Cross_Sections_from_AECOM.pdf

PDF 36 MB Posted

Attached to
Flying Fortress Parkway Phase II
Solicitation number
2026-IFB-003
Issued by
Mohave County, Arizona

About this file

This document is a set of cross-sections prepared by AECOM for the City of Kingman, Arizona, supporting the Flying Fortress Parkway Phase II infrastructure project (IFB 2026-IFB-003). The cross-sections provide detailed engineering drawings showing the roadway and drainage design specifications for the project, which encompasses public roadway construction with both Portland Cement Concrete Pavement (PCCP) and Asphalt Concrete (AC) options, concrete box culverts, drainage channels, retention basins, riprap and gabion construction, and associated site improvements. The project requires completion within a mandatory 150-calendar-day construction period, with pre-cast box culvert deliveries scheduled between March 2026 and June 2026. A non-mandatory pre-bid meeting is scheduled for March 12, 2026, at 10:00 a.m. Arizona time with a Zoom option available. Written questions must be submitted through the OpenGov procurement portal by 10:00 a.m. Arizona time on Monday, March 16, 2026, and sealed bids are due electronically by 10:00 a.m. Arizona time on Tuesday, March 24, 2026, through the City of Kingman's procurement portal at https://procurement.opengov.com/portal/cityofkingman.

The 105-page cross-section document serves as a technical reference illustrating pavement structure layers, drainage infrastructure alignment, channel and basin configurations, and utility placement throughout the project corridor. Bidders must perform at least 51 percent of the work with their own forces unless written approval for greater subcontracting is obtained from the City. Contractors must factor Transaction Privilege Tax (TPT) into their overall pricing, as the City is not exempt from applicable Arizona taxes. Award will be made to the lowest responsible, responsive bidder meeting all prescribed requirements and qualifications. The project is subject to Arizona Pollutant Discharge Elimination System (AZPDES) requirements, with contractors responsible for environmental mitigation including invasive species prevention and stormwater pollution prevention planning. Failure to complete work within the 150-day contract period will result in liquidated damages as specified in Maricopa Association of Governments Section 108 standards.

View the file

Other files

File Type Posted
Flying_Fortress_Parkway_Phase_II_(Addendum_#2_Revision).pdf PDF
Pre-Bid_Attendees.pdf PDF
Airway_Avenue_Geotech_Eval_Rpt_3-22-19.pdf PDF
Rinker's_Precast_Box_Culvert_Shop_Drawing.pdf PDF
FFP-Airway_100%_Sealed_Specs_02-24-2026.pdf PDF
ENG25-0079_Sheet22of32_Dibble.pdf PDF
Proctor_for_Earthwork_(stockpile).pdf PDF
Proctor_for_Earthwork_(stockpile).pdf PDF
RSFP_TI_Final_Geotech_Roadway_Report.pdf PDF
FFP-Airway_100%_Sealed_Specs_02-24-2026.pdf PDF
Airway_Avenue_Geotech_Eval_Rpt_3-22-19.pdf PDF
Student_calendar_for_the_2025-26_school_year___Kingman_Unified_School_District_#20.pdf PDF
Student_calendar_for_the_2026-27_school_year_Kingman_Unified_School_District_#20.pdf PDF
Student_calendar_for_the_2025-26_school_year___Kingman_Unified_School_District_#20.pdf PDF
RSFP_TI_Final_Geotech_Roadway_Report.pdf PDF
Cross_Sections_from_AECOM.pdf PDF
Flying_Fortress_Parkway_Phase_II_(Addendum_#1_Revision).pdf PDF
Flying_Fortress_Parkway_Phase_II.pdf PDF
AD91304_jnl.pdf PDF
Proctor_for_Earthwork_(stockpile).pdf PDF
RSFP_TI_Final_Geotech_Roadway_Report.pdf PDF
Airway_Avenue_Geotech_Eval_Rpt_3-22-19.pdf PDF
FFP-Airway_100%_Sealed_Plans_02-20-2026.pdf PDF
FFP-Airway_100%_Sealed_Specs_02-24-2026.pdf PDF
Student_calendar_for_the_2025-26_school_year___Kingman_Unified_School_District_#20.pdf PDF
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .