B08_Attach_16_MEVE_218998_Rehab_Chapin_Mesa_Submittal_List___Review_Estimate_2024_09_20.xlsx

XLSX spreadsheet 107 KB Posted

Attached to
MEVE 218998, Rehabilitate Eight Residences and Mus
Solicitation number
140P2025R0094
Issued by

About this file

This is a submittal list template with review time estimates for construction services related to the rehabilitation of eight residences and museum buildings at Chapin Mesa for Mesa Verde National Park (MEVE project 218998). The document serves as both a planning tool for the Design Architect/Engineer during the Construction Documents phase and a workload estimation tool for the Construction Contracting Officer Representative and Architect/Engineer during the construction phase.

The template catalogs 227 total submittals across multiple construction divisions, including specialized historic preservation treatments for masonry, wood doors, windows, and plaster work, as well as hazardous material abatement for asbestos, lead-based paint, PCBs, and mercury. Major construction elements include concrete work, roofing systems, HVAC equipment, electrical systems, plumbing fixtures, fire suppression systems, and site utilities. The document estimates architect/engineer review times totaling 443 hours across various disciplines: 147 hours for architects, 95 hours for structural engineers, 65.5 hours for mechanical engineers, 28 hours for civil engineers, 22 hours for electrical engineers, 21 hours for fire engineers, and 10 hours for project management coordination. Review estimates are provided only for "Action" submittals that require government responsive action, while "Informational" submittals will be reviewed by the Construction Management Representative. The template is designed to help negotiate the submittal review portion of the Architect/Engineer Construction Services task order by applying hourly rates from the Indefinite Delivery/Indefinite Quantity contract.

View the file

Other files

File Type Posted
Sol_140P2025R0094_Amd_0006.pdf PDF
Attach_34_Answers_to_Questions_Amendment_06_9_18_25_0006.pdf PDF
Sol_140P2025R0094_Amd_0005.pdf PDF
Attach_33_Answers_to_Questions_Amendment_05_9_8_25_0005.pdf PDF
Sol_140P2025R0094_Amd_0004.pdf PDF
Attach_32_Answers_to_Questions_Amendment_04_9_4_25_(4)_0004.pdf PDF
Attach_31_Answers_to_Questions_Amendment_03_0003.pdf PDF
Sol_140P2025R0094_Amd_0003.pdf PDF
B11_Attach_30_MEVE_Pre_Prop_Slides_0003.pdf PDF
B11_Attach_29_MEVE_218998_-_Pre_Proposal_Conference_Attendance_0002.pdf PDF
Sol_140P2025R0094_Amd_0002.pdf PDF
Sol_140P2025R0094_Amd_0001.pdf PDF
MEVE_218998_PreProposalAgenda_2025_08_26_0001.pdf PDF
B08_Attach_26_MEVE_218998_FIO_HPG_Final_2023_09_29.pdf PDF
B08_Attach_11_Solit_PSP_Vol_II_BidBond.pdf PDF
B08_Attach_08_Solit_PSP_Vol_I_PastPerf_REQD.docx DOCX document
B08_Attach_15_MEVE_218998_Rehab_Chapin_Mesa_StatementOfStructuralTestsSpecialInspections_2024_09_20.pdf PDF
B08_Attach_02_MEVE_218998_Rehab_Chapin_Mesa_Final_CD_Drawings_Part_1_of_2.pdf PDF
B08_Attach_12_Solit_PSP_Vol_II_GenRefs.pdf PDF
B08_Attach_20_MEVE_218998_FIO_Rehab_Chapin_Mesa_Topographic_Survey_2022_12_22.pdf PDF
B08_Attach_14_MEVE_218998_Rehab_Chapin_Mesa_Product_File_2024_09_20.pdf PDF
B08_Attach_22_MEVE_218998_FIO_Final_Utility_Locate_Report_2023_11_10.pdf PDF
B08_Attach_17_MEVE_218998_Rehab_Chapin_Mesa_Closeout_O_M_Reqs_2024_09_20.pdf PDF
Sol_140P2025R0094.pdf PDF
B08_Attach_09_Solit_PSP_Vol_I_Exp_REQD.pdf PDF
B08_Attach_04_-_Wage_Determination.pdf PDF
B08_Attach_27_MEVE_218998_FIO_Empire_Electric_Service_2023_09_22.pdf PDF
B08_Solit_Clauses_Construction_06Aug2025.pdf PDF
B08_Attach_19_MEVE_218998_FIO_Rehab_Chapin_Mesa_Permit_Assessment_Form_2024_08_02.pdf PDF
B08_Attach_01_MEVE_218998_Rehab_Chapin_Mesa_Final_CD_Specifications_2024_09_20.pdf PDF
B08_Attach_03_MEVE_218998_Rehab_Chapin_Mesa_Final_CD_Drawings_Part_2_of_2.pdf PDF
B08_Attach_18_MEVE_218998_FIO_Rehab_Chapin_Mesa_Permit_List_2024_08_02.pdf PDF
B08_Attach_25_MEVE_218998_FIO_Hazardous_Materials_Survey_Report_2023_07_14.pdf PDF
B08_Attach_13_Solit_PSP_Vol_II_LmtOnSubcontracting_REQD.xlsx XLSX spreadsheet
B08_Attach_06_Solit_PSP_Vol_II_SubKPlan_REQD_RELEASED_v2_Mar25.pdf PDF
B08_Attach_21_MEVE_218998_FIO_Rehab_Chapin_Mesa_Final_Geotech_Report_2023_11_30.pdf PDF
B08_Attach_23_MEVE_218998_FIO_Sewer_Lateral_CCTV_Inspection_Map_2023_03_30.pdf PDF
B08_Attach_07_Solit_PSP_Cover.pdf PDF
B08_Attach_10_Solit_PSP_Vol_II_Equals_RELEASED_v1_25Feb25.pdf PDF
B08_Attach_24_MEVE_218998_FIO_Sewer_Lateral_CCTV_Inspection_Report_2023_03_30.pdf PDF
B08_Attach_05_MEVE_218998_Rehab_Chapin_Mesa_ContractPriceSchedule_blank_2024_09_20.xlsx XLSX spreadsheet
Show all 41

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions

Submittal List with Review Estimate Instructions
National Park Service (NPS) - Denver Service Center (DSC) | 1-27-21
DESIGN SERVICES (Construction Documents (CD) Phase)
Responsible Party: Design Architect/Engineer (A/E)
1Enter Park Acronym, Project Management Information System (PMIS) Number, and Project Title.
2Record construction submittal requirements. Complete Specification Section, Paragraph Number, and Description sections. Insert additional rows as required for sections containing multiple submittals.
3In Requirements section, enter X for submittal requirements where applicable. Insert additional columns as needed under Informational or Action. Refer to Specification Section 01 33 23 for clarification. (Action submittals require Government resposive action and Informational submittals do not.) Division 1 Specifications submittals are Information submittals.
4Attach black and white version to Specification Section 01 33 23 in project manual. Delete instructional note on top of page.
CONSTRUCTION SERVICES (Construction Phase)
Responsible Party: Construction Contracting Officer Representative (COR)
1Use Submittal List submitted with Final Construction Documents. Copy/paste submittal information into Submittal List with Review Estimate Template. If amendments issued, adjust submittal requirements as necessary.
2Attach this template to Architect/Engineer (A/E) Construction Services Scope of Services.
3Use Review Estimate to estimate time required for Architect/Engineer to accomplish Action submittal reviews. Enter estimated whole or partial number of hours per discipline.
4Add discipline heading column as required.
5Use total number of hours per discipline at bottom of template and apply hourly rates listed in Indefinite Delivery/Indefinite Quantity (IDIQ) contract (using appropriate option period rates) to formulate Government estimate for submittal reviews.
6Use information from this template to negotiate submittal review portion of Architect/Engineer Construction Services task order.
7Provide template to Construction Management Representative (CMR) to show submittals they are responsible for and submittals to be forwarded to the Architect/Engineer. All Informational submittals will be reviewed by Construction Management Representative.
Responsible Party: Architect/Engineer (A/E)
1Indicate level of effort required for each Action submittal review by entering number of whole or partial hours for each discipline under Architect/Engineer Review Time section.
2All Informational submittals will be reviewed by Construction Management Representative (CMR).
3Use total number of hours per discipline at bottom of template and apply hourly rates listed in Indefinite Delivery/Indefinite Quantity (IDIQ) contract (using appropriate option period rates) to formulate estimate.
4Use this estimate to negotiate submittals review portion of Architect/Engineer Construction Services portion of the task order.

&8&K01+024Submittal List with Review Estimate Instructions | National Park Service (NPS) - Denver Service Center (DSC) &8&K01+024page &P of &N

Template

Submittal List with Review Estimate Template
National Park Service (NPS) - Denver Service Center (DSC) | 1-27-21
SUBMITTAL LISTACTION SUBMITTAL
REVIEW ESTIMATE
Park Acronym/Project Management Information System (PMIS) Number:MEVE - 218998
Project Title:Rehabilitate and Stabilize Chapin

Mesa Historic Buildings and Houses

SUBMITTALREQUIREMENTSARCHITECT / ENGINEER REVIEW TIME
(Indicate with X)(Indicate in whole or partial hours.)
INFORMATIONALACTION
SPECIFICATION SECTIONPARAGRAPH NUMBERDESCRIPTIONCERTIFICATIONS OR LABORATORY TESTSREPORTS OR CALCULATIONS
OR PLANMANUFACTURER DATA
AND INSTRUCTIONSOTHERSAMPLESSHOP DRAWINGSMANUFACTURER DATA
AND INSTRUCTIONSOTHERARCHITECTCIVIL ENGINEERSTRUCTURAL ENGINEERMECHANICAL ENGINEERELECTRICAL ENGINEERFIRE ENGINEERPROJECT MANAGER COORDINATIONLANDSCAPE ARCHITECT
01 31 00PROJECT MANAGEMENT AND COORDINATION
1.4Coordination DrawingsX
1.4Division 1 DocumentsX
01 32 16CONSTRUCTION SCHEDULE
1.3Schedule of ValuesX
1.3Construction Baseline ScheduleX
1.3Critical Path Method (CPM) ReportsX
1.3Construction Schedule UpdatesX
1.3Construction Schedule Revisions and Time Impact AnalysisX
01 32 33SUBMITTAL PROCEDUR
1.2Construction ImagesX
1.2Closeout ImagesX
01 35 13.22ARCHEOLOGICAL PROTECTION
1.3Daily Work ScheduleX
01 35 23SAFETY REQUIREMENTS
1.3Accident Prevention Plan (APP)X
01 35 91HISTORIC PRESERVATION TREATMENT PROCEDURES
1.3Historic Preservation Treatment PlanX10.25
1.3Alternative Methods and MaterialsX
1.3Photographs or VideotapeX
01 40 00QUALITY REQUIREMENTS
1.4Quality Control PlanX
1.4Qualification DataX
1.4Contractor Quality Control Daily Reports
1.4Test ReportsX
1.4Accessibility Inspection ReportX
1.4Off-Site Inspection ReportsX
1.4Permits, Licenses, and CertificatesX
01 56 39TREE RETENTION AND PROTECTION
1.6Arborists qualificationsX
1.6Tree Protection PlanX
1.6Tree Protection SignX
1.6Maintenance ScheduleX
01 57 19.11INDOOR AIR QUALITY MANAGEMENT
1.4Indoor Air Quality (IAQ) Management PlanX
1.4Product Data - MSDSX
1.4Inspection and Test ReportsX
01 57 23TEMPORARY STORM WATER POLLUTION PREVENTION
1.3UPPP in conformance with NPS guidelines and adherence to applicable construction storm water management practicesX
1.3Inspection Schedule (PPP Measures)X
1.3Inspection Schedule (SWPPP Measures)X
1.3Erosion Control ProductsX
01 67 00PRODUCT REQUIREMENTS
1.3Affirmative Procurement Reporting FormX
1.3Environmental DataX
1.3Chain of CustodyX
01 73 29CUTTING AND PATCHING
1.2Cutting and Patching PlanX
01 73 40EXECUTION
1.2Landfill Receipts
01 74 19CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL
1.4Waste Management PlanX
1.4Progress DocumentationX
1.4Recycling and Processing Facility RecordsX
1.4Closeout Submittals - Summary of Project Waste Management PlanX
01 77 00CLOSEOUT PROCEDURES
1.3Closeout Submittals
1.3Warranties, Guarantees, Workmanship Bonds, Final CertificationsX
1.3NPS required Occupancy Forms, Other NPS FormsX
1.3Project Record DocumentsX
1.3Environmental Record DocumentsX
01 78 23OPERATION AND MAINTENANCE DATA
1.2Operation and Maintenance ManualX
01 81 13SUSTAINABLE DESIGN REQUIREMENTS
1.3Preliminary Submittals:

Recycled content Certified wood IAQ Management Plan - During Construction IAQ Management Plan - Before Occupancy Low Emitting Materials - Adhesives and Sealants Low Emitting Materials- Paints and Coatings Low Emitting Materials - Flooring, Biopreferred Products X X X

02 4119SELECTIVE DEMOLITION
1.6Site PlanX
1.6Demolition PlanX
1.6Demolition firm qualificationsX
1.6Project Record DocumentsX
02 82 00ASBESTOS ABATEMENT
2.1.CDesign and Layout for negative air machineX
2.1.CManufacturer's information on the negative air machine(s).X
2.1.CMethod of supplying power to the units and designation/location of the panels.X
2.1.CDescription of testing method(s) for correct air volume and pressure differential.X
2.1.CProvide manufacturer's product data on the pressure differential measuring device used.X
2.1.CIf an auxiliary power supply is to be provided for the negative air machines,
provide a schematic diagram of the power supply and manufacturer's data on the generator and switch.XX
2.5.AEmergency Action Plan.X
2.5.AWork schedule for the entire project reflecting contract documents and the phasing/schedule requirements.X
2.5.ASubmit a staff organization chart showing all personnel who will be working on

the project and their capacity/function. Provide their qualifications, training, accreditations, and licenses, as appropriate. Provide a copy of the "Certificate of Worker's Acknowledgment" and the "Affidavit of Medical Surveillance and

Respiratory Protection" for each person.XX
2.5.ASOPs developed specifically for this project, incorporating the requirements of the specifications, prepared, signed, and dated.X
2.5.ASubmit the specifics of the materials and equipment to be used for this project with manufacture names, model numbers, performance characteristics,
pictures/diagrams, and numbers available.X
2.5.ASubmit the name, location, and phone number of the approved landfill;

proof/verification the landfill is approved for ACM disposal; the landfill's

requirements for ACM waste; the type of vehicle to be used for transportation; and name, address, and phone number of subcontractor, if used. Proof of asbestos training for transportation personnel shall be provided.XX
2.5.ASubmit required notifications and arrangements made with regulatory agencies

having regulatory jurisdiction and the specific contingency/emergency

arrangements made with local health, fire, ambulance, hospital authorities and any other notifications/arrangements.X
2.5.AName, location, and verification of the laboratory and/or personnel to be used for analysis of air and/or bulk samples.X
2.5.ASubmit qualifications verification.X
2.5.ASubmit information on personnel.X
2.5.ASubmit copies of the State license for asbestos abatement; copy of the insurance policy, including exclusions with a letter from the agent stating in English the coverage provided and the fact that asbestos abatement activities are covered by the policy; copy of SOPs incorporating the requirements of this specification; information on who provides your training, how often; who provides medical surveillance, how often; who does and how is air monitoring conducted; a list of references of independent laboratories/IH's familiar with your air monitoring and SOPs; and copies of monitoring results of the five (5) referenced projects listed and analytical method(s) used.X
2.5.AManufacturer's technical data for all types of encapsulants, all SDSs, and application instructionsX
2.5.BDaily logX
2.5.BDocument and maintain the inspection and approval of the
regulated area preparation prior to the start of work and daily during workX
2.5.CProject report consisting of the daily logbook requirements and documentation of events during the abatement project including Waste Shipment Records signed by the landfill's agent.X
02 83 00LEAD-BASED PAINT STABILIZATION, COMPONENT REMOVAL, AND SOIL REMOVAL
2.5.AEmergency Action PlanX
2.5.ADetailed work schedule for the entire project reflecting contract

documents and the phasing/schedule requirements.

2.5.A Submit a staff organization chart showing all personnel who will be working on the project and their capacity/function. Provide their qualifications, training,

accreditations, and licenses, as appropriate. Provide a copy of the "Certificate of Worker's Acknowledgment" and the "Affidavit of Medical Surveillance and Respiratory Protection" for each person.X
2.5.ASOPs developed specifically for this project, incorporating the requirements of the specifications, prepared, signed, and dated.X
2.5.ASubmit the specifics of the materials and equipment to be used for this project with manufacture names, model numbers, performance characteristics, pictures/diagrams, and numbers availableX
2.5.ASubmit the name, location, and phone number of the approved landfill;

proof/verification the landfill is approved for lead disposal; the landfill's

requirements for lead waste; the type of vehicle to be used for transportation; and name, address, and phone number of subcontractor, if used. Proof of training for transportation personnel shall be provided.X
2.5.ASubmit required notifications and arrangements made with regulatory agencies

having regulatory jurisdiction and the specific contingency/emergency

arrangements made with local health, fire, ambulance, and hospital authorities and any other notifications/arrangements.X
2.5.ASubmit the name, location, and verification of the laboratory and/or personnel to be used for the analysis of air, wipe, and/or bulk samples.X
2.5.ASubmit qualifications verification.X
2.5.ASubmit information on personnel.X
2.5.ASubmit copies of the State license; copy of the insurance policy, including

exclusions with a letter from the agent stating in English the coverage provided

and the fact that LBP stabilization, component removal, and soil removal activities are covered by the policy; copy of SOPs incorporating the requirements of this specification; information on who provides your training, how often; who provides medical surveillance, how often; who does and how is air monitoring conducted.X
2.5.ACleaning Agent Requirements.X
2.5.BDaily logX
2.5.BDocument and maintain the inspection and approval of the
regulated area preparation prior to the start of work and daily during workX
2.5.CProject report consisting of the daily logbook requirements and documentation of events during the abatement project including Waste Shipment Records signed by the landfill's agent.X
02 84 00PCB REMOVAL
2.5Pre-Construction Meeting Submittals: Submit an Emergency Action PlanX
2.5Pre-Construction Meeting Submittals: Work scheduleX
2.5Pre-Construction Meeting Submittals: Staff organization chartX
2.5Pre-Construction Meeting Submittals: SOPsX
2.5Pre-Construction Meeting Submittals: Materials and equipment dataX
2.5Pre-Construction Meeting Submittals: Submit required notifications and arrangements made with regulatory agencies having regulatory jurisdiction and the specific contingency/emergency arrangements made with local health, fire, ambulance, and hospital authorities and any other notifications/arrangements.X
2.5Pre-Construction Meeting Submittals: Submit the name, location, and verification of the laboratory and/or personnel to be used for analysis of air, wipe, and/or bulk samples.X
2.5Pre-Construction Meeting Submittals: Qualifications verificationX
2.5Pre-Construction Meeting Submittals: Personnel informationX
2.5Pre-Construction Meeting Submittals: Submit copies of the State license; copy of the insurance policy, including exclusions with a letter from the agent stating in English the coverage provided and the fact that PCB removal activities are covered by the policy; copy of SOPs incorporating the requirements of this specification; information on who provides your training, how often; who provides medical surveillance, how often; who does and how is air monitoring conducted.X
2.5Pre-Construction Meeting Submittals: Rental equipment decontaminationX
2.5Submittals During Removal: Daily logbookX
2.5Submittals at Completion of Removal: Project reportX
02 87 00MERCURY REMOVAL
2.5Pre-Construction Meeting Submittals: Submit an Emergency Action PlanX
2.5Pre-Construction Meeting Submittals: Work scheduleX
2.5Pre-Construction Meeting Submittals: Staff organization chartX
2.5Pre-Construction Meeting Submittals: SOPsX
2.5Pre-Construction Meeting Submittals: Materials and equipment dataX
2.5Pre-Construction Meeting Submittals: Submit required notifications and arrangements made with regulatory agencies having regulatory jurisdiction and the specific contingency/emergency arrangements made with local health, fire, ambulance, and hospital authorities and any other notifications/arrangements.X
2.5Pre-Construction Meeting Submittals: Submit the name, location, and verification of the laboratory and/or personnel to be used for analysis of air, wipe, and/or bulk samples.X
2.5Pre-Construction Meeting Submittals: Qualifications verificationX
2.5Pre-Construction Meeting Submittals: Personnel informationX
2.5Pre-Construction Meeting Submittals: Submit copies of the State license; copy of the insurance policy, including exclusions with a letter from the agent stating in English the coverage provided and the fact that mercury removal activities are covered by the policy; copy of SOPs incorporating the requirements of this specification; information on who provides your training, how often; who provides medical surveillance, how often; who does and how is air monitoring conducted.X
2.5Pre-Construction Meeting Submittals: Rental equipment decontaminationX
2.5Submittals During Removal: Daily logbookX
2.5Submittals at Completion of Removal: Project reportX
03 20 00CONCRETE REINFORCING
Submittals
1.5Shop Drawings - Assume 2 SubmittalsX60.25
1.5Manufacturer's Certificate: Meets Specification RequirementsX
1.5Mill Test ReportX
1.5Welder Certificates: Certify Welders & Welding ProceduresX
1.5Worker Verification of AWS Qualifications w/in previous 12 monthsX
1.5Source Quality ControlX
1.5Field Quality ControlX
1.5Qualifications Statement: Welders per AWS D1.1X
Sustainable Design Submittals
1.6Manufacture's Certificate: Design RequirementsX
1.6Materials Resources Certificate: Certify Recycled Material ContentX
1.6Materials Resources Certificate: Certify Source & Distance from Project SiteX
1.6Product Cost Data: Products with Recycled Material ContentX
1.6Product Cost Data: Regional ProductsX
03 30 00CAST-IN-PLACE CONCRETE (CIVIL-SITEWORK)
Submittals
1.4Product DataX
1.4Design DataX
Closeout Submittals
1.5Record DrawingsX
03 33 00CAST-IN-PLACE CONCRETE (STRUCTURAL-ARCHITECTURAL)
Action Submittals
4.2Product DataX1
4.2Design MixturesX1
4.2Steel Reinforcement Shop DrawingsX8
Informational Submittals
4.3Material CertificatesX
4.3Material Test ReportsX
4.3Formwork Shop DrawingsX
4.3Floor Surface ComplianceX
03 60 00GROUTING
Submittals
1.3Product DataX
1.3Manufacturer's CertificateX
1.3Manufacturer's InstructionsX10.25
1.3Field Quality Control Test & InspectionsX
1.3Qualification CertificateX
Sustainable Design Submittals
1.4Manufacture's Certificate: Design RequirementsX
1.4Materials Resources Certificate: Certify Recycled Material ContentX
1.4Materials Resources Certificate: Certify Source & Distance from Project SiteX
1.4Product Cost Data: Products with Recycled Material ContentX
1.4Product Cost Data: Regional ProductsX
04 03 00HISTORIC TREATMENT OF MASONRY
1.7Product Data: Provide data on cleaning compounds, cleaning solutions, and repair compounds.X20.25
1.7Shop Drawings: Indicate special supports for the work. Detail shoring, bracing, and temporary or permanent support.X100.5
1.7Manufacturer's Instructions: For cleaning materials, indicate special procedures, conditions requiring special attention.X10.25
1.7Conservation Treatment Quality Control Plan.X
1.7Restorer's qualification statement.X
1.7Mortar testing agency qualification statement.X
1.7Testing results for compressive strength of existing mortars.X
05 52 13PIPE AND TUBE RAILINGS
1.4Shop DrawingsX40.5
1.4Samples: Submit two, 12 inch long samples of handrail. Submit two samples of elbow, wall bracket, and end stop.X10.25
1.4Welders' Qualification Statement: Welders' certificates in accordance with AWS B2.1/B2.1M and dated within the previous 12 months.X
06 03 12HISTORIC WOOD REPAIR
1.5Shop DrawingsX40.5
1.5Include field-verified dimensionsXX10.25
1.5Identification of each new unit and its corresponding location in the building on
annotated plans and elevations.X
1.5Provisions for flashing as required for location.X10.25
1.6Qualification DataX
1.6Wood Historic Treatment Program: Submit before work begins.X
1.6Preconstruction Test Reports: For historic wood repair.X
06 10 00ROUGH CARPENTRY
1.2Product Data: For each type of process and factory-fabricated product.X20.25
1.3Material CertificatesX10.25
1.3ICC-ES Reports - Engineered Wood ProductsX40.25
1.3ICC-ES Reports - Metal Framing AnchorsX40.25
06 16 00SHEATHING
1.2Product Data: For each type of process and factory-fabricated product.X10.25
1.3Certificates of ConformanceX
07 21 00THERMAL INSULATION
1.4Product Data: Provide data on product characteristics, performance criteria, and product limitations.X20.25
1.4Manufacturer's CertificateX
1.4Manufacturer's Installation InstructionsX
1.4Manufacturer's qualification statement.X
1.4Installer's qualification statement.X
07 26 00VAPOR RETARDERS
1.5Product Data: Provide data on material characteristics, performance criteria, and limitations.X20.25
1.5Shop Drawings: Provide drawings of special joint conditions.X80.5
1.5Manufacturer's Installation Instructions: Indicate preparation, installation methods, and storage and handling criteria.X10.25
1.5Installer's qualification statement.X
1.5Testing agency qualification statement.X
07 27 00AIR BARRIERS
1.4Product Data: Provide data on material characteristics, performance criteria, and limitations.X20.25
1.4Shop Drawings: Provide drawings of special joint conditions.X80.5
1.4Manufacturer's Installation Instructions: Indicate preparation, installation methods, and storage and handling criteria.X10.25
1.4Manufacturer's qualification statement.X
1.4Installer's qualification statement.X
1.4Testing agency qualification statement.X
07 54 23THERMOPLASTIC POLYOLEFIN (TPO) MEMBRANE ROOFING
Product Data:
1.51. Product data indicating membrane materials, flashing materials, insulation, vapor retarder, surfacing, and fasteners.

2. Preparation instructions and recommendations.

3. Storage and handling requirements.X20.25
1.5Shop Drawings: Indicate joint or termination detail conditions, conditions of interface with other materials, and paver layout.X80.5
1.5Samples for Selection: Submit two samples 4 by 4 inches (0.1 by 0.1 mm) in size illustrating colored coating.X10.25
1.5Manufacturer's Certificate: Certify that products meet or exceed specified requirements.X
1.5Manufacturer's Field Reports: Indicate procedures followed, ambient temperatures, humidity, wind velocity during application, and supplementary instructions given.X
1.5Manufacturer's Installation Instructions: Indicate membrane seaming precautions and perimeter conditions requiring special attention.X
1.5Warranty:

1. Submit manufacturer warranty and ensure that forms have been completed in Owner's name and registered with manufacturer.

2. Submit installer's certification that installation complies with all warranty conditions for the waterproof membrane.X
1.5Manufacturer's Qualification Statement.X
1.5Installer's Qualification Statement.X
07 62 00SHEET METAL FLASHING AND TRIM
1.5Shop Drawings: Indicate material profile, jointing pattern, jointing details, fastening methods, flashings, terminations, and installation details.X80.5
1.5Samples:

1. Submit two samples 12 by 12 inch in size illustrating metal finish color.

2. Submit one sample of fabricated gutter 24 inch long showing corner assembly and attachment to roof. X 1 0.25

07 92 00JOINT SEALANTS
1.3Product Data: Submit manufacturer's technical datasheets for each product to be used.X20.25
1.3Color Cards for Selection: Where sealant color is not specified, submit manufacturer's color cards showing standard colors available for selection.X10.25
1.3Samples for Verification: Where custom sealant color is specified, obtain directions from Contracting Officer and submit at least two physical samples for verification of color of each required sealant.X10.25
1.3Manufacturer's qualification statement.X
1.3Installer's qualification statement.X
1.3Executed warranty.X
08 03 14HISTORIC TREATMENT OF WOOD DOORS
1.6Product Data: For each type of product.X20.25
1.6Door Restoration Schedule: Provide schedule identifying each door by number and room location. Include overall repair level identified by inspection, hardware replacement or restoration, glazing replacement, and special conditions identified during inspection.X
1.6Shop Drawings: For locations and extent of wood-door repair and replacement work.X80.5
1.6Samples for Initial Selection: For each type of exposed wood and finish.X10.25
1.6Samples for Verification: Actual sample of finished products for the following, in manufacturer's standard sizesX10.25
1.7Qualification Statements: For historic treatment specialist.X
1.7Wood Door Historic Treatment Program: Submit before work begins.X
08 03 52HISTORIC TREATMENT OF WOOD WINDOWS
1.6Product Data: For each type of product.X20.25
1.6Shop Drawing.X40.5
1.6Samples for Initial Selection: For each type of exposed wood and finish.X10.25
1.6Samples for Verification: For the following products in manufacturer's standard sizes unless otherwise indicated, finished as required for use in the Work:X10.25
1.7Qualification Data: For historic treatment specialist.X
1.7Wood Window Historic Treatment Program: Submit before work begins.X
08 14 33STILE AND RAIL WOOD DOORS
1.4Product Data: Indicate stile and rail core materials and construction; veneer species, type and characteristics.X20.25
1.4Shop Drawings: Illustrate door opening criteria, elevations, sizes, types, swings, undercuts required, special beveling, special blocking for hardware, factory machining criteria, factory finishing criteria, and cutouts for glazing.X40.5
1.4Certificate: Submit labels and certificates required by quality assurance and quality control programs.X
1.4Manufacturer's Installation Instructions: Indicate special installation instructions.X
1.4Manufacturer's qualification statement.X
1.4Installer's qualification statement.X
1.4Warranty, executed in Contracting Officer's name.X
08 31 00ACCESS DOORS AND PANELS
1.3Product Data: Provide sizes, types, finishes, hardware, scheduled locations, and details of adjoining work.X20.25
1.3Shop Drawings: Indicate exact position of each access door and/or panel unit.X20.5
1.3Manufacturer's qualification statement.X
1.3Installer's qualification statement.X
1.3Project Record Documents: Record actual locations of each access unit.X10.25
08 52 00WOOD WINDOWS
1.5Product Data: Show component dimensions, anchorage and fasteners, glass, and internal drainage details.X30.5
1.5Shop Drawings: Indicate opening dimensions, framed opening tolerances, affected related work, and installation requirements.X80.5
1.5Operating HardwareX10.25
1.5Manufacturer's Certificate: Certify that products furnished meet or exceed specified requirements.X
1.5Test Reports.X
1.5Field Quality Control Submittals.X
1.5Manufacturer's qualification statement.X
1.5Installer's qualification statement.X
1.5Specimen warranty.X
08 71 00DOOR HARDWARE
1.5Product Data: Manufacturer's catalog literature for each type of hardware, marked to clearly show products to be furnished for this project, and includes construction details, material descriptions, finishes, and dimensions and profiles of individual components.X60.5
1.5Shop DrawingsX90.5
1.5Samples for VerificationX10.25
1.5Manufacturer's Installation InstructionsX
1.5Maintenance DataX
1.5Keying ScheduleX20.25
1.5Manufacturer's qualification statementX
1.5Installer's qualification statementX
1.5Supplier's qualification statementX
1.5Specimen warrantyX
1.5Maintenance Materials and ToolsX
08 80 00GLAZING
1.5Product Data on Insulating Glass Unit and Glazing Unit Glazing Types: Provide structural, physical and environmental characteristics, size limitations, special handling and installation requirements.X20.25
1.5Samples.X10.25
1.5Certificate: Certify that products of this section meet or exceed specified requirements.X
1.5Manufacturer's qualification statement.X
1.5Installer's qualification statement.X
1.5Warranty Documentation: Submit manufacturer warranty and ensure that forms have been completed in Contracting Officer's name and registered with manufacturer.X
08 83 00MIRRORS
1.3Product Data on Mirror Types: Submit structural, physical and environmental characteristics, size limitations, special handling and installation requirements.X20.25
1.3Product Data on Glazing Compounds: Submit chemical, functional, and environmental characteristics, limitations, special application requirements, and identify available colors.X20.25
1.3Manufacturer's Certificate: Certify that mirrors, meets or exceeds specified requirements.X
1.3Warranty: Submit manufacturer warranty and ensure that forms have been completed in Owner's name and registered with manufacturer.X
08 95 16WALL VENTS
1.3Product Data: For each type of product.X20.25
1.3Samples: For each type of metal finish required.X10.25
09 03 20HISTORIC TREATMENT OF PLASTER
1.5Product Data: For each type of product.X20.25
1.5Shop DrawingsX90.5
1.5Samples for Initial SelectionX10.25
1.5Samples for VerificationX10.25
1.6Qualification Data: For qualified historic treatment specialist.X
1.6Plasterwork Historic Treatment Program: Submit before work begins.X
09 21 16GYPSUM BOARD ASSEMBLIES
1.4Product Data: Provide data on gypsum board, accessories, and joint finishing system.X20.25
1.4Installer's Qualification Statement.X
09 30 00TILING
1.4Product Data: Provide manufacturers' data sheets on tile, mortar, grout, and accessories. Include instructions for using grouts and adhesives.X20.25
1.4Shop Drawings: Indicate tile layout, patterns, color arrangement, perimeter conditions, junctions with dissimilar materials, control and expansion joints, thresholds, and setting details.X30.5
1.4Samples: Mount tile and apply grout on two plywood panels, minimum 18 by 18 inches (457 by 457 mm) in size illustrating pattern, color variations, and grout joint size variations.X10.25
1.4Manufacturer's Certificate: Certify that products meet or exceed specified requirements.X
1.4Installer's Qualification StatementX
1.4Maintenance Data: Include recommended cleaning methods, cleaning materials, and stainremoval methods.X
09 64 00WOOD FLOORING
1.4Product Data: Provide data for flooringX20.25
1.4Shop Drawings: Indicate floor joint pattern and termination details.X80.5
1.4Manufacturer's Instructions: Indicate standard and special installation procedures and
perimeter conditions requiring special attention.X10.25
1.4Samples: Submit two samples 3-1/4 by 12 inch (82 by 304 mm) in size illustrating floor finish, color, and sheen.X10.25
1.4Maintenance Data: Include maintenance procedures and recommended maintenance materials.X
1.4Maintenance MaterialsX
09 65 00RESILIENT FLOORING
1.3Product Data: Provide data for flooringX20.25
1.3Shop Drawings: Indicate seaming plans and floor patterns.X80.5
1.3Verification SamplesX10.25
1.3CertificationX
1.3Manufacturer's Qualification Statement.X
1.3Installer's Qualification Statement.X
1.3Maintenance DataX
09 91 13EXTERIOR PAINTING
1.5Product Data: Provide complete list of products to be usedX20.25
1.5Samples: Submit three paper "draw down" samples, 8-1/2 by 11 inches in size, illustrating range of colors available for each finishing product specified.X20.25
1.5Manufacturer's InstructionsX
1.5Maintenance DataX
1.5Maintenance MaterialsX
09 91 23INTERIOR PAINTING
1.5Product Data: Provide complete list of products to be usedX20.25
1.5Samples: Submit three paper "draw down" samples, 8-1/2 by 11 inches in size, illustrating range of colors available for each finishing product specified.X20.25
1.5Manufacturer's InstructionsX
1.5Maintenance DataX
1.5Maintenance MaterialsX
10 14 00SIGNAGE
1.3Product DataX20.25
10 28 00TOILET, BATH, AND LAUNDRY ACCESSORIES
1.5Product DataX20.25
1.5Manufacturer's Installation InstructionsX10.25
10 31 00MANUFACTURERED FIREPLACES
1.6Product DataX10.25
1.6Shop DrawingsX80.5
1.6Manufacturer's CertificateX
1.6Manufacturer's InstructionsX
1.6Manufacturer's qualification statementX
1.6Installer's qualification statementX
1.6Executed warrantyX
11 30 13RESIDENTIAL APPLIANCES
1.3Product DataX60.5
1.3WarrantiesX
12 24 00WINDOW SHADES
1.3Product DataX20.25
1.3Shop DrawingsX80.5
1.3Source Quality Control SubmittalsX
1.3Selection SamplesX10.25
1.3Manufacturer's InstructionsX
1.3Operation and Maintenance DataX
1.3WarrantyX
21 00 00FIRE SUPRESSION BASIC REQUIREMENTS
1.4Shop drawings, calculations and product data sheets as a complete packageXXXX40.25
1.4O&M ManualX20.25
1.4Record drawingsX20.25
21 05 00COMMON WORK RESULTS FOR FIRE SUPPRESSION
None
21 13 00FIRE SUPRESSION SPRINKLER SYSTEMS
1.4System installer and designer qualifications.X20.25
22 05 00COMMON WORK RESULTS FOR PLUMBING
1.5Piping materials and installation instructions common to most piping systemsXX0.50.25
1.5Concrete equipment base construction requirementsXX0.50.25
1.5Equipment nameplate data requirementsXX0.50.25
1.5Nonshrink grout for equipment installationsXX0.50.25
1.5Field-fabricated metal and wood equipment supportsXX0.50.25
1.5Installation requirements common to equipment specification sectionsXX0.50.25
1.5Mechanical demolitionXX0.50.25
1.5Cutting and patchingXX0.50.25
1.5Touch-up painting and finishingXX0.50.25
22 05 17SLEEVES AND SLEEVE SEALS FOR PLUMBING PIPING
1.2SleevesX10.25
1.2Sleeve-seal SystemsX10.25
1.2GroutX0.50.25
1.2Silicon SealantsX0.50.25
22 05 18ESCUTCHEONS FOR PLUMBING PIPING
1.2EscutcheonsX10.25
1.2Floor PlatesX10.25
22 05 19METERS AND GAGES FOR PLUMBING PIPING
1.4Liquid-in-glass thermometersXX10.25
1.4ThermowellsXX10.25
22 05 23GENERAL DUTY VALVES FOR PLUMBING PIPING
1.2Brass Ball ValvesX10.25
1.2Bronze Ball ValvesX10.25
1.2Bronze Swing Check ValvesX10.25
22 05 29HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT
1.3Metal Pipe Hangers and SupportsX20.25
1.3Thermal Hanger-Shield InsertsX10.25
1.3Fastner SystemsX10.25
1.3Pipe-positioning SystemsX10.25
1.3Equipment SupportsX10.25
22 05 53IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT
1.2Equipment LabelsX0.50.25
1.2Warning Signs and LabelsX0.50.25
1.2Pipe LabelsX0.50.25
22 07 19PLUMBING PIPING INSULATION
1.2,1.3Domestic cold-water piping.XX10.25
1.2,1.3Domestic hot-water pipingXX10.25
1.2,1.3Sanitary waste piping exposed to freezing conditionsXX10.25
1.2,1.3Supplies and drains for handicap-accessible lavatories and sinks.XX10.25
22 11 16DOMESTIC WATER PIPING
1.2,1.3Copper tube and fittingsXX10.25
1.2,1.3PEX tube and fittingsXX10.25
1.2,1.3Pipe joining materialsXX0.50.25
1.2,1.3Transition FittingsXX0.50.25
1.2,1.3Dielectric fittingsXX0.50.25
22 11 19DOMESTIC WATER PIPING SPECIALTIES
1.2Temperature-actuated, water mixing valvesX10.25
1.2StrainersX10.25
1.2Drain ValvesX0.50.25
22 13 16SANITARY WASTE AND VENT PIPING
1.2,1.3Copper tube and fittingsXX10.25
1.2,1.3PVC pipe and fittingsXX10.25
1.2,1.3Specialty pipe fittingsXX0.50.25
22 13 19SANITARY WASTE AND VENT PIPING SPECIALTIES
1.3CleanoutsXX0.50.25
1.3Roof flashing assembliesXX0.50.25
1.3Miscellaneous sanitary drainage piping specaltiesXX0.50.25
22 13 19.13SANITARY DRAINS
1.3Floor DrainsX20.25
22 14 29SUMP PUMPS
1.2Wet-pit-volute sump pumpsX1.50.25
1.2Sump-pump basins and basin coversX0.50.25
22 33 00ELECTRIC, DOMESTIC-WATER HEATERS
1.2Commercial, light-duty, storage, domestic-water heatersXXXX320.25
1.2Domestic-water heater accessoriesXXXX20.25
22 41 00PLUMBING FIXTURES
1.2SinksX20.25
1.2LavatoriesX20.25
1.2Water ClosetsX20.25
1.2BathtubsX20.25
1.2ShowersX20.25
1.2Ice MakerX10.25
1.2Washer BoxX10.25
23 05 29HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT
1.2Metal pipe hangers and supportsX10.25
1.2Fastener systemsX0.50.25
1.2Equipment supportsX10.25
23 05 48VIBRATION CONTROLS FOR HVAC
1.2Elastomeric isolation pads.X10.25
1.2Elastomeric Hangers.X10.25
1.2Post-installed concrete anchors.X0.50.25
1.2Concrete inserts.X0.50.25
23 05 93TESTING, ADJUSTING, AND BALANCING FOR HVAC
1.3Strategies and Procedures PlanX
1.3Certified TAB ReportsXX120.25
23 07 13DUCT INSULATION
1.2InsulationX20.25
1.2Adhesives, Mastics, SealantsX0.50.25
1.2Factory applied jacketsX0.50.25
1.2Field applied jacketsX10.25
1.2TapesX0.50.25
1.2SecurementsX0.50.25
23 07 19HVAC PIPING INSULATION
1.2InsulationXXX20.25
1.2Adhesives, Mastics, SealantsXXX0.50.25
1.2Field applied jacketsXXX10.25
1.2TapesXXX0.50.25
23 23 00REFRIGERANT PIPING
1.3Copper Tube and FittingsXX20.25
1.3Valves and specialtiesX10.25
1.3Shop DrawingsX80.25
23 31 13METAL DUCTS
1.3Rectangular Duct and FittingsX20.25
1.3Round ducts and fittingsX20.25
1.3Sealants and GasketsX10.25
1.3Hangers and SupportsX10.25
1.3Shop DrawingsX80.25
23 33 00AIR DUCTS ACCESSORIES
1.2Backdraft DampersX20.25
1.2Manual volume dampersX10.25
1.2Flange connectorsX0.50.25
1.2Turning vanesX0.50.25
1.2Flexible connectorsX10.25
1.2Duct accessory hardwareX0.50.25
1.2Dryer Exhaust VentX10.25
23 34 23CENTRIFUGAL HVAC POWER VENTILATORS
1.2Ceiling-mounted ventilatorsX620.25
23 37 13DIFFUSERS, AIR DUCTS, AND GRILLS
1.2Adjustable flade face registersX20.25
1.2Fixed face registers and grilles.X20.25
23 81 29VARIABLE-REFRIGERANT-FLOW HVAC SYSTEMS
1.1Indoor, concealed, floor-mounted units for ductingX420.25
1.1Indoor, exposed, wall-mounted unitsX120.25
1.1Outdoor, Air-source, heat pump unitsX420.25
1.1heat recovery contorl units (Branch Boxes)X10.25
1.1System controlsX20.25
1.1System refrigerant and oilX00.25
1.1Equpment standsX10.25
1.1Miscellaneous support materialsX0.50.25
1.1System control cable and racewaysX0.50.25
23 82 36BASEBOARD HEATERS
1.2Electric baseboard radiation heatersX620.25
23 82 39UNIT HEATERS
1.2Propeller unit heatersX220.25
26 00 00ELECTRICAL BASIC REQUIREMENTS
1.4O&M manualXX20.25
1.4Record DrawingsXX20.25
1.7Coordination DocumentsXX80.25
3.13Letter of ConformanceXX10.25
26 05 19LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES
2.1Low-Voltage Electrical power conductors and cablesXX20.25
26 05 26GROUNDING AND BONDINGS FOR ELECTRICAL SYSTEMS
2.1Grounding Electrodes, accessories, bussbar, conductorXX10.25
26 05 33RACEWAYS
2.1ConduitXX20.25
26 05 73ELECTRICAL DISTRIBUTION SYSTEM STUDIES
1.1Electrical distribution system studiesXX80.25
26 09 23OCCUPANCY AND VACANCY SENSORS
2.1Occupancy and Vacancy SensorsXX20.25
26 24 16PANELBOARDS
2.1PanelboardsXX80.25
26 27 26WIRING DEVICES
2.1Wiring DevicesXX40.25
26 28 16ENCLOSED SWITCHES AND CIRCUIT BREAKERS
2.1Enclosed Switches and Circuit BreakersXX20.25
26 41 13LIGHTNING PROTECTION FOR STRUCTURES
2.1Lightning Protection SystemXX40.25
26 43 00SURGE PROTECTIVE DEVICES
2.1Surge Protective DevicesXX20.25
26 51 00LIGHTING
2.1LightingXX80.25
27 00 00COMMUNICATIONS BASIC REQUIREMENTS
1.4System installer and designer qualifications.X
1.4Submit shop drawings, and product data sheets as one complete stand-alone package.XX10.25
1.4Operation and Maintenance ManualsX20.25
1.4Record DrawingsX20.25
27 15 00COMMUNICATIONS HORIZONTAL CABLING
Horizontal Cabling Test ReportsX40.25
27 53 20CABLE TELEVISION DISTRIBUTION SYSTEM
Cable Television Cabling Test ReportsX40.25
28 00 01ELECTRONIC SAFETY BASIC REQUIREMENTS
1.4 A-OSubmit shop drawings, calculations and product data sheets as one complete stand-alone package.XXX80.25
1.4 POperation and Maintenance ManualsXX20.25
1.4 QRecord DrawingsX20.25
28 08 00ELECTRONIC SAFETY BASIC REQUIREMENTS
1.4, B, 2, aNFPA 72 Record of CompletionXX20.25
1.4, B, 2, bSmoke Detector Sensitivity ReportX40.25
1.4, B, 2, cAlarm Signal Audibility (dB) Levels ReportXX40.25
28 31 00FIRE DETECTION AND ALARM
1.4 BSystem installer and designer qualifications.X10.25
31 05 13SOILS FOR EARTHWORK
None
31 05 16AGGREGATES FOR EARTHWORK
Submittals
1.4Product Data
1.4Samples for Testing Laboratory - Assume 2 SubmittalsX40.25
1.4Supplier's Certificate: Meets Specification RequirementsX
1.4Source Quality Control: Shop Tests & InspectionsX10.25
Sustainable Design Submittals
1.5Manufacture's Certificate: Design RequirementsX
1.5Materials Resources Certificate: Certify Source & Distance from Project SiteX
1.5Product Cost Data: Regional ProductsX
31 05 19.13GEOTEXTTILES FOR EARTHWORK
Submittals
1.4Product DataX
1.4Shop DrawingsX20.25
1.4SamplesX20.25
1.4Manufacturer's Certificate: Meets Specification RequirementsX
1.4Manufacturer's InstructionsX10.25
1.4Source Quality Control: Shop Tests & InspectionsX10.25
1.4Qualification Statements: Manufacturer and InstallerX
1.4Qualification Statements: Manufacturer Approval of InstallerX
Sustainable Design Submittals
1.5Manufacture's Certificate: Design RequirementsX
1.5Materials Resources Certificate: Certify Source & Distance from Project SiteX
1.5Product Cost Data: Regional ProductsX
1.5Product Cost Data: Rapidly Renewable ProductsX
Closeout Submittals
1.6Project Record DrawingsX
Maintenance Material Submittals
1.7Extra Stock Materials: Two Seam Repair KitsX10.25
1.7Tools: Special Tools and Devices Required for Owner to Maintain and Repair Geotextile MaterialX10.25
31 10 00SITE CLEARING
None
31 23 16EXCAVATION
None
31 23 16.13TRENCHING
Submittals
1.5Excavation Protection Plan: Describe furnishing and installing materials to protect excavation and adjacent structures an property; including structural calculationsX
1.5Manufacture's Certificate: Design RequirementsX
1.5Materials Resources Certificate: Certify Recycle ContentX
1.5Materials Resources Certificate: Certify Source & Distance from Project SiteX
1.5Product Cost Data: Products with Recycled Material ContentX
1.5Product Cost Data: Regional ProductsX
Sustainable Design Submittals
1.6Manufacture's Certificate: Design RequirementsX
1.6Materials Resources Certificate: Certify Recycled Material ContentX
1.6Materials Resources Certificate: Certify Source & Distance from Project SiteX
1.6Product Cost Data: Products with Recycled Material ContentX
1.6Product Cost Data: Regional ProductsX
31 23 23FILL
Submittals
1.3Product DataX
1.3Samples for Testing Laboratory - Assumes 4 SubmittalsX80.25
1.3Material's Source: Name of Imported Materials SuppliersX
1.3Manufacturer's Certificate: Meets Specification RequirementsX
1.3Field Quality Control Test & InspectionsX
Sustainable Design Submittals
1.4Manufacture's Certificate: Design RequirementsX
1.4Materials Resources Certificate: Source and Origin of Salvaged and Reused MaterialsX
1.4Materials Resources Certificate: Certify Recycled Material ContentX
1.4Materials Resources Certificate: Certify Source & Distance from Project SiteX
1.4Product Cost Data: Salvaged and Reused, Refurbished MaterialsX
1.4Product Cost Data: Products with Recycled Material ContentX
1.4Product Cost Data: Regional ProductsX
31 37 19STONEWORK
1.4Installer qualificationsX0.251
32 12 16ASPHALT PAVING
Submittals
1.4Product Data: Asphalt and Aggregate MaterialX
1.4Product Data: Mix Design and Laboratory TestsX
32 91 13SOIL PROTECTION
1.3Field quality-control reportsX
1.3Product DataXX0.252
1.3Product CertificatesX
1.3Weekly inspection and maintenance reportsX
1.3Obstructions below ground reportingX
1.3Soil preparation damage reportingX
1.3Materials listX
1.3Construction equipment cleaning recordX
1.3Weed free material sources documentationX
32 91 19TOP SOIL
1.4Qualification DataX
1.4Field quality-control reportsX
1.4Preconstruction test reportsX
1.4Product dataXX0.252
1.4Product CertificatesX
1.4Soil analysis reportXX0.252
1.4Samples for verificationX0.250.5
1.4Certification of weed free imported topsoilX
1.4Topsoil scheduleXX0.250.5
1.4Topsoil stockpile and maintenance planXX0.250.5
1.4Obstructions below ground reportingXX0.250.5
1.4Topsoil damage reportingXX0.250.5
1.4Materials listX
1.4Construction equipment cleaning recordX
1.4Weed free material sources documentationXX0.250.5
33 01 10.58DISINFECTION OF WATER UTILITY PIPELINES
Submittals
1.3Disinfection Procedure: Description of Procedure, Type of Disinfectant, Quantity Calculations of DisinfectantX
1.3Product DataX
1.3Manufacture's Certificate: Design RequirementsX
1.3Certification: Meets Required SpecificationsX
1.3Test and Evaluation Reports: Meets SpecificationsX
1.3Field Quality Control Submittals: Results of Contractor Tests & InspectionsX
1.3Qualification Statement: Manufacturer and ApplicatorX
Closeout Submittals
1.4Disinfection ReportX
33 14 16SITE WATER DISTRIBUTION PIPING
Submittals
1.3Product Data: Pipe Material, Pipe Fittings, Valves & HydrantsX
1.3Manufacturer's Certificate: Meets Specification RequirementsX
1.3Field Quality Control Submittals: Results of Contractor Tests & InspectionsX
1.3Qualification Statement: Manufacturer and InstallerX
Sustainable Design Submittals
1.4Manufacture's Certificate: Design RequirementsX
1.4Materials Resources Certificate: Source and Origin of Salvaged and Reused MaterialsX
1.4Materials Resources Certificate: Certify Recycled Material ContentX
1.4Materials Resources Certificate: Certify Source & Distance from Project SiteX
1.4Product Cost Data: Salvaged and Reused, Refurbished MaterialsX
1.4Product Cost Data: Products with Recycled Material ContentX
1.4Product Cost Data: Regional ProductsX
33 31 00SANITARY SEWERAGE PIPING
Submittals
1.6Product Data: Pipe Material and AccessoriesX
1.6Manufacturer's Certificate: Meets Specification RequirementsX
1.6Source Quality Control Submittals: Factory Tests and InspectionsX
1.6Field Quality Control Submittals: Results of Contractor Tests & InspectionsX
1.6Qualification Statement: Manufacturer and InstallerX
Sustainable Design SubmittalsX
1.7Manufacture's Certificate: Design RequirementsX
1.7Materials Resources Certificate: Source and Origin of Salvaged and Reused MaterialsX
1.7Materials Resources Certificate: Certify Recycled Material ContentX
1.7Materials Resources Certificate: Certify Source & Distance from Project SiteX
1.7Product Cost Data: Salvaged and Reused, Refurbished MaterialsX
1.7Product Cost Data: Products with Recycled Material ContentX
1.7Product Cost Data: Regional ProductsX
Closeout Submittals
1..8Project Record DocumentsX
Total:2272822147952165.510
Notes:
1Samples, Shop Drawings, and Manufacturer Data and Instructions that apply to all buildings are estimated based on grouping product types into one submittal. Samples, Shop Drawings, and Manufacturer Data and Instructions that are building specific are estimated as separate submittals.
2Estimated review times are based on review of Action Submittals only. Informational Submittal to be reviewed by the Construction Manger Representative (CMR).