This document is a De-Installation / Installation Checklist for the L3 Implant Sciences QSB220 screening equipment used by the Transportation Security Administration (TSA). The comprehensive checklist provides detailed guidance for technicians performing equipment de-installation and installation, covering multiple critical evaluation criteria including inventory verification, unit condition assessment, functionality testing, cleaning procedures, and packaging requirements.

The checklist outlines specific steps for documenting equipment status, including visual inspections, photographic documentation of serial numbers, barcodes, unit conditions, and packaging. Key requirements include using Isopropyl Alcohol Wipes for cleaning, packaging the equipment in a specific 26L x 24W x 22H triple wall fiberboard box with a foam insert and an electrostatic discharge bag, and ensuring proper labeling. The document is associated with the TSA's Screening Equipment Deployment Services (SEDS) - Checkpoint contract, which is anticipated to have its full Request for Proposals released in Q1 or Q2 of FY26.

View the file

Other files

File Type Posted
Contract Att14 - CP SEDS Pricing Sheet_07.31.2025.xlsx XLSX spreadsheet
Contract Att04 - CDRL D001 - BLS - CEIA EMA-MS Decommission Checklist_05.21.2025.xlsx XLSX spreadsheet
Contract Att05 - CDRL D001 - BLS - Smiths Responder Decomm Checklist_05.21.2025.xlsx XLSX spreadsheet
Contract Att01 - CDRL D001 - AIT-1 and AIT-2 - Leidos Decommission Checklist_05.21.2025.xlsx XLSX spreadsheet
Questions on Draft PWS SEDS CP.xlsx XLSX spreadsheet
Contract Att03- CDRL D001 - AT Decommission Checklist_05.19.2025.xlsx XLSX spreadsheet
Contract Att06 - CDRL D001 - CT De-install Decommission Checklist_05.28.2025.xlsx XLSX spreadsheet
Contract Att13 - CDRL B006 - Closeout Report_05.12.2025.xlsx XLSX spreadsheet
Contract Att10 - CDRL B002 - PSP Site Survey_06.04.2025.xlsx XLSX spreadsheet
Contract Att09 - CDRL D001 - WTMD - CEIA Decommission Checklist_05.19.2025.xlsx XLSX spreadsheet
Contract Att12 - CDRL B001- Daily Site Report_05.12.2025.xlsx XLSX spreadsheet
CP SEDS II IDIQ SOW_08.19.2025.docx DOCX document
Contract Att11 - CDRL A004 - Weekly Status Report (WSR)_02.13.2025.xlsx XLSX spreadsheet
Contract Att02 - CDRLD001 - AIT - RS Decommission Checklist _08.18.2025.xlsx XLSX spreadsheet
Contract Att07 - CDRL D001 - ETD - 500DT Install - De-Installation Checklist_05.19.2025.xlsx XLSX spreadsheet
Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Table 1 De-Installation / Installation Checklist For the L3 Implant Sciences QSB220 TSA Bar Code Number:

Airport Code: Location of Unit: Date of Test: Time:

The comments/concerns section may be used to provide further detail concerning unit quality, quantity, or general notes on unit/part condition
SectionEvaluation CriteriaYe sNoComments/Concerns
InventoryL3 Implant Sciences QS-B220 System?
Power Supply?
Unit Hand Wand?
Unit Swabs?
Printer Paper?
Unit Filter?
Current Software Version
Unit
ConditionDoes the unit have any Exterior Damage?

(i.e. broken pieces, dents, paint chipping, locally added stickers) If external damage is identified during De-installation, stop and notify your PM,(your PM will provide you next steps) & notify local TSA is to open a ILS work order so that contractual repairs can be completed before de-install continues. If damage occurred during shipping notify your PM (your PM will provide your next steps) & notify local TSA.

Does the unit have Interior Damage?

(i.e. broken pieces, dust, locally added stickers) Testing Did you SHUTDOWN the software and wait for the screen to turn black?

Did you turn off the power switch and disconnect power cords?
Unit FunctionalityDoes the System turn on?
Does the System become "Ready"?
Does the System allow Supervisor-level log on?
Is the System time correct?
Does the System pass the verification check?
Does the System alarm correctly?
Does the System clear alarms correctly?
Does the Printer function correctly?
Cleaning UnitOuter House Cleaning

The Contractor shall use Isopropyl Alcohol Wipes to wipe down all surfaces of the system, including the touchscreen.

• Caution! The Contractor shall use care when wiping down the Desorber Cover as the Desorber is hot and may cause burns.

Visual Verification Take a photo of the unit while OPERATIONAL and document any damage or concerns.

Take a photo of the FRONT of the unit and document any damage or concerns.

Take a photo of the SIDES of the unit and document any damage or concerns.

Take a photo of the BACK of the unit and document any damage or concerns.

Take a photo of the SERIAL NUMBER and BARCODE on the unit and document any damage or concerns.

Take a photo of the POWER CORD and document any damage or concerns.

Unit
PackagingThe Contractor shall use a 26L x 24W x 22H Triple Wall 80lb Edge Crushed Test (ECT) Fiberboard box with a foam insert. The ETD is to be placed into 23”X21”X56” Black Electrostatic Discharge (ESD) bag and secured with a zip tie or similar fastener to ensure the ETD is encased within the bag. The ETD is secured inside the bag prior to securing inside the case.
Take photo of ETD to document the serial number, barcode, Front, Back, Sides, Top, Bottom, unit in bag, sealed box, power cord, wand and shipping address. If damaged photo of the damage, notify the local TSA and Program Manager and document incident report.ake photo of the unit PACKAGED and document any damage or concerns.
Is the labeling correct on the packaging?
Subcontractor Contact Information and Verification
Print your name, signature and date this De-Installation / Installation Checklist and leave a copy with the unit.
Performed By:
Printed NameEmail Address
Company NameDateDateSignature/ Phone
Contractor Section (This section should be filled in by the Contractor ONLY)
Evaluation CriteriaYesNoComments/Concerns

Contractor Additional Comments

Contractor Contact Information and Verification
Sign and date this De-Installation / Installation Checklist and leave a copy with the unit.
Reviewed By:
Email Address
Company NameSignature
Federal Employee Comments/Concerns
Federal Employee Verification
As a witness, sign and date this De-Installation / Installation Checklist to confirm the document was completed on-site.

Confirmed By:

Signature Date: