B08_Attach_05_MEVE_218998_Rehab_Chapin_Mesa_ContractPriceSchedule_blank_2024_09_20.xlsx

XLSX spreadsheet 23 KB Posted

Attached to
MEVE 218998, Rehabilitate Eight Residences and Mus
Solicitation number
140P2025R0094
Issued by

About this file

This is a blank contract price schedule template for a National Park Service construction project at Chapin Mesa. The template is for solicitation number 140P2025R0094 (PARK - PMIS: 218998) titled "REHAB & STABILIZE CHAPIN MESA HISTORIC BUILDINGS & HOUSES" managed by the NPS Denver Service Center.

The contract structure includes five base Contract Line Items (CLINs) covering rehabilitation and structural upgrades for Quarters 4, 5, and 6, Building 13 (Museum), and site utilities with select sitework, all priced as lump sum items. Five additional option CLINs (A through E) cover similar work for Quarters 1, 2, 3, 7, and 8. Offerors must submit pricing for all base and option line items or risk having their proposal deemed unacceptable. The template specifies that unit prices govern over extended prices in case of calculation errors, totals should be rounded to whole dollars, and all measurement and payment information is detailed in Division 01 Specifications Section 01 27 00. As this is a blank pricing template, no actual pricing, dates, or award information is provided.

View the file

Other files

File Type Posted
Sol_140P2025R0094_Amd_0006.pdf PDF
Attach_34_Answers_to_Questions_Amendment_06_9_18_25_0006.pdf PDF
Sol_140P2025R0094_Amd_0005.pdf PDF
Attach_33_Answers_to_Questions_Amendment_05_9_8_25_0005.pdf PDF
Sol_140P2025R0094_Amd_0004.pdf PDF
Attach_32_Answers_to_Questions_Amendment_04_9_4_25_(4)_0004.pdf PDF
Attach_31_Answers_to_Questions_Amendment_03_0003.pdf PDF
Sol_140P2025R0094_Amd_0003.pdf PDF
B11_Attach_30_MEVE_Pre_Prop_Slides_0003.pdf PDF
B11_Attach_29_MEVE_218998_-_Pre_Proposal_Conference_Attendance_0002.pdf PDF
Sol_140P2025R0094_Amd_0002.pdf PDF
Sol_140P2025R0094_Amd_0001.pdf PDF
MEVE_218998_PreProposalAgenda_2025_08_26_0001.pdf PDF
B08_Attach_26_MEVE_218998_FIO_HPG_Final_2023_09_29.pdf PDF
B08_Attach_11_Solit_PSP_Vol_II_BidBond.pdf PDF
B08_Attach_08_Solit_PSP_Vol_I_PastPerf_REQD.docx DOCX document
B08_Attach_15_MEVE_218998_Rehab_Chapin_Mesa_StatementOfStructuralTestsSpecialInspections_2024_09_20.pdf PDF
B08_Attach_02_MEVE_218998_Rehab_Chapin_Mesa_Final_CD_Drawings_Part_1_of_2.pdf PDF
B08_Attach_12_Solit_PSP_Vol_II_GenRefs.pdf PDF
B08_Attach_20_MEVE_218998_FIO_Rehab_Chapin_Mesa_Topographic_Survey_2022_12_22.pdf PDF
B08_Attach_14_MEVE_218998_Rehab_Chapin_Mesa_Product_File_2024_09_20.pdf PDF
B08_Attach_22_MEVE_218998_FIO_Final_Utility_Locate_Report_2023_11_10.pdf PDF
B08_Attach_17_MEVE_218998_Rehab_Chapin_Mesa_Closeout_O_M_Reqs_2024_09_20.pdf PDF
Sol_140P2025R0094.pdf PDF
B08_Attach_09_Solit_PSP_Vol_I_Exp_REQD.pdf PDF
B08_Attach_04_-_Wage_Determination.pdf PDF
B08_Attach_27_MEVE_218998_FIO_Empire_Electric_Service_2023_09_22.pdf PDF
B08_Solit_Clauses_Construction_06Aug2025.pdf PDF
B08_Attach_19_MEVE_218998_FIO_Rehab_Chapin_Mesa_Permit_Assessment_Form_2024_08_02.pdf PDF
B08_Attach_01_MEVE_218998_Rehab_Chapin_Mesa_Final_CD_Specifications_2024_09_20.pdf PDF
B08_Attach_03_MEVE_218998_Rehab_Chapin_Mesa_Final_CD_Drawings_Part_2_of_2.pdf PDF
B08_Attach_18_MEVE_218998_FIO_Rehab_Chapin_Mesa_Permit_List_2024_08_02.pdf PDF
B08_Attach_25_MEVE_218998_FIO_Hazardous_Materials_Survey_Report_2023_07_14.pdf PDF
B08_Attach_13_Solit_PSP_Vol_II_LmtOnSubcontracting_REQD.xlsx XLSX spreadsheet
B08_Attach_06_Solit_PSP_Vol_II_SubKPlan_REQD_RELEASED_v2_Mar25.pdf PDF
B08_Attach_21_MEVE_218998_FIO_Rehab_Chapin_Mesa_Final_Geotech_Report_2023_11_30.pdf PDF
B08_Attach_23_MEVE_218998_FIO_Sewer_Lateral_CCTV_Inspection_Map_2023_03_30.pdf PDF
B08_Attach_07_Solit_PSP_Cover.pdf PDF
B08_Attach_16_MEVE_218998_Rehab_Chapin_Mesa_Submittal_List___Review_Estimate_2024_09_20.xlsx XLSX spreadsheet
B08_Attach_10_Solit_PSP_Vol_II_Equals_RELEASED_v1_25Feb25.pdf PDF
B08_Attach_24_MEVE_218998_FIO_Sewer_Lateral_CCTV_Inspection_Report_2023_03_30.pdf PDF
Show all 41

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Price Schedule Template

Contract Price Schedule Template
National Park Service (NPS) - Denver Service Center (DSC) | 3/29/2024
Solicitation Number:
PARK - PMIS:218998
(Project Management Information System)
Developed Area:
Project Title:REHAB & STABILIZE CHAPIN MESA HISTORIC BUILDINGS & HOUSES
Notice: Offerors are required to submit, a minimum, an offer that conforms to the solicitation documents with pricing for Base line items and all
option line items. Failure to do so may render the proposal unacceptable. On lump-sum line items, provide the total price only. For all unit-priced
line items, provide the unit price and the extended total price. If no specific line item exists for a portion of the work, include the costs in a related
item. In case of error in calculation of extended prices, the unit price governs. In case of error in summation, the total of the corrected amounts
govern. Round totals and extended prices to whole dollars.
Contract Line Item Number (CLIN)Contract Line Item (CLI) TitleQuantityUnit of MeasureUnit PriceTotal Price
1Quarters 4 incl. Select Sitework & Structural Upgrades1Lump Sum
2Quarters 5 incl. Select Sitework & Structural Upgrades1Lump Sum
3Quarters 6 incl. Select Sitework & Structural Upgrades1Lump Sum
4Building 13 (Musuem) incl. Select Sitework1Lump Sum
5Site Utilities incl. Select Sitework1Lump Sum
TOTAL BASE PRICE (Contract Line Item Number 1 through 5) ---------------------------------------------------------------------------------$0.00
6OPTION A: (Quarters 1) incl. Select Sitework & Structural Upgrades1Lump Sum
7OPTION B: (Quarters 2) incl. Select Sitework & Structural Upgrades1Lump Sum
8OPTION C: (Quarters 3) incl. Select Sitework & Structural Upgrades1Lump Sum
9OPTION D: (Quarters 7) incl. Select Sitework & Structural Upgrades1Lump Sum
10OPTION E: (Quarters 8) incl. Select Sitework & Structural Upgrades1Lump Sum
TOTAL PRICE FOR ALL OPTIONS (Contract Line Item Number 6 through 10) -----------------------------------------------------------$0.00
TOTAL PROPOSED PRICE - BASE PLUS ALL OPTIONS (Contract Line Item Number 1 through 10) --------------------------$0.00