DID (DI_PSSS_81534B) 4229642_ATTACH.pdf

Data Item Description Rev. B PDF 124 KB Posted

Attached to
Repair of B-1 Data Display Group, NSN: 6610-01-603-0699, P/N 7800303-19
Solicitation number
FA811725R0031
Issued by

About this file

This document is a Data Item Description (DID) for the Acquisition and Sustainment Data Package (ASDP) Teardown Deficiency Report, approved on August 9, 2022, and identified by number DI-PSSS-81534B. The document specifies the format, content, and requirements for a report that provides a detailed analysis of equipment deficiencies, including cause of failure, recommended corrective actions, and failure categories such as workmanship, material failure, technical data deficiency, field-induced deficiency, maintenance deficiency, design deficiency, and handling or shipping issues.

The report must be text searchable, potentially include embedded models in native format, and use a Microsoft Excel spreadsheet for Data Objects/Attributes and Associated Metadata (DOAM). The completed report must comply with format requirements to be integrated into a Product Lifecycle Management (PLM) solution, ensuring proper tracking and linking to the lowest component of the end item. The document supersedes the previous version DI-PSSS-81534A and is prepared by the Air Force Life Cycle Management Center (AFLCMC/EZSC) under project number PSSS-2022-004.

View the file

Other versions and copies of DI-PSSS-81534B

File Revision Posted Attached to
Teardown Deficiency Report DI-PSSS-81534B ASDP.pdf Rev. B Overhaul of KC-135 and E-3 Horizontal Stabilizer Trim Actuator, NSN 1680-01-497-3293RK, 1680-01-005-8163RK
DiD-DI-PSSS-81534B Teardown Deficiency Report.pdf Rev. B Repair of B-2 Transponder Set (KU Band)
DI-PSSS-81534B.pdf Rev. B Remanufacture of C-5 Dual Boost Fuel Pump; NSN: 2915-00-489-9215RK
DI-PSSS-81534B_TTE_Deficiency_Report.pdf Rev. B Teardown, Test and Evaluation (TT&E) of Electron Tube for the Mini MUTES Program NSN 5960014811572
DI-PSSS-81534B.pdf Same revision and size as this file Rev. B F101 DEC Repair
DI-PSSS-81534B.pdf Same revision and size as this file Rev. B REMANUFACTURE F110 MOTIONAL TRANSDUCER
DI-PSSS-81534B.pdf Same revision and size as this file Rev. B REMANUFACTURE OF THE C-5 DUAL FUEL BOOST PUMP
DI-PSSS-81534B.pdf Same revision and size as this file Rev. B F110 LVDT (Motional Transducer) Remanufacture
ATTACHMENT_6_DI-PSSS-81534B.pdf Same revision and size as this file Rev. B Overhaul F100-PW-229 Seal, Air, Aircraft G
A001_DI-PSSS-81534B_Teardown.pdf Same revision and size as this file Rev. B Repair: Altimeter Encoder
DI-PSSS-81534B.pdf Same revision and size as this file Rev. B Remanufacture of the B-2 Flight Control Actuators
DI-PSSS-81534B.pdf Rev. B Overhaul and Upgrade of the F107 2nd Stage Turbine Nozzles
3667478_TDR DI-PSSS-81534B.pdf Same revision and size as this file Rev. B Repair of B-52 YECU/PECU Circuit Card & Power Supply
DI-PSSS-81534A_Teardown Deficiency Report.pdf Rev. A Check and Test of the B52 Flow Control Sensor Valve
DI-PSSS-81534A_Teardown Deficiency Report.pdf Rev. A Check and Test of the B-52 Flow Control Sensor Valve
DI-PSSS-81534A-Teardown Deficiency Report.pdf Rev. A Repair of B-2 Tailpipe and Duct Assembly
DI-PSSS-81534A DID.pdf Rev. A Repair: Control Indicator/Flight Data Recorder
DI-PSSS-81534A - Teardown Deficiency Report.pdf Rev. A Repair of KC-135 Attitude Indicator
Exhibit_A005_DI_PSSS_81534A.pdf Rev. A B2 Automatic Printer, Printer Sub Assembly, and Power Supply Repair
DI-PSSS-81534.pdf Revision not stated Repair J85-21 T5 Digital Temperature Control Amplifier
Show all 20

Who attaches DI-PSSS-81534B

Other files

File Type Posted
DID (DI_PSS_81995A) 4229650_ATTACH.pdf PDF
4228970_TRNSPDATA_REPORT.pdf PDF
DID (DI_PSSS_81656B) 4229648_ATTACH.pdf PDF
GFP 4228966_ATTACH.pdf PDF
4229629_CDRL1_REPORT.pdf PDF
Wage_Determination.pdf PDF
DID (DI_MGMT_80441D) 4229647_ATTACH.pdf PDF
FA811725R0031.pdf PDF
DID (DI SESS 80639E) 4229644_ATTACH.pdf PDF
4228969_PKGRQMT_REPORT.pdf PDF
DID (DI_ MGMT _80969) 4229645_ATTACH.pdf PDF
4229609_PWS.docx DOCX document
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DATA ITEM DESCRIPTION

Title: Acquisition and Sustainment Data Package (ASDP) Teardown Deficiency Report

Number: DI-PSSS-81534B Approved Date: 20220809

AMSC Number: F10348 Limitation: N/A

DTIC Applicable: No GIDEP Applicable: No

Preparing Activity: 11 (AFLCMC/EZSC) Project Number: PSSS-2022-004

Applicable Forms: N/A

Use/Relationship: The Acquisition and Sustainment Data Package (ASDP) Teardown Deficiency Report provides a factual narrative analysis of a deficiency which has been noted on equipment.

a. This Data Item Description (DID) is applicable when contractors are responsible for maintaining custodial records for government property being repaired, or, when detailed analysis is required for components undergoing a teardown investigation.

b. This DID contains the format, content, and intended use information for the data deliverable resulting from the work task described in the solicitation.

c. This DID supersedes DI-PSSS-81534A.

Requirements:

1. Reference documents. None.

2. Format. The ASDP Teardown Deficiency Report shall be in a text searchable format. If a model (e.g., Cameo, CAD, etc.) is used for the analysis or resolution of problems, the model shall be embedded in its native format. The Data Objects/Attributes and Associated Metadata (DOAM) listing shall be in Microsoft Excel spreadsheet format in accordance with the template provided in the DOAM Specification attached to the contract. All data shall be in the English language.

3. Content. The Teardown Deficiency Report shall include an analysis of the deficiency which includes cause of failure, recommended corrective action and recommendations for actions to prevent recurrence of the failure/deficiency, and the applicable category of the failure defined as follows:

a. Workmanship and non-conformance. Any deficiency (e.g., physical, chemical, electrical, functional) noted in materiel which is attributed to non-conformance to applicable specifications, drawing, standards, or Technical Order (TO); or workmanship during manufacture, repair modification or maintenance.

b. Material failure. The failure of an end item which was attributable to neither the repair nor the manufacturing process, but was due to an unpredictable failure of an internal component or sub-assembly.

c. No defect found/could not duplicate: Investigation of the exhibit revealed no deficiency.

Equipment conforms to specifications and TO standards and procedures.

d. Technical data, deficiency: Technical data (including TOs, drawings, and work specifications) was deficient or inadequate so as to cause the deficiency/failure on the item.

Source: http://assist.dla.mil -- Downloaded: 2022-10-06T17:08Z Check the source to verify that this is the current version before use.

DI-PSSS-81534B

e. Field induced deficiency. Deficiency confirmed by the investigation to have been caused by operator error, i.e., wrong voltage applied, misaligned, maladjusted, mishandling, or not used for intended purpose.

f. Maintenance deficiency. An unfavorable characteristic of an item that impedes the accomplishment of maintenance operations which results in excessive maintenance operations and/or in excessive maintenance man-hour consumption.

g. Design deficiency. A condition that limits or prevents the use of material for purpose intended or required where the material meets all other specifications.

h. Handling or shipping deficiency. A deficiency induced by improper handling or shipping, i.e., improper packaging, which prohibits the use for intended purpose.

i. Packaging specifications inadequate - not complied with. Unsatisfactory conditions including item damage resulting from improper packaging.

3.1 DOAM. The completed Teardown Deficiency Report template, provided in the DOAM Specification attached to the contract, shall comply with the format requirements (see 2. above) so that it can be ingestible into a Product Lifecycle Management (PLM) solution to ensure proper tying, tracing, and linking to the lowest component of the end item to which the delivered Teardown Deficiency Report Information is applicable. Any field that is not applicable shall be marked “NA.”

End of DI-PSSS-81534B.

Source: http://assist.dla.mil -- Downloaded: 2022-10-06T17:08Z Check the source to verify that this is the current version before use.

File details come from the government source that posted it. Updated .