This document is a comprehensive Passenger Screening Program (PSP) Site Survey Report template designed for detailed airport checkpoint deployment documentation. The Excel file contains multiple worksheets covering critical site survey elements including badging requirements, permitting needs, insurance specifications, electrical infrastructure assessment, information technology connectivity, floor and ceiling details, structural and seismic considerations, queue area validation, existing equipment inventory, and duress alarm system documentation.

The site survey template is specifically aligned with the Transportation Security Administration's (TSA) Screening Equipment Deployment Services (SEDS) - Checkpoint opportunity, which is anticipated to be solicited in Q1 or Q2 of FY26. The document provides a structured approach for contractors to comprehensively document airport checkpoint characteristics, technical infrastructure, and deployment readiness, with sections designed to capture granular details about electrical systems, IT connectivity, equipment placement, structural considerations, and operational constraints that would be critical for successful checkpoint equipment installation and modification.

View the file

Other files

File Type Posted
Contract Att14 - CP SEDS Pricing Sheet_07.31.2025.xlsx XLSX spreadsheet
Contract Att04 - CDRL D001 - BLS - CEIA EMA-MS Decommission Checklist_05.21.2025.xlsx XLSX spreadsheet
Contract Att08 - CDRL D001 - ETD - QSB220 De-Install - Install Checklist_05.19.2025.xlsx XLSX spreadsheet
Contract Att05 - CDRL D001 - BLS - Smiths Responder Decomm Checklist_05.21.2025.xlsx XLSX spreadsheet
Contract Att01 - CDRL D001 - AIT-1 and AIT-2 - Leidos Decommission Checklist_05.21.2025.xlsx XLSX spreadsheet
Questions on Draft PWS SEDS CP.xlsx XLSX spreadsheet
Contract Att03- CDRL D001 - AT Decommission Checklist_05.19.2025.xlsx XLSX spreadsheet
Contract Att06 - CDRL D001 - CT De-install Decommission Checklist_05.28.2025.xlsx XLSX spreadsheet
Contract Att13 - CDRL B006 - Closeout Report_05.12.2025.xlsx XLSX spreadsheet
Contract Att09 - CDRL D001 - WTMD - CEIA Decommission Checklist_05.19.2025.xlsx XLSX spreadsheet
Contract Att12 - CDRL B001- Daily Site Report_05.12.2025.xlsx XLSX spreadsheet
CP SEDS II IDIQ SOW_08.19.2025.docx DOCX document
Contract Att11 - CDRL A004 - Weekly Status Report (WSR)_02.13.2025.xlsx XLSX spreadsheet
Contract Att02 - CDRLD001 - AIT - RS Decommission Checklist _08.18.2025.xlsx XLSX spreadsheet
Contract Att07 - CDRL D001 - ETD - 500DT Install - De-Installation Checklist_05.19.2025.xlsx XLSX spreadsheet
Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Cover Sheet

Passenger Screening Program (PSP) Site Survey Report
Site Survey Checklist Cover Page
Checkpoint Deployment Contractor (CDC):
Checkpoint Deployment Contractor POC:
Airport Name:
Airport Code:Survey Date:
TitleNamePhoneEmail
CDC Task Order Manager
CDC Site Survey Lead
CDC Architectural Designer
CDC Electrical Engineer
TSA Federal Security Director (FSD)
TSA Assistant Federal Security Director (AFSD)
TSA Project Lead/Primary POC
TSA Project Assistant
IT POC
Airport Authority Representative
Airport Facilities
Airport Electrical
Checkpoints/Overview
Terminal/Checkpoint Name or IDNumber of LanesComments
0
Scope of Work
Please provide list of TSE to be installed/removed. Confirm if site prep and site restoration will be needed and list any potential risk.
Shipping Address
0
Drawing Set Used for Validation
Title and TSA Approval StatusDateSource
0

Sign-in Sheet

Passenger Screening Program (PSP) Site Survey Report
Site Survey Attendees Sign-in Sheet
Checkpoint Deployment Contractor (CDC):
Checkpoint Deployment Contractor POC:
Airport Name:
Airport Code:Survey Date:

Name Organization Phone Number Email

Badging

Passenger Screening Program (PSP) Site Survey Report
Badging Requirements
Checkpoint Deployment Contractor (CDC):0
Checkpoint Deployment Contractor POC:0
Airport Name:0
Airport Code:0Survey Date:0
BADGING
The following documents the badging requirements.
Will local Airport Security Personnel provide escort?0
Is contractor badging required?0
Is a badging class required?0
What is the schedule for the badging class?0
Badging AuthorityPOCContact InformationHours of Operation

Time To Obtain Cost Associated Valid For Escorting Privileges (Y/N)

Documents AcceptedNotes:
Driver's License0
Birth Certificate0
Social Security Card0
Passport0
# of Docs Required0

Office of Security Capabilities Passenger Screening Program

YES

YES

YES

YES

NO

NO

NO

NO

Permitting

Passenger Screening Program (PSP) Site Survey Report
Permitting Requirements
Checkpoint Deployment Contractor (CDC):0
Checkpoint Deployment Contractor POC:0
Airport Name:0
Airport Code:0Survey Date:0
PERMIT GENERAL DOCUMENTATION REQUIREMENTS
Is permitting required? If no, skip lines 10-180
Permitting Authority and Address:
Describe the Process Required by Permitting Agencies:0
Describe the Permitting Requirements:0
Describe Permitting Lead Time:0
# Raised/Signed & Sealed Drawings and Specifications Required:0
# D Sized Drawings Required:0
# of 11x17-Size Copies Req'd:0
Address to Send Signed & Sealed Copies:0
Cost of Obtaining Permits:0
PERMIT TYPE APPLICABILITY FOR THIS PROJECT0
Type of PermitDescribe the Type of Work Effort that Requires Each Type of PermitAirport POC and Contact Info (Phone, E-Mail)
Construction Permit0
Building Permit00
Electrical Permit00
Electrical Load Study00
Seismic Analysis00
Structural Analysis00
HVAC Analysis00
Asbestos Study00
Waste Removal Plan00
Spill Response Plan00
Other (e.g., Tenant Improvement Plan):00

Cert of Insurance

Passenger Screening Program (PSP) Site Survey Report
Certificate of Insurance Requirements
Checkpoint Deployment Contractor (CDC):0
Checkpoint Deployment Contractor POC:0
Airport Name:0
Airport Code:0Survey Date:0
Certificate of Insurance
The following documents any Certificate of Insurance requirements. Include additional attachments or documentation as necessary.
Is a Certificate of Insurance required?Minimum Insurance Requirements
General Liability
Additional InsuredAutomobile Liability
NameUmbrella Liability
AddressWorker's Compensation
Bodily Injury
City, State, ZIPProperty Damage
Submit toNotes
Name
E-Mail
Fax
Performance/Payment Bond
Is a Performance and/or Payment Bond required?Additional Bond Requirements
Special Bond Form Required?
Obligee/Customer# of Copies Required
NameNotes
Address
City, State, ZIP
Submit to
Name
E-Mail
Fax

Office of Security Capabilities Passenger Screening Program

Vendors

Passenger Screening Program (PSP) Site Survey Report
Current List of Permitted/Badged Airport Service Contractors
Checkpoint Deployment Contractor (CDC):0
Checkpoint Deployment Contractor POC:0
Airport Name:0
Airport Code:0Survey Date:0

Any special licensing requirements for trades (e.g., must be licensed in the state, county, city, etc.)? Any special licensing requirements for trades (e.g., must be licensed in the state, county, city, etc.)? 0

Type ContractorElectrical/DataType ContractorElectrical/Data
NameName
AddressAddress
CityCity
StateState
Zip CodeZip Code
Point of ContactPoint of Contact
Phone OfficePhone Office
Phone CellPhone Cell
E-Mail AddressE-Mail Address
Badged?Badged?

Office of Security Capabilities Passenger Screening Program

Hours of Operation

Passenger Screening Program (PSP) Site Survey Report
Hours of Operation/Equipment Summary
Checkpoint Deployment Contractor (CDC):0
Checkpoint Deployment Contractor POC:0
Airport Name:0
Airport Code:0Survey Date:0
Checkpoint Operational Hours
Weekdays0
Weekends0
Available Installation Hours
Checkpoint must be turned over0
Electrical room access0
Basement access0
Hours available for site survey0
Hours available for site preparation0
Notifications to be made when arriving on site0

Elec Panel

Passenger Screening Program (PSP) Site Survey Report
Electrical Panel(s)
Checkpoint Deployment Contractor (CDC):0
Checkpoint Deployment Contractor POC:0
Airport Name:0
Airport Code:0Survey Date:0
Describe required procedure to obtain access to power panel
0
Describe required conduit route from electrical room to checkpoint; noting any restricted areas, space characteristics (public, utilities, etc.), special conditions, floor wall penetrations, or other potential cost considerations.
0
Are panels located in locked rooms or areas? (Y/N)0Are panels located in locked rooms or areas? (Y/N)
Approximate average physical distance and conduit distance of panels from Checkpoint lanes (feet)0Approximate average physical distance and conduit distance of panels from Checkpoint lanes (feet)
Is there a Customs Area in the Conduit Route? (nearest point of checkpoint)
Volt-amp (VA) or current rating of existing significant non-checkpoint loads on the panel (i.e., HVAC, transformers, refrigeration, motors, other industrial equipment, etc.)0Volt-amp (VA) or current rating of existing significant non-checkpoint loads on the panel (i.e., HVAC, transformers, refrigeration, motors, other industrial equipment, etc.)
New panels required?
New transformer required?
Other New Equipment Required?
Number of Open/Vacant Breaker Slots
Pictures of panels feeding Checkpoint equipment. Include panel ID/label, rating, main breaker, branch circuit breakers, schedule, etc.

Pictures of appropriate sub-panel, if needed. Panel label, rating, panel capacity, and type of panel showing

**Pictures of conduit routes, if possible.**

Office of Security Capabilities Passenger Screening Program

Elec Existing

Passenger Screening Program (PSP) Site Survey Report
Existing Electrical
Checkpoint Deployment Contractor (CDC):0
Checkpoint Deployment Contractor POC:0
Airport Name:0
Airport Code:0Survey Date:0
Answer noted questions with relevant pictures and descriptions.
Describe mounting of existing electrical devices.

Floor-mounted or power pole?

If floor, recessed (poke-thru) or surface?

If floor, conduit entry core-drilled or surface run?0
Does airport currently have back-up power/generator?
Other Notes:0
Pictures of Electrical/Data Outlets - Labeled for Each TSE & Lane

Elec Delta

Passenger Screening Program (PSP) Site Survey Report
Electrical Changes
Checkpoint Deployment Contractor (CDC):0
Checkpoint Deployment Contractor POC:0
Airport Name:0
Airport Code:0Survey Date:0
List tasks required to modify/upgrade infrastructure to accommodate required CAT units, starting from existing conditions.
Additional Breakers in Existing Panel (panel ID, quantity, ratings, etc.)Additional Breakers in Existing Panel (panel ID, quantity, ratings, etc.)
0
0
New Receptacles (quantity, location, etc.)New Receptacles (quantity, location, etc.)
0
0
New Data OutletsNew Data Outlets
0
0
New Conduit (quantity, distance, location, routing, etc.)New Conduit (quantity, distance, location, routing, etc.)
0
0
New Panel (rating, source [480V] panel location, conduit distance from source to new panel, feed breaker required, conduit required, etc.)New Panel (rating, source [480V] panel location, conduit distance from source to new panel, feed breaker required, conduit required, etc.)
0
0
Panel Expansion/Extension, Sub-Panel (size, location, etc.)Panel Expansion/Extension, Sub-Panel (size, location, etc.)
0
0
OtherOther
0
0
Discuss with facility electrical personnel potential location(s) and distribution source(s) for adding a new transformer and panel.

Describe recommendations.

Location and ID of distribution panel, switchgear, substation, or other potential power source. Provide photos of panel, breakers, and schedule below.
Potential location(s) space for transformer and/or panel. Provide photos and dimensions of space below.
Approximate conduit distance from source to proposed transformer and from proposed transformer to proposed panel.
Other relevant information.
Insert photos of electrical equipment, schedules, and space as described above. (Include pictures of conduit route, if possible.)

IT

Passenger Screening Program (PSP) Site Survey Report
Information Technology Connectivity
Checkpoint Deployment Contractor (CDC):0
Checkpoint Deployment Contractor POC:0
Airport Name:0
Airport Code:0Survey Date:0

Make & Model of Switch(es) & Patch Panel(s) Total # of Ports # of Open Switch Ports or UnTerminated Patch Ports Location (room #) Is cable distance to TSE more than 295'? Category Cable

Is there room in existing rack for additional patch panels/switches? (Y/N) Is there space/power in existing room for an additional IT rack?

List any cables that exceed 295'.

Measure cable lengths on open ports in checkpoint using Fluke Meter. Record average lengths.

Describe required procedure to obtain access to IT rack(s).

Describe required routing for data cables and if conduit is required.

Any airport-provided IT connections? If yes, describe.

Pictures: Location/Patch Panel

Floors & Ceilings

Passenger Screening Program (PSP) Site Survey Report
Floors and Ceilings
Checkpoint Deployment Contractor (CDC):0
Checkpoint Deployment Contractor POC:0
Airport Name:0
Airport Code:0Survey Date:0

Terminal/Checkpoint Floor Material If Tile/Carpet, How Much Spare Stock Does Airport Have and Is It Allowed for Use? Manufacturer, Model Number, Vendor for Replacement Floor Material

Confirm with airport that proposed location will support weight per CRPG guidelines:
Identify whether expansion joints are present in area where TSE will be installed:
Measure the slope of the floor in degrees where the TSE will be placed and record here. Any slope between 0.5 and 2.0 degrees will require OEM installation modification.

Note: TOPM will notify the COR in writing if the checkpoint has a slope in excess of 2.0 degrees.

Is the checkpoint slab-on-grade? If Yes:

Is it acceptable to saw-cut and trench the floor, if necessary?

Confirm with airport authority.

Potential design issue.

Identify ceiling height within checkpoint:

If this is a design issue, address in the Design Issues tab.

Identify any ceiling protrusions (sprinkler heads, monitors, signage, etc.) that may be below the minimum height requirement.

• R&S AIT 8’7’ (103”)

• SES AIT1 9' (108") AIT2 8' (96”)

• Analogic CT 7’7” (91”) Identify the type of ceiling above checkpoint (ceiling finish, drop ceiling tile type, other). Describe it: drop ceiling tile size, finished ceiling, exposed ceiling with conduit, etc.? Provide photos.

If this is a design issue, address in the Design Issues tab.

Photos

Design Issues

Passenger Screening Program (PSP) Site Survey Report
Design Issues
Checkpoint Deployment Contractor (CDC):0
Checkpoint Deployment Contractor POC:0
Airport Name:0
Airport Code:0Survey Date:0

Terminal/Checkpoint Lane Drawing/Design Issue Additional Comments to include Pending/Planned/In-progress Construction

Structural & Seismic

Passenger Screening Program (PSP) Site Survey Report
Structural & Seismic
Checkpoint Deployment Contractor (CDC):0
Checkpoint Deployment Contractor POC:0
Airport Name:0
Airport Code:0Survey Date:0
Is the airport in a seismic zone and confirmed to require seismic anchoring?
Are existing AITs anchored?

Provide photos.

Are existing CTs anchored?

Provide photos.

Architect already in possession of structural record drawings? (i.e. from previous project)
If not, have structural record drawings been requested from the airport and/or AHJ or Local POC?
Is a current soils report available? If no, use default site soil data in ASCE tool for determination. (https://ascehazardtool.org/)
Have structural concerns been observed? (brief description of concern, such as checkpoint has a raised, grid flooring system requiring product/engineering data)
Is the checkpoint Slab on Grade?
Are there utility tunnels?
Is the suspended slab with occupiable spaces below?
Is there a raised floor system installed in the checkpoint?

If so, who is the manufacturer and model (cut sheets available)?

If the floor is a raised floor in the checkpoint, are the WTMD’s and CT’s sitting on concrete pads for support?

Any vibration damping issues?

Do structural concerns require onsite presence of a structural engineer for assessment? (Structural Engineer determination)

Is a separate permit required for structural scope or seismic anchoring? (i.e. Building permit vs. Electrical permit)
What is the length of the permit review cycle?
Does the Building Permit have specific fees and submittal/approval days?
What are the inspection requirements for seismic and/or structural scope? (i.e. CA requires onsite presence of EOR and sign-off confirming work was done to spec and drawings)
Unless slab-on-grade, has a visual inspection been completed of the space below the checkpoint? (Prioritize taking photos of floor below checkpoint)
In the event that thru-bolting is required, is the area accessible?

Provide photos of spaces below the checkpoint.

If visual inspection is needed, are there any anomalies, including conveyors, cable trays, HVAC and plumbing, airport systems, etc.?

Coordinate with the airport to get photos above ceiling where accessible.

Will shut down request(s) be needed for installation of new conduit and cabling?

If so what is the timeline and procedure to schedule and request a shut down?

Are there any or has there been any issues or interference with WTMD ghost alarming due to below floor vibrations and or frequency changes? This is also very important for slab on grade checkpoints.
Photos

Queue Area Validation

Passenger Screening Program (PSP) Site Survey Report
Queue Area Validation
Checkpoint Deployment Contractor (CDC):0
Checkpoint Deployment Contractor POC:0
Airport Name:0
Airport Code:0Survey Date:0
Checkpoint/TerminalDimensions of Queue AreaNumber of TDCsNumber of StanchionsAdditional Comments
00
Identify if an Employee/Known Crew Members (KCM) lane is being used?
Is the Employee/KCM lane identified with signage?Identify if an Employee/Known Crew Members (KCM) lane is being used?
Is the Employee/KCM lane identified with signage?0
Identify if a PreCheck lane is being used?
Is the PreCheck lane identified with signage?Identify if a PreCheck lane is being used?
Is the PreCheck lane identified with signage?0
How many lanes are established for passenger use?How many lanes are established for passenger use?0
Are there any other lanes/queues established for other use? If so, please identify their usage.Are there any other lanes/queues established for other use? If so, please identify their usage.0
Pictures of Queue Area Surveyed, Including Proposed CT Testing Area

Existing Equip Summary

Passenger Screening Program (PSP) Site Survey Report
Existing Equipment Summary
Checkpoint Deployment Contractor (CDC):0
Checkpoint Deployment Contractor POC:0
Airport Name:0
Airport Code:0Survey Date:0
Existing Equipment Summary (TSA Standard Equipment Only)
TSE TypeTSE QuantityTSE OEM

Existing Equipment Detail Passenger Screening Program (PSP) Site Survey Report

Existing Equipment Detail
Checkpoint Deployment Contractor (CDC):0
Checkpoint Deployment Contractor POC:0
Airport Name:0
Airport Code:0Survey Date:0
Terminal / CheckpointLaneEquipment TypeOEM / ModelConfiguration
(RH/LH AT/CT; Standard/Opposite for AIT)Serial NumberTSA BarcodeIf X-Ray, Number and Size of RollersPicture or Serial/Barcode Missing:

Reason and Corrective Action *

American Science & Engineering SmartCheck AIT
Analogic Connect AT/CT EDS
Analogic Connect AT/CT EDS Primary Viewing Station (PVS)
Analogic Connect AT/CT EDS Alternate Viewing Station (AVS)
CEIA 02PN20 RAG WTMD
Photos of TSE/Serial Numbers/TSA BarcodesLeidos SDA Provision2 AIT2
MDI Itemizer DX ETD

MDI Itemizer DX ETD

MorphoTrust ECAT

&F - &A Page &P of &N

Ancillary Material

Passenger Screening Program (PSP) Site Survey Report

Existing Ancillary Material
Checkpoint Deployment Contractor (CDC):0
Checkpoint Deployment Contractor POC:0
Airport Name:0
Airport Code:0Survey Date:0
*NOTE* Two rows per Checkpoint are required--one for reusable equipment and a second for equipment that will be disposed of.

For equipment located between lanes, express its location as (Lane A/Lane B). Example: a gate between Lanes 3 and 4 would be listed as "3/4".

LocationExisting BarriersADA GateExisting TablesOther FF&E
12"24"36"48"Left or Right4'5'6'Composure BenchesPodiumsETD TablesETD Cabinets

&F - &A Page &P of &N

Duress Alarms Integrated

Passenger Screening Program (PSP) Site Survey Report
Duress/Covert Alarms
Checkpoint Deployment Contractor (CDC):0
Checkpoint Deployment Contractor POC:0
Airport Name:0
Airport Code:0Survey Date:0
Existing Equipment Summary
Terminal / Checkpoint:
Current Duress Alarm Systems & Hardware
Transmitters
(i.e., EN1233 S/D; EN1235S/D)"As Labeled"

Location Coded Name (i.e., XRAY5) Physical Location Installed (Lane 1, 2, 3 etc.)

(i.e., TDC, XRAY, Exit, KCM, EDS, STSO) Notes:

See point status instructions below

Equipment Make/Model/Quantity Terminal Checkpoint Specific Location (i.e., on wall next to Room 123 in terminal)

Existing Power, Ethernet, and POTS (telephone jack) Locations
Connection type
(i.e., Ethernet, POTS)TerminalCheckpointLocations Installed

(i.e., Supervisor podium, TDC, X-Ray)

0
TSAAirportTSA
Terminates (location where monitored) i.e., where duress
alarm is received0
TSA Maintenance ContractorName:

Telephone:

Address:

Email:0
Airport Maintenance Contractor (preferred)Name:

Telephone:

Address:

Email:0
Who is the main POC for identifying/confirming alarm naming?

(primary decision-maker; power to confirm local AP response preferences) How far is the furthest alarm in this area from the monitoring panel (Receivers)?

Direct length; provide in feet Are the duress alarm buttons easily removable/transferable (document below with photos)?

Discuss duress alarm mobility during IPT calls if they are not easily moved/removed.

Is a repeater(s) required to amplify the signal between the duress alarm buttons and the monitoring panel? (Receiver) Repeater required if distance is more than 400-feet; max total distance of 1200' How many repeaters are required?

Ex: 900' = (3) repeaters [1 repeater for every 400'] See Notes for point status instructions.

Where will the repeater(s) be installed?

Non-public space; preferably TSA controlled; work with AP maintenance/operations Is there available power (120v outlet) for the repeater(s)?

Repeaters can be hardwired or plugged into a power source; repeaters/receivers have 24-hour backup battery Are additional modifications required?

Note additional efforts required to support installation (i.e. electrical modifications for power, or low voltage wiring from receivers to monitoring panels) Describe the additional modifications?

Provide detail to include any additional permitting requirements, etc.

Photos

Point Status Instructions (Captures current I/O availability)
The point status menu allows you to view detailed alarm and fault

information. Point status information is available without entering a password.

To access the point status menu:

1. From the EN4232MR start screen, press the enter button to access the receiver’s three main menus. “Point Status” displays.

2. Press the enter to display point status details.

3. Use the up/down buttons to scroll through the points; press the enter button again to view the outputs the displayed conditions are mapped to.

• Point status flags are defined as follows: A = Alarm (transmitter only);

T = Tamper; B = Low Battery; L = AC loss (repeater only); I = Inactive.

Duress Alarms Stand Alone

Passenger Screening Program (PSP) Site Survey Report
Duress/Covert Alarms
Checkpoint Deployment Contractor (CDC):0
Checkpoint Deployment Contractor POC:0
Airport Name:0
Airport Code:0Survey Date:0
Duress Equipment Detail
Total number of all new DA buttons (for all CP)
Are the duress alarm buttons easily removable/transferable (document below with photos)?

Discuss duress alarm mobility during IPT calls if they are not easily moved/removed.

Total number of all new receivers (for all CP)
Total number of all new repeaters (for all CP)
Who is the main POC for the central monitoring location?
(primary decision-maker; power to confirm local AP response preferences)Name:

Address:

Telephone:

Email:

Where is the central monitoring location?

(room number, occupant/owner, description) (NON-TSA; on-site monitoring during operational hours) Name:

Address:

Telephone:

Email:

Are there restrictions for accessing the central monitoring location? (badge, key, hours of operation, etc.)

(notifications, escorting needs, availability to access area) Are there any construction materials/obstructions that may affect a wireless signal?

(ex: shielded rooms, in-wall obstructions, mechanical systems, etc.)

How many receivers are required?

Up to (30) alarm inputs per receiver (ex: 36 alarms are needed = Receivers must be installed) Are duress buttons installed by zone, or is 1-1 monitoring preferred?

If zone, how will the alarms will be grouped? i.e., TDC 1-4, X-ray 1-5 Each alarm is programmed to display exact location on panel If 1-1, how many alarms/messages are required? i.e., TDC 1, X-ray 1, PSR 1

Alarms located closely together display same location on panel0
Where do monitoring personnel prefer the receiver to be installed (wall, desk, etc.)? Provide description and/or photo
Specifications: 8.75" x 7" x 1.63", <2 lbs.0
Is power (120V outlet) available for each Receiver?
Dedicated circuit NOT required, (1) outlet per monitoring panel0
How far is the outlet/power source from the receiver location?
30' maximum allowable distance0
Is the outlet/power in this area on emergency or generator power?
If not, we must provide a UPS for backup power.0
How should the system be reset (toggle, latching, momentary)? If momentary, how long to reset?

> Toggle: panel displays alarm when button is activated; only resets by pressing alarm again (not recommended) > Latching: panel displays alarm when button is activated; remains on until panel is reset > Momentary: panel displays alarm when button is activated; remains on for period of time (2.0 to 99.5 seconds)

>See notes below for existing conditions What type of alarm enunciation is preferred, either audible alarm OR flashing light?

the audible alarm is adjustable (80-110 dB); the flashing light is similar to a strobe light, and or flashing light.

Data Requirements for Auto-Dialer
When a Duress Alarm is activated, what is the pre-recorded message that is sent?
Sequential order or Continuous order when notifying authorities of an alarm?
How many times should the Auto-Dialer attempt to make contact with each phone number before moving on to the next phone number?
How many times should the pre-recorded voice message repeat?
What should the "outgoing message" say?
Photos

Equipment Access

Passenger Screening Program (PSP) Site Survey Report

Equipment Access / Rigging Path
Checkpoint Deployment Contractor (CDC):0
Checkpoint Deployment Contractor POC:0
Airport Name:0
Airport Code:0Survey Date:0
Terminal ID
Delivery Description, Truck Route
Curbside Delivery
AOA Side Delivery
Loading DOCK Delivery
Notifications Needed? To whom?
Store Forklift On Site? (Yes/No)

If Yes, storage location?

Freight Elevator Access
Delivery Path Description

Note: The TOPM will contact the COR in writing if the only rigging path options would require significant construction efforts or structural modifications potentially resulting in a "no fit" scenario.

Sherrie Tsen: List any restrictions such as truck size/type, Walk/drive the delivery route from the airport entrance, describe any low overhangs, under 15 feet, any tight turns, any obstacles, ballads etc., to hamper or restrict the delivery.

Delivery Description, Inside the Terminal
Type Flooring
Doors Location

Sherrie Tsen: Include all doors along the route

Door ID
Door H / W
Elevators, Location & Size (Confirm elevator weight requirements)

Sherrie Tsen: Make sure to include measurements to the elevator door, this will be the limiting factors take into account rails within the elevator Confirm elevator weight requirements.

Inclines
Inside Delivery Path Description to include floor protection type, as required

Photos

&F - &A Page &P of &N image1.png