B08_Attach_05_MEVE_218998_Rehab_Chapin_Mesa_ContractPriceSchedule_blank_2024_09_20.xlsx
XLSX spreadsheet 23 KB Posted
- Solicitation number
- 140P2025R0094
About this file
This is a blank contract price schedule template for a National Park Service construction project at Chapin Mesa. The template is for solicitation number 140P2025R0094 (PARK - PMIS: 218998) titled "REHAB & STABILIZE CHAPIN MESA HISTORIC BUILDINGS & HOUSES" managed by the NPS Denver Service Center.
The contract structure includes five base Contract Line Items (CLINs) covering rehabilitation and structural upgrades for Quarters 4, 5, and 6, Building 13 (Museum), and site utilities with select sitework, all priced as lump sum items. Five additional option CLINs (A through E) cover similar work for Quarters 1, 2, 3, 7, and 8. Offerors must submit pricing for all base and option line items or risk having their proposal deemed unacceptable. The template specifies that unit prices govern over extended prices in case of calculation errors, totals should be rounded to whole dollars, and all measurement and payment information is detailed in Division 01 Specifications Section 01 27 00. As this is a blank pricing template, no actual pricing, dates, or award information is provided.
View the file
Other files
Show all 41
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Price Schedule Template
| Contract Price Schedule Template | |||||
| National Park Service (NPS) - Denver Service Center (DSC) | 3/29/2024 | |||||
| Solicitation Number: | |||||
| PARK - PMIS: | 218998 | ||||
| (Project Management Information System) | |||||
| Developed Area: | |||||
| Project Title: | REHAB & STABILIZE CHAPIN MESA HISTORIC BUILDINGS & HOUSES | ||||
| Notice: Offerors are required to submit, a minimum, an offer that conforms to the solicitation documents with pricing for Base line items and all | |||||
| option line items. Failure to do so may render the proposal unacceptable. On lump-sum line items, provide the total price only. For all unit-priced | |||||
| line items, provide the unit price and the extended total price. If no specific line item exists for a portion of the work, include the costs in a related | |||||
| item. In case of error in calculation of extended prices, the unit price governs. In case of error in summation, the total of the corrected amounts | |||||
| govern. Round totals and extended prices to whole dollars. | |||||
| Contract Line Item Number (CLIN) | Contract Line Item (CLI) Title | Quantity | Unit of Measure | Unit Price | Total Price |
| 1 | Quarters 4 incl. Select Sitework & Structural Upgrades | 1 | Lump Sum | ||
| 2 | Quarters 5 incl. Select Sitework & Structural Upgrades | 1 | Lump Sum | ||
| 3 | Quarters 6 incl. Select Sitework & Structural Upgrades | 1 | Lump Sum | ||
| 4 | Building 13 (Musuem) incl. Select Sitework | 1 | Lump Sum | ||
| 5 | Site Utilities incl. Select Sitework | 1 | Lump Sum | ||
| TOTAL BASE PRICE (Contract Line Item Number 1 through 5) --------------------------------------------------------------------------------- | $0.00 | ||||
| 6 | OPTION A: (Quarters 1) incl. Select Sitework & Structural Upgrades | 1 | Lump Sum | ||
| 7 | OPTION B: (Quarters 2) incl. Select Sitework & Structural Upgrades | 1 | Lump Sum | ||
| 8 | OPTION C: (Quarters 3) incl. Select Sitework & Structural Upgrades | 1 | Lump Sum | ||
| 9 | OPTION D: (Quarters 7) incl. Select Sitework & Structural Upgrades | 1 | Lump Sum | ||
| 10 | OPTION E: (Quarters 8) incl. Select Sitework & Structural Upgrades | 1 | Lump Sum | ||
| TOTAL PRICE FOR ALL OPTIONS (Contract Line Item Number 6 through 10) ----------------------------------------------------------- | $0.00 | ||||
| TOTAL PROPOSED PRICE - BASE PLUS ALL OPTIONS (Contract Line Item Number 1 through 10) -------------------------- | $0.00 | ||||
| All measurement and payment information is included in Division 01 Specifications Section 01 27 00 Definition of Contract Line Items. |