Cross_Sections_from_AECOM.pdf
PDF 36 MB Posted
- Attached to
- Flying Fortress Parkway Phase II
- Solicitation number
- 2026-IFB-003
- Issued by
- Mohave County, Arizona
About this file
This document is a cross-sections drawing set prepared by AECOM for the City of Kingman, Arizona, supporting the Flying Fortress Parkway Phase II infrastructure project. The file consists of 105 pages of technical cross-sectional drawings that illustrate the roadway design, drainage infrastructure, and structural details for the public roadway and drainage improvements. These cross-sections provide the detailed engineering specifications necessary for contractors to understand the pavement structure, grading, drainage channels, retention basins, concrete box culverts, utility conduit locations, and other civil infrastructure components required for project construction. The drawings serve as essential reference documents for bid preparation and subsequent construction execution. A non-mandatory pre-bid meeting is scheduled for March 12, 2026, at 10:00 a.m. Arizona time with an online Zoom option available. Written questions must be submitted through the OpenGov procurement portal by 10:00 a.m. Arizona time on Monday, March 16, 2026, and sealed bids are due electronically by 10:00 a.m. Arizona time on Tuesday, March 24, 2026. The mandatory construction completion period is 150 calendar days, accounting for 15 rain days, with pre-cast box culvert deliveries scheduled from March 2026 through June 2026.
Contractors must submit bids addressing both Portland Cement Concrete Pavement (PCCP) and Asphalt Concrete (AC) pavement options and must factor Transaction Privilege Tax (TPT) into their overall pricing. The project will be awarded to the lowest responsible, responsive bidder meeting all prescribed requirements and qualifications, with no specific budget range disclosed. Contractors must perform at least 51 percent of the work with their own forces unless written approval for greater subcontracting is obtained from the City. Bidders must demonstrate previous acceptable experience in similar concrete roadway construction, hold an Arizona Registrar of Contractors (ROC) license for public roadway work, obtain a City of Kingman business license where applicable, and furnish a statutory bid bond. The project is subject to Arizona Pollutant Discharge Elimination System (AZPDES) requirements, and failure to complete work within the 150-day contract period will result in liquidated damages per Maricopa Association of Governments (MAG) Section 108 standards. No set-aside designations or incumbent vendor information is specified.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .