Contract Att08 - CDRL D001 - ETD - QSB220 De-Install - Install Checklist_05.19.2025.xlsx
XLSX spreadsheet 48 KB Posted
- Solicitation number
- TSA25-04-0506
About this file
This document is a De-Installation / Installation Checklist for the L3 Implant Sciences QSB220 screening equipment used by the Transportation Security Administration (TSA). The comprehensive checklist provides detailed guidance for technicians performing equipment de-installation and installation, covering multiple critical evaluation criteria including inventory verification, unit condition assessment, functionality testing, cleaning procedures, and packaging requirements.
The checklist outlines specific steps for documenting equipment status, including visual inspections, photographic documentation of serial numbers, barcodes, unit conditions, and packaging. Key requirements include using Isopropyl Alcohol Wipes for cleaning, packaging the equipment in a specific 26L x 24W x 22H triple wall fiberboard box with a foam insert and an electrostatic discharge bag, and ensuring proper labeling. The document is associated with the TSA's Screening Equipment Deployment Services (SEDS) - Checkpoint contract, which is anticipated to have its full Request for Proposals released in Q1 or Q2 of FY26.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Table 1 De-Installation / Installation Checklist For the L3 Implant Sciences QSB220 TSA Bar Code Number:
Airport Code: Location of Unit: Date of Test: Time:
| The comments/concerns section may be used to provide further detail concerning unit quality, quantity, or general notes on unit/part condition | ||||||
| Section | Evaluation Criteria | Ye s | No | Comments/Concerns | ||
| Inventory | L3 Implant Sciences QS-B220 System? | |||||
| Power Supply? | ||||||
| Unit Hand Wand? | ||||||
| Unit Swabs? | ||||||
| Printer Paper? | ||||||
| Unit Filter? | ||||||
| Current Software Version | ||||||
| Unit | ||||||
| Condition | Does the unit have any Exterior Damage? |
(i.e. broken pieces, dents, paint chipping, locally added stickers) If external damage is identified during De-installation, stop and notify your PM,(your PM will provide you next steps) & notify local TSA is to open a ILS work order so that contractual repairs can be completed before de-install continues. If damage occurred during shipping notify your PM (your PM will provide your next steps) & notify local TSA.
Does the unit have Interior Damage?
(i.e. broken pieces, dust, locally added stickers) Testing Did you SHUTDOWN the software and wait for the screen to turn black?
| Did you turn off the power switch and disconnect power cords? | |
| Unit Functionality | Does the System turn on? |
| Does the System become "Ready"? | |
| Does the System allow Supervisor-level log on? | |
| Is the System time correct? | |
| Does the System pass the verification check? | |
| Does the System alarm correctly? | |
| Does the System clear alarms correctly? | |
| Does the Printer function correctly? | |
| Cleaning Unit | Outer House Cleaning |
The Contractor shall use Isopropyl Alcohol Wipes to wipe down all surfaces of the system, including the touchscreen.
• Caution! The Contractor shall use care when wiping down the Desorber Cover as the Desorber is hot and may cause burns.
Visual Verification Take a photo of the unit while OPERATIONAL and document any damage or concerns.
Take a photo of the FRONT of the unit and document any damage or concerns.
Take a photo of the SIDES of the unit and document any damage or concerns.
Take a photo of the BACK of the unit and document any damage or concerns.
Take a photo of the SERIAL NUMBER and BARCODE on the unit and document any damage or concerns.
Take a photo of the POWER CORD and document any damage or concerns.
| Unit | |||||||
| Packaging | The Contractor shall use a 26L x 24W x 22H Triple Wall 80lb Edge Crushed Test (ECT) Fiberboard box with a foam insert. The ETD is to be placed into 23”X21”X56” Black Electrostatic Discharge (ESD) bag and secured with a zip tie or similar fastener to ensure the ETD is encased within the bag. The ETD is secured inside the bag prior to securing inside the case. | ||||||
| Take photo of ETD to document the serial number, barcode, Front, Back, Sides, Top, Bottom, unit in bag, sealed box, power cord, wand and shipping address. If damaged photo of the damage, notify the local TSA and Program Manager and document incident report. | ake photo of the unit PACKAGED and document any damage or concerns. | ||||||
| Is the labeling correct on the packaging? | |||||||
| Subcontractor Contact Information and Verification | |||||||
| Print your name, signature and date this De-Installation / Installation Checklist and leave a copy with the unit. | |||||||
| Performed By: | |||||||
| Printed Name | Email Address | ||||||
| Company Name | Date | Date | Signature/ Phone |
| Contractor Section (This section should be filled in by the Contractor ONLY) | |||
| Evaluation Criteria | Yes | No | Comments/Concerns |
Contractor Additional Comments
| Contractor Contact Information and Verification | ||
| Sign and date this De-Installation / Installation Checklist and leave a copy with the unit. | ||
| Reviewed By: | ||
| Email Address | ||
| Company Name | Signature | |
| Federal Employee Comments/Concerns |
| Federal Employee Verification |
| As a witness, sign and date this De-Installation / Installation Checklist to confirm the document was completed on-site. |
Confirmed By:
Signature Date: