This document is a federal solicitation for the CMS Back on Campus Phase 04 (CMS BOCp4) project located at 7500 Security Blvd, Windsor Mill, MD. The solicitation includes three line items: Line Item #1 involves renovating 16 sets of restrooms across the South Building, Central Building, and Auditorium, with a 650-calendar-day performance period and restrictions of one restroom set open per building per floor. Line Item #2 focuses on converting approximately 13,000 square feet of the Central Building's first floor into a conferencing center, with a 210-calendar-day performance period starting 11/1/26. Line Item #3 is an add-alternate for replacing two deteriorating metal pipe culverts with a single precast concrete culvert, with a 180-calendar-day performance period and requiring MDE permits.
The solicitation was revised on 8/28/25 to update line item numbering to match the pricing sheet and SF1442 form. Key restrictions include phased work limitations, such as main isolation valves to be managed during weekends/off-hours and specific start dates for certain project components. On-site work for each line item can commence upon approved workplans, and the project involves significant renovation and infrastructure improvement activities at the CMS facility.
View the file
Other files
Show all 42
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation Number: 47PD0225R0055 Project Title: CMS Back on Campus Phase 04 (CMS BOCp4) Location: 7500 Security Blvd, Windsor Mill, MD 21244
Project Scope attached drawings and specifications.
Line Item #1: Restrooms Summary: Renovation of 16 sets of restrooms in the South Building (6), Central Building (9), and Auditorium (1).
Period of Performance: 650 calendar days Restrictions: 1 set of restrooms to be open per building per floor. Main isolation valves per risers to be weekends/off hours. On-site work can start upon approved workplans.
Line Item #2: CMS Conferencing Center Summary: Convert approximately 13,000 SF of the 1st floor of the Central Building at CMS into a conferencing center.
Period of Performance: 210 calendar days starting 11/1/26 Restrictions: Work within the space can not start until 11/1/26.
Line Item #3: North Culvert - Add Alternate Summary: Replacement of two (2) deteriorating metal pipe culverts with one (1) precast concrete culvert.
Period of Performance: 180 calendar days Restrictions: MDE Permits, On-site work can start upon approved workplans.
Revised 8/28/25 to update line item numbering to match pricing sheet and SF1442