14 MDE Wetland Approval.pdf

PDF 2 MB Posted

Attached to
Centers for Medicare & Medicaid Services Headquarters (CMS) Back on Campus-Phase 4
Solicitation number
47PD0225R0055
Issued by

About this file

This document is a Maryland Department of the Environment Letter of Authorization for a culvert replacement project at the Centers for Medicare and Medicaid Services headquarters in Baltimore County, Maryland. The authorization (Number 15-NT-0373/20156138) is valid from June 21, 2016 to June 21, 2019, and permits the replacement of four existing 41-inch x 64-inch corrugated metal pipes with a new concrete box culvert. The project will result in permanent impacts to 580 square feet of forested nontidal wetlands, 385 square feet of emergent nontidal wetlands, 105 square feet of 25-foot buffer, and 1,365 square feet of temporary nontidal wetland impacts. The work is located at 7500 Security Boulevard and will involve stream and wetland restoration, with specific best management practices required to minimize environmental disruption, including erosion control, vegetation stabilization, and careful management of construction activities.

View the file

Other files

File Type Posted
Amendment 8-CMS Phase 4- RFIs.pdf PDF
Solicitation Amendment 47PD0225R0055_0008.pdf PDF
Solicitation Amendment 47PD0225R0055_0007.pdf PDF
Amendment 7-CMS Phase 4- RFIs - 2025-09-03.pdf PDF
Solicitation Amendment 47PD0225R0055_0006.pdf PDF
Amendment 6-CMS Phase 4- RFIs-2025-09-02.pdf PDF
Revised SF 1442 2025 08 26 .pdf PDF
Revised Solicitation CMS Phase 4 Amendment 5 2025 08 25.pdf PDF
Solicitation Amendment 47PD0225R0055_0005 2025 08 27.pdf PDF
CMS BOCp4_Attic Stock Minimums R.xlsx XLSX spreadsheet
CMS Phase 4-Pricing Sheet 20250827.xlsx XLSX spreadsheet
CMS Phase 4- RFI Responses0250828.pdf PDF
Revised Agreement - CMS Phase 4 Construction.pdf PDF
CMS Phase 4-SOW Cover Sheet-R1.pdf PDF
CMS Phase 5-Amendment 4.zip ZIP file
Amendment 3-Revised Solicitation 2025 08 20.pdf PDF
Amendment 3-CMS P4 08-14-25 site visit signed.pdf PDF
Solicitation Amendment 47PD0225R0055_0003 2025 08 20.pdf PDF
Amendment 2-25-SF-0138 MDE Stamped Plans - CMMS Culvert Replacement - GSA - 2025-04-08.zip ZIP file
Solicitation Amendment 47PD0225R0055_0002.pdf PDF
Solicitation Amendment 0001_ 47PD0225R0055.pdf PDF
Amendment 1- CMS BOC Phase 4 Pre-Proposal Conference Presentation.pptx PPTX presentation
Amendment 1-CMS - Building Standards (8702) - February 2025 Rev Reduced.zip ZIP file
16 CMS Culvert Project Specifications.pdf PDF
04 SF 1442 .pdf PDF
08 CMS Site Visit Form.pdf PDF
CMS Back on Campus Phase 4 Design 100 Percent CD Drawings The CCC And Restrooms 07242025.pdf PDF
02 Agreement -- CMS Phase 4 Construction.pdf PDF
09 Past Performance Questionnaire.pdf PDF
05 Wage Determination MD20250108 Mod 01.pdf PDF
10 Prior Experience on Relevant Projects Offeror Worksheet .docx DOCX document
01 RFP CMS Phase 4 Restrooms - North Culvert - CMS Conferencing Center Woodlawn Maryland.pdf PDF
12 GSA527-21a.pdf PDF
15 25-SF-0138 MDE Signed Approval - CMMS Culvert Replacement - GSA.pdf PDF
03 CMS Phase 4- Reps and Certs GC MAY 2025.pdf PDF
13 MDE Wetland Extension Letter.pdf PDF
00 CMS Phase 4 SOW Cover Sheet.pdf PDF
07 CMS BOC P4-Procurement RFI Log.xlsx XLSX spreadsheet
CMS Back on Campus Phase 4 Design DRAFT 100 Percent CD Specifications 07242025.pdf PDF
11 SF24-23a (1).pdf PDF
06 CMS Phase 4-Pricing Sheet 20250805.xlsx XLSX spreadsheet
CMS Back on Campus Phase 4 Design DRAFT 100 Percent CD Final Basis of Design Report 07242025.pdf PDF
Show all 42

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .