The file is an Excel spreadsheet detailing attic stock minimum requirements for the CMS Back on Campus-Phase 4 renovation project. The document specifies precise spare material quantities for various building components, including ceiling systems, acoustical panels, sound-absorbing wall units, carpet tiles, painting, toilet compartments, window shades, building management systems, wiring devices, luminaires, lighting controls, faucets, soap dispensers, and water filters.

Specific attic stock requirements include maintaining 2-5% of installed quantities for most materials, with precise component breakdowns such as three spare door hinges for toilet compartments, five spare wiring devices, one full-size roller window shade per type, five lamp replacements per 100 installed, and 30 extra water filters per refrigerator. These spare materials are to be packaged with protective covering, labeled with contents description, and held for potential future replacement or maintenance needs during the project's lifecycle.

View the file

Other files

File Type Posted
Amendment 8-CMS Phase 4- RFIs.pdf PDF
Solicitation Amendment 47PD0225R0055_0008.pdf PDF
Solicitation Amendment 47PD0225R0055_0007.pdf PDF
Amendment 7-CMS Phase 4- RFIs - 2025-09-03.pdf PDF
Solicitation Amendment 47PD0225R0055_0006.pdf PDF
Amendment 6-CMS Phase 4- RFIs-2025-09-02.pdf PDF
Revised Solicitation CMS Phase 4 Amendment 5 2025 08 25.pdf PDF
Solicitation Amendment 47PD0225R0055_0005 2025 08 27.pdf PDF
CMS Phase 4-Pricing Sheet 20250827.xlsx XLSX spreadsheet
Revised SF 1442 2025 08 26 .pdf PDF
CMS Phase 4- RFI Responses0250828.pdf PDF
Revised Agreement - CMS Phase 4 Construction.pdf PDF
CMS Phase 4-SOW Cover Sheet-R1.pdf PDF
CMS Phase 5-Amendment 4.zip ZIP file
Amendment 3-Revised Solicitation 2025 08 20.pdf PDF
Amendment 3-CMS P4 08-14-25 site visit signed.pdf PDF
Solicitation Amendment 47PD0225R0055_0003 2025 08 20.pdf PDF
Amendment 2-25-SF-0138 MDE Stamped Plans - CMMS Culvert Replacement - GSA - 2025-04-08.zip ZIP file
Solicitation Amendment 47PD0225R0055_0002.pdf PDF
Solicitation Amendment 0001_ 47PD0225R0055.pdf PDF
Amendment 1- CMS BOC Phase 4 Pre-Proposal Conference Presentation.pptx PPTX presentation
Amendment 1-CMS - Building Standards (8702) - February 2025 Rev Reduced.zip ZIP file
CMS Back on Campus Phase 4 Design 100 Percent CD Drawings The CCC And Restrooms 07242025.pdf PDF
02 Agreement -- CMS Phase 4 Construction.pdf PDF
09 Past Performance Questionnaire.pdf PDF
05 Wage Determination MD20250108 Mod 01.pdf PDF
10 Prior Experience on Relevant Projects Offeror Worksheet .docx DOCX document
01 RFP CMS Phase 4 Restrooms - North Culvert - CMS Conferencing Center Woodlawn Maryland.pdf PDF
12 GSA527-21a.pdf PDF
15 25-SF-0138 MDE Signed Approval - CMMS Culvert Replacement - GSA.pdf PDF
03 CMS Phase 4- Reps and Certs GC MAY 2025.pdf PDF
13 MDE Wetland Extension Letter.pdf PDF
00 CMS Phase 4 SOW Cover Sheet.pdf PDF
07 CMS BOC P4-Procurement RFI Log.xlsx XLSX spreadsheet
CMS Back on Campus Phase 4 Design DRAFT 100 Percent CD Specifications 07242025.pdf PDF
16 CMS Culvert Project Specifications.pdf PDF
04 SF 1442 .pdf PDF
08 CMS Site Visit Form.pdf PDF
14 MDE Wetland Approval.pdf PDF
11 SF24-23a (1).pdf PDF
06 CMS Phase 4-Pricing Sheet 20250805.xlsx XLSX spreadsheet
CMS Back on Campus Phase 4 Design DRAFT 100 Percent CD Final Basis of Design Report 07242025.pdf PDF
Show all 42

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

CMS Phase 4 Attic Stock Requirement
MaterialDescription of Requirements
Beam and Baffle Ceiling System1. Ceiling Units: Full-size panels equal to 2 percent of quantity installed.

2. Suspension-System Components: Quantity of each exposed component equal to 2 percent of quantity installed.

Acoustical Panel Ceilings 1. Acoustical Ceiling Units: Full-size panels equal to 2 percent of quantity installed.

2. Suspension-System Components: Quantity of each exposed component equal to 2 percent of quantity installed.

Sound Absorbing Wall UnitsFurnish extra materials ( 1 full panel per color) from same production run that match products installed and that are packaged with protective covering for storage and identified with labels describing the contents.
Tile CarpetingCarpet Tile: Full-size units equal to 5 percent of amount installed for each type indicated, but not less than 10 sq. yd.
Interior PaintingProvide 1 gal for any non building standard colors.
Phenolic-Core Toilet CompartmentsFurnish extra materials that match products installed and that are packaged with protective covering for storage and identified with labels describing contents.

1. Door Hinges: Three hinge(s) with associated fasteners.

2. Latch and Keeper: Three latch(es) and keeper(s) with associated fasteners.

3. Door Bumper: Three door bumper(s) with associated fasteners.

4. Door Pull: Three door pull(s) with associated fasteners.

5. Fasteners: Ten fasteners of each size and type.

Roller Window ShadesProvide 1 full-size units for each size and type and minimum of 2 additional daylight sensors.
Building Management SystemProvide three service kits for use by Owner's personnel in testing and making minor service adjustments to the system. Include as a minimum:

1. All specialized nonstandard tools and adapters and fittings required for operating, maintaining, testing and adjustment of the system.

2. Lubricant required for automatic valves and automatic dampers, one year supply.

Wiring DevicesProvide five (5) spare devices for each type used on the project
Luminaires and AccessoriesA. Provide spare materials described below that match products installed and that are packaged with protective covering for storage and identified with labels describing contents. Provide at least one (1) of each type.

1. Lamps: Five (5) for every 100 of each type and rating installed. - (all lights on this job LED

2. Plastic Diffusers and Lenses: One (1) for every 100 of each type and rating installed.

3. Battery and Charger: One (1) for every 20 emergency lighting units installed.

4. Drivers: One (1) for every 100 of each type and rating installed.

5. Globes and Guards: One (1) for every 20 of each type and rating installed.

Lighting Control DevicesProvide five (5) spare devices for each type used on the project.
FaucetsProvide one (1) faucet of each type installed.
Soap DispensersRequest (3) full set of soap Dispenser
Water FiltersRequest (30) extra Water filter for each refrigerator installed