This document provides instructions for a solicitation seeking Depot Level Maintenance (DLM) support services for Fleet Readiness Center Southwest (FRCSW) in North Island, CA. The Navy requires aircraft, aircraft engines, components, and material undergoing DLM to be reworked, overhauled, repaired, assembled, disassembled, and supported by business programs. The anticipated single-award IDIQ contract will have cost-plus-fixed-fee CLINs for level of effort services and cost reimbursable CLINs for other direct costs like travel and material. The period of performance is a five-year ordering period. The incumbent contractor is Aircraft Readiness Alliance, LLC under contract N68936-17-C-0081. This acquisition is being competed as a 100% 8(a) small business set-aside. The solicitation number is N6852021R0007.
View the file
Other files
Show 40 more
Latest 50 of 68 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Instructions Instructions to Prime Contractors for completing Attachment L-5 Annual Fully Burdened Labor
RFP N68520-21-R-0007
| COLUMN/AREA | COLUMN HEADING | DESCRIPTION OF DATA UNDER THIS COLUMN HEADING |
| B | Offeror Name | Enter the Offeror (Prime's name or Subcontractor's name) in this field to distinguish between the companies |
| C | Proposed Labor Category (Furnished by Government) | Enter the Proposed Labor Category, as recorded in the Prime or Subcontractor's accounting system, that correlates to each of the Government solication Labor Category on that row. Spell and format entry the same every time it is used on the template (for example, when it relates to the Prime Offeror's rates on one row and to a Subcontractor's rates on another row). If the Offeror determines that no personnel will be proposed to perform work defined by one of the Government Estimate Labor Categories listed, enter "NA". |
| D | Individual Designator* | For each individual Contractor employee proposed, the contractor shall enter the corresponding Position Number as found on Attachment 5. |
| E-I | Proposed Annual Fully-Burdened Regular Labor and Overtime (OT) Labor, per Labor Catergory, per Labor Individual Designator | Enter the Annual Fully-Burdened Labor proposed for the applicable performance period (e.g. Year_#) for personnel associated with the Proposed Labor Category and Individual Designator. Enter numbers only, in U.S. Dollar format $###.## rounded to the nearest cent. Annual Fully-Burdened Regular Labor and OT Labor shall include fringe, overhead, G&A, and fee on total cost, but should not include Fully-Burdened Other Direct Costs (ODCs) such as Materials, Travel, and Cost of Money costs. Annual Fully-Burdened Labor shall be the Fully-Burdened Labor Rate times the amount of hours proposed for the applicable performance period. |
Prime Burdened Labor Rates
| Offeror Name | ATTACHMENT 5 | Individual Designator* | Proposed Annual Fully-Burdened Labor | |||||
| Proposed Labor Category | Ordering Year 1 | Ordering Year 2 | Ordering Year 3 | Ordering Year 4 | Ordering Year 5 | 6-mo extension | ||
| Aircraft Mechanic II | ||||||||
| Aircraft Mechanic II (OT) | ||||||||
| Electrician, Maintenance | ||||||||
| Electrician, Maintenance (OT) | ||||||||
| Sheet metal Mechanic | ||||||||
| Sheet metal Mechanic (OT) | ||||||||
| Logs & Records Clerk | ||||||||
| Logs & Records Clerk (OT) | ||||||||
| Supervisor (Lemoore) | ||||||||
| Team Lead | ||||||||
| Team Lead (OT) | ||||||||
| AC Worker: Sand Blaster, Sheet metal, general | ||||||||
| AC Worker: Sand Blaster, Sheet metal, general (OT) | ||||||||
| Aircraft Rubber Equipment Repairer (Fuel Cell Mechanic) | ||||||||
| Aircraft Rubber Equipment Repairer (Fuel Cell Mechanic) (OT) | ||||||||
| Aircraft Painter | ||||||||
| Aircraft Painter (OT) | ||||||||
| Welder | ||||||||
| Welder (OT) | ||||||||
| Program Manager | ||||||||
| Production Controller (material coordinator/expeditor) | ||||||||
| Production Controller (material coordinator/expeditor) (OT) | ||||||||
| Precision Measurement Equipment Calibrator - Instrument Mechanic | ||||||||
| Precision Measurement Equipment Calibrator - Instrument Mechanic (OT) | ||||||||
| Electronic Technician III | ||||||||
| Electronic Technician III (OT) | ||||||||
| Electronic Technician II | ||||||||
| Electronic Technicial II (OT) | ||||||||
| Pneudraulic Systems Mechanic | ||||||||
| Pneudraulic Systems Mechanic (OT) | ||||||||
| Aircraft Machinist (Machinist) | ||||||||
| Aircraft Machinist (Machinist) (OT) | ||||||||
| Administrative Assistant | ||||||||
| Administrative Assistant (OT) | ||||||||
| Aircraft Mechanic Helper (Aircraft Electroplate Helpter) | ||||||||
| Aircraft Mechanic Helper (Aircraft Electroplate Helpter) (OT) | ||||||||
| Quality Assurance Program Monitor/Quality Control Inspector |