CMS Back on Campus Phase 4 Design 100 Percent CD Drawings The CCC And Restrooms 07242025.pdf
PDF 94 MB Posted
- Solicitation number
- 47PD0225R0055
About this file
The file appears to be a design document for the Centers for Medicare & Medicaid Services (CMS) Back on Campus Phase 4 project, specifically focusing on 100 percent Construction Documents (CD) for the CCC and restrooms.
The project, solicited by the General Services Administration (GSA) under Solicitation Number 47PD0225R0055, is a small business set-aside renovation of the CMS Headquarters in Woodlawn, Maryland. The scope includes renovating approximately 32 restrooms, converting 13,000 square feet of first-floor space in the Central Building to a conference space, and potentially replacing two deteriorating culverts with a single concrete culvert. The project is located at 7500 Security Blvd, Baltimore, MD, with an estimated budget between $15-20 million. The NAICS code is 236220 (Commercial and Institutional Building Construction), with a small business size standard of $45 million. Potential offerors must register on sam.gov to access solicitation materials and be certified to work within the specified NAICS code.
View the file
Other files
Show all 42
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .