Drawings-589A4-22-100-2023-02-15 BID Set-Part6-pages 6.pdf
PDF 5 MB Posted
- Solicitation number
- 36C25523R0072
About this file
This set of documents includes construction drawings and specifications for a federal contract to relocate a physical medicine and rehabilitation department to the fourth floor of a hospital. The drawings show demolition, phasing, and new construction plans for plumbing, fire alarm, and other systems on the third and fourth floors. Key details include relocating physical medicine and rehabilitation from the third to fourth floor; demolishing existing plumbing, fire alarm, and other systems on the third floor as shown in plan drawings; installing new systems on the fourth floor as laid out in construction documents; and phasing the work over multiple stages as indicated in phasing plans. The solicitation is issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 15 for contract number 36C25523R0072 with a project number of 589A4-22-100 to relocate the department as specified in the construction drawings and specifications provided.
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
F E
C
F E
C
FEC
FEC
F E
C
FEC
FEC
S
S
S S S S
S
S
S
S
S
S
F
F
S
S
S D
S D
S D
F R F R
FR
FR
S D
S D
S D
S D
S D
S
DS
D S
D
S D
S D
S D
FOURTH FLOOR KEY PLAN
AREA A
N
B
A
EaFGGaHHbJJbKLLaMNNa H.5Ja F.1 EbMaNb
2.8
3.7
4.5
6.2
5.4
5.7
5.3
4.6
7.1
3.6
4.1
4.7
5.1
6.1
6.3
5.5
3.1
4.4
110Cd
110Cd
110Cd
75Cd
15Cd15Cd
75Cd
30Cd
15Cd
75Cd SEE SHEET FA102
SEE SHEET FA102
75Cd
75Cd
15Cd
1. CONTRACTOR TO COORDINATE WITH OTHER
DISCIPLINE PRIOR TO INSTALLATION. REFER TO
COORDINATION REQUIREMENTS IN SPECS.
FIRE ALARM GENERAL NOTES
A
2 3 4 5 6
B
C
D
1 2 3 4 5 6
A
B
C
D
VA FORM 08-6231
o n e e ig h th in c o n e fo o t o n e q u a rt e r i n c e fo o t th re e e ig h th s in c e fo o t o n e h a lf in c e fo o t th re e q u a rt e rs e fo o t o n e in c e fo o t o n e a n d o n e h a lf in c h e s e fo o t th re e in c h e e fo o t
CONSULTANTS: ARCHITECT/ENGINEERS:
Drawing Title
Office of Construction and Facilities ManagementApproved: Project Director
Project Title
Location
Date Checked Drawn
Dwg.
Drawing Number
Building Number
Project Number
600 EAST 7TH STEET
SIOUX FALLS, SOUTH DAKOTA 57103
605.274.2893
6 SOUTH OLD ORCHARD
ST. LOUIS, MISSOURI 63119
800.404.7677
330 N MEAD
WICHITA, KANSAS 67202
316.262.2500
FA101
FIRE ALARM FLOOR PLAN - 4TH
FLOOR - AREA A
RELOCATE PHYSICAL
MEDICINE & REHAB. TO THE
4TH FLOOR
800 HOSPITAL DRIVE COLUMBIA, MO 65201
02-15-2023
589A4-22-100
BID DOCUMENTS
TLKGF
3/16" = 1'-0"
FIRE ALARM 4TH FLOOR AREA A NEW WORK
# Revision Date JAIME ABSHIER, PE, MO-2020010419
JAIME ABSHIER, PE
MO-2020010419
R
F
F E
C
F E
C
F E
C
F E
C
F E
C
S
S
S S S
S
S
S S
S
S
S
S
S
S
S
S
S
S S
S
S
S
S S
S
S
S
S
F
F
R N
P S
S
FM
F R F R
FR
FR
F R
FR
S D
S D
S D
S D
S D
S D
S
DS
D
S D
S D
S D
S D
S D
FOURTH FLOOR KEY PLAN
AREA B
N
B
A
EaFGGaHHbJJbKLLaMNNa H.5Ja F.1 EbMaNb
7.3
8.2
9.1
10.4
6.2
10.2
9.8
8.9
8.3
7.2
7.1
6.1
6.3
8.0
7.5
OT TRAIN. RM.
PT GYM
PT GYM
PT/OT SWAMP
REHAB. COOR.
STAFF TLT.
TELE HEALTH
PSA
OT SUPER.
AO
CHIEF PM&R EXAM
CORR.
C43
PT/OT SWAMP
WAIT.
CORR.
C42
WC STOR./SHOP
ELEV. LOBBY
PROST. STOCK RM.
PELVIC
PELVIC
PT TLT.
ACUPUNCTURE
ACUPUNCTURE
PT/OT EXAM
PT/OT EXAM
OT TLT.
440A
CORR.
C44
PT/OT STOR.
PT/OT EXAM BARIATRIC
75Cd
15Cd
75Cd
75Cd
75Cd
75Cd
75Cd
75Cd
75Cd
75Cd
75Cd
75Cd75Cd
75Cd
75Cd
110Cd
SEE SHEETFA101
SEE SHEETFA101
110Cd
110Cd
75Cd
75Cd
75Cd
1. PROVIDE MONITORING MODULE FOR HOOD ANSUL
SYSTEM.
2. PROVIDE FIRE ALARM CONTROL MODULE TO RELEASE
ELECTRONIC LOCK DOORS. PROVIDE CONTROL WIRE IN
3/4" CONDUIT FROM FIRE ALARM DEVICE TO DOOR
LOCKING RELEASE.
SHEET KEYNOTES#
1. CONTRACTOR TO COORDINATE WITH OTHER
DISCIPLINE PRIOR TO INSTALLATION. REFER TO
COORDINATION REQUIREMENTS IN SPECS.
FIRE ALARM GENERAL NOTES
A
2 3 4 5 6
B
C
D
1 2 3 4 5 6
A
B
C
D
VA FORM 08-6231
o n e e ig e fo o t o n e q u a rt e r i n c e fo o t th re e e ig h th s in c e fo o t o n e h a lf in c e fo o t th re e q u a rt e fo o t o n e in c e fo o t o n e a n d o n e h a lf in c h e e fo o t th re e in c h e e fo o t
CONSULTANTS: ARCHITECT/ENGINEERS:
Drawing Title
Office of Construction and Facilities ManagementApproved: Project Director
Project Title
Location
Date Checked Drawn
Dwg.
Drawing Number
Building Number
Project Number
600 EAST 7TH STEET
SIOUX FALLS, SOUTH DAKOTA 57103
605.274.2893
6 SOUTH OLD ORCHARD
ST. LOUIS, MISSOURI 63119
800.404.7677
330 N MEAD
WICHITA, KANSAS 67202
316.262.2500
FA102
FIRE ALARM FLOOR PLAN - 4TH
FLOOR - AREA B
RELOCATE PHYSICAL
MEDICINE & REHAB. TO THE
4TH FLOOR
800 HOSPITAL DRIVE COLUMBIA, MO 65201
02-15-2023
589A4-22-100
BID DOCUMENTS
TLKGF
3/16" = 1'-0"
FIRE ALARM 4TH FLOOR AREA B NEW WORK
# Revision Date JAIME ABSHIER, PE, MO-2020010419
JAIME ABSHIER, PE
MO-2020010419
COMMON PIPING SYMBOLS &
ABBREVIATIONS
NOT ALL SYMBOLS ARE USED FOR THIS PROJECT
DIRECTION OF FLOW
BRANCH CONNECTION, BOTTOM
BRANCH CONNECTION, TOP
ELBOW, TURNED DOWN
ELBOW TURNED UP
SHUTOFF VALVE
CHECK VALVE
PRESSURE REDUCING VALVE
PRESSURE GAUGE
UNION
PIPING CAP
RISER DESIGNATION
ABOVE FINISH FLOOR
AUTHORITIES HAVING JURISDICTION
ACCESS PANEL
BOTTOM OF PIPE
DIAMETER
DOWN
EXISTING
FINISHED FLOOR ELEVATION
GALLONS PER HOUR
GALLONS PER MINUTE
HORSEPOWER
INVERT ELEVATION
NORMALLY CLOSED
NOT TO SCALE
POUNDS PER SQUARE INCH
REVOLUTIONS PER MINUTE
ROUGH-IN
SHUTOFF VALVE
TOTAL DYNAMIC HEAD
VERIFY IN FIELD
AFF
AHJ
AP
BOP
DIA
DN
EX OR EXIST
FFE
GPH
GPM
HP
IE OR INV. ELEV
NC
NTS
PSI
RPM
RI
SOV
TDH
VIF
X
PLUMBING SYMBOLS & ABBREVIATIONS
NOT ALL SYMBOLS ARE USED FOR THIS PROJECT
TRAPPED CONNECTION
STRAINER
BALANCING VALVE
CLEANOUT (CO)
OS & Y GATE VALVE
TEMPERATURE GAUGE
THERMOSTATIC MIXING VALVE
REDUCED PRESSURE BACKFLOW PREVENTER
HOSE BIBB/WALL HYDRANT
ACID VENT PIPING
ACID WASTE PIPING
DOMESTIC COLD WATER PIPING (CW)
DOMESTIC HOT WATER PIPING (HW)
DOMESTIC HOT WATER RETURN PIPING (HWR)
DRAIN PIPING
DEIONIZED WATER PIPING
GREASE VENT PIPING
GREASE WASTE PIPING
NATURAL GAS PIPING
NON-POTABLE WATER PIPING
OVERFLOW STORM PIPING
OIL WASTE PIPING
PUMP DISCHARGE PIPING
REVERSE OSMOSIS PIPING (RO)
SANITARY PIPING
SOFTENED COLD WATER PIPING
SOFTENED HOT WATER PIPING
SUBSOIL DRAINAGE PIPING
STORM PIPING
TEMPERED WATER PIPING
VENT PIPING
WASTE PIPING
FLEXIBLE CONNECTION
FLOOR DRAIN/FLOOR SINK (FD/FS)
CIRCULATION PUMP
AV
AW
D
DI
RO
NP
PD
SSD
ST
OST
TW
S
GW
GV
OW
W
SCW
SHW
G
PROCESS PIPING SYMBOLS &
ABBREVIATIONS
NOT ALL SYMBOLS ARE USED FOR THIS PROJECT
ARGON PIPING
CARBON DIOXIDE PIPING
COMPRESSED AIR PIPING (NON-MEDICAL)
COMPRESSED AIR INTAKE PIPING (NON-MEDICAL)
DENTAL AIR PIPING
DENTAIL AIR INTAKE PIPING
DENTAL VACUUM PIPING
DENTAL VACUUM EXHAUST PIPING
DENTAL SURGICAL VACUUM PIPING
DENTAL SURGICAL VACUUM EXHAUST PIPING
LAB COLD WATER
LAB HOT WATER
LAB GAS PIPING
LAB VACUUM PIPING
MEDICAL AIR PIPING
MEDICAL AIR INTAKE PIPING
MEDICAL VACUUM PIPING
MEDICAL VACUUM EXHAUST PIPING
NITROGEN PIPING
NITROUS OXIDE PIPING
OXYGEN PIPING
WASTE ANESTHETIC GAS DISPOSAL PIPING
EXISTING GAS OUTLET
NEW GAS OUTLET
EXISTING ZONE VALVE DESIGNATION
NEW ZONE VALVE DESIGNATION
EXISTING AREA ALARM DESIGNATION
NEW AREA ALARM DESIGNATION
EXISTING MEDICAL GAS MASTER ALARM DESIGNATION
NEW MEDICAL GAS MASTER ALARM DESIGNATION
AREA ALARM
EMERGENCY SHUT-OFF VALVE
ZONE VALVE
AR
CA
CAI
CO2
DA
DAI
DV
DVE
LG
LV
MA
MAI
MV
MVE
WAGD
OX
N2
N2O
LHW
LCW
AA
ESOV
ZV
DSV
DSVE
GENERAL NOTES
1. DUE TO THE LIMITED SPACE AVAILABLE FOR THE INSTALLATION OF
ALL THE PLUMBING WORK, COORDINATION BETWEEN ALL OTHER
TRADES IS OF UTMOST IMPORTANCE.
2. THIS CONTRACTOR SHALL VISIT THE PROJECT SITE AND VERIFY
LOCATIONS, ELEVATIONS AND SIZES OF ALL UTILITIES AT SITE PRIOR
TO PROCEEDING WITH WORK. EXISTING SYSTEMS AND STRUCTURE
SHALL BE INVESTIGATED FOR BEST POSSIBLE ROUTING OF COLD
WATER, HOT WATER, SANITARY WASTE AND VENT, STORM AND
MEDICAL LABORATORY GAS PIPING.
3. THESE PLANS ARE DIAGRAMMATIC IN NATURE SINCE THE ONLY
AVAILABLE INFORMATION HAS BEEN OBTAINED FROM EXISTING
PLANS, SPECIFICATIONS, AND FIELD SURVEYS. THE EXACT
LOCATION OF PIPING, FIXTURES AND EQUIPMENT MAY DEVIATE
FROM THE LOCATION INDICATED ON THESE DRAWINGS. EXTREME
ACCURACY IS NOT GUARANTEED. THIS CONTRACTOR SHALL BE
PREPARE TO MAKE ALTERATIONS TO NEW AND/OR EXISTING
SERVICES TO FIT JOB CONDITIONS. THIS CONTRACTOR SHALL
FURNISH A COMPLETE CODE COMPLYING SYSTEM. THIS
CONTRACTOR SHALL REPORT, IN WRITING, ANY DISCREPANCIES
WHICH PREVENT THE INSTALLATION OF WORK AS SHOWN.
4. IF THIS CONTRACTOR DOES NOT CLEARLY UNDERSTAND THESE
PLANS OR IS NOT COMPLETELY SURE OF THEIR MEANING, THIS
CONTRACTOR SHOULD OBTAIN THE ENGINEER'S WRITTEN
EXPLANATION AND/OR INTERPRETATION PRIOR TO SUBMITTING
BIDS, SINCE THIS CONTRACTOR WILL BE HELD RIGIDLY TO THE
INTERPRETATION OF THE ENGINEER.
5. IT IS THE RESPONSIBILITY OF THIS CONTRACTOR TO REPAIR THE
EXISTING SURFACES TO REMAIN WHERE THEIR WORK HAS BEEN
COMPLETED. REPAIR SHALL INCLUDE, BUT NOT LIMITED TO, ANY
EXISTING WALL, CEILING OR FLOOR THAT IS SCHEDULED TO REMAIN.
REPAIR, PAINTING, AND PATCHING SHALL BE COMPLETED BY AN
APPROPRIATE CONTRACTOR QUALIFIED FOR THIS TYPE OF WORK.
6. THE OWNER SHALL MAINTAIN ALL SALVAGE RIGHTS OF FIXTURES,
EQUIPMENT AND MATERIALS REMOVED, HOWEVER, ALL FIXTURES,
EQUIPMENT AND MATERIALS NOT CLAIMED BY THE OWNER SHALL
BE REMOVED FROM THE PREMISES AND PROPERLY DISPOSED OF
THE BY THE DEMOLITION CONTRACTOR.
7. CEILING REMOVAL, STORAGE AND REPLACEMENT FOR NEW PIPING
INSTALLATION SHALL BE BY THE GENERAL CONTRACTOR.
8. IF HAZARDOUS MATERIALS ARE ENCOUNTERED DURING
DEMOLITION OPERATIONS, THE CONTRACTOR WILL NOTIFY
BUILDING OWNER OF THE HAZARDOUS MATERIAL.
9. TEMPORARY CONNECTION SHALL BE PROVIDED BY RESPECTIVE
PLUMBING AND FIRE PROTECTION CONTRACTORS WHEN EXTENDED
INTERRUPTIONS OF SERVICES AND UTILITIES SUCH AS WATER,
WASTE AND FIRE PROTECTION WHICH SERVE OTHER AREAS ARE
NECESSARY.
10. COORDINATE WITH MAINTENANCE PERSONNEL AS TO SOURCE OF
UTILITIES AND TEMPORARILY DISCONNECT OR SHUT OFF SERVICES
OR UTILITIES AT NEAREST MAIN. TEMPORARY AND ACCESSIBLE
ISOLATION VALVES SHALL BE INSTALLED CLOSE TO THIS POINT OF
WORK.
11. IT IS ESSENTIAL THAT BUILDING OPERATIONS CONTINUE WITH
MINIMAL INTERRUPTIONS. IT IS NECESSARY THAT OPERATION OF
EXISTING SYSTEMS BE INTERFACED WITH AS LITTLE DISRUPTION AS
POSSIBLE EXCEPT IN AREAS VACATED FOR CONSTRUCTION WORK.
WORK WHICH WILL INTERFERE WITH OPERATION OF EXISTING FIRE
SUPPRESSION AND PLUMBING SYSTEMS OR WHICH REQUIRE
DOWNTIME WILL BE SCHEDULED ONLY AFTER CONSULTATION WITH
AND PERMISSION GIVEN BY THE OWNER. ALLOW 10 DAYS PRIOR TO
ANTICIPATED INTERRUPTION OF SYSTEMS. WORK MAY BE REQUIRED
TO BE PERFORMED OUTSIDE NORMAL WORKING HOURS.
12. ARCHITECTURAL DEMOLITION DRAWINGS AND SPECIFICATIONS
SHALL BE READ IN CONJUNCTION WITH THESE DRAWINGS.
13. ALL PIPING HANGERS AND SUPPORTS SHALL BE REMOVED ALONG
WITH PIPING BEING REMOVED.
14. THE CONTRACTOR SHALL COORDINATE DEMOLITION WORK WITH
PROJECT'S PHASING SCHEDULE PRIOR TO COMMENCEMENT OF ANY
WORK.
15. WHEN PLACING NEW PLUMBING FIXTURES, CONTRACTOR SHALL
VERIFY LOCATIONS OF PLUMBING VENTS. OFFSET VENTS THAT
TERMINATE WITHIN 25 FEET OF HVAC UNITS OUTDOOR AIR INTAKES.
CONTRACTOR SHALL FIELD VERIFY PRIOR TO BID WHERE THE
INTERFERENCE'S ARE PRICE ACCORDINGLY OR MAKE ALLOWANCES
IN BID.
16. USE CAUTION WHEN SAW-CUTTING THROUGH EXISTING CONCRETE
FLOOR OR WALL CONSTRUCTION FOR THE INSTALLATION OF
PLUMBING SYSTEMS TO AVOID CUTTING REBAR AT EDGE OF
OPENING. LEAVE SUFFICIENT REBAR EXPOSED TO TIE NEW
REINFORCING REPLACEMENT CONCRETE AND/OR OTHER
STRUCTURAL ATTACHMENTS FOR NEW CONSTRUCTION.
17. CONTRACTOR SHALL BE RESPONSIBLE FOR ANY REVISIONS,
TRANSITIONS, OFFSETS, ETC., TO AVOID DUCTWORK, PIPING,
EQUIPMENT OR STRUCTURE NEW OR EXISTING AND TO MAKE A
COMPLETE AND FUNCTIONING SYSTEM.
PLUMBING ABBREVIATIONS
NOT ALL SYMBOLS ARE USED FOR THIS PROJECT
ADA AMERICANS WITH DISABILITIES ACT
A.F.F. ABOVE FINISH FLOOR
AP ACCESS PANEL
BP BOOSTER PUMP
BT BATHTUB
BTC BRANCH TO CONNECTION
CBV CALIBRATED BALANCING VALVE
CI CAST IRON
CO CLEANOUT
CSS CLINICAL SERVICE SINK
CW COLD WATER
DCVA DOUBLE CHECK VALVE ASSEMBLY
DF DRINKING FOUNTAIN
DI DEINOIZED WATER
DS DOWNSPOUT
DW DISHWASHER
DWH DOMESTIC WATER HEATER
EEW EMERGENCY EYE WASH
ESEW EMERGENCY SHOWER & EYE WASH
ESH EMERGENCY SHOWER
ET EXPANSION TANK
EWC ELECTRIC WATER COOLER
FCO FLOOR CLEANOUT
FD FLOOR DRAIN
F.F. FINISH FLOOR ELEVATION
FS FLOOR SINK
G NATURAL GAS
GCO GRADE CLEANOUT
GD GARBAGE DISPOSAL
HB HOSE BIBB
HW HOT WATER
HWR HOT WATER RETURN
HWRP HOT WATER RETURN PUMP
HWST HOT WATER STORAGE TANK
I.E. INVERT ELEVATION
IM ICE MAKER
IW INDIRECT WASTE
LA LAVATORY
MB MOP BASIN
NIC NOT IN CONTRACT
NP NON-POTABLE
OB OUTLET BOX
ORD OVERFLOW ROOF DRAIN
PG PRESSURE GAUGE
PRV PRESURE REDUCING VALVE
RD ROOF DRAIN
RH ROOF HYDRANT
RO REVERSE OSMOSIS
RPZ REDUCED PRESSURE BACKFLOW PREVENTER
S SANITARY
SCW SOFTENED COLD WATER
SH SHOWER
SHW SOFTENED HOT WATER
SK SINK
SOV SHUT OFF VALVE
SP SUMP PUMP
S/S STAINLESS STEEL
SS SANITARY STACK
SSD SUBSOIL DRAINAGE
SSK SHOP SINK
TD TRENCH DRAIN
TMV THERMOSTATIC MIXING VALVE
TP TRAP PRIMER
TW TREATED WATER
UR URINAL
V VENT
VIV VALVE IN VERTICAL
VB VACUUM BREAKER
VS VENT STACK
VTR VENT THRU ROOF
W WASTE
WC WATER CLOSET
WCO WALL CLEANOUT
WD WASHER DRAIN
WH WALL HYDRANT
WHA WATER HAMMER ARRESTOR
WM WATER METER
WS WASTE STACK
WSV WASTE STACK VENT
YCO YARD CLEANOUT
YH YARD HYDRANT
PLAN MARK
EQUIPMENT NUMBER
SHEET NUMBER
LINE TYPE LEGEND
DRAWING REFERENCES
NEW WORK BY THIS CONTRACTOR
(DARK, SOLID LINE)
EXISTING TO REMAIN OR NEW WORK BY OTHERS
(LIGHT, SOLID LINE)
EXISTING TO BE REMOVED BY THIS CONTRACTOR
(DARK, DASHED LINE, DEMOLITION PLANS)
NEW WORK BY THIS CONTRACTOR TO BE
INSTALLED UNDERGROUND, OR BELOW FLOOR
(DARK, LONG DASHED LINE)
NORTH ARROW
PLAN DETAIL REFERENCE TITLE
KEYED NOTE DESIGNATION
PLAN MARK
EQUIPMENT NUMBER
EQUIPMENT DESIGNATION REFER TO MEP
SCHEDULE FOR CIRCUITING AND DEVICE
REQUIREMENTS AND FLOOR PLANS FOR
LOCATIONS
ENLARGED PLAN REFERENCE
PLAN MARK
SHEET NUMBER
A101
SIM
AHU
TITLE
SCALE
PLAN
NORTH
TRUE
NORTH
INTERFACE, EXISTING TO NEW
EXTENT OF DEMOLITION
SECTION
MATCHLINE
1 REVISION TAG
AD888
A
2 3 4 5 6
B
C
D
1 2 3 4 5 6
A
B
C
D
VA FORM 08-6231
o n e e ig e fo o t o n e q u a rt e r i n c e fo o t th re e e ig h th s in c e fo o t o n e h a lf in c e fo o t th re e q u a rt e fo o t o n e in c e fo o t o n e a n d o n e h a lf in c h e e fo o t th re e in c h e e fo o t
CONSULTANTS: ARCHITECT/ENGINEERS:
Drawing Title
Office of Construction and Facilities ManagementApproved: Project Director
Project Title
Location
Date Checked Drawn
Dwg.
Drawing Number
Building Number
Project Number
600 EAST 7TH STEET
SIOUX FALLS, SOUTH DAKOTA 57103
605.274.2893
6 SOUTH OLD ORCHARD
ST. LOUIS, MISSOURI 63119
800.404.7677
330 N MEAD
WICHITA, KANSAS 67202
316.262.2500
JOHN ERNEST SOMMERS, PE
#2015028399
NOT FOR
CONSTRUCTION P-000
PLUMBING SYMBOLS AND
ABBREVIATIONS
RELOCATE PHYSICAL
MEDICINE & REHAB. TO THE
4TH FLOOR
800 HOSPITAL DRIVE COLUMBIA, MO 65201
02-15-2023
589A4-22-100
BID DOCUMENTS
MASAJH
# Revision Date
JOHN ERNEST SOMMERS, PE
#2015028399
N
02/13/2023
FEC
FEC
FEC
F E
C
FEC
FEC
FEC
FE
F E
FEC
FEC
FE
F E
FEC
FEC
FEC
FEC
F E
C
FEC
FEC
EaFGGaHHbJJbKLLaMNNa H.5Ja F.1 EbMaNb
2.8
3.7
7.3
8.2
9.1
4.5
6.2
5.4
6.7
5.7
5.3
4.6
9.8
8.9
8.3
7.2
7.1
3.6
4.1
4.7
5.1
6.1
6.3
8.0
5.5
7.5
3.1
4.4
NOT IN PROJECT SCOPE
EaFGGaHHbJJbKLLaMNNa H.5Ja F.1 EbMaNb
2.8
3.7
7.3
8.2
9.1
4.5
6.2
5.4
6.7
5.7
5.3
4.6
9.8
8.9
8.3
7.2
7.1
3.6
4.1
4.7
5.1
6.1
6.3
8.0
5.5
7.5
3.1
4.4
NOT IN PROJECT SCOPE
EaFGGaHHbJJbKLLaMNNa H.5Ja F.1 EbMaNb
2.8
3.7
7.3
8.2
9.1
4.5
6.2
5.4
6.7
5.7
5.3
4.6
9.8
8.9
8.3
7.2
7.1
3.6
4.1
4.7
5.1
6.1
6.3
8.0
5.5
7.5
3.1
4.4
NOT IN PROJECT SCOPE
EaFGGaHHbJJbKLLaMNNa H.5Ja F.1 EbMaNb
2.8
3.7
7.3
8.2
9.1
4.5
6.2
5.4
6.7
5.7
5.3
4.6
9.8
8.9
8.3
7.2
7.1
3.6
4.1
4.7
5.1
6.1
6.3
8.0
5.5
7.5
3.1
4.4
NOT IN PROJECT SCOPE
FOURTH FLOOR KEY PLAN
N
A
2 3 4 5 6
B
C
D
1 2 3 4 5 6
A
B
C
D
VA FORM 08-6231
o n e e ig e fo o t o n e q u a rt e r i n c e fo o t th re e e ig h th s in c e fo o t o n e h a lf in c e fo o t th re e q u a rt e fo o t o n e in c e fo o t o n e a n d o n e h a lf in c h e e fo o t th re e in c h e e fo o t
CONSULTANTS: ARCHITECT/ENGINEERS:
Drawing Title
Office of Construction and Facilities ManagementApproved: Project Director
Project Title
Location
Date Checked Drawn
Dwg.
Drawing Number
Building Number
Project Number
600 EAST 7TH STEET
SIOUX FALLS, SOUTH DAKOTA 57103
605.274.2893
6 SOUTH OLD ORCHARD
ST. LOUIS, MISSOURI 63119
800.404.7677
330 N MEAD
WICHITA, KANSAS 67202
316.262.2500
JOHN ERNEST SOMMERS, PE
#2015028399
PD100
PLUMBING PHASING PLAN - 4TH
FLOOR
RELOCATE PHYSICAL
MEDICINE & REHAB. TO THE
4TH FLOOR
800 HOSPITAL DRIVE COLUMBIA, MO 65201
02-15-2023
589A4-22-100
BID DOCUMENTS
MASAJH
1/16" = 1'-0"
PLUMBING PHASING PLAN - 4TH FLOOR - PHASE 3
1/16" = 1'-0"
PLUMBING PHASINH PLAN - 4TH FLOOR - PHASE 1
1/16" = 1'-0"
PLUMBING PHASING PLAN - 4TH FLOOR - PHASE 2
1/16" = 1'-0"
PLUMBING PHASING PLAN - 4TH FLOOR - PHASE 4
1. REFER TO ARCHITECTURAL PHASING PLAN FOR
ADDITIONAL INFORMATION.
GENERAL NOTES
# Revision Date
02/13/2023
1 2
3 4
F
C
F E
C
FEC
EaFGGaHJJbKLLaMNNa H.5Ja F.1 EbMaNb
2.8
3.7
7.3
8.2
9.1
6.2
5.4
6.7
5.7
5.3
4.6
9.8
8.9
8.3
7.2
7.1
3.6
4.1
4.7
5.1
6.1
6.3
8.0
5.5
7.5
3.1
4.4
MECH CHASE
AREA B
AREA A
AREA B
AREA A
THIRD FLOOR KEY PLAN
AREA A
N
B
A
A
2 3 4 5 6
B
C
D
1 2 3 4 5 6
A
B
C
D
VA FORM 08-6231
o n e e ig e fo o t o n e q u a rt e r i n c e fo o t th re e e ig h th s in c e fo o t o n e h a lf in c e fo o t th re e q u a rt e fo o t o n e in c e fo o t o n e a n d o n e h a lf in c h e e fo o t th re e in c h e e fo o t
CONSULTANTS: ARCHITECT/ENGINEERS:
Drawing Title
Office of Construction and Facilities ManagementApproved: Project Director
Project Title
Location
Date Checked Drawn
Dwg.
Drawing Number
Building Number
Project Number
600 EAST 7TH STEET
SIOUX FALLS, SOUTH DAKOTA 57103
605.274.2893
6 SOUTH OLD ORCHARD
ST. LOUIS, MISSOURI 63119
800.404.7677
330 N MEAD
WICHITA, KANSAS 67202
316.262.2500
JOHN ERNEST SOMMERS, PE
#2015028399
NOT FOR
CONSTRUCTION PD101
PLUMBING DEMOLITION PLAN - 3RD
FLOOR - OVERALL
RELOCATE PHYSICAL
MEDICINE & REHAB. TO THE
4TH FLOOR
800 HOSPITAL DRIVE COLUMBIA, MO 65201
02-15-2023
589A4-22-100
BID DOCUMENTS
MASAJH
1. OVERALL PLAN SHOWN FOR REFERENCE ONLY. SEE
PLAN AREAS A AND B FOR MORE INFORMATION.
GENERAL NOTES
1/8" = 1'-0"
PLUMBING DEMOLITION PLAN - 3RD FLOOR - OVERALL
# Revision Date
JOHN ERNEST SOMMERS, PE
#2015028399
JT
JT
JT
JT
JT
JT F
E
C
FEC
JT
JT
JT
JT
JT
JT
JT
JT
JT
EaFGGaHJJbKLLaMNNa H.5Ja F.1 EbMaNb
2.8
3.7
6.2
5.4
6.7
5.7
5.3
4.6
3.6
4.1
4.7
5.1
6.1
6.3
5.5
3.1
4.4
1 EX 4"S-UP&DN
EX 2"W-UP
EX 1/2"CW-UP
EX 1/2"HWR-UP
EX 1/2"HW-UP
EX 4"S-UP
EX 1 1/2"CW-UP
EX 2"W-UP
EX 1/2"HW-UP
EX 1/2"HWR-UP
EX 1/2"CW-UP
EX 4"S
EX 3"V-UP
EX CW-UP
EX HW-UP
EX HWR-UP
NOT IN PROJECT SCOPE
EX 3"V-UP
EX 4"S-UP&DN
EX 1"CW-UP
EX 1"HW-UP
EX 1 1/2"HW-UP
EX 1 1/2"CW-UP
EX 4"
EX CW-UP
EX W-UP
EX CW-UP
EX HW-UP
EX HWR-UP
EX 4"S-UP
EX 2"W-UP
EX HW-UP
EX CW-UP
EX HWR-UP
EX 2"W-UP
EX 3"
EX 3"
EX 3"
EX 1/2" HWR-UP
EX 1/2"HW-UP
EX 2"W-UP
EX 1/2"CW-UP
EX 1/2"HW-UP
EX 2"W-UP
EX 1/2"CW-UP
EX 1 1/2"CW-UP
EX 4"S-UP
EX 2"
EX 2"
EX 1/2"HW-UP
EX 1/2"HWR-UP
EX 2"W-UP
EX 1/2"CW-UP
EX 1 1/2"CW-UP
EX 4"S-UP
EX 4"
EX 1/2"HW-UP
EX 1/2"HWR-UP
EX 2"W-UP
EX 1/2"CW-UP
EX 4"S-UP
EX HWR-UP
EX HW-UP
EX CW-UP
EX ST
EX 1 1/2"CW-UP 1
EX ST-UP&DN
EX 3"V-UP
EX 2"W-UP
EX 4"
AREA B
AREA A
AREA B
AREA A
EX 4"
THIRD FLOOR KEY PLAN
AREA A
N
B
A
A
2 3 4 5 6
B
C
D
1 2 3 4 5 6
A
B
C
D
VA FORM 08-6231
o n e e ig e fo o t o n e q u a rt e r i n c e fo o t th re e e ig h th s in c e fo o t o n e h a lf in c e fo o t th re e q u a rt e fo o t o n e in c e fo o t o n e a n d o n e h a lf in c h e e fo o t th re e in c h e e fo o t
CONSULTANTS: ARCHITECT/ENGINEERS:
Drawing Title
Office of Construction and Facilities ManagementApproved: Project Director
Project Title
Location
Date Checked Drawn
Dwg.
Drawing Number
Building Number
Project Number
600 EAST 7TH STEET
SIOUX FALLS, SOUTH DAKOTA 57103
605.274.2893
6 SOUTH OLD ORCHARD
ST. LOUIS, MISSOURI 63119
800.404.7677
330 N MEAD
WICHITA, KANSAS 67202
316.262.2500
JOHN ERNEST SOMMERS, PE
#2015028399
NOT FOR
CONSTRUCTION PD102
PLUMBING DEMOLITION PLAN - 3RD
FLOOR - AREA A
RELOCATE PHYSICAL
MEDICINE & REHAB. TO THE
4TH FLOOR
800 HOSPITAL DRIVE COLUMBIA, MO 65201
02-15-2023
589A4-22-100
BID DOCUMENTS
MASAJH
3/16" = 1'-0"
PLUMBING DEMOLITION PLAN - 3RD FLOOR - AREA A
1. REMOVE EXISTING DOMESTIC WATER / WASTE BACK
TO NEAREST ACTIVE MAIN IN THIRD FLOOR CEILING
AND CAP.
2. THE OUTLINED AREA WAS UNDER CONSTRUCTION
DURING INITIAL SITE INVESTIGATIONS, THEREFORE
EXACT EXISTING CONDITIONS WILL NEED FIELD
VERIFICATION PRIOR TO THE START OF
CONSTRUCTION.
SHEET KEYNOTES#
# Revision Date
JOHN ERNEST SOMMERS, PE
#2015028399
File details come from the government source that posted it. Updated .