This document is a Statement of Work (SOW) for the Centers for Medicare & Medicaid Services (CMS) Back on Campus Phase 04 project. The solicitation (47PD0225R0055) covers three primary line items at the CMS Headquarters in Windsor Mill, MD: (1) North Culvert Replacement - replacing two deteriorating metal pipe culverts with one precast concrete culvert over 180 calendar days, (2) CMS Conferencing Center - converting approximately 13,000 square feet of the Central Building's first floor into a conferencing center with a 210-day performance period starting 11/1/26, and (3-5) Restroom Renovations - renovating 16 sets of restrooms across the South Building, Central Building, and Auditorium over 650 calendar days.
The project is set aside for small businesses under NAICS code 236220 with a size standard of $45 million, and has an estimated price range of $15-20 million. Key restrictions include obtaining MDE permits, maintaining one set of restrooms open per building per floor during renovations, and performing main isolation valve work during weekends/off-hours. The solicitation is available exclusively through sam.gov, requiring potential offerors to register on the platform to access solicitation materials. The project will be managed by the General Services Administration Public Buildings Service Region 3 at the CMS Headquarters located at 7500 Security Blvd, Windsor Mill, MD 21244.
View the file
Other files
Show all 42
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation Number: 47PD0225R0055 Project Title: CMS Back on Campus Phase 04 (CMS BOCp4) Location: 7500 Security Blvd, Windsor Mill, MD 21244
Project Scope attached drawings and specifications.
Line Item #1: North Culvert Summary: Replacement of two (2) deteriorating metal pipe culverts with one (1) precast concrete culvert.
Period of Performance: 180 calendar days Restrictions: MDE Permits, On-site work can start upon approved workplans.
Line Item #2: CMS Conferencing Center Summary: Convert approximately 13,000 SF of the 1st floor of the Central Building at CMS into a conferencing center.
Period of Performance: 210 calendar days starting 11/1/26 Restrictions: Work within the space can not start until 11/1/26.
Line Item #3-5: Restrooms Summary: Renovation of 16 sets of restrooms in the South Building (6), Central Building (9), and Auditorium (1).
Period of Performance: 650 calendar days Restrictions: 1 set of restrooms to be open per building per floor. Main isolation valves per risers to be weekends/off hours. On-site work can start upon approved workplans.