CDRL_A003_PRODUCTION SURGE PLAN_DI-MGMT-80969.pdf
Data Item Description PDF 86 KB Posted
- Solicitation number
- FD20302501800
About this file
This document is a Contract Data Requirements List (CDRL) for a Production Surge Plan related to the F100-PW-220 High Pressure Turbine contract with solicitation number FD20302501800. The CDRL requires the contractor to prepare a Capability Analysis Plan (CAP) within 30 days of contract award, which must include a delivery schedule demonstrating the maximum sustainable rate of delivery for contract items. The plan should address surge capacity without increasing contract prices and potentially allow for up to a 20% increase in quantity and accelerated delivery rates, to be negotiated after contract award. The document is associated with the 421 SCMS/GUMA office at Tinker Air Force Base in Oklahoma and is approved for unlimited public and foreign distribution.
View the file
Other versions and copies of DI-MGMT-80969
Show all 20
Who attaches DI-MGMT-80969
Other files
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .