DID (DI_ MGMT _80969) 4229645_ATTACH.pdf

PDF 157 KB Posted

Attached to
Repair of B-1 Data Display Group, NSN: 6610-01-603-0699, P/N 7800303-19
Solicitation number
FA811725R0031
Issued by

About this file

This document is a Data Item Description (DID) for a Production Surge Plan, identified by the number DI-MGMT-80969. The document provides detailed instructions for contractors to develop a plan that demonstrates their capability to rapidly accelerate and sustain production utilizing existing facilities and equipment during a peace-time acquisition environment, without a declaration of war or mobilization.

The Production Surge Plan must include specific components such as the maximum sustainable production rate, lists of subcontracted and non-subcontracted items/components, production schedule, critical leadtime and pacing items, and potential impact on other government contracts. Key requirements include identifying additional skilled labor needs, strategic or critical materials, production equipment, and potential surge capabilities. The plan should detail how a contractor can increase production rate, reduce leadtime by at least 10 percent, and provide flexibility for rapid production scaling within current facility limitations.

View the file

Other files

File Type Posted
Wage_Determination.pdf PDF
4228970_TRNSPDATA_REPORT.pdf PDF
4228969_PKGRQMT_REPORT.pdf PDF
FA811725R0031.pdf PDF
DID (DI_PSS_81995A) 4229650_ATTACH.pdf PDF
DID (DI_PSSS_81534B) 4229642_ATTACH.pdf PDF
DID (DI_MGMT_80441D) 4229647_ATTACH.pdf PDF
4229629_CDRL1_REPORT.pdf PDF
GFP 4228966_ATTACH.pdf PDF
4229609_PWS.docx DOCX document
DID (DI_PSSS_81656B) 4229648_ATTACH.pdf PDF
DID (DI SESS 80639E) 4229644_ATTACH.pdf PDF
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .