part11-pages 9.pdf PDF
Drawings-589A4-22-100-2023-02-15 BID Set-Part10-pages 13.pdf PDF
Drawings-589A4-22-100-2023-02-15 BID set - Part7-pages 9.pdf PDF
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

F E

C

F E

C

FEC

FEC

F E

C

FEC

FEC

S

S

S S S S

S

S

S

S

S

S

F

F

S

S

S D

S D

S D

F R F R

FR

FR

S D

S D

S D

S D

S D

S

DS

D S

D

S D

S D

S D

FOURTH FLOOR KEY PLAN

AREA A

N

B

A

EaFGGaHHbJJbKLLaMNNa H.5Ja F.1 EbMaNb

2.8

3.7

4.5

6.2

5.4

5.7

5.3

4.6

7.1

3.6

4.1

4.7

5.1

6.1

6.3

5.5

3.1

4.4

110Cd

110Cd

110Cd

75Cd

15Cd15Cd

75Cd

30Cd

15Cd

75Cd SEE SHEET FA102

SEE SHEET FA102

75Cd

75Cd

15Cd

1. CONTRACTOR TO COORDINATE WITH OTHER

DISCIPLINE PRIOR TO INSTALLATION. REFER TO

COORDINATION REQUIREMENTS IN SPECS.

FIRE ALARM GENERAL NOTES

A

2 3 4 5 6

B

C

D

1 2 3 4 5 6

A

B

C

D

VA FORM 08-6231

o n e e ig h th in c o n e fo o t o n e q u a rt e r i n c e fo o t th re e e ig h th s in c e fo o t o n e h a lf in c e fo o t th re e q u a rt e rs e fo o t o n e in c e fo o t o n e a n d o n e h a lf in c h e s e fo o t th re e in c h e e fo o t

CONSULTANTS: ARCHITECT/ENGINEERS:

Drawing Title

Office of Construction and Facilities ManagementApproved: Project Director

Project Title

Location

Date Checked Drawn

Dwg.

Drawing Number

Building Number

Project Number

600 EAST 7TH STEET

SIOUX FALLS, SOUTH DAKOTA 57103

605.274.2893

6 SOUTH OLD ORCHARD

ST. LOUIS, MISSOURI 63119

800.404.7677

330 N MEAD

WICHITA, KANSAS 67202

316.262.2500

FA101

FIRE ALARM FLOOR PLAN - 4TH

FLOOR - AREA A

RELOCATE PHYSICAL

MEDICINE & REHAB. TO THE

4TH FLOOR

800 HOSPITAL DRIVE COLUMBIA, MO 65201

02-15-2023

589A4-22-100

BID DOCUMENTS

TLKGF

3/16" = 1'-0"

FIRE ALARM 4TH FLOOR AREA A NEW WORK

# Revision Date JAIME ABSHIER, PE, MO-2020010419

JAIME ABSHIER, PE

MO-2020010419

R

F

F E

C

F E

C

F E

C

F E

C

F E

C

S

S

S S S

S

S

S S

S

S

S

S

S

S

S

S

S

S S

S

S

S

S S

S

S

S

S

F

F

R N

P S

S

FM

F R F R

FR

FR

F R

FR

S D

S D

S D

S D

S D

S D

S

DS

D

S D

S D

S D

S D

S D

FOURTH FLOOR KEY PLAN

AREA B

N

B

A

EaFGGaHHbJJbKLLaMNNa H.5Ja F.1 EbMaNb

7.3

8.2

9.1

10.4

6.2

10.2

9.8

8.9

8.3

7.2

7.1

6.1

6.3

8.0

7.5

OT TRAIN. RM.

PT GYM

PT GYM

PT/OT SWAMP

REHAB. COOR.

STAFF TLT.

TELE HEALTH

PSA

OT SUPER.

AO

CHIEF PM&R EXAM

CORR.

C43

PT/OT SWAMP

WAIT.

CORR.

C42

WC STOR./SHOP

ELEV. LOBBY

PROST. STOCK RM.

PELVIC

PELVIC

PT TLT.

ACUPUNCTURE

ACUPUNCTURE

PT/OT EXAM

PT/OT EXAM

OT TLT.

440A

CORR.

C44

PT/OT STOR.

PT/OT EXAM BARIATRIC

75Cd

15Cd

75Cd

75Cd

75Cd

75Cd

75Cd

75Cd

75Cd

75Cd

75Cd

75Cd75Cd

75Cd

75Cd

110Cd

SEE SHEETFA101

SEE SHEETFA101

110Cd

110Cd

75Cd

75Cd

75Cd

1. PROVIDE MONITORING MODULE FOR HOOD ANSUL

SYSTEM.

2. PROVIDE FIRE ALARM CONTROL MODULE TO RELEASE

ELECTRONIC LOCK DOORS. PROVIDE CONTROL WIRE IN

3/4" CONDUIT FROM FIRE ALARM DEVICE TO DOOR

LOCKING RELEASE.

SHEET KEYNOTES#

1. CONTRACTOR TO COORDINATE WITH OTHER

DISCIPLINE PRIOR TO INSTALLATION. REFER TO

COORDINATION REQUIREMENTS IN SPECS.

FIRE ALARM GENERAL NOTES

A

2 3 4 5 6

B

C

D

1 2 3 4 5 6

A

B

C

D

VA FORM 08-6231

o n e e ig e fo o t o n e q u a rt e r i n c e fo o t th re e e ig h th s in c e fo o t o n e h a lf in c e fo o t th re e q u a rt e fo o t o n e in c e fo o t o n e a n d o n e h a lf in c h e e fo o t th re e in c h e e fo o t

CONSULTANTS: ARCHITECT/ENGINEERS:

Drawing Title

Office of Construction and Facilities ManagementApproved: Project Director

Project Title

Location

Date Checked Drawn

Dwg.

Drawing Number

Building Number

Project Number

600 EAST 7TH STEET

SIOUX FALLS, SOUTH DAKOTA 57103

605.274.2893

6 SOUTH OLD ORCHARD

ST. LOUIS, MISSOURI 63119

800.404.7677

330 N MEAD

WICHITA, KANSAS 67202

316.262.2500

FA102

FIRE ALARM FLOOR PLAN - 4TH

FLOOR - AREA B

RELOCATE PHYSICAL

MEDICINE & REHAB. TO THE

4TH FLOOR

800 HOSPITAL DRIVE COLUMBIA, MO 65201

02-15-2023

589A4-22-100

BID DOCUMENTS

TLKGF

3/16" = 1'-0"

FIRE ALARM 4TH FLOOR AREA B NEW WORK

# Revision Date JAIME ABSHIER, PE, MO-2020010419

JAIME ABSHIER, PE

MO-2020010419

COMMON PIPING SYMBOLS &

ABBREVIATIONS

NOT ALL SYMBOLS ARE USED FOR THIS PROJECT

DIRECTION OF FLOW

BRANCH CONNECTION, BOTTOM

BRANCH CONNECTION, TOP

ELBOW, TURNED DOWN

ELBOW TURNED UP

SHUTOFF VALVE

CHECK VALVE

PRESSURE REDUCING VALVE

PRESSURE GAUGE

UNION

PIPING CAP

RISER DESIGNATION

ABOVE FINISH FLOOR

AUTHORITIES HAVING JURISDICTION

ACCESS PANEL

BOTTOM OF PIPE

DIAMETER

DOWN

EXISTING

FINISHED FLOOR ELEVATION

GALLONS PER HOUR

GALLONS PER MINUTE

HORSEPOWER

INVERT ELEVATION

NORMALLY CLOSED

NOT TO SCALE

POUNDS PER SQUARE INCH

REVOLUTIONS PER MINUTE

ROUGH-IN

SHUTOFF VALVE

TOTAL DYNAMIC HEAD

VERIFY IN FIELD

AFF

AHJ

AP

BOP

DIA

DN

EX OR EXIST

FFE

GPH

GPM

HP

IE OR INV. ELEV

NC

NTS

PSI

RPM

RI

SOV

TDH

VIF

X

PLUMBING SYMBOLS & ABBREVIATIONS

NOT ALL SYMBOLS ARE USED FOR THIS PROJECT

TRAPPED CONNECTION

STRAINER

BALANCING VALVE

CLEANOUT (CO)

OS & Y GATE VALVE

TEMPERATURE GAUGE

THERMOSTATIC MIXING VALVE

REDUCED PRESSURE BACKFLOW PREVENTER

HOSE BIBB/WALL HYDRANT

ACID VENT PIPING

ACID WASTE PIPING

DOMESTIC COLD WATER PIPING (CW)

DOMESTIC HOT WATER PIPING (HW)

DOMESTIC HOT WATER RETURN PIPING (HWR)

DRAIN PIPING

DEIONIZED WATER PIPING

GREASE VENT PIPING

GREASE WASTE PIPING

NATURAL GAS PIPING

NON-POTABLE WATER PIPING

OVERFLOW STORM PIPING

OIL WASTE PIPING

PUMP DISCHARGE PIPING

REVERSE OSMOSIS PIPING (RO)

SANITARY PIPING

SOFTENED COLD WATER PIPING

SOFTENED HOT WATER PIPING

SUBSOIL DRAINAGE PIPING

STORM PIPING

TEMPERED WATER PIPING

VENT PIPING

WASTE PIPING

FLEXIBLE CONNECTION

FLOOR DRAIN/FLOOR SINK (FD/FS)

CIRCULATION PUMP

AV

AW

D

DI

RO

NP

PD

SSD

ST

OST

TW

S

GW

GV

OW

W

SCW

SHW

G

PROCESS PIPING SYMBOLS &

ABBREVIATIONS

NOT ALL SYMBOLS ARE USED FOR THIS PROJECT

ARGON PIPING

CARBON DIOXIDE PIPING

COMPRESSED AIR PIPING (NON-MEDICAL)

COMPRESSED AIR INTAKE PIPING (NON-MEDICAL)

DENTAL AIR PIPING

DENTAIL AIR INTAKE PIPING

DENTAL VACUUM PIPING

DENTAL VACUUM EXHAUST PIPING

DENTAL SURGICAL VACUUM PIPING

DENTAL SURGICAL VACUUM EXHAUST PIPING

LAB COLD WATER

LAB HOT WATER

LAB GAS PIPING

LAB VACUUM PIPING

MEDICAL AIR PIPING

MEDICAL AIR INTAKE PIPING

MEDICAL VACUUM PIPING

MEDICAL VACUUM EXHAUST PIPING

NITROGEN PIPING

NITROUS OXIDE PIPING

OXYGEN PIPING

WASTE ANESTHETIC GAS DISPOSAL PIPING

EXISTING GAS OUTLET

NEW GAS OUTLET

EXISTING ZONE VALVE DESIGNATION

NEW ZONE VALVE DESIGNATION

EXISTING AREA ALARM DESIGNATION

NEW AREA ALARM DESIGNATION

EXISTING MEDICAL GAS MASTER ALARM DESIGNATION

NEW MEDICAL GAS MASTER ALARM DESIGNATION

AREA ALARM

EMERGENCY SHUT-OFF VALVE

ZONE VALVE

AR

CA

CAI

CO2

DA

DAI

DV

DVE

LG

LV

MA

MAI

MV

MVE

WAGD

OX

N2

N2O

LHW

LCW

AA

ESOV

ZV

DSV

DSVE

GENERAL NOTES

1. DUE TO THE LIMITED SPACE AVAILABLE FOR THE INSTALLATION OF

ALL THE PLUMBING WORK, COORDINATION BETWEEN ALL OTHER

TRADES IS OF UTMOST IMPORTANCE.

2. THIS CONTRACTOR SHALL VISIT THE PROJECT SITE AND VERIFY

LOCATIONS, ELEVATIONS AND SIZES OF ALL UTILITIES AT SITE PRIOR

TO PROCEEDING WITH WORK. EXISTING SYSTEMS AND STRUCTURE

SHALL BE INVESTIGATED FOR BEST POSSIBLE ROUTING OF COLD

WATER, HOT WATER, SANITARY WASTE AND VENT, STORM AND

MEDICAL LABORATORY GAS PIPING.

3. THESE PLANS ARE DIAGRAMMATIC IN NATURE SINCE THE ONLY

AVAILABLE INFORMATION HAS BEEN OBTAINED FROM EXISTING

PLANS, SPECIFICATIONS, AND FIELD SURVEYS. THE EXACT

LOCATION OF PIPING, FIXTURES AND EQUIPMENT MAY DEVIATE

FROM THE LOCATION INDICATED ON THESE DRAWINGS. EXTREME

ACCURACY IS NOT GUARANTEED. THIS CONTRACTOR SHALL BE

PREPARE TO MAKE ALTERATIONS TO NEW AND/OR EXISTING

SERVICES TO FIT JOB CONDITIONS. THIS CONTRACTOR SHALL

FURNISH A COMPLETE CODE COMPLYING SYSTEM. THIS

CONTRACTOR SHALL REPORT, IN WRITING, ANY DISCREPANCIES

WHICH PREVENT THE INSTALLATION OF WORK AS SHOWN.

4. IF THIS CONTRACTOR DOES NOT CLEARLY UNDERSTAND THESE

PLANS OR IS NOT COMPLETELY SURE OF THEIR MEANING, THIS

CONTRACTOR SHOULD OBTAIN THE ENGINEER'S WRITTEN

EXPLANATION AND/OR INTERPRETATION PRIOR TO SUBMITTING

BIDS, SINCE THIS CONTRACTOR WILL BE HELD RIGIDLY TO THE

INTERPRETATION OF THE ENGINEER.

5. IT IS THE RESPONSIBILITY OF THIS CONTRACTOR TO REPAIR THE

EXISTING SURFACES TO REMAIN WHERE THEIR WORK HAS BEEN

COMPLETED. REPAIR SHALL INCLUDE, BUT NOT LIMITED TO, ANY

EXISTING WALL, CEILING OR FLOOR THAT IS SCHEDULED TO REMAIN.

REPAIR, PAINTING, AND PATCHING SHALL BE COMPLETED BY AN

APPROPRIATE CONTRACTOR QUALIFIED FOR THIS TYPE OF WORK.

6. THE OWNER SHALL MAINTAIN ALL SALVAGE RIGHTS OF FIXTURES,

EQUIPMENT AND MATERIALS REMOVED, HOWEVER, ALL FIXTURES,

EQUIPMENT AND MATERIALS NOT CLAIMED BY THE OWNER SHALL

BE REMOVED FROM THE PREMISES AND PROPERLY DISPOSED OF

THE BY THE DEMOLITION CONTRACTOR.

7. CEILING REMOVAL, STORAGE AND REPLACEMENT FOR NEW PIPING

INSTALLATION SHALL BE BY THE GENERAL CONTRACTOR.

8. IF HAZARDOUS MATERIALS ARE ENCOUNTERED DURING

DEMOLITION OPERATIONS, THE CONTRACTOR WILL NOTIFY

BUILDING OWNER OF THE HAZARDOUS MATERIAL.

9. TEMPORARY CONNECTION SHALL BE PROVIDED BY RESPECTIVE

PLUMBING AND FIRE PROTECTION CONTRACTORS WHEN EXTENDED

INTERRUPTIONS OF SERVICES AND UTILITIES SUCH AS WATER,

WASTE AND FIRE PROTECTION WHICH SERVE OTHER AREAS ARE

NECESSARY.

10. COORDINATE WITH MAINTENANCE PERSONNEL AS TO SOURCE OF

UTILITIES AND TEMPORARILY DISCONNECT OR SHUT OFF SERVICES

OR UTILITIES AT NEAREST MAIN. TEMPORARY AND ACCESSIBLE

ISOLATION VALVES SHALL BE INSTALLED CLOSE TO THIS POINT OF

WORK.

11. IT IS ESSENTIAL THAT BUILDING OPERATIONS CONTINUE WITH

MINIMAL INTERRUPTIONS. IT IS NECESSARY THAT OPERATION OF

EXISTING SYSTEMS BE INTERFACED WITH AS LITTLE DISRUPTION AS

POSSIBLE EXCEPT IN AREAS VACATED FOR CONSTRUCTION WORK.

WORK WHICH WILL INTERFERE WITH OPERATION OF EXISTING FIRE

SUPPRESSION AND PLUMBING SYSTEMS OR WHICH REQUIRE

DOWNTIME WILL BE SCHEDULED ONLY AFTER CONSULTATION WITH

AND PERMISSION GIVEN BY THE OWNER. ALLOW 10 DAYS PRIOR TO

ANTICIPATED INTERRUPTION OF SYSTEMS. WORK MAY BE REQUIRED

TO BE PERFORMED OUTSIDE NORMAL WORKING HOURS.

12. ARCHITECTURAL DEMOLITION DRAWINGS AND SPECIFICATIONS

SHALL BE READ IN CONJUNCTION WITH THESE DRAWINGS.

13. ALL PIPING HANGERS AND SUPPORTS SHALL BE REMOVED ALONG

WITH PIPING BEING REMOVED.

14. THE CONTRACTOR SHALL COORDINATE DEMOLITION WORK WITH

PROJECT'S PHASING SCHEDULE PRIOR TO COMMENCEMENT OF ANY

WORK.

15. WHEN PLACING NEW PLUMBING FIXTURES, CONTRACTOR SHALL

VERIFY LOCATIONS OF PLUMBING VENTS. OFFSET VENTS THAT

TERMINATE WITHIN 25 FEET OF HVAC UNITS OUTDOOR AIR INTAKES.

CONTRACTOR SHALL FIELD VERIFY PRIOR TO BID WHERE THE

INTERFERENCE'S ARE PRICE ACCORDINGLY OR MAKE ALLOWANCES

IN BID.

16. USE CAUTION WHEN SAW-CUTTING THROUGH EXISTING CONCRETE

FLOOR OR WALL CONSTRUCTION FOR THE INSTALLATION OF

PLUMBING SYSTEMS TO AVOID CUTTING REBAR AT EDGE OF

OPENING. LEAVE SUFFICIENT REBAR EXPOSED TO TIE NEW

REINFORCING REPLACEMENT CONCRETE AND/OR OTHER

STRUCTURAL ATTACHMENTS FOR NEW CONSTRUCTION.

17. CONTRACTOR SHALL BE RESPONSIBLE FOR ANY REVISIONS,

TRANSITIONS, OFFSETS, ETC., TO AVOID DUCTWORK, PIPING,

EQUIPMENT OR STRUCTURE NEW OR EXISTING AND TO MAKE A

COMPLETE AND FUNCTIONING SYSTEM.

PLUMBING ABBREVIATIONS

NOT ALL SYMBOLS ARE USED FOR THIS PROJECT

ADA AMERICANS WITH DISABILITIES ACT

A.F.F. ABOVE FINISH FLOOR

AP ACCESS PANEL

BP BOOSTER PUMP

BT BATHTUB

BTC BRANCH TO CONNECTION

CBV CALIBRATED BALANCING VALVE

CI CAST IRON

CO CLEANOUT

CSS CLINICAL SERVICE SINK

CW COLD WATER

DCVA DOUBLE CHECK VALVE ASSEMBLY

DF DRINKING FOUNTAIN

DI DEINOIZED WATER

DS DOWNSPOUT

DW DISHWASHER

DWH DOMESTIC WATER HEATER

EEW EMERGENCY EYE WASH

ESEW EMERGENCY SHOWER & EYE WASH

ESH EMERGENCY SHOWER

ET EXPANSION TANK

EWC ELECTRIC WATER COOLER

FCO FLOOR CLEANOUT

FD FLOOR DRAIN

F.F. FINISH FLOOR ELEVATION

FS FLOOR SINK

G NATURAL GAS

GCO GRADE CLEANOUT

GD GARBAGE DISPOSAL

HB HOSE BIBB

HW HOT WATER

HWR HOT WATER RETURN

HWRP HOT WATER RETURN PUMP

HWST HOT WATER STORAGE TANK

I.E. INVERT ELEVATION

IM ICE MAKER

IW INDIRECT WASTE

LA LAVATORY

MB MOP BASIN

NIC NOT IN CONTRACT

NP NON-POTABLE

OB OUTLET BOX

ORD OVERFLOW ROOF DRAIN

PG PRESSURE GAUGE

PRV PRESURE REDUCING VALVE

RD ROOF DRAIN

RH ROOF HYDRANT

RO REVERSE OSMOSIS

RPZ REDUCED PRESSURE BACKFLOW PREVENTER

S SANITARY

SCW SOFTENED COLD WATER

SH SHOWER

SHW SOFTENED HOT WATER

SK SINK

SOV SHUT OFF VALVE

SP SUMP PUMP

S/S STAINLESS STEEL

SS SANITARY STACK

SSD SUBSOIL DRAINAGE

SSK SHOP SINK

TD TRENCH DRAIN

TMV THERMOSTATIC MIXING VALVE

TP TRAP PRIMER

TW TREATED WATER

UR URINAL

V VENT

VIV VALVE IN VERTICAL

VB VACUUM BREAKER

VS VENT STACK

VTR VENT THRU ROOF

W WASTE

WC WATER CLOSET

WCO WALL CLEANOUT

WD WASHER DRAIN

WH WALL HYDRANT

WHA WATER HAMMER ARRESTOR

WM WATER METER

WS WASTE STACK

WSV WASTE STACK VENT

YCO YARD CLEANOUT

YH YARD HYDRANT

PLAN MARK

EQUIPMENT NUMBER

SHEET NUMBER

LINE TYPE LEGEND

DRAWING REFERENCES

NEW WORK BY THIS CONTRACTOR

(DARK, SOLID LINE)

EXISTING TO REMAIN OR NEW WORK BY OTHERS

(LIGHT, SOLID LINE)

EXISTING TO BE REMOVED BY THIS CONTRACTOR

(DARK, DASHED LINE, DEMOLITION PLANS)

NEW WORK BY THIS CONTRACTOR TO BE

INSTALLED UNDERGROUND, OR BELOW FLOOR

(DARK, LONG DASHED LINE)

NORTH ARROW

PLAN DETAIL REFERENCE TITLE

KEYED NOTE DESIGNATION

PLAN MARK

EQUIPMENT NUMBER

EQUIPMENT DESIGNATION REFER TO MEP

SCHEDULE FOR CIRCUITING AND DEVICE

REQUIREMENTS AND FLOOR PLANS FOR

LOCATIONS

ENLARGED PLAN REFERENCE

PLAN MARK

SHEET NUMBER

A101

SIM

AHU

TITLE

SCALE

PLAN

NORTH

TRUE

NORTH

INTERFACE, EXISTING TO NEW

EXTENT OF DEMOLITION

SECTION

MATCHLINE

1 REVISION TAG

AD888

A

2 3 4 5 6

B

C

D

1 2 3 4 5 6

A

B

C

D

VA FORM 08-6231

o n e e ig e fo o t o n e q u a rt e r i n c e fo o t th re e e ig h th s in c e fo o t o n e h a lf in c e fo o t th re e q u a rt e fo o t o n e in c e fo o t o n e a n d o n e h a lf in c h e e fo o t th re e in c h e e fo o t

CONSULTANTS: ARCHITECT/ENGINEERS:

Drawing Title

Office of Construction and Facilities ManagementApproved: Project Director

Project Title

Location

Date Checked Drawn

Dwg.

Drawing Number

Building Number

Project Number

600 EAST 7TH STEET

SIOUX FALLS, SOUTH DAKOTA 57103

605.274.2893

6 SOUTH OLD ORCHARD

ST. LOUIS, MISSOURI 63119

800.404.7677

330 N MEAD

WICHITA, KANSAS 67202

316.262.2500

JOHN ERNEST SOMMERS, PE

#2015028399

NOT FOR

CONSTRUCTION P-000

PLUMBING SYMBOLS AND

ABBREVIATIONS

RELOCATE PHYSICAL

MEDICINE & REHAB. TO THE

4TH FLOOR

800 HOSPITAL DRIVE COLUMBIA, MO 65201

02-15-2023

589A4-22-100

BID DOCUMENTS

MASAJH

# Revision Date

JOHN ERNEST SOMMERS, PE

#2015028399

N

02/13/2023

FEC

FEC

FEC

F E

C

FEC

FEC

FEC

FE

F E

FEC

FEC

FE

F E

FEC

FEC

FEC

FEC

F E

C

FEC

FEC

EaFGGaHHbJJbKLLaMNNa H.5Ja F.1 EbMaNb

2.8

3.7

7.3

8.2

9.1

4.5

6.2

5.4

6.7

5.7

5.3

4.6

9.8

8.9

8.3

7.2

7.1

3.6

4.1

4.7

5.1

6.1

6.3

8.0

5.5

7.5

3.1

4.4

NOT IN PROJECT SCOPE

EaFGGaHHbJJbKLLaMNNa H.5Ja F.1 EbMaNb

2.8

3.7

7.3

8.2

9.1

4.5

6.2

5.4

6.7

5.7

5.3

4.6

9.8

8.9

8.3

7.2

7.1

3.6

4.1

4.7

5.1

6.1

6.3

8.0

5.5

7.5

3.1

4.4

NOT IN PROJECT SCOPE

EaFGGaHHbJJbKLLaMNNa H.5Ja F.1 EbMaNb

2.8

3.7

7.3

8.2

9.1

4.5

6.2

5.4

6.7

5.7

5.3

4.6

9.8

8.9

8.3

7.2

7.1

3.6

4.1

4.7

5.1

6.1

6.3

8.0

5.5

7.5

3.1

4.4

NOT IN PROJECT SCOPE

EaFGGaHHbJJbKLLaMNNa H.5Ja F.1 EbMaNb

2.8

3.7

7.3

8.2

9.1

4.5

6.2

5.4

6.7

5.7

5.3

4.6

9.8

8.9

8.3

7.2

7.1

3.6

4.1

4.7

5.1

6.1

6.3

8.0

5.5

7.5

3.1

4.4

NOT IN PROJECT SCOPE

FOURTH FLOOR KEY PLAN

N

A

2 3 4 5 6

B

C

D

1 2 3 4 5 6

A

B

C

D

VA FORM 08-6231

o n e e ig e fo o t o n e q u a rt e r i n c e fo o t th re e e ig h th s in c e fo o t o n e h a lf in c e fo o t th re e q u a rt e fo o t o n e in c e fo o t o n e a n d o n e h a lf in c h e e fo o t th re e in c h e e fo o t

CONSULTANTS: ARCHITECT/ENGINEERS:

Drawing Title

Office of Construction and Facilities ManagementApproved: Project Director

Project Title

Location

Date Checked Drawn

Dwg.

Drawing Number

Building Number

Project Number

600 EAST 7TH STEET

SIOUX FALLS, SOUTH DAKOTA 57103

605.274.2893

6 SOUTH OLD ORCHARD

ST. LOUIS, MISSOURI 63119

800.404.7677

330 N MEAD

WICHITA, KANSAS 67202

316.262.2500

JOHN ERNEST SOMMERS, PE

#2015028399

PD100

PLUMBING PHASING PLAN - 4TH

FLOOR

RELOCATE PHYSICAL

MEDICINE & REHAB. TO THE

4TH FLOOR

800 HOSPITAL DRIVE COLUMBIA, MO 65201

02-15-2023

589A4-22-100

BID DOCUMENTS

MASAJH

1/16" = 1'-0"

PLUMBING PHASING PLAN - 4TH FLOOR - PHASE 3

1/16" = 1'-0"

PLUMBING PHASINH PLAN - 4TH FLOOR - PHASE 1

1/16" = 1'-0"

PLUMBING PHASING PLAN - 4TH FLOOR - PHASE 2

1/16" = 1'-0"

PLUMBING PHASING PLAN - 4TH FLOOR - PHASE 4

1. REFER TO ARCHITECTURAL PHASING PLAN FOR

ADDITIONAL INFORMATION.

GENERAL NOTES

# Revision Date

02/13/2023

1 2

3 4

F

C

F E

C

FEC

EaFGGaHJJbKLLaMNNa H.5Ja F.1 EbMaNb

2.8

3.7

7.3

8.2

9.1

6.2

5.4

6.7

5.7

5.3

4.6

9.8

8.9

8.3

7.2

7.1

3.6

4.1

4.7

5.1

6.1

6.3

8.0

5.5

7.5

3.1

4.4

MECH CHASE

AREA B

AREA A

AREA B

AREA A

THIRD FLOOR KEY PLAN

AREA A

N

B

A

A

2 3 4 5 6

B

C

D

1 2 3 4 5 6

A

B

C

D

VA FORM 08-6231

o n e e ig e fo o t o n e q u a rt e r i n c e fo o t th re e e ig h th s in c e fo o t o n e h a lf in c e fo o t th re e q u a rt e fo o t o n e in c e fo o t o n e a n d o n e h a lf in c h e e fo o t th re e in c h e e fo o t

CONSULTANTS: ARCHITECT/ENGINEERS:

Drawing Title

Office of Construction and Facilities ManagementApproved: Project Director

Project Title

Location

Date Checked Drawn

Dwg.

Drawing Number

Building Number

Project Number

600 EAST 7TH STEET

SIOUX FALLS, SOUTH DAKOTA 57103

605.274.2893

6 SOUTH OLD ORCHARD

ST. LOUIS, MISSOURI 63119

800.404.7677

330 N MEAD

WICHITA, KANSAS 67202

316.262.2500

JOHN ERNEST SOMMERS, PE

#2015028399

NOT FOR

CONSTRUCTION PD101

PLUMBING DEMOLITION PLAN - 3RD

FLOOR - OVERALL

RELOCATE PHYSICAL

MEDICINE & REHAB. TO THE

4TH FLOOR

800 HOSPITAL DRIVE COLUMBIA, MO 65201

02-15-2023

589A4-22-100

BID DOCUMENTS

MASAJH

1. OVERALL PLAN SHOWN FOR REFERENCE ONLY. SEE

PLAN AREAS A AND B FOR MORE INFORMATION.

GENERAL NOTES

1/8" = 1'-0"

PLUMBING DEMOLITION PLAN - 3RD FLOOR - OVERALL

# Revision Date

JOHN ERNEST SOMMERS, PE

#2015028399

JT

JT

JT

JT

JT

JT F

E

C

FEC

JT

JT

JT

JT

JT

JT

JT

JT

JT

EaFGGaHJJbKLLaMNNa H.5Ja F.1 EbMaNb

2.8

3.7

6.2

5.4

6.7

5.7

5.3

4.6

3.6

4.1

4.7

5.1

6.1

6.3

5.5

3.1

4.4

1 EX 4"S-UP&DN

EX 2"W-UP

EX 1/2"CW-UP

EX 1/2"HWR-UP

EX 1/2"HW-UP

EX 4"S-UP

EX 1 1/2"CW-UP

EX 2"W-UP

EX 1/2"HW-UP

EX 1/2"HWR-UP

EX 1/2"CW-UP

EX 4"S

EX 3"V-UP

EX CW-UP

EX HW-UP

EX HWR-UP

NOT IN PROJECT SCOPE

EX 3"V-UP

EX 4"S-UP&DN

EX 1"CW-UP

EX 1"HW-UP

EX 1 1/2"HW-UP

EX 1 1/2"CW-UP

EX 4"

EX CW-UP

EX W-UP

EX CW-UP

EX HW-UP

EX HWR-UP

EX 4"S-UP

EX 2"W-UP

EX HW-UP

EX CW-UP

EX HWR-UP

EX 2"W-UP

EX 3"

EX 3"

EX 3"

EX 1/2" HWR-UP

EX 1/2"HW-UP

EX 2"W-UP

EX 1/2"CW-UP

EX 1/2"HW-UP

EX 2"W-UP

EX 1/2"CW-UP

EX 1 1/2"CW-UP

EX 4"S-UP

EX 2"

EX 2"

EX 1/2"HW-UP

EX 1/2"HWR-UP

EX 2"W-UP

EX 1/2"CW-UP

EX 1 1/2"CW-UP

EX 4"S-UP

EX 4"

EX 1/2"HW-UP

EX 1/2"HWR-UP

EX 2"W-UP

EX 1/2"CW-UP

EX 4"S-UP

EX HWR-UP

EX HW-UP

EX CW-UP

EX ST

EX 1 1/2"CW-UP 1

EX ST-UP&DN

EX 3"V-UP

EX 2"W-UP

EX 4"

AREA B

AREA A

AREA B

AREA A

EX 4"

THIRD FLOOR KEY PLAN

AREA A

N

B

A

A

2 3 4 5 6

B

C

D

1 2 3 4 5 6

A

B

C

D

VA FORM 08-6231

o n e e ig e fo o t o n e q u a rt e r i n c e fo o t th re e e ig h th s in c e fo o t o n e h a lf in c e fo o t th re e q u a rt e fo o t o n e in c e fo o t o n e a n d o n e h a lf in c h e e fo o t th re e in c h e e fo o t

CONSULTANTS: ARCHITECT/ENGINEERS:

Drawing Title

Office of Construction and Facilities ManagementApproved: Project Director

Project Title

Location

Date Checked Drawn

Dwg.

Drawing Number

Building Number

Project Number

600 EAST 7TH STEET

SIOUX FALLS, SOUTH DAKOTA 57103

605.274.2893

6 SOUTH OLD ORCHARD

ST. LOUIS, MISSOURI 63119

800.404.7677

330 N MEAD

WICHITA, KANSAS 67202

316.262.2500

JOHN ERNEST SOMMERS, PE

#2015028399

NOT FOR

CONSTRUCTION PD102

PLUMBING DEMOLITION PLAN - 3RD

FLOOR - AREA A

RELOCATE PHYSICAL

MEDICINE & REHAB. TO THE

4TH FLOOR

800 HOSPITAL DRIVE COLUMBIA, MO 65201

02-15-2023

589A4-22-100

BID DOCUMENTS

MASAJH

3/16" = 1'-0"

PLUMBING DEMOLITION PLAN - 3RD FLOOR - AREA A

1. REMOVE EXISTING DOMESTIC WATER / WASTE BACK

TO NEAREST ACTIVE MAIN IN THIRD FLOOR CEILING

AND CAP.

2. THE OUTLINED AREA WAS UNDER CONSTRUCTION

DURING INITIAL SITE INVESTIGATIONS, THEREFORE

EXACT EXISTING CONDITIONS WILL NEED FIELD

VERIFICATION PRIOR TO THE START OF

CONSTRUCTION.

SHEET KEYNOTES#

# Revision Date

JOHN ERNEST SOMMERS, PE

#2015028399

File details come from the government source that posted it. Updated .