MEVE_218998_PreProposalAgenda_2025_08_26_0001.pdf

PDF 557 KB Posted

Attached to
MEVE 218998, Rehabilitate Eight Residences and Mus
Solicitation number
140P2025R0094
Issued by

About this file

This document is a Pre-Proposal Project Overview and Site Visit document for the Mesa Verde National Park project (MEVE_218998) to Rehabilitate Eight Residences and Museum at Chapin Mesa, scheduled for August 26, 2025. The project is located within the Mesa Verde National Park Headquarters District, approximately 20 miles from the Main Park Entrance Station, with an estimated 45-minute travel time.

The pre-proposal event will consist of two primary activities: a Pre-Proposal Conference at the REC Hall (starting at 11:00am Mountain Time) and a Site Visit to the Headquarters District (starting at 1:00pm). The agenda includes NPS Project Team introductions, a presentation covering the project's introduction, brief park history, project overview, and contracting information. Participants will tour staging areas, historic Chapin Mesa houses, and the Archaeological Museum. The document provides detailed maps and instructions for attendees, including parking locations, lunch options (Spruce Tree Café), and guidance for entering the park at no cost for the site visit.

View the file

Other files

File Type Posted
Sol_140P2025R0094_Amd_0006.pdf PDF
Attach_34_Answers_to_Questions_Amendment_06_9_18_25_0006.pdf PDF
Sol_140P2025R0094_Amd_0005.pdf PDF
Attach_33_Answers_to_Questions_Amendment_05_9_8_25_0005.pdf PDF
Sol_140P2025R0094_Amd_0004.pdf PDF
Attach_32_Answers_to_Questions_Amendment_04_9_4_25_(4)_0004.pdf PDF
Attach_31_Answers_to_Questions_Amendment_03_0003.pdf PDF
Sol_140P2025R0094_Amd_0003.pdf PDF
B11_Attach_30_MEVE_Pre_Prop_Slides_0003.pdf PDF
B11_Attach_29_MEVE_218998_-_Pre_Proposal_Conference_Attendance_0002.pdf PDF
Sol_140P2025R0094_Amd_0002.pdf PDF
Sol_140P2025R0094_Amd_0001.pdf PDF
B08_Attach_26_MEVE_218998_FIO_HPG_Final_2023_09_29.pdf PDF
B08_Attach_11_Solit_PSP_Vol_II_BidBond.pdf PDF
B08_Attach_08_Solit_PSP_Vol_I_PastPerf_REQD.docx DOCX document
B08_Attach_15_MEVE_218998_Rehab_Chapin_Mesa_StatementOfStructuralTestsSpecialInspections_2024_09_20.pdf PDF
B08_Attach_02_MEVE_218998_Rehab_Chapin_Mesa_Final_CD_Drawings_Part_1_of_2.pdf PDF
B08_Attach_12_Solit_PSP_Vol_II_GenRefs.pdf PDF
B08_Attach_20_MEVE_218998_FIO_Rehab_Chapin_Mesa_Topographic_Survey_2022_12_22.pdf PDF
B08_Attach_14_MEVE_218998_Rehab_Chapin_Mesa_Product_File_2024_09_20.pdf PDF
B08_Attach_22_MEVE_218998_FIO_Final_Utility_Locate_Report_2023_11_10.pdf PDF
B08_Attach_17_MEVE_218998_Rehab_Chapin_Mesa_Closeout_O_M_Reqs_2024_09_20.pdf PDF
Sol_140P2025R0094.pdf PDF
B08_Attach_09_Solit_PSP_Vol_I_Exp_REQD.pdf PDF
B08_Attach_04_-_Wage_Determination.pdf PDF
B08_Attach_27_MEVE_218998_FIO_Empire_Electric_Service_2023_09_22.pdf PDF
B08_Solit_Clauses_Construction_06Aug2025.pdf PDF
B08_Attach_19_MEVE_218998_FIO_Rehab_Chapin_Mesa_Permit_Assessment_Form_2024_08_02.pdf PDF
B08_Attach_01_MEVE_218998_Rehab_Chapin_Mesa_Final_CD_Specifications_2024_09_20.pdf PDF
B08_Attach_03_MEVE_218998_Rehab_Chapin_Mesa_Final_CD_Drawings_Part_2_of_2.pdf PDF
B08_Attach_18_MEVE_218998_FIO_Rehab_Chapin_Mesa_Permit_List_2024_08_02.pdf PDF
B08_Attach_25_MEVE_218998_FIO_Hazardous_Materials_Survey_Report_2023_07_14.pdf PDF
B08_Attach_13_Solit_PSP_Vol_II_LmtOnSubcontracting_REQD.xlsx XLSX spreadsheet
B08_Attach_06_Solit_PSP_Vol_II_SubKPlan_REQD_RELEASED_v2_Mar25.pdf PDF
B08_Attach_21_MEVE_218998_FIO_Rehab_Chapin_Mesa_Final_Geotech_Report_2023_11_30.pdf PDF
B08_Attach_23_MEVE_218998_FIO_Sewer_Lateral_CCTV_Inspection_Map_2023_03_30.pdf PDF
B08_Attach_07_Solit_PSP_Cover.pdf PDF
B08_Attach_16_MEVE_218998_Rehab_Chapin_Mesa_Submittal_List___Review_Estimate_2024_09_20.xlsx XLSX spreadsheet
B08_Attach_10_Solit_PSP_Vol_II_Equals_RELEASED_v1_25Feb25.pdf PDF
B08_Attach_24_MEVE_218998_FIO_Sewer_Lateral_CCTV_Inspection_Report_2023_03_30.pdf PDF
B08_Attach_05_MEVE_218998_Rehab_Chapin_Mesa_ContractPriceSchedule_blank_2024_09_20.xlsx XLSX spreadsheet
Show all 41

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MEVE_218998, REHABILITATE EIGHT RESIDENCES AND MUSEUM AT

CHAPIN MESA August 26, 2025

PROJECT INFORMATION

Park Mesa Verde National Park

PARK / PMIS Number MEVE 218998

Project Title Rehabilitate Eight Residences and Museum at Chapin Mesa

Pre-Proposal Project Overview and Site Visit

Location :

The “Rehabilitate Eight Residences and Museum at Chapin Mesa” project is located within the Mesa Verde National Park Headquarters District - approximately 20 miles inbound from the Main Park Entrance Station – anticipate 45 minutes +/- of travel from the Main Park Entrance Station.

The 26 AUG 2025 Pre-Proposal Site Visit will consist of two primary activities 1) Pre-Proposal Conference which shall be held at the REC Hall directly off Mile Post 19, and 2) Site-Visit which shall include walk-through of multiple buildings and project site areas within the Headquarters District.

We will convene at the Rec Hall at 10:45 am MT. The Pre-Proposal Conference will be held in the Rec Hall and begin at 11:00am MT – PLEASE see the map on the following pages for directions/instructions to assist you in finding the Rec Hall as well as where to park for the Pre-Proposal Conference.

Following the Pre-Proposal Conference, we will break for a short lunch and then re-convene at 1:00pm MT further down the road for the Site-Visit in the Headquarters District – when arriving here park just north of the Museum in the diagonal parking spaces…we’ll re-group outside of the Museum.

Note : There are limited food/drink options available within the Headquarters District. The Spruce Tree Café is located within walking distance. There are no other nearby options for dining.

- info available here : https://www.visitmesaverde.com/dining/spruce-tree-terrace-cafe

When arriving at the Main Park Entrance Station off Route 160, please inform staff at the Entrance Station that you are here for the Chapin Mesa Rehabilitation project Site-Visit…you will be able to pass into the park at no cost.

Agenda (all times are MT) :

10:45 am Convene at Rec Hall parking lot area, Brief Welcome

10:55 am Proceed to Rec Hall (less than 1 minute walk)

11:00 am Pre-Proposal Conference

- NPS Project Team Introductions, Attendee Introductions, Attendee sign-in

- Pre-Proposal Presentation

- Introduction

- Brief History of Mesa Verde National Park

- Project Overview

- Contracting and Proposals Information

12:00 pm Break for Lunch (one hour)

1:00 pm Convene at Parking area immediately north of Archaeological Museum

1:10 pm Project Site Tour : Staging Area(s), Historic Chapin Mesa Houses, Archaeological

Museum

3:30 pm Wrap-Up, re-visit any locations, Contracting Team Project Solicitation Info and Guidance

File details come from the government source that posted it. Updated .